For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 21-44 — Maintenance, construction, inspection, and notice of termination (not) for activities authorized under a land disturbance permit

Code of Ordinances, City of Columbia, South Carolina (Supp. No. 35: codified through Ordinance No. 2025-090, enacted October 28, 2025) · Columbia, S.C., City Code § 21-44

Corpus is an independent public-information project, not the official City of Columbia website. Stable reference: corpuslaw.us/code/96972339-d4a9-4804-91bc-23bddfe18c8d

Sec. 21-44. - Maintenance, construction, inspection, and notice of termination (not) for activities authorized under a land disturbance permit.

Proposed installation and long-term maintenance of a stormwater management system is critical for the achievement of its purpose of controlling stormwater runoff quantity and quality and the short-term and long-term public health, safety and general welfare of the citizens of the city. (a) A permanent maintenance agreement and plan for the stormwater management system shall be included in the SWPPP. As part of the maintenance plan, the property owner or lessee of such structure or control shall specifically agree to be responsible for permanent maintenance. In order to transfer maintenance responsibility, a letter of acceptance by the new owner(s) accepting permanent maintenance responsibility shall be filed, along with any proof of required training or certification, with the Stormwater Division. (b) As part of the land disturbance permit application, the applicant shall submit construction and BMP maintenance and inspection schedules. Required and recommended schedules for BMP maintenance and inspection shall be provided in the Stormwater BMP Design Manual. (c) If the construction is to be phased, no construction stage work of a phase which includes the installation of stormwater management structures or controls shall commence until the preceding phase of work is completed in accordance with the approved land disturbance permit and SWPPP. (d) The permittee shall notify the director before commencing any work to implement the approved land disturbance permit and SWPPP and upon completion of any phase or designated component of the site. The contractor and/or owner shall hold a pre-construction conference with stormwater division staff a minimum of 48-hrs prior to the commencement of work as outlined in permit approval. All self-inspections, maintenance actions, BMP replacements, co-permittee agreements and changes to the approved land disturbance permit and SWPPP shall be documented and maintained on-site from the commencement of any work until such time as the NOT is processed. (e) The permittee shall notify the stormwater division when the site or portion of the site is sufficiently stabilized to begin the NOT process. If portions of the site are to be completed prior to others (e.g., phased construction), a proposed schedule shall be included in the approved land disturbance permit. The NOT process shall at a minimum require: (1) A final plat showing the location of all stormwater easements and responsible party for the maintenance of the system. The plat shall also show conflicts with other new or existing easements and tracking of GPS coordinates for all stormwater structures. References shall be made to any and all owners and lessees. Any covenants established to ensure the maintenance and long-term functioning of the stormwater system must be recorded with the Register of Deeds for Richland County; (2) Documentation of project completion from the owner of the approved Land Disturbance Permit, including any revisions and as-built construction drawings, inspection reports and stormwater system ownership transfers; (3) Verification that all components of the stormwater management system meet the approved Land Disturbance Permit and SWPPP specifications or achieve the function for which they were designed. In addition, the site shall be cleared of all construction trash and debris from the stormwater system and the site as a whole; (4) A maintenance plan and maintenance agreement accepting responsibility for permanent maintenance of post-construction stormwater control measures, if different from the agreement submitted during the review process; (5) The permittee to pay in full all outstanding fees, penalties, fines, judgments, awards, and/or costs, if incurred pursuant to this article; and (6) A final inspection conducted by the stormwater division. (f) Permit notice of termination (NOT) procedures shall be developed by the stormwater division and shall include inspection procedures to assure that the work has been carried out in accordance with the permit and this article. The project NOT process may include phasing so that portions of a project can be closed out at various time periods, provided that the necessary documentation is submitted for approval. This process and required documentation are detailed in the stormwater website. (g) The NOT process must be finalized by the stormwater division prior to: (1) The use or occupancy of any newly constructed components of the site. (2) Final acceptance of any road for maintenance or designation of road owner and associated stormwater management system. (3) Release of any bond held by the city in connection with the development or any construction on the site. (4) Approval and/or acceptance for recording of a final plat for a subdivision of property pursuant to section 17-492 of the City Code.

(Ord. No. 2011-095, 12-20-11)