§ 23-105 — Discharge permit required; issuance; conditions
Code of Ordinances, City of Columbia, South Carolina (Supp. No. 35: codified through Ordinance No. 2025-090, enacted October 28, 2025) · Columbia, S.C., City Code § 23-105
Corpus is an independent public-information project, not the official City of Columbia website. Stable reference: corpuslaw.us/code/554aa7aa-a51e-4190-945b-895f1d18099b
Sec. 23-105. - Discharge permit required; issuance; conditions.
(a) Permit required. Any person desiring to deposit or discharge any industrial waste or other pollutant into the sanitary sewerage system or any person now discharging any industrial waste or other pollutant into the sanitary sewerage system shall make application to the control authority. The control authority will approve such application and issue a permit to discharge only when satisfactory evidence is submitted by the applicant to the control authority that the discharge of such industrial waste or other pollutants is in full compliance with this article. (b) Application. In addition to the requirements and criteria set for in section 23-103, persons seeking a permit shall complete and file with the control authority an application in the form prescribed by the control authority. The applicant shall submit, where appropriate: (1) The name, address and telephone number of the applicant and the owner of the premises from which industrial wastes are intended to be discharged. (2) Daily average volume of wastewater to be discharged. (3) Schedule of all industrial process waste flows produced before and after pretreatment, if any, at the premises, including the daily volume, and wastewater constituents and characteristics as determined by representative samples and analyses done by a qualified laboratory acceptable to the control authority and in accordance with 40 CFR 136 and amendments thereto. (4) Estimated time and duration of discharge within a 20 percent tolerance. (5) Estimated hourly peak wastewater flow rates, including daily, monthly and seasonal variations within a 20 percent tolerance. (6) Site and plumbing plans describing any pretreatment facilities and showing all connections to the sanitary sewerage system. (7) A description of activities, facilities and plant processes on the premises, including all process waste materials which are or could be discharged, but excluding proprietary information concerning processes and products. (8) Type or classes of products produced. (9) The average number of employees and normal hours of work. (10) Any other relevant information as may be deemed by the control authority to be necessary to evaluate the permit application. (c) Failure to apply for permit. The responsibility for filing an application for a permit to discharge shall rest upon the person discharging or proposing to discharge industrial waste or other pollutants to the sanitary sewerage system. Should such person fail to file an application for a permit to discharge and should such person then be discharging any industrial waste or other pollutant to the sanitary sewerage system, the control authority shall, after 24 hours' notice has been given, cause such person's water service from the public water system to be discontinued, and water service will be restored at such person's expense only after he has complied with the provisions of this article. If such person does not use water exclusively from the public water system, the control authority shall, after 24 hours' notice has been given, cause such person's connection to the sanitary sewerage system to be severed, and such connection will be restored at such person's expense only after he has complied with the provisions this article. The control authority may discontinue water service without providing 24 hours' notice if the control authority determines, in its discretion, that the unpermitted discharge has the potential to cause a substantial interference or pass through or potential to cause damage to the sanitary sewerage system or rapid deterioration of the system structures. (d) Discharging waste prior to approval of permit application. Should any person discharging or proposing to discharge any industrial waste or other pollutant into the sanitary sewerage system file an application with the control authority for a permit to discharge and should such person then be discharging any industrial waste or other pollutant to the sanitary sewerage system prior to the issuance of a permit for the discharge, the control authority may discontinue the person's water service in accordance with subsection (c) herein. The control authority, in its discretion, may authorize discharge of industrial waste into the sanitary sewerage system during the pendency of the permit application pursuant to a corrective action plan under an appropriate enforcement action. (e) General permits. The control authority may, but is not required to, issue a general permit for any industrial sector which satisfies the criteria in S.C. Reg. 61-9.403.8(f)(iii)(A)(1). Industrial users seeking coverage under a general permit must submit an application in accordance with this section 23-105. (f) Compliance with discharge standards. All permit holders shall make wastewater acceptable under the limitations established in this article and in their individual permits before discharging directly or indirectly into any part of the sanitary sewerage system. For existing industrial discharges, an appropriate compliance schedule may be included in the permit. (g) Compliance with permit conditions. No permit holder shall discharge industrial wastewaters in excess of the quantity, rate of discharge, or quality conditions specified in the permit. Any person desiring to modify his discharge in a manner which would violate conditions of his permit shall notify the control authority in advance of such discharge and shall apply for an amended permit. (h) Issuance. The control authority will evaluate the data furnished by the applicant and may require additional information. A proposed permit may be issued within 60 days after all data has been furnished to and accepted by the control authority. The applicant shall then be allowed a 30-day comment period. Upon the expiration of the comment period, or upon the expiration of 90 days from the date the data has been furnished and accepted, the control authority shall issue or deny a permit. A permit may contain appropriate restrictions that are more stringent than requirements and limitations set forth in this article; in such case such restrictions shall apply. Issuance of a permit shall not relieve the user from complying with all applicable laws, regulations and ordinances promulgated by other government authority, nor shall the issuance of a permit be construed as a representation by the city that the discharge permitted therein complies with all of such laws, regulations and ordinances. (i) Restrictions. The restrictions in permits shall be uniformly enforced by the control authority, and may include but shall not be limited to the following: (1) The maximum permissible concentration or mass of wastewater constituents. Permit limits may include nutrient-based limits, such as total phosphorous, total nitrogen, and ammonia nitrogen. (2) Limits on rate and time of discharge, or requirements for flow regulation and equalization. (3) Requirements for inspection, flow metering and sampling facilities, and alternative sampling methods. (4) Pretreatment of industrial wastewater before discharge. (5) Provisions for intentional diversion of waste streams from any portion of the pretreatment facility. (6) Specifications for monitoring programs, which may include sampling locations, frequency and method of sampling, flow metering, number, types and standards for tests, and reporting schedule. (7) Prohibition of discharge of certain wastewater constituents. (8) Requirement for submission of periodic discharge reports, to include information concerning volume, rate of flow, constituent concentrations, peak flow rates, hours of operation, number of employees or other information. (9) Requirements for the protection of the sanitary sewerage system. (10) Other conditions as deemed appropriate by the control authority to ensure compliance with this article. (j) Term. Permits shall be issued for any specified period of time, not to exceed five years. (k) Separate permit required for each connection; required conditions; transfer of permit. A separate permit shall be required for each wastewater connection discharging directly or indirectly into the sanitary sewerage system. Each permit must contain effluent limits, including best management practices, based on applicable pretreatment standards and requirements to control slug discharge, if determined by the control authority to be necessary. For each user having multiple connections at a single plant or facility, a single permit shall be required which may set forth specific effluent limitations and conditions for discharge from each separate connection. No permit is transferable. (l) Pretreatment facilities. Any facilities required for pretreatment or equalization of wastewater prior to discharge into the sanitary sewerage system shall be provided and maintained at the permit holder's expense. Where pretreatment or equalization of wastewater flows is required by the control authority, plans, specifications and other pertinent data or information relating to such pretreatment or flow control facilities shall be filed with the control authority prior to the construction thereof. Plans and specifications for industrial pretreatment facilities must also be submitted to the state department of health and environmental control, industrial wastewater division, for review and approval prior to construction. Neither filing of the plans nor the issuance of a permit shall be construed to indicate that the control authority in any way vouches for or warrants the capabilities of any such plans, specifications or data in any manner. Subsequent alterations or additions to such pretreatment of flow control facilities shall not be made without prior notice to the control authority. (m) Surveys and zero discharge industrial users. For the purpose of maintaining an accurate, up-to-date industrial user inventory, the control authority may, at its discretion, require the submittal of a survey questionnaire from any nondomestic user. Upon request by the city, a zero discharge industrial user shall submit an survey questionnaire to the city to include the means by which the zero discharge industrial user will manage non-domestic waste without discharge to the POTW. The survey questionnaire must be certified in accordance with section (n)(12) below and signed by an authorized representative of the user. In its discretion, the city may issue a permit to a zero discharge industrial user. If a permit is not issued to a zero discharge industrial user, the city may require an annual statement and documentation to demonstrate that the zero discharge industrial user is managing non-domestic waste without discharge to the POTW. If required, this annual statement must be certified in accordance with section (n)(12) below and signed by an authorized representative of the user. (n) Reporting. Sewer users that become subject to new or revised categorical pretreatment standards are required to comply with the following requirements. (1) Baseline monitoring reports. (i) Within either one hundred eighty (180) days after the effective date of a categorical pretreatment standard, or the final administrative decision on a category determination under S.C. Reg. 61-9.403.6(a)(4), whichever is later, existing categorical industrial users currently discharging to or scheduled to discharge to the POTW shall submit to the control authority a report which contains the information listed in paragraph ii, below. At least ninety (90) days prior to commencement of their discharge, new sources, and sources that become categorical industrial users subsequent to the promulgation of an applicable categorical standard, shall submit to the control authority a report which contains the information listed in paragraph (ii), below. A new source shall report the method of pretreatment it intends to use to meet applicable categorical standards. A new source also shall give estimates of its anticipated flow and quantity of pollutants to be discharged. (ii) Industrial users described above shall submit the information set forth below. 1. Identifying information. The user shall submit the name and address of the facility including the name of the operator and owners; 2. Permits. The user shall submit a list of any environmental control permits held by or for the facility; 3. Description of operations. The user shall submit a brief description of the nature, average rate of production, and Standard Industrial Classification of the operations(s) carried out by such industrial user. This description should include a schematic process diagram which indicates points of discharge to the POTW from the regulated processes. 4. Flow measurement. The user shall submit information showing the measured average daily and maximum daily flow, in gallons per day, to the control authority from each of the following: a. Regulated process streams; and b. Other streams as necessary to allow use of the combined wastewater formulate of S.C. Reg. 61-9.403.6(e). 5. Measurement of pollutants. a. The user shall identify the pretreatment standards applicable to each regulated process. b. In additional, the user shall submit the results of sampling and analysis identifying the nature and concentration (or mass, where required by the standard or control authority) of regulated pollutants in the discharge from each of the user's regulated processes. Both daily maximum and average concentration (for mass, where required) shall be reported. The sample shall be representative of daily operations. In cases where the standard requires compliance with a best management practice or pollution prevention alternative, the user shall submit documentation as required by the control authority or the applicable standards to determine compliance; c. A minimum of four grab samples must be used for pH, cyanide, total phenols, oil and grease, sulfide, and volatile organics. For all other pollutants, 24-hour composite samples must be obtained through flow-proportional composite sampling techniques where feasible. The control authority may waive flow-proportional composite sampling techniques for any industrial user that demonstrates that flow-proportional sampling is infeasible. In such cases, samples may be obtained through time-proportional composite sampling techniques or through a minimum of four grab samples where the user demonstrates that this will provide a representative sample of the effluent being discharged. d. The user shall take a minimum of one representative sample to compile that data necessary to comply with the requirements of this paragraph. e. Samples should be taken immediately downstream from pretreatment facilities if such exist or immediately downstream from the regulated process if no pretreatment exists. If other wastewaters are mixed with the regulated wastewater prior to pretreatment the industrial user should measure the flows and concentrations necessary to allow use of the combined wastestream formula of S.C. Reg. 61-9.403.6(e) in order to evaluate compliance with the pretreatment standards. Where an alternate concentration or mass limit has been calculated in accordance with S.C. Reg. 61-9.403.6(e) this adjusted limit along with supporting data shall be submitted to the control authority; f. Sampling and analysis shall be performed in accordance with the techniques prescribed in 40 CFR part 136 and amendments thereto. Where 40 CFR part 136 does not contain sampling or analytical techniques for the pollutant in question, or where the EPA determines that the part 136 sampling and analytical techniques are inappropriate for the pollutant in question, sampling and analysis shall be performed by using validated analytical methods or any other applicable sampling and analytical methods procedures, including procedures suggested by the control authority or other parties; g. The control authority may allow the submission of a baseline report which utilizes only historical data so long as the data provides information sufficient to determine the need for industrial pretreatment measures; h. The baseline report shall indicate the time, date and place of sampling, and methods of analysis, and shall certify that such sampling and analysis is representative of normal work cycles and expected pollutant discharge to the POTW. 6. Compliance schedule. If additional pretreatment and/or operation and maintenance will be required to meet the pretreatment standards, the shortest schedule by which the industrial user will provide such additional pretreatment and/or O&M must be provided. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard; and 7. Signature and report certifications. All baseline monitoring reports must be certified in accordance with this section (n)(12) below and signed by an authorized representative of the user. A compliance certification must be signed by an authorized representative of the user. (2) Compliance schedule progress reports. The following conditions shall apply to the compliance schedule required by section (1)(ii)(6) above: (i) The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the industrial user to meet the applicable pretreatment standards (such events include, but are not limited to, hiring an engineer, completing preliminary and final plans, executing contracts for major components, commencing and completing construction, and beginning and conducting routine operation); (ii) No increment referred to above shall exceed nine months; (iii) The user shall submit a progress report to the control authority no later than 14 days following each date in the schedule and the final date of compliance including, as a minimum, whether or not it complied with the increment of progress, the reason for any delay, and, if appropriate, the steps being taken by the industrial user to return to the established schedule; and (iv) In no event shall more than nine months elapse between such progress reports to the control authority. (3) Reports on compliance with categorical pretreatment standard deadline. Within 90 days following the date for final compliance with applicable categorical pretreatment standards, or in the case of a new source following commencement of the introduction of wastewater into the POTW, any user subject to such pretreatment standards and requirements shall submit to the control authority a report containing the information described in section (1)(ii)(1) through (7) above. All compliance reports must be signed and certified in accordance with section (n)(12) below. All sampling will be done in conformance with section (1)(ii)(5)(f) above. (4) Periodic compliance reports. (i) All significant industrial users must, at a frequency determined by the control authority submit no less than twice per year (January and July) reports indicating the nature, concentration of pollutants in the discharge which are limited by pretreatment standards and the measured or estimated average and maximum daily flows for the reporting period. In cases where the pretreatment standard requires compliance with a best management practice or pollution prevention alternative, the user must submit documentation required by the control authority or the pretreatment standard necessary to determine the compliance status of the user. (ii) All periodic compliance reports must be signed and certified in accordance with section (n)(12) below. (iii) All wastewater samples must be representative of the user's discharge. Wastewater monitoring and flow measurements facilities shall be properly operated, kept clean, and maintained in good working order at all times. The failure of a user to keep its monitoring facility in good working order shall not be grounds for the user to claim that sample results are unrepresentative of its discharge. (iv) If a user subject to the reporting requirement in this section monitors any regulated pollutant at the appropriate sampling location more frequently than required by control authority, the results of this monitoring shall be included in the report. (5) Reports of changed conditions. Each user must notify the control authority of any significant changes to the user's operations or system which might alter the nature, quality, or volume of its wastewater at least 30 days before the change. (i) The control authority may require the user to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of a wastewater discharge permit application under section (b) above. (ii) The control authority may issue an individual wastewater discharge permit or modify an existing wastewater discharge permit in response to changed conditions or anticipated changed conditions. (6) Reports of potential problems. (i) In the case of any discharge, including, but not limited to, accidental discharges, discharges of a nonroutine, episodic nature, a noncustomary batch discharge, a slug discharge or slug load, that might cause potential problems for the POTW, the user shall immediately telephone and notify control authority in writing of the incident. This notification shall include the location of the discharge, type of waste, concentration and volume, if known, and corrective actions taken by the user. (ii) A notice shall be permanently posted on the user's bulletin board or other prominent place advising employees who to call in the event of a discharge described in paragraph (i) above. Employers shall ensure that all employees, who could cause such a discharge to occur, are advised of the emergency notification procedure. (iii) Significant industrial users are required to notify the control authority immediately of any changes at its facility affecting the potential for a slug discharge. (7) Reports from unpermitted users. All users not required to obtain an individual wastewater discharge permit shall provide appropriate reports to the control authority in writing as the control authority may require. (8) Analytical requirements. All pollutant analyses, including sampling techniques, to be submitted as part of a wastewater discharge permit application or report shall be performed in accordance with the techniques prescribed in 40 CFR Part 136 and amendments thereto, unless otherwise specified in an applicable categorical pretreatment standard. If 40 CFR Part 136 does not contain sampling or analytical techniques for the pollutant in question, or where the EPA determines that the Part 136 sampling and analytical techniques are inappropriate for the pollutant in question, sampling and analyses shall be performed by using validated analytical methods or any other applicable sampling and analytical procedures, including procedures suggested by the control authority or other parties approved by EPA. (9) Sample collection. Samples collected to satisfy reporting requirements must be based on data obtained through appropriate sampling and analysis performed during the period covered by the report, based on data that is representative of conditions occurring during the reporting period. (i) Except as indicated in section 23-107, the user must collect wastewater samples using 24-hour flow-proportional composite sampling techniques, unless time-proportional composite sampling or grab sampling is authorized by control authority. Where time-proportional composite sampling or grab sampling is authorized by the control authority, the samples must be representative of the discharge. Using protocols (including appropriate preservation) specified in 40 CFR Part 136 and appropriate EPA guidance, multiple grab samples collected during a 24-hour period may be composited prior to the analysis as follows: for cyanide, total phenols, and sulfides the samples may be composited in the laboratory or in the field; for volatile organics and oil and grease, the samples may be composited in the laboratory. Composite samples for other parameters unaffected by the compositing procedures as documented in approved EPA methodologies may be authorized by the control authority, as appropriate. In addition, grab samples may be required to show compliance with instantaneous standards. (ii) Samples for oil and grease, temperature, pH, cyanide, total phenols, sulfides, and volatile organic compounds must be obtained using grab collection techniques. (iii) For sampling required in support of baseline monitoring and 90-day compliance reports required by section (n)(1), (n)(2), and (n)(3) above, a minimum of four grab samples must be used for pH, cyanide, total phenols, oil and grease, sulfide and volatile organic compounds for facilities for which historical sampling data do not exist; for facilities for which historical sampling data are available, control authority may authorize a lower minimum. For the reports required by section (n)(4) above, the industrial user is required to collect the number of grab samples necessary to assess and assure compliance by with applicable pretreatment standards and requirements. (10) Date of receipt of reports. Written reports will be deemed to have been submitted on the date postmarked and deposited in a mail collection box or facility serviced by the United States Postal Service, postage prepaid. For reports, which are not mailed, postage prepaid, into a mail collection box or facility serviced by the United States Postal Service, the date of receipt of the report shall govern. (11) Recordkeeping. Users subject to the reporting requirements of this article shall retain, and make available for inspection and copying, all records of information obtained pursuant to any monitoring activities required by this article, any additional records of information obtained pursuant to monitoring activities undertaken by the user independent of such requirements, and documentation associated with best management practices. Records shall include the date, exact place, method, and time of sampling, and the name of the person(s) taking the samples; the dates analyses were performed; who performed the analyses; the analytical techniques or methods used; and the results of such analyses. These records shall remain available for a period of at least three years. This period shall be automatically extended for the duration of any litigation concerning the user or the control authority, or where the user has been specifically notified of a longer retention period by control authority. (12) Certification statements. The following certification statement is required to be signed and submitted by users submitting permit applications in accordance with section (b); users submitting baseline monitoring reports under section (n)(1); users submitting reports on compliance with the categorical pretreatment standard deadlines under section (n)(3); and users submitting periodic compliance reports required by section (n)(4). The following certification statement must be signed by an authorized representative: I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
(Ord. No. 2019-043, 8-20-19; Ord. No. 2021-029, 5-4-21)
Ask a question about Columbia law
Corpus searches the Columbia sections it holds and shows the ones that match, with their citations. Free, no sign-in.
