§ 922.15 — Mixed Use Development Standards
Pittsburgh Code of Ordinances, Pennsylvania (Code 2026-11-04: eCode360 publication current through legislation 2026-11-04 (scraped 2026-11-19)) · Pittsburgh Zoning Code § 922.15
Corpus is an independent public-information project, not the official City of Pittsburgh website. Stable reference: corpuslaw.us/code/9ff14c19-3961-4784-89f5-d7431c126d12
§ 922.15: Mixed Use Development Standards.
The following standards shall apply to the UC-MU, UC-E, and R-MU only. A. Parking. In addition to the Parking, Loading and Access requirements of Chapter 914, the following limitations on parking shall apply. In the case of conflict with other provisions of the Code, these provisions control. 1. Surface Parking. a. Surface parking is prohibited, except as accessory to single and two-unit residential when located at the rear of the property, or as exempted in Section 904.08.B.2. Tuck-in parking, located at the rear and underneath multi-unit residential structures shall not be considered surface parking. 2. Structured and Integral Parking. a. New structured and integral parking with six (6) or more spaces, whether a Primary or Accessory use, must have at least ten (10) percent of spaces EV Ready or twenty (20) percent of spaces EV Capable. Structured and integral parking accessory to Affordable Housing, housing with a gross cost, including utilities, that does not exceed thirty (30) percent of the occupant's income, shall be exempt from this requirement. When the minimum number of EV spaces required results in a fractional number, a fraction of less than one-half (½) shall be rounded down to next lowest number and a fraction of one-half (½) or more shall be rounded to the next highest whole number. Prior to issuance of the Record of Zoning Approval, an electrical engineer or other qualified, licensed professional shall document that the building and/or electrical permit drawings approved by the Department of Permits, Licenses, and Inspections are in compliance with requirement. b. On any Street frontage, ground level parking is prohibited except if lined with an active use. Active uses include residential, retail, office, lobbies, and bike facilities. B. Urban Open Space. Urban Open Space shall be provided in accordance with district requirements and shall be located, developed and maintained in accordance with the following standards. 1. Components. The particular functions and kinds of Urban Open Space to be provided at a development site shall be based upon consideration of existing and projected pedestrian volumes and circulation patterns; the location, size and character of existing Urban Open Space in the vicinity of the development site; existing and proposed land use patterns; relation to public transportation; and objectives contained in the adopted plan and policy documents pertaining to this District. 2. Development Standards. a. There are two types of Urban Open Space: Urban Open Space designed to facilitate pedestrian circulation or relieve pedestrian congestion. This type of Urban Open Space shall be at the same level as abutting public sidewalks, shall provide a clear path or area for movement, and shall be accessible to persons with disabilities throughout the entire area. Urban Open Space designed to provide passive recreation space or informal activity areas. This type of Urban Open Space shall abut and be accessible from a public sidewalk. A plaza or park may be located above or below the level of the abutting sidewalk or open space provided it is accessible to the handicapped. A plaza or park shall contain seating, permanent landscaping and lighting for nighttime illumination. b. The Urban Open Space shall be open without restriction to the general public at least during business hours normal to the area in which it is located and during periods of heavy pedestrian movement in the area. c. Urban Open Space located under a colonnade is discouraged. If it is provided, the underside of the colonnade shall be two stories above grade. This style of colonnade should be at grade and lined with active uses. The colonnade shall be accessible at the entry and exits and to the extent possible, continuously open to the sidewalk. d. When a development site is adjacent to a bus stop or transit station, the Urban Open Space shall be designed to provide access to and waiting areas for transit riders. e. Loading and service uses, including trash storage, shall be separate from Urban Open Space to the largest extent feasible. f. Landscaping in the Urban Open Space shall assist in managing stormwater and an operations and maintenance plan shall be provided for all stormwater management features. Landscaping selections shall be appropriate for the urban environment and seventy-five (75) percent of planting area shall be composed of native species as defined by the Pennsylvania Department of Conservation and Natural Resources' (DCNR's). Development applications shall include a statement from a registered landscape architect or other qualified professional regarding species selected for durability, survivability, and potential air pollution mitigation. g. The Planning Commission may approve the payment of funds in-lieu of the provision of open space in the following cases: (1) On small sites where required open space would result in areas of limited public usefulness; (2) In locations where required open space would be adjacent to existing large open spaces; or (3) In specific locations such as historic districts or other areas where the adopted plans and policy documents applicable to the district indicate that open space is not desirable. The funds from any approved, in-lieu payments shall be used by the City for the acquisition and development of open space elsewhere within the same neighborhood. The amount of such payment shall be based upon the value of the land that would otherwise be required to be devoted to open space on the development site, plus the cost that would otherwise be incurred by the applicant for development of that space in accordance with the provisions of this section. h. Open air restaurants shall be permitted within the area of an Urban Open Space provided that seventy-five (75) percent of the urban open space is still available to the public without charge. i. Enlargement of a structure on a lot that does not comply with the required Urban Open Space at ground level may be permitted only if the enlargement does not reduce any of the existing Urban Open Space. C. Building Length. Building length on street facing facades is limited to a maximum of three hundred (300) feet, except in the UC-MU the maximum limit shall be four hundred twenty-five (425) feet where a building includes a Grocery Store (General) use with a gross floor area in excess of 15,000 square feet. Where a zoning lot has a building at a length of two hundred fifty (250) feet along a street facing facade, any new buildings or building addition on the same zoning lot shall be separated by at least ten (10) feet. Separate buildings connected by an above ground pedestrian bridge shall exclude the length of the pedestrian bridge from this calculation. D. Mechanical Equipment. Mechanical equipment includes heating, ventilation, and air conditioning (HVAC) equipment, electrical generators, and similar equipment. These standards do not apply to wind turbines and solar panels. a. Ground-Mounted Equipment. Mechanical equipment must be located to the side or rear of the structure. Any mechanical equipment visible from the public realm must be screened from view by a decorative wall or solid fence that is compatible with the architecture of the building and/or landscaping. The wall or fence must be of a height equal to or greater than the height of the mechanical equipment being screened. b. Roof-Mounted Equipment. Roof-mounted equipment visible from the proximal public realm must be screened. c. Wall-Mounted Equipment. 1. Wall-mounted mechanical equipment is not permitted on any facade abutting a primary street frontage. 2. Wall-mounted mechanical equipment on a secondary street-fronting facade that protrudes more than twelve (12) inches from the outer building wall must be screened from view by structural features that are compatible with the architecture of the subject building. This does not apply to window-mounted air conditioners. E. Alternative Compliance for Design Standards. The Zoning Administrator may approve alternative design standard compliance where the alternative design is determined to achieve the purpose of the district equally or more so than through strict adherence to the standards. F. Design Standards for Commercial and Mixed Uses. a. Facade Design. 1. The ground floor of a multi-story building must be a minimum of fifteen (15) feet in height measured floor to floor, to promote mixed-use and accommodate a variety of ground-floor uses. 2. No facade adjacent to a street shall contain a non-articulated condition greater than fifty (50) linear feet in length. Building wall articulation must be achieved through changes in the facade depth of no less than six (6) inches. 3. Facades must be designed with consistent building materials and treatments that wrap around all facades. A unifying architectural theme must be used for the entire development, using a common vocabulary of architectural forms, elements, materials, and/or colors. b. Building Entry. 1. All buildings must maintain a public entrance from the sidewalk along the primary street frontage. 2. Public entrances on any facade must be designed as visually distinct elements of the facade. c. Fenestration Design. 1. The street level facade shall be transparent between the height of three (3) feet and eight (8) feet above the walkway grade for no less than sixty (60) percent of the horizontal length of the building facade. d. Roof Design. 1. Cool Roofs are required for new construction and for roof replacement on existing buildings. Solar Reflective Index values of cool roofs must be consistent with Energy Star Roof Products Key Product Criteria, except where Green Roofs are installed. 2. Reflective roof surfaces that produce glare are prohibited, except for solar panels or cool roofs intended to radiate absorbed or non-reflected solar energy and reduce heat transfer to the building. e. Site Design. 1. Security elements, such as bollards, and site amenities, like bike racks, should be coordinated with the architectural theme of the building and/or the surrounding landscape and hardscape design and shall not impede the five (5) foot accessible pedestrian route in the sidewalk. 2. No curb cuts should be permitted along primary streets when access to a lot is otherwise available via a secondary street or a way, unless technically infeasible. Requests for curb cuts on primary streets shall include documentation from a licensed transportation professional and the Zoning Administrator shall consult with the Department of Mobility and Infrastructure on these requests. f. Flat Roof Features. 1. Green roofs, rooftop decks, rooftop gardens, and stormwater management systems are permitted to extend above the parapet of any flat roof building. 2. Accessory rooftop features of a flat roof, including green roofs, rooftop decks, rooftop gardens, and stormwater management systems are excluded from the calculation of maximum building height. G. Design Standards for Residential Uses. Single-Unit Attached Residential, Two-Unit Residential, Three-Unit Residential and Multi-Unit Residential uses must meet the following requirements: 1. Facades must be designed with consistent building materials and treatments that wrap around all facades. There must be a unifying architectural theme for the entire development, using a common vocabulary of architectural forms, elements, materials, and colors. 2. Facades of structures containing Multi-Unit Residential uses abutting a street must be articulated through the use of architectural elements to break up blank walls, add visual interest, and present a residential character. Two (2) or more of the following forms of building articulation must be incorporated into the design of structures containing Multi-Unit Residential uses: a. For facades over fifty (50) feet in length, modulation of the facade through the use of features such as projections or indentations. Such building modulations must either be projected or be set back a minimum of two (2) feet in depth, and must be a minimum of four (4) feet in width. There may be no more than fifty (50) feet between such modulations. b. Architectural elements such as balconies, bay windows, patios, porches, or terraces. There may be no more than fifty (50) feet between such elements. c. Changes in color, texture, or material. Changes should occur at inside corners to convey solidity and permanence, and should not occur on a flat wall plane or an outside edge. There may be no more than fifty (50) feet between such changes. d. Lighting fixtures or other building ornamentation such as artwork, trellises, or green walls. There may be no more than fifty (50) feet between such fixtures or elements of ornamentation. 3. Public entrances on any facade must be designed as visually distinct elements of the facade. 4. Where private open space for residents is maintained, only forty (40) percent of the total of such area may consist of impervious surface. Any fencing that delineates the private open space from public space must be open fencing of at least sixty (60) percent open design with a maximum height of six and one half (6½) feet. Shadowbox fencing is prohibited. 5. Single-Unit Attached Residential uses are subject to the following curb cut standards: a. Garages and parking spaces must be accessed from the rear yard if rear yard access is available. Corner lots, with or without rear access, may alternatively access garages and parking spaces from the exterior side yard. b. In cases where front-loaded garage design is the remaining option, shared driveways with one (1) curb cut are encouraged. H. Bird Safe Glazing. Bird Safe Glazing is encouraged in the following applications: 1. New Construction, except single-unit residential. 2. Replacement of fifty (50) percent of the glazing on an existing structure except single-unit residential. 3. Additions to existing buildings totaling of 15,000 sf or greater. 4. New or renovated above grade pedestrian bridges. On the first sixty (60) feet of the building from the ground floor, Bird Safe Glazing is required. Above sixty (60) feet, where Intensive Green Roof or Extensive Green Roof exists or trees and vegetation are architecturally integrated into patios or balconies, bird safe glazing is required on the facade of the floor immediately adjacent and the two floors above. For locally designated historic structures and structures in local historic district subject to the provisions of Chapter 1101, reversible treatment methods may be used such as netting, glass films, grates and screens. Where ground floor transparency is required, applicant shall work through the Design Review Process to ensure that the Bird Safe Glazing still meets the design intent of ground floor transparency, including visibility into the building from the adjacent pedestrian realm. I. Fences and Walls. 1. Fences and walls in the Build-To Zones are permitted to a maximum four (4) feet in height and shall be of an open design. 2. Fences and walls in the rear and interior side yard are permitted to a maximum height of six (6) feet and may be opaque. 3. Fences and walls, shall meet the Materials and Methods Standards in Section 918.03.B.1.(b). 4. Fences that do not comply with the height standards above may be reviewed and approved in accordance with the Administrator Exception procedures of Section 922.08 subject to the following standards: a. No fence or wall shall exceed a height of one foot in additional to what is permitted in the standards above; and b. The exception shall not have a detrimental impact on adjacent, impacted, properties or streets. J. Residential Compatibility. The Building Height and Setback Standards of Section 916.02 shall not apply. The Screening standards of Section 916.03; the Site Design standards of Section 916.04, the Operating Hours standards of Section 916.05; Noise standards of Section 916.06; and Lighting standards of Section 916.07; and Odor standards of Section 916.08 shall apply. K. Height Reduction Zone. Where identified in Height map, the height reduction zone restricts building height for twenty (20) feet into the development parcel. Structures or portions of structures in this zone may not exceed the maximum height permitted in the adjacent zoning district plus twenty (20) feet. The height reduction zone is not a setback, it restricts height within the first twenty (20) feet as shown on the adopted height map. L. Whole-Building Life-Cycle Assessment. All projects requiring Planning Commission Review and Approval under Section 904.08.D.2, Section 904.09.D.2, Section 904.10.D.2, shall submit an initial draft Whole-Building Life-Cycle Assessment as part of application materials, except building demolitions and new open spaces. The intent of the study is to have those proposing new buildings or significant additions to identify pathways to reducing to zero (0) the net carbon emissions from the project. The study will allow the applicant to understand what would be required to meet that goal, and clearly show through the application review process what recommendations from the study are being incorporated into the project, what are not, and why. The study must include the following elements: 1. Embodied carbon in existing structures. Includes consideration of how existing structures can be reused in whole through rehabilitation or in part through retaining components of the building or reusing significant portion of the building materials (e.g., bricks, timber, stonework). 2. Carbon capture value of existing trees on the site. Includes options for development that retain existing and mature trees already on the site in addition to inclusion of new trees and vegetation that would be added through development. Specifically, how can the building be shaped and massed around existing trees in ways that maintain their health and environmental function? 3. Zero Carbon energy sourcing. How can the project's construction and operation result in zero net carbon emissions? How can energy for building operation be sources through on- or off-site renewables?
[ Ord. No. 17-2022 , § 8, eff. 6-30-2022 ; Ord. No. 1-2023 , § 16, eff. 3-1-2023 ; Ord. No. 31-2026 , eff. 10-29-2026 ]
Ask a question about Pittsburgh law
Corpus searches the Pittsburgh sections it holds and shows the ones that match, with their citations. Free, no sign-in.
