Sec. 18-10. - Building permit fees.
(a) A permit to begin work for new construction, alteration, removal, demolition or other building operation shall not be issued until the fees prescribed in this section shall have been paid to the department of building inspection or other authorized agency of the city, nor shall an amendment to a permit necessitating an additional fee because of an increase in the estimated cost of the work involved be approved until the additional fee shall have been paid. (b) Schedule of permit fees: Building permit fees are to be based on the valuation of the current construction cost as follows: Valuation Method Residential Valuation Formula Cost Per Square Foot Main floor .....$50.00 Second floor .....45.00 Finished basement .....20.00 Unfinished first or second floor .....25.00 Second floor addition .....50.00 Garage .....15.00 Enclosed or screened porch or breezeway .....20.00 Second floor addition .....50.00 Open porch .....15.00 Deck .....10.00 Shed and carport .....10.00 2 Story, Slab on Grade Slab on grade .....No fee 1st floor—Unfinished/storage .....25.00 1st floor—Finished at a later date .....20.00 1st floor—Finished at time of application .....45.00 2nd floor—Finished .....50.00 Raised Ranch Unfinished basement/storage .....No fee Finished basement .....20.00 Upper level .....50.00 Commercial Valuation Formula: BOCA cost index based on use and type of construction: December, 1997. Special inspections: Inspections that are required above the normal required inspections will be: Residential, per inspection .....$25.00 Commercial, per inspection .....50.00 Signs: $10.00, plus $1.00 per square foot in excess of ten square feet Certificate of occupancy: Residential .....$25.00 Commercial .....50.00 Licenses .....50.00 Existing structures (per State Building Code) .....150.00 Permit Fee Schedule $500.00 or less | $30.00 $1,000.00 | $40.00 $2,000.00 | $50.00 $3,000.00 | $60.00 $4,000.00 | $70.00 $5,000.00 | $80.00 $6,000.00 | $90.00 $7,000.00 | $100.00 $8,000.00 | $110.00 $9,000.00 | $120.00 $10,000.00 | $130.00 $11,000.00 | $136.00 $12,000.00 | $142.00 $13,000.00 | $148.00 $14,000.00 | $154.00 $15,000.00 | $160.00 $16,000.00 | $166.00 $17,000.00 | $172.00 $18,000.00 | $178.00 $19,000.00 | $184.00 $20,000.00 | $190.00 $21,000.00 | $197.00 $22,000.00 | $204.00 $23,000.00 | $211.00 $24,000.00 | $218.00 $25,000.00 | $225.00 $25,001.00 to $50,000.00 | $225.00 plus $8.00 for each $1,000.00 over $25,001.00 and not over $50,000.00 $50,001.00 to $100,000.00 | $425.00 plus $7.00 for each $1,000.00 over $50,001.00 and not over $100,000.00 $100,001.00 to $250,000.00 | $775.00 plus $6.50 for each $1,000.00 over $100,001.00 and not over $250,000.00 $250,001.00 to $500,000.00 | $ 1,750.00 plus $6.00 for each $1,000.00 over $250,001.00 and not over $500,000.00 $500,001.00 and over | $3,250.00 plus $5.50 for each $1,000.00 over $500,001.00 Signs: | $10.00 plus $1.00 per sq. ft. in excess of 10 square ft. Certificate of Occupancy: | Residential $25.00 | Commercial $50.00 Special Fees: Re-inspections $25.00 | Demolitions $75.00 | Late Apps $250.00/$500.00 (per section 8-1 Penalty for failure to obtain building permit of the Code of Ordinances). For projects with a construction value greater than $100,000.00, one-third of the estimated cost of the building permit fee is due upon submission of the building permit application. The remainder of the building permit fee shall be paid upon the issuance of the building permit. Permit fees based on valuation of current construction cost. Note Add .001 x valuation for CE/ADA fee (rounded up). $50.00 maximum for residential only.
(Code 1971, § 4-3; Ord. No. O-97-19, § 1, 9-8-97; Ord. No. O-98-17, § I, 5-18-98; Ord. No. O-02-8, § I, 3-14-02; Ord. No. O-15-7, § I, 6-16-15)
Ask a question about Warwick law
Corpus searches the Warwick sections it holds and shows the ones that match, with their citations. Free, no sign-in.