For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 54-822 — Design standards for easements

Code of the City of Charleston, South Carolina (Supp. No. 115: codified through Ordinance No. 2026-092, enacted May 26, 2026) · Charleston, S.C., Zoning Ordinance § 54-822

Corpus is an independent public-information project, not the official City of Charleston website. Stable reference: corpuslaw.us/code/07bb5067-3e56-4595-bc79-996875cbb5a6

Sec. 54-822. - Design standards for easements.

a. Easements for utilities along rear and side property lines may be required by the city engineer where necessary. In particular cases, easements across lots may be required by the city engineer to meet extreme conditions. b. Easements, when provided, shall be a minimum of twelve (12) feet in width and shall center along a common property line where appropriate. c. Easements, when required for drainage or sewage for the area to be subdivided, shall be of such width as necessary to permit proper construction of drainage facilities based on the drainage system of the area. No subdivision shall block or obstruct the natural drainage of an adjoining area. Existing natural drainage shall be maintained or replaced where possible or feasible.

Ask a question about Charleston law

Corpus searches the Charleston sections it holds and shows the ones that match, with their citations. Free, no sign-in.