Sec. 8. - Transportation impact analyses.
Transportation impacts, and how to mitigate them, are an important consideration for our community when a development is proposed. Public policy makers, citizens, and developers all have a stake in understanding and responding to additional demands on the transportation system. A Transportation Impact Analysis (TIA) is a tool used to evaluate the incremental impacts on the surrounding transportation infrastructure and how to mitigate them to maintain safe traffic and transportation operations. A. TIA determination. The town shall determine the need for a TIA upon receipt of any development application (by-right or rezoning) accompanied by a sketch or schematic plan. Types of development applications could include, but are not limited to, multi-family developments, single family developments, commercial developments, mixed-use projects, rezonings, or annexation requests. If warranted, the transportation consultant assigned by the town shall prepare the TIA. At the discretion of the South Carolina Department of Transportation (SCDOT) and the town, a Transportation Technical Memorandum, in lieu of a full TIA report, may be allowed for some developments. B. Minimum thresholds for TIAs. A TIA will be required to accompany any development plan when expected gross trip generation is 400 total trips or more in a 24-hour period, and/or 100 total trips during either the AM or PM peak hours [prior to any trip reductions applied - see section 8.6.G.(10)]. The gross trip generation will be calculated by the town or its consultant based on information (proposed project summary and development plan) provided by the applicant, and the final determination for requiring the TIA will be made by the town. The town may also determine the need for a TIA based on special circumstances associated with the development, even if the gross trip generation falls below the identified threshold(s). This may be due to location, an intersection or thoroughfare nearby that is at or above capacity, the nature of the use, or one of the following: 1. Traffic generated from a non-residential development that could potentially significantly impact adjacent residential neighborhoods. 2. Traffic operation issues for current and/or future years on nearby streets are expected to be significantly worsened by traffic generated from the proposed new development. 3. Arterials and/or collectors near the site are experiencing significant/unacceptable delays. 4. Traffic safety issues exist at the intersection(s) or street(s) that would serve the proposed new development. 5. The proposed land use differs significantly from the future land use designation of the town's adopted Comprehensive Plan. 6. The internal street or access system is not anticipated to accommodate the expected traffic generation. 7. The proposed development project includes a drive-through facility or other uses, such as schools, that require significant on-site circulation that may have an offsite impact to adjoining roads and/or intersections. 8. The amount, behavior, and/or assignment of traffic is deemed by the town as being significantly different from a previously approved TIA, or more than 24 months have passed since completion of a previous TIA for the site. A transportation technical memorandum (TTM) will be required for any proposed development when the conditions above are not met. In this case, the town and its consultant will determine what the TTM will address. C. Scoping meeting. A mandatory scoping meeting is required prior to beginning the TIA to discuss the requirements and strategies for a TIA specific to the site and the proposed development. Background information shall be submitted by the applicant and shall include a conceptual site plan showing proposed access points, access spacing/distances between one another and adjacent roads, proposed land uses and densities, structure and parking envelopes. The town, the transportation consultant assigned by the town, and the applicant(s) are required to attend the mandatory scoping meeting, and representatives from the SCDOT District 4 office, York County, and Rock Hill-Fort Mill Area Transportation Study (RFATS) will be invited and encouraged to attend as needed. The applicant may invite members of his/her development team as needed. D. Scoping document. A scoping document detailing the understood scope and parameters of the TIA shall be prepared by the transportation consultant assigned by the town. The Scoping Document shall be signed by the applicant, the town, and the SCDOT and/or York County (if access to a state or county road is involved) before the consultant can begin work on the TIA. Failure by the applicant to provide accurate information or failure by the assigned transportation consultant to follow the scoping document shall result in disapproval of the TIA. If significant changes are made to the parameters outlined in the scoping document, a revised scoping document will be required. E. Fees. Prior to the scoping meeting, the transportation consultant assigned by the town shall submit a summary of consultant fees to the town to perform the scoping portion of the TIA based upon the background information submitted by the applicant (discussed in item C. above). The applicant shall agree to provide payment in full to the town for these services prior to scheduling of the scoping meeting. After the scoping document is prepared, changes by the applicant which require updates to the scoping document, will result in additional services and must be paid for by the applicant prior to performance of the additional services. After the scoping meeting, the transportation consultant assigned by the town shall submit a summary of consultant fees for preparing the TIA to the town. Per the scoping document, the applicant shall agree to provide payment in full to the town for preparation of the TIA so that the town can release the work to the consultant. Any additional services incurred by the transportation consultant in addition to the scoping document must be approved by the town and agreed to and paid for by the applicant prior to performance of the additional services. F. Transportation mitigation agreement (TMA). Upon completion of the TIA, certain on- or off-site transportation mitigation measures may be required as recommended by the TIA. If so, the transportation consultant assigned by the town shall prepare a transportation mitigation agreement (TMA) which will summarize the following: 1. Development plan. 2. Development phasing and timing (if applicable). 3. Site access and points of ingress/egress. 4. On- and off-site improvements required to adequately mitigate the project impacts to the town's transportation system, including vehicular, pedestrian, and bicycle improvements. 5. Trigger points and deadlines for construction and/or submittal of financial guarantees for any improvements. The TMA must be signed by the applicant and town following the approval of the TIA by all applicable parties. All required mitigation measures must be implemented as prescribed in the TMA. If the development program is planned to be phased, then a development phasing analysis shall be performed, either as part of the TIA or as an additional service to the TIA, to determine the mitigation for each phase of development if mitigation phasing is desired by the applicant. The applicant shall provide a financial guarantee in a manner acceptable to the town in the amount of 150% of all phased transportation improvements as prescribed in the TMA. A planning-level opinion of probable construction cost (OPCC) will be performed by the town and its consultant as an additional service, and submitted to the applicant to provide payment. The OPCC will include costs for planning/design, utilities, permitting, construction, and right-of-way. G. TIA outline and contents. The outline and contents of what is required to be included in the TIA will be discussed at the scoping meeting and included in the scoping document. A detailed summary of the expected content and methodologies to be used in the TIA is discussed below: 1. Cover/signature page. Includes the project name, location, name of the applicant, contact information for the applicant, and date of the study. The name, contact information, registration number, signature, and seal of a duly qualified and registered professional engineer in the State of South Carolina are also required to appear on this page. 2. Table of contents. Includes a list of all section headings, figures, tables, and appendices included in the TIA report. Page numbers shall denote the location of all information, excluding appendices, in the TIA report. 3. Executive summary. Includes a description of the study findings, a general description of the project scope, study horizon years, expected transportation impacts of the project, and mitigation measure recommendations. Technical publications, calculations, documentation, data reporting, and detailed design shall not be included in this section. 4. Project description. Includes a detailed description of the development, including the size of the parcel, development size, existing and proposed uses for the site, anticipated completion dates (including phasing if appropriate). It shall also include the square footage of each use and/or the number and size of dwelling units proposed, and a map and copy of the site plan provided by the applicant. 5. Site description. Includes a description of the project location within the town and region, existing zoning and use (and proposed use if applicable), and key physical characteristics of the site, including general terrain and environmentally sensitive or protected areas. 6. Site access. A complete description of the ingress/egress of the site shall be explained and depicted. It shall include number of driveways, their locations, distances between driveways and intersections, access control (full-movement, leftover, right-in/right-out, etc.), types of driveways (two-way, one-way, etc.), traffic controls, etc. Internal streets (lanes, flow, and queuing), parking lots, pedestrian and bicycle facilities, and designated loading/unloading areas shall also be described. Similar information for adjacent properties, including topographic grade relationship, shall be provided to evaluate opportunities for internal and/or adjacent connectivity. The design, number, and location of access points to collector and arterial roadways immediately adjacent to the site must be fully analyzed. The number of access points shall be kept to a minimum and designed to be consistent with the type of roadway facility. Driveways serving the site from state roads shall be designed in accordance with the SCDOT's Access and Roadside Management Standards (ARMS) Manual and/or town standards, as applicable. 7. Study area. The limits of the study area shall be based on the location, size and extent of the proposed project, and an understanding of existing and future land uses and traffic conditions surrounding the site. The limits of the study area for the TIA shall be reviewed and approved by the town and SCDOT staff at the mandatory scoping meeting. At a minimum, the study area shall include all streets and signalized intersections within a one-mile radius of the proposed site and/or where site traffic estimated for build-out of the project will constitute 10% or more of any signalized intersection approach during one or both peak hours. During the scoping meeting, staff may reduce the radius due to conditions specific to the site based on request by applicant and supported with valid reasoning. Unsignalized intersections between the required signalized intersections will be added to the scope as directed by the town. To initially determine the impacts, the town will maintain a database of recent peak-hour intersection turning movement counts. The applicable intersection counts will be equated to current year baseline volumes. Based on the proposed development program submitted by the applicant, a preliminary trip generation analysis, distribution, and assignment will be performed within the area surrounding the site and compared to the current year base volumes. Related impacts or current operational problems may dictate that other intersections be included in the study area as determined by town staff and/or SCDOT staff. A narrative describing the study area shall identify the location of the proposed project in relation to the existing transportation system and list the specific study intersections and/or segments. Any unique transportation plans or policies applicable to the area (e.g., CATS bus service and future plans) shall be mentioned. A site location map shall be provided and shall identify natural features, major and minor roadways within the study area, study intersections, and a boundary of the site under consideration. 8. Existing conditions. Shall include a narrative and map that represents AM and PM peak-hour turning-movement volumes for all intersections within the study area. Traffic volumes shall represent 15-minute interval weekday turning movement counts (Tuesday through Thursday), include heavy-vehicle, pedestrian and bicycle counts, no more than twelve months old, and shall be collected during periods of the year when local schools are in session and during weeks that have no observed federal, state, or local holidays and periods unless otherwise approved by the town. The required count timeframes are from 6:30—9:00 a.m. and 3:00—7:00 p.m. The PM count timeframe is expected to cover peaking characteristics caused by local Middle and High School dismissal times, as well as typical employment peaking characteristics; however, site-specific conditions may necessitate additional or different traffic counting hours and/or days depending on the development program and location within the town. These unique circumstances will be determined and directed by the town. The town will determine if modified peak hours or weekend analyses shall be included in the TIA at the mandatory scoping meeting. For example, eight-, 12-, or 16-hour turning movement counts shall be required to complete the analysis if a full traffic signal warrant analysis is required as part of the TIA. The source of existing traffic volume information shall be explicitly stated (e.g., town counts, new counts collected by the applicant, SCDOT counts, etc.). If previous counts were obtained, only counts collected within one year of TIA submittal for the proposed site will be deemed acceptable. Summary sheets for existing turning movement counts shall be included in the appendix of the TIA report. A separate narrative and map shall be prepared to describe the characteristics of surrounding major roadways, including functional classification, number of lanes, posted speed limit, existing average daily traffic volumes, typical cross section, intersection control, and lineal distance between major roadways. Field notes for the existing conditions observation may be included in the appendix of the TIA report. 9. Future year conditions. Unless otherwise approved by the town, future year conditions for a single-phase development shall be analyzed for the year the development is expected to be at full occupancy (build-out year). For multiple-phased developments, the scenarios shall be completed in order, with any improvements specified by development included in the subsequent build scenarios. Specific analysis periods to include in the study shall depend upon the development program, proposed project phasing plan, and significant improvements programmed for the surrounding transportation system. The approved offsite developments and transportation projects to be included in the base future-year background conditions for the transportation system within the study area shall be determined during the scoping meeting. Transportation improvements assumed in the future-year background conditions analysis may include those with an expected completion date concurrent with that of the development and funded either by the town, SCDOT, or indicated as a required condition of approval from an offsite development application. Only projects approved by the town at the scoping meeting may be included in the analysis as future existing infrastructure. Those improvements committed by other developments must be clearly identified in the report as approved offsite development road improvements. Adjacent development traffic information used in the development of the future year background traffic volumes shall be included in the appendix of the TIA report. Unfunded, planned infrastructure projects may be mentioned in the TIA, but the description shall specifically identify that these projects are not included in the background condition. Future year background traffic volumes shall be forecasted using historical growth rate information, regional models, and/or TIA reports for development(s) approved by the town but not yet built. Additional future year scenarios may be applicable in the case that there are committed offsite approved development improvements as indicated in section 8.6 G.(17). A narrative and map shall be prepared that presents turning movement volumes for each peak hour for all intersections identified within the study area. Future year base (existing plus historical growth) traffic volumes, offsite approved development volumes, and site traffic volumes shall be clearly separated and combined in the map. 10. Trip generation. Base trip generation for the proposed land use(s) shall be calculated using data published in the latest version of the Institute of Transportation Engineers' (ITE) Trip Generation Manual. Data limitations, data age, choice of peak hour of adjacent street traffic, choice of independent variable, and choice of average rate versus equation shall be discussed at the mandatory scoping meeting. Local trip generation rates may be acceptable if appropriate validation is provided by the applicant to support them. Any deviation from ITE trip generation rates shall be discussed in the mandatory scoping meeting and documented in the scoping document if approved by the town and SCDOT. a. Internal capture. Base trip generation may be reduced by rate of internal capture when two or more land uses are proposed using methodology recommended in the most current Trip Generation Handbook published by ITE, or research published by the National Cooperative Highway Research Program (NCHRP) Transportation Research Board. Reductions for internal capture shall be applied to multi- or mixed-use sites only. The internal capture reduction shall be applied before pass-by trips are calculated. b. Pass-by trips. Pass-by trips are those made as intermediate trips between an origin and primary destination (i.e., home to work, home to shopping, etc.). However, pass-by trips are not diverted from another roadway. Base trip generation may be reduced by rate of pass-by capture using methodology recommended in the most current Trip Generation Handbook published by the ITE. Pass-by trips associated with the development program may not exceed 10% of the peak-hour background volume reported for the adjacent public street network. This network shall include the streets that provide primary access to/from the site. For example, if a site access drive that connects to a low-volume local street, which its primary access is to a major collector road, the traffic on the major collector shall be used as the adjacent street for pass-by calculation purposes. Evaluation of diverted trips may apply depending on the specifics of each site. A trip generation table shall summarize all trip generation calculations for the project. 11. Trip distribution. External trip distribution shall be determined on a project-by-project basis using one of several sources of information available to transportation and land planning professionals. Potential sources for determining project trip distribution may include the regional travel demand model, market analysis, existing traffic patterns, and/or professional judgment. At the town's direction, multiple trip distributions may be required for differing land use types. Regardless of methodology, the procedures followed and logic for estimating trip distribution percentages must be well-documented in the TIA. Trip distribution percentages proposed for the surrounding transportation network shall be discussed during the Scoping Meeting and shall be approved by the town and SCDOT before proceeding with the TIA. A map showing the percentage of site traffic on each street included in the study area shall be included in the TIA. 12. Trip assignment. Site traffic shall be distributed to the surrounding transportation system based on the site's trip generation estimates and trip distribution percentages. Future year build-out traffic forecasts (i.e., future year background traffic plus site traffic) shall be represented in graphic formats for AM and PM peak-hour conditions at all intersections included in the study area. If the project will be built in phases, traffic assignments shall be reported for each phase. Pass-by traffic shall be included at the driveways and access points for evaluating driveway volumes. Multiple assignment analyses may be required if the traffic control at the access drives varies (i.e., right-in/right-out vs. stop controlled vs. signalized). 13. Operations analysis. The TIA shall include multi-modal operations analyses including vehicular, pedestrian and bicycle, to allow for the safe and convenient travel for all modes. Level-of-service (LOS) and delay are the primary measures of effectiveness for impacts to the transportation system and are defined by the most current edition of the Highway Capacity Manual (HCM). Operations analyses shall be performed for the existing and all future year scenarios, as described in section 8.6.G.(17). Impacts from the proposed project shall be measured by comparing the future year background conditions to the future year build-out conditions. Requirements for mitigation are described in Section 8.6.G.(17). a. Vehicular capacity analysis. Unless otherwise noted, Synchro level-of-service (LOS) and delay shall be reported for all signalized intersections and approaches identified in the study area. Based on HCM, LOS for unsignalized intersections is not defined as a whole; instead, only the individual approaches shall be reported as applicable based on the HCM reports determined through the Synchro analysis. Existing signalized intersections shall be modeled based on existing signal timing plans provided by either the town or SCDOT. Existing signal timing plans shall be included in the appendix of the TIA report. Pedestrian movements must be considered in the evaluation and adequate pedestrian clearance provided in the signal cycle split assumptions. If a traffic signal is part of a coordinated system it must be analyzed as such under all conditions. Other standard practices and default input values for evaluating signalized intersections shall be consistent with the most recent guidelines published by the SCDOT. The town may also require safety, traffic simulation, gap and/or other analyses appropriate for evaluating a development application. Additional analyses and/or traffic capacity or simulation tools (such as VISSIM or Transmodeler) required for the TIA shall be identified during the scoping meeting. All TIA reports submitted to the town shall use Synchro, SimTraffic, VISSIM, and/or Transmodeler analysis software for signalized and unsignalized intersections, or Sidra Software for roundabouts, consistent with SCDOT policies. A narrative, table, and map shall be prepared that summarizes the methodology and measured conditions at the intersections reported in LOS (LOS A—F), the intersection and approach signal delay for signalized intersections, the approach delay for unsignalized intersections, and 95th percentile queue lengths for all movements. Capacity analysis worksheets and SCDOT auxiliary turn-lane warrants for unsignalized intersections shall be included in the appendix of the TIA report. b. Pedestrian operations analysis. Unless otherwise noted, methodology provided in the latest edition of the Highway Capacity Manual shall be used to evaluate pedestrian LOS for the intersections identified in the study area. The current methodology is based on geometric data, demand data, and signal control data including, but not limited to: • Number of lanes on the major street. • Crossing distance. • Traffic volumes. • Motorist yielding rates to pedestrians. • Cycle length. • Walk time. • Presence of pedestrian phase. c. Bicycle operations analysis. The bicycle LOS at intersections identified in the study area shall be evaluated using locally accepted methodology. This current methodology assesses bicyclists' comfort based on geometric and traffic signal features including, but not limited to: • Number of lanes crossed. • Presence of conflicting turning movements. • Presence of bike lanes. Under this methodology, intersection features are assigned points, where the LOS for each approach is calculated based on the accumulation of points for each geometric and traffic signal feature identified in the worksheet. Currently, this methodology does not take into account demand volumes; therefore, the bicycle LOS would not differ between AM and PM peak hours, and thus would not need to be reported for both under this methodology. 14. Queuing analysis. 95th percentile and simulation analysis of future year queues shall be consistent with SCDOT's current practices and published Capacity Analysis Guidelines, as applicable. Turn lanes and storage lengths for the major street (uncontrolled) approaches at unsignalized intersections shall be identified using volume thresholds published in the SCDOT's 2017 Roadway Design Manual (see Guidelines for Left- and Right-Turn Lanes Nomographs, section 9.5.1). Recommendations for left- and right-turn lanes serving the site shall be designed to account for both the SCDOT warrants described above and to meet future year capacity needs identified through the capacity analyses. For projects that include drive-through facilities, pick-up/drop-off areas, or entrance gates, a queuing analysis may be required by the town to ensure that vehicle stacking will not adversely impact the public transportation system. The queuing analysis must be performed using accepted transportation engineering procedures approved by the town. If a TIA is required for a new school site, the internal circulation and ingress/egress of the site shall be modeled using a "dummy signal" in the Synchro software as prescribed by NCDOT Municipal School Transportation Assistance (MSTA) department. 15. Crash analysis. A summary of crash data (type, number, and severity) for the most recent three-year period at each study location may be required. South Carolina Department of Public Safety reports will be requested by the town's consultant and shall be included in the appendix of the TIA report if required. For locations with prevalent crash types and/or frequency, a discussion shall be included describing factors that may be contributing to the incidents. At a minimum, the proposed development features shall not contribute to factors potentially involved in the existing crash rates. If contributing factors are identified, recommendations to eliminate or mitigate these features shall be included. 16. Traffic signal warrants. Town staff and/or SCDOT may consider potential signal locations at the scoping meeting. However, traffic flow progression is of paramount importance when considering a new traffic signal location. A new traffic signal shall not cause an undesirable delay to the surrounding transportation system. Installation of a traffic signal at a new location shall be based on the application of warrant criteria contained in the most current edition of the Manual on Uniform Traffic Control Devices (MUTCD) and engineering judgment. Traffic signal warrants shall be included in the appendix of the TIA report. Additionally, spacing of traffic signals within the town must adhere to SCDOT requirements. If a full signal warrant analysis is recommended in the TIA, then the consultant identified by the town will perform the associated warrant analysis as an additional service if not performed as part of the TIA. The town and/or SCDOT may decide to defer a signal warrant analysis until after the development has opened to allow use of actual turning movement counts at an intersection. As such, the TIA recommendations must clearly state that this analysis shall occur at a specified date following the opening of the development. The applicant shall provide a financial guarantee as outlined in TMA for the estimated cost of the signal warrant analysis and resulting signal prior to final approval of the TIA. The cost shall be established based on an engineer's estimate provided by the consultant identified by the town. 17. Mitigation measure recommendations. This section of the TIA report shall provide a description of the study's findings regarding impacts of the proposed project on the existing and future transportation system and describe the location, nature, and extent of all mitigation measures recommended to the applicant to improve and/or maintain the future year background level-of-service (LOS) conditions through phasing and ultimate build-out of the project. This mitigation will be identified by measuring the impact between the future year background conditions and the future year build-out conditions. The applicant is required to mitigate transportation deficiencies caused solely by the projected impact of their proposed development, and not unacceptable background conditions or other deficiencies caused by offsite development within the defined study area. The applicant shall be required to identify mitigation improvements to the transportation network if at least one of the following conditions exists when comparing the multimodal operations analyses of future year background conditions to future year build-out conditions: a. The total average delay at an intersection or individual approach increases by 25% or greater, while maintaining the same LOS, b. The LOS degrades by at least one level, c. Or the LOS does not meet the identified standard (as shown below) in background conditions, and the proposed project shows a negative impact on the intersection or approach. Adopted LOS Standard Intersection Type | LOS Threshold Involving only collector or local streets | LOS C or better Involving one or more arterial or higher order streets | LOS D or better If the background LOS (intersection or approach) is inadequate, the applicant will be expected to mitigate only the impact caused by the proposed site. For example, if the background LOS of an intersection is LOS F with 85 seconds of delay, and the site traffic increases the delay to 95 seconds at LOS F, the applicant will be required to mitigate the added 10 seconds of delay, not the inadequate background delay. Town staff and SCDOT will review the recommendations in the final version of the TIA and will have the ultimate determination in the scope of the required mitigation measures. The applicant shall also be responsible for committed transportation improvements by approved offsite developments included in the background and build-out scenarios in the case that they are not completed prior to build-out of the proposed site, unless additional background and build-out analyses are performed without the approved offsite development traffic and associated committed improvements, and the analyses show that such committed improvements would not be caused by the proposed site. A transportation mitigation agreement (TMA) as outlined in Part F. of this ordinance may apply if there are mitigation requirements. For multi-phase developments, the capacity analyses scenarios shall address the phasing of improvements for each phase of development. A narrative and table shall be prepared that summarizes the methodology and measured conditions at the intersections reported in LOS (LOS A-F) and average control delay for each intersection and approach. A narrative and map shall also be prepared that describes and illustrates recommended improvements, by development phase if necessary, for mitigating the projected impact of the proposed development. 18. Compliance with adopted transportation plans. All TIA reports must include a statement of compliance with plans, programs, and policies adopted by the Town of Fort Mill for maintaining a safe and efficient multi-modal transportation system.
(Ord. No. 2019-03, § I, 1-28-19; Ord. No. 2020-12, § I, 3-23-20)
Ask a question about Fort Mill law
Corpus searches the Fort Mill sections it holds and shows the ones that match, with their citations. Free, no sign-in.