§ 915.07 — Performance Points System
Pittsburgh Code of Ordinances, Pennsylvania (Code 2026-11-04: eCode360 publication current through legislation 2026-11-04 (scraped 2026-11-19)) · Pittsburgh Zoning Code § 915.07
Corpus is an independent public-information project, not the official City of Pittsburgh website. Stable reference: corpuslaw.us/code/da748713-a50f-4dd2-8d28-e21a31cde720
§ 915.07: Performance Points System.
A. Purpose. The City of Pittsburgh recognizes that communities that embrace innovation and livability while remaining affordable to all citizens will be more sustainable both in their demands on the environment and their ability to continue to grow and succeed over time. This set of incentives for development seeks to increase the provision of affordable housing, increase the number of green buildings constructed, and incent the retention of existing structures that represent the city's built heritage. B. Applicability. The following incentives are available within designated zoning districts that include the following elements: 1. Provision enabling use of this bonus system; 2. Bonus Goals and Points section specifying the points awarded for each option; and 3. Bonus section specifying how points earned through the incentives can be used. C. Definitions. 1. (Reserved) 2. 95TH PERCENTILE RAIN EVENT shall mean the measured precipitation depth accumulated over a 24-hour period for the period of record that ranks in the 95th percentile rainfall depth based on the range of all daily event occurrences during this period. 3. AFFORDABLE HOUSING shall mean housing with a gross cost, including utilities, that does not exceed thirty (30) percent of the occupant's income. 4. AREA MEDIAN INCOME (AMI) shall mean the average medium income of the metropolitan area (MSA) or Non-Metropolitan areas (counties) as established annually by the U.S. Department of Housing and Urban Development (HUD). 5. BUILDING ENERGY MODEL (BEM) shall mean the use of a physics-based software simulation of building energy use. A BEM program takes as input a description of a building form and materials, the building's use and operation including schedules for occupancy, lighting, plug-loads, and thermostat settings, and combines these inputs with information about local weather and uses physics equations to calculate thermal loads, system response to those loads, and resulting energy use, along with related metrics like occupant comfort and energy costs. 6. DISTRIBUTED ENERGY SYSTEMS shall mean a range of smaller-scale technologies designed to provide electricity and thermal energy closer to consumers. These approaches include fossil and renewable energy technologies, micro-grids, on-site energy storage, and combined heat and power systems. Technologies could include: existing district energy facilities combined heat and power systems, microgrids, fuel cells, and batteries. 7. FRESH FOOD MARKET shall mean an establishment (under Grocery Store - General) primarily engaged in the sale of grocery products and that provides all of the following: i. At least five thousand (5,000) sq. ft. of customer-accessible floor area use for display and sales of a general line of food and nonfood grocery products such as dairy, canned and frozen foods, fresh fruits and vegetables, and fresh and prepared meats, fish, and poultry, intended for home preparation, consumption, and use; ii. At least fifty (50) percent of such customer-accessible sales and display area is used for the sale of general line of food products intended for home preparation and consumption; iii. At least twenty-five (25) percent of retail inventory by volume is in the form of perishable goods, which must include dairy, fresh fruits and vegetables, and frozen foods that may include fresh meats, poultry and fish; and iv. At least twenty-five (25) percent of such customer-accessible sales and display area is used for the sale of fresh fruits and vegetables. 8. GREEN INFRASTRUCTURE shall mean systems and practices that use or mimic natural processes to infiltrate, evapotranspire, or reuse stormwater on the site where it is generated. 9. ON-SITE RENEWABLE ENERGY shall mean renewable sources, such as wind, solar, and co-generation, that are generated on the project site, thereby relieving reliance on the grid and providing alternative sources of electricity. 10. NATIVE PLANTS shall mean plants indigenous to Western Pennsylvania. This includes plants that have developed or occurred naturally, excluding invasive species. 11. NETWORKED WALKSHED shall mean the land area within a defined walking range, traversable on established streets or pathways. 12. RAPID SERVICES shall mean all modes of transit which use an exclusive right-of-way or have at least seventy-five (75) percent of route miles along a fixed guideway. 13. PREFERRED STORMWATER MANAGEMENT TECHNOLOGIES shall mean stormwater management practices that can provide additional co-benefits, increased reliability, or better performance than other technologies. Preferred Stormwater Management Technologies must be in accordance with the City of Pittsburgh Stormwater Design Manual. 14. LOCAL WORKFORCE GROUP shall mean an organization that provides publicly available workforce development services, career training services, entrepreneurial services, or business incubation and startup services or a local, non-franchise business owned and operated by City of Pittsburgh resident. 15. UNDERREPRESENTED GROUPS shall mean existing residents of the Pittsburgh Metropolitan Statistical Area with incomes at or below eighty (80) percent AMI; or lack a four-year degree; or reside in a City of Pittsburgh neighborhood with an unemployment rate that is more than double the City of Pittsburgh average. D. Bonus Goals and Points. Goal | Points 1. Zero Energy or Zero Carbon Buildings 1.a | Demonstrate compliance with International Energy Conservation Code Section C407 Total Building Performance criteria or ASHRAE Standard 90.1-2019 Appendix G Building Performance Rating Method. | 1 1.b | Demonstrate compliance with International Energy Conservation Code Section C407 Total Building Performance criteria or ASHRAE Standard 90.1-2019 Appendix G Building Performance Rating Method and buildings shall be designed and constructed with no gas or fossil-fuel fired equipment as described in Zero Code 2.0. | 2 1.c | Demonstrate compliance with International Energy Conservation Code Appendix CC: Zero Energy Commercial Building Provisions. | 3 2. (Reserved) 3. On-Site Energy Generation At least one (1) point from Zero Energy or Zero Carbon Buildings required prior to using the On-Site Energy Generation points below. 3.a | At least 25% of energy use is generated from on-site renewable sources. | 1 3.b | At least 50% of energy use is generated from on-site renewable sources; or Connecting to distributed energy systems. | 2 3.c | 75% or more of energy use is generated from on-site renewable sources. | 3 4. Affordable Housing Available only to projects where at least 50% of the gross floor area is used for residential units. Points for options 4.e and 4.f below will only be awarded to development projects providing at least 20 housing units. 4.a | At least 10% of units for rent on-site are affordable housing for persons at or below 50% AMI. | 2 4.b | At least 10% of units for sale on-site are affordable housing for persons at or below 80% AMI. | 2 4.c | At least 12% of the project's number of units are provided off-site for rent as affordable housing for persons at or below 50% AMI. | 2 4.d | At least 12% of the project's number of units are provided off-site for sale as affordable housing for persons at or below 80% AMI. | 2 4.e | At least 20% of units for rent on-site are affordable housing for persons at or below 50% AMI. | 4 4.f | At least 20% of units for sale on-site are affordable housing for persons at or below 80% AMI. | 4 4.g | A payment per square foot of the project's residential gross floor area is made as a one-time contribution to the City's Affordable Housing Payment Fund for use by the City to support new and continued affordable housing within the same neighbourhood. The payment amount is set annually as part of the City of Pittsburgh fee schedule, based on current construction costs. | 2 5. Rainwater All vegetated Green Infrastructure must use at least 50% Native Plants. 5.a | At least 50% of the first two (2) inches of runoff from impervious surfaces is captured and managed using Preferred Stormwater Management Technology installations; or | 1 At least 15% of the first two (2) inches of runoff from impervious surfaces is captured and reused on-site. 5.b | At least 75% of the first two (2) inches of runoff from impervious surfaces is captured and managed using Preferred Stormwater Management Technology installations; or | 2 At least 30% of the first two (2) inches of runoff from impervious surfaces is captured and reused on-site. 5.c | 100% or more of the first two (2) inches of runoff from impervious surfaces is captured and managed using Preferred Stormwater Management Technology installations; or | 3 45% of the first two (2) inches of runoff from impervious surfaces is captured and reused on-site. 6. Building Reuse 6.a | Exterior design of new development is compatible with nearby structures more than fifty (50) years old including the use of similar window and door sizes and materials, cladding materials, bays, cornices, and other primary structure elements. | 1 6.b | At least 75% of street facing building facades from structures more than 50 years old are restored and integrated into new development. | 2 6.c | Existing building shell is restored and retained. | 3 7. Riverfront Public Access Easements, Trails and Amenities 7.a | For parcels that abut the riverfront and are not separated by a right-of-way, provision of a riverfront public access easement held by the City of Pittsburgh of at least 20 feet in width and runs the entire length of the parcel's riverfront boundary. | 1 7.b | For sites where no trail exists and a public easement has been made, construction of a trail that meets all City standards as well as national standards of Manual on Uniform Traffc Control Devices (MUTCD), and that connects to existing adjacent trails when feasible. | 2 7.c | For sites where an existing trail is present and a public easement has been made, improvement of trail to City standards as well as national standards of Manual on Uniform Traffc Control Devices (MUTCD), and that connects to existing adjacent trails when feasible. | 1 7.d | For sites where a riverfront or riverfront-adjacent trail is not feasible, development provides public access that allows for or contributes to continuous mobility parallel the riverfront. | 2 7.e | Provision of public restrooms accessible from the public riverfront trail, open during expected hours of trail use. | 2 7.f | Provision of public access easement and passageway built in accordance with Section 905.04.G.5(a) and (b), providing connections from public rights-of-way to the riverfront. | 1 8. Neighborhood Ecology 8.a | Ground-level surface parking area is designed so that a minimum of 50% of the total paved area is shaded by solar panels. | 1 8.b | The top level of a parking structure is designed so that a minimum of 50% of the total area is shaded by solar panels. | 1 9. Public Art The percent of estimated gross construction cost applied to public art includes artist engagement; design, fabrication and placement of art; insurance; and funds dedicated for ongoing maintenance. 9.a | At least 1% of the estimated gross construction cost is applied directly to the creation and maintenance of on-site public art as defined by the URA's Public Art Resource Guide for Developers, OR made as a one-time contribution to the City's Public Art Fund for use by the City for art on publicly owned lands within the same neighborhood. | 1 9.b | At least 2% of the estimated gross construction cost is applied directly to the creation and maintenance of on-site public art as defined by the URA's Public Art Resource Guide for Developers, OR made as a one-time contribution to the City's Public Art Fund for use by the City for art on publicly owned lands within the same neighborhood. | 2 9.c | At least 3% of the estimated gross construction cost is applied directly to the creation and maintenance of on-site public art as defined by the URA's Public Art Resource Guide for Developers, OR made as a one-time contribution to the City's Public Art Fund for use by the City for art on publicly owned lands within the same neighborhood. | 3 10. Urban Fabric 10.a | Structured parking is designed to allow for conversion to other (non-parking) uses. | 2 11. Transit-Oriented Development 11.a | Site is within ½ mile networked walkshed of rapid service routes. | 1 11.b | On-site transit station for rapid service routes, designed as an integral part of the development project and to meet Port Authority standards for transit stations. | 3 12. Equitable Development 12.a | Commitment to ensuring ten (10) percent of jobs in the building will be hired from Underrepresented Groups for the first ten (10) years the building is in operation and recertified by the City of Pittsburgh every two (2) years; or | 1 Contribution of a sum equal to $3 per rentable square foot (RSF) of the project into the City's Equitable Development Trust Fund either in full or annually over a period not to exceed 10 years with a minimum of twenty-five (25) percent of the total sum due at the time the project completes construction; or A signed lease agreement between the applicant and a Local Workforce Group for a period not less than five (5) years. 12.b. | Commitment to ensuring 20 percent of jobs in the building will be hired from Underrepresented Groups for the first 10 years the building is in operation and recertified by the City of Pittsburgh every two (2) years; or | 2 Contribution of a sum equal to $4 per rentable square foot (RSF) of the project into the City's Equitable Development Trust Fund either in full or annually over a period not to exceed 10 years with a minimum of twenty-five (25) percent of the total sum due at the time the project completes construction. 12.c | Commitment to ensuring thirty (30) percent of jobs in the building will be hired from Underrepresented Groups for the first 10 years the building is in operation and recertified by the City of Pittsburgh every two (2) years; or | 3 Contribution of a sum equal to $5 per rentable square foot (RSF) of the project into the City's Equitable Development Trust Fund either in full or annually over a period not to exceed ten (10) years with a minimum of twenty-five (25) percent of the total sum due at the time the project completes construction. 13. Fresh Food Access 13.a | The building is designed and constructed, or a renovation of a building within the District, includes a Fresh Food Market as a tenant. | 2 E. Compliance and Enforcement. 1. If a project is awarded a height or riparian buffer bonus pursuant to this subsection, the Developer shall provide the Department of City Planning with satisfactory evidence of having completed the procedures as developed by the Department of City Planning and the following steps in the process toward achieving the requirements of the bonus: a. Zero Energy or Zero Carbon Buildings: (1) Application and predesign phase: Submission of intent to comply with International Energy Conservation Code Section C407 Total Building Performance criteria or ASHRAE Standard 90.1-2019 Appendix G Building Performance Rating Method and how the project intends to meet this requirement. (2) Design completion and prior to construction: Provide design narrative and construction documents. A BEM will be required showing that the building is designed to comply with International Energy Conservation Code Section C407 Total Building Performance criteria or ASHRAE Standard 90.1-2019 Appendix G Building Performance Rating Method. (3) Construction completion and building occupancy: Provide final performance-based commissioning report and/or a building energy model reflecting the as-built condition showing International Energy Conservation Code Section C407 Total Building Performance criteria or ASHRAE Standard 90.1-2019 Appendix G Building Performance Rating Method. (4) Following first-year operations completion: Provide proof of whole building energy consumption, verified with utility invoices or digital meter data for energy consumed and produced or third party verified by Professional Engineer or equivalent. b. Affordable Housing: (1) Unless otherwise stated, all projects providing on-site units shall comply with On-Site Inclusionary Standards Section 907.04.A.6, except (f). [a] Rental and Owner Occupied Units must remain affordable for 35 years. (2) Application and predesign phase: Provide a matrix that documents the unit count and includes AMI of occupants. Identify in writing all subsidies and/or financing programs the project will utilize in the provision of affordable housing. Provide letters of commitment for any subsidies and/or financing secured. (3) Design completion and prior to construction: Provide floor plans that identify housing unit types and location of amenities, entrances, lobbies with American Disabilities Act (ADA) accessibility, and documenting compliance with On-Site Inclusionary Standards Section 907.04.A.6. Provide letters of commitment for any subsidies and/or financing secured. Where letters of commitment are forthcoming, this requirement can be met by submitting the project for review by the Housing Department of the Urban Redevelopment Authority which will provide a memo to the Department of City Planning. (4) All projects providing off-site units shall comply with Section 907.04.A.7, except (c)2 and (e), and Section 907.04.A.6 except (f). [a] The off-site units must be located within 1/2 mile of the subject site, within City limits. [b] Rental and Owner Occupied Units must remain affordable for 35 years. c. Rainwater: (1) Application and predesign phase: Provide a conceptual stormwater management plan in accordance with Title 13: Stormwater Management and clearly identifying how the project will satisfy the bonus. (2) Design completion and prior to construction: Provide a Stormwater Management Site Plan in accordance with Title 13: Stormwater Management and clearly identifying how the project will satisfy the bonus. (3) Construction completion and building occupancy: Provide documentation of completion of all Record Drawings, Completion Certificate, and Final Inspection requirements in accordance with Title 13: Stormwater Management. (4) Following first-year operations completion: Provide a performance-based report following one (1) year of operation that shows stormwater management installations are performing as specified in the project's Stormwater Management Site Plan and in accordance with Title 13: Stormwater Management requirements. d. On-Site Public Art: (1) Application and predesign phase: Provide a preliminary public art plan that clearly identifies how the project will satisfy the bonus, including estimated gross construction cost, opportunities for inclusion of public art, and a plan for artist engagement. (2) Design completion and prior to construction: The Department of City Planning will approve final plan for public art including a final budget, design of public art element(s), and proof of establishment of fund for ongoing maintenance. (3) Construction completion and building occupancy: Provide Department of City Planning with verification that art was installed as designed along with breakdowns and receipts of final project costs. If art was not installed as designed, provide narrative explanation of what alterations were made and why. e. Equitable Development: (1) For projects providing the percentage employment from Underrepresented Groups, initial compliance report shall be submitted to the Department of City Planning no later than three (3) years following issuance of the Certificate of Occupancy and shall meet standards set by the Department of City Planning at the time of reporting. After that time, compliance reports must be submitted every two (2) years through the first ten (10) years the building is operational. (2) For projects contributing to the City's Equitable Development Trust Fund per rentable commercial square foot (RCSF), seventy-five (75) percent of the structure's Gross Floor Area must contain commercial, non-residential uses. For purposes of this calculation, shared spaces shall be excluded from Gross Floor Area. (3) If a building should be found at any point out of compliance with this Performance Point, the property owner shall beginning that year pay the fee per rentable commercial square foot (RCSF) option for the remainder of the ten (10) years from the date construction was completed. This bonus point shall be exempt from Section 915.07.E.2, however, the first payment shall be made to the Equitable Development Trust Fund within thirty (30) days of the documentation of non-compliance or the City shall have the authority to revoke the certificate of occupancy for the building. f. Food Access: (1) A project which receives bonus points for the presence of a Fresh Food Market pursuant to subsection 13(a) shall maintain such tenant or use for a period of at least ten (10) years from the issuance of a Certificate of Occupancy. The Fresh Food Market must be located on the ground floor of the structure and accessible through a separate entrance that must be located on the primary street frontage. At the time of application, no Fresh Food Market may be in operation within a 2,640-foot radius of the proposed project, as determined by the Department of City Planning. 2. If the project does not provide satisfactory evidence of achieving the performance standards of each used bonus within three (3) years of receiving its initial certificate of occupancy, then unless otherwise noted in this section, the property owner shall be subject to a fine equal to one (1) percent of the construction costs and shall provide a plan for compliance with the bonus point. If the plan is not submitted and the fine is not paid within thirty (30) days of the date it is imposed, then the City shall have the authority to revoke the certificate of occupancy for the building. If the project is not brought into compliance within one (1) year, then the City shall have the authority to revoke the certificate of occupancy for the building. The following Performance Points shall have the compliance path as provided, if projects do not provide satisfactory evidence of achieving the performance standards of each used bonus at time of final inspection, Build For 3.b, Connecting to distributed energy systems only, the property owner shall be subject to a fine of two (2) percent of construction cost. If the fine is not paid within thirty (30) days of the date it is imposed, then the City shall have the authority to revoke the certificate of occupancy for the building. Building Reuse For 6.b and 6c., the property owner shall be subject to a fine of two (2) percent of construction cost. If the fine is not paid within thirty (30) days of the date it is imposed, then the City shall have the authority to revoke the certificate of occupancy for the building. Urban Fabric For 10a., the property owner shall be subject to a fine of two (2) percent of construction cost. If the fine is not paid within thirty (30) days of the date it is imposed, then the City shall have the authority to revoke the certificate of occupancy for the building. Transit Oriented Development (1) | For 11.a, no fine shall be imposed, nor compliance required, under section 915.07.E.2 if rapid service routes are discontinued through no fault of the property owner.
[ Ord. No. 48-2017 , § 7, 12-8-2017 ; Ord. No. 31-2018 , § 13, eff. 8-6-2018 ; Ord. No. 34-2021 , § 1, eff. 10-11-2021 ; Ord. No. 17-2022 , § 5, eff. 6-30-2022 ; Ord. No. 1-2023 , § 13, eff. 3-1-2023 ; Ord. No. 31-2026 , eff. 10-29-2026 ; Ord. No. 32-2026 , eff. 10-29-2026 ]
Ask a question about Pittsburgh law
Corpus searches the Pittsburgh sections it holds and shows the ones that match, with their citations. Free, no sign-in.
