For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 28 — TCP Transportation corridor protection overlay district

Code of Ordinances of the Town of Fort Mill, South Carolina (Codified through Ordinance No. 13-21, enacted July 22, 2013. (Supp. No. 9)) · Fort Mill Zoning Ordinance § 28

Corpus is an independent public-information project, not the official City of Fort Mill website. Stable reference: corpuslaw.us/code/5b8c6a0b-90b4-403e-8131-e3ac88545163

Sec. 28. - TCP Transportation corridor protection overlay district.

1. Purpose and intent: a. The town council finds the need for additional setbacks for road improvements identified in the capital projects sales and use tax programs, applicable Town of Fort Mill or York County Transportation Plans, and/or the Rock Hill-Fort Mill Area Transportation Study (RFATS) Long Range Transportation Plan to: i. Assist in the preservation of public health, safety, and welfare and to aid in the harmonious, orderly, and beneficial development of the county in accordance with the Comprehensive Plan; ii. Provide for the preservation and protection of corridors where transportation improvements are scheduled to occur; and iii. Minimize impacts associated with road widening and new road construction. b. This section shall apply to all land within the Town of Fort Mill which abuts or is located within the corridors identified within the capital projects sales and use tax programs, applicable Town of Fort Mill or York County Transportation Plans, and/or the Rock Hill-Fort Mill Area Transportation Study (RFATS) Long Range Transportation Plan. 2. Relation to generally required setback: When determining the cumulative setback requirement for property within the identified corridors, the setback requirement provided in this section would be in addition to the setback requirement of the underlying zoning district, if applicable, in which the property is located. 3. Administration: Any proposed structure or development which abuts or is located within a corridor as stated in subsection 28 6. from the capital projects sales and use tax programs, applicable Town of Fort Mill or York County Transportation Plans, and/or the Rock Hill-Fort Mill Area Transportation Study (RFATS) Long Range Transportation Plan will require the review by the planning director prior to receiving site plan approval and/or zoning compliance, in order to assess the impact of any proposed development on the road improvement and to ensure that the cumulative setback requirement is being met. 4. Protection from encroachment: No building, structure, or facility shall be erected, constructed, reconstructed, moved, added to, or structurally altered within the limits of the minimum preservation corridor as defined in subsection 28 6. of the transportation corridor preservation overlay for any proposed street or highway improvement included within the capital projects sales and use tax programs, applicable Town of Fort Mill or York County Transportation Plans, and/or the Rock Hill-Fort Mill Area Transportation Study (RFATS) Long Range Transportation Plan. 5. Establishment of setbacks: When a future alignment right-of-way for a road improvement has been established by the appropriate reviewing agency, the setback and associated buffer requirements shall be applied to the approved alignment right-of-way. Where an alignment for expanding an existing road or highway has not been determined, no construction or development shall occur on properties within the limits of the minimum preservation corridor until a final alignment has been determined by the appropriate agency or until the planning director, in coordination with appropriate agencies, has determined that the proposed construction or development will not have a negative impact on the future alignment or corridor. 6. List of roads: The following roads have been identified for inclusion in the preservation corridor requirements: Pennies 3 (2011 Pennies for Progress) Project Description | Location | Minimum Preservation Corridor Limits SC Highway 160 (Springfield Parkway to County Line) | From 300 feet west of Springfield Parkway to Sugar Creek Bridge (County Line) | 150 feet US Highway 21 Bypass North Phase 1 | From 300 feet south of Springfield Parkway to 300 feet north of SC Highway 51 | 170 feet SC Highway 51 | US Highway 21 to the NC state line | 170 feet Gold Hill Road/I-77 | From 300 feet west of Pleasant Road to 300 feet east of Deerfield Drive Redesign Interchange | 170 feet Fort Mill Parkway/Spratt Street intersection | Realignment | 150 feet Pennies 4 (2017 Pennies for Progress) Project Description | Location | Minimum Preservation Corridor Limits Sutton/Spratt/Fort Mill Parkway | From I-77 to RR bridge @ US Foods (5-lane widening) | 170 feet US Highway 21 Bypass North | From Springfield Parkway to SC Highway 160 (5-lane widening) | 170 feet Sutton/New Gray Rock/Sam Smith/Harris | Intersection | Improvement limits shall be verified with York County Engineering

(Ord. No. 2018-18, § II, 6-11-18)

Ask a question about Fort Mill law

Corpus searches the Fort Mill sections it holds and shows the ones that match, with their citations. Free, no sign-in.