For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 10.5-95 — Engineering analysis and system architecture

Code of Ordinances of the City of North Charleston, South Carolina (Supp. No. 76: codified through Ordinance No. 2026-022, adopted June 25, 2026) · North Charleston Code of Ordinances § 10.5-95

Corpus is an independent public-information project, not the official City of North Charleston website. Stable reference: corpuslaw.us/code/a8496ef6-d515-4198-937e-afd004ea8581

Sec. 10.5-95. - Engineering analysis and system architecture.

(a) After a franchise is awarded, a franchisee shall, within two hundred ten (210) days after a franchise agreement has been executed, submit to the council an engineering analysis and system architecture. (b) The engineering analysis and system architecture shall ensure that, as constructed and operated, a franchisee's cable television system shall be able to provide the capacity and services required by this code in a manner consistent with the applicable performance standards. (c) The initial version of the engineering analysis and system architecture shall contain, at a minimum: (1) A description of the design philosophy and principal assumptions for the cable television system; (2) An interference study, including site measurements, for all noncable signal paths to be utilized for receipt or distribution of signals by or within the cable system. (3) A description of all steps to be taken by a franchisee to ensure cable system reliability, and to protect against failures to meet the applicable performance standards; and (4) A description of all channeling plans and switching system to be utilized, together with the proposed assignment, both dial location and spectrum location. (d) The system architecture shall contain, at a minimum: (1) A block diagram of all principal sections of the cable system (e.g., headends, hubs and production facilities) and the function and performance standards of all principal equipment to be utilized; and (2) Design maps for the initial section of the cable system to be constructed by a franchisee (after commencement of construction) showing spacing between and actual street location of the infrastructure of the cable system, including: a. The headend(s); b. The hubs; c. Trunk cables; d. Feeder cables; e. Proposed studios and other production facilities; and f. Antennas, microwave towers, and satellite earth stations and uplink. (3) The detailed plan for the sequence of construction of the cable television system in a narrative and chart/graphic form. (e) Throughout construction of the cable system, actual "as built" maps shall be substituted for the design maps to be furnished with the initial version of the engineering analysis and system architecture.

(Ord. No. 1988-22, § 46, 3-3-88)

Ask a question about North Charleston law

Corpus searches the North Charleston sections it holds and shows the ones that match, with their citations. Free, no sign-in.