§ 32-106 — Grading
Code of Ordinances of the Town of Fort Mill, South Carolina (Codified through Ordinance No. 13-21, enacted July 22, 2013. (Supp. No. 9)) · Fort Mill Code of Ordinances § 32-106
Corpus is an independent public-information project, not the official City of Fort Mill website. Stable reference: corpuslaw.us/code/5e24243d-a70c-40eb-98d0-a2ecebd40ec0
Sec. 32-106. - Grading.
(a) All subdivision grading shall be done in such a manner as to preserve natural vegetation and topographic features. Wholesale removal of topsoil from subdivision areas, other than those to be paved, shall not be permitted. Where extensive grading is required, the topsoil shall be removed and piled near the site until rough grading is completed, after which the topsoil shall be spread over the portions of the site which are not to be paved. When grading is completed, the topography will generally agree with the contour changes shown and approved on the preliminary plat. Seeding, strawing, staking, and/or other means necessary to prevent erosion shall be completed. (b) All contractors, homeowners or agents desiring to clear at least 15 percent or more of any lot will be required to obtain a grading permit and to maintain necessary erosion controls to prevent additional water from flowing into the streets or adjacent property. Erosion control measures will include, but not be limited to, the installation of sediment basins, traps and fences, installation of construction entrances as specified by the town; installation of driveway culverts; and the construction of perimeter erosion controls in all areas of land disturbing activities.
(Code 1984, § 5-3-66; Ord. No. 97-2, 1-13-97)
Ask a question about Fort Mill law
Corpus searches the Fort Mill sections it holds and shows the ones that match, with their citations. Free, no sign-in.