§ 17-84 — Base and surface courses
Code of Ordinances of the City of North Charleston, South Carolina (Supp. No. 76: codified through Ordinance No. 2026-022, adopted June 25, 2026) · North Charleston Code of Ordinances § 17-84
Corpus is an independent public-information project, not the official City of North Charleston website. Stable reference: corpuslaw.us/code/07be8401-e6e6-4f2a-bb56-912e6e2a05df
Sec. 17-84. - Base and surface courses.
(a) Four (4) inches of hot plant mix sand asphalt base with Class "A" or double bituminous treatment. The four-inch sand asphalt base shall be placed in two (2) courses in accordance with the state highway department's standard specifications for highway construction, current edition. The first course shall be properly scarified and a tack coat applied before the second course is laid, to insure a proper bond between courses. After the sand asphalt base has been properly placed and compacted to the approval typical section in accordance with the state highway department's standard specifications for highway construction, then a prime coat shall be applied using RC-250 cutback asphalt or RS-2 emulsified asphalt at the rate of one-tenth (0.10) to twenty-five-hundredth gallons per square year, the exact rate of application to be determined by the city engineer, provided, however, that no less than fourteen (14) days have elapsed since the base course was placed. After the prima coat has properly cured, then the class "A" treatment or the double bituminous treatment shall be placed in accordance with the state highway department's standard specifications for highway construction, provided, however, that, not less than forty-eight (48) hours have elapsed since the prime coat was placed. (b) Three (3) inches of hot plant mix sand asphalt base with one inch of hot laid asphaltic concrete surface course. After the three-inch sand asphalt base has been properly placed and compacted to the approved typical section, in accordance with the state highway department's standard specifications for highway construction, then the base shall be scarified and tacked prior to the placing of the asphaltic concrete surface source; provided, however, that, not less than seven (7) days have elapsed since the base course was placed. The asphaltic concrete surface shall meet the requirements of the state highway department's standard specifications for highway construction. (c) Four (4) inches of stabilized aggregate base course (with prime) and double bituminous treatment or one and one-half (1½) inches of asphaltic concrete surface course. A minimum of two hundred twenty-five (225) pounds of course aggregate per square yard is to be used. Delivery tickets showing the weight of the course aggregate shall be furnished to the city engineer. After the stabilized aggregate base has been properly blended, mixed, wetted, shaped and rolled to the approved typical section, and has been seasoned sufficiently, then a prime coat shall be applied in accordance with the state highway department's standard specifications for highway construction. After the prime coat has penetrated and dried sufficiently, then the surface course shall be applied in accordance with the state highway department's standard specifications for highway construction; provided, however, that, not less than four (4) days have elapsed since the prime coat was applied. (d) Four (4) inches of macadam base course (with prime) and one and one-half (1½) inches of hot laid asphaltic concrete surface course. After the base course, consisting of crushed stone or slag bound by stone dust and screenings has been constructed in accordance with the requirements of the state highway department's standard specifications for highway construction to the required typical section, and after the base course has seasoned sufficiently, the prime coat shall be applied. The surface course, consisting of one and one-half (1½) inches of asphaltic concrete, shall be applied in accordance with the requirement of the state highway department's standard specifications for highway construction after the base course has penetrated and dried sufficiently; provided, however, that, not less than four (4) days have elapsed since the prime coat was applied. (e) Five (5) inches of soil cement base (with prime) and one inch of hot laid asphaltic concrete surface course. All work, methods, materials, equipment and tests used in the construction of the portland cement stabilized earth base course shall be in strict accordance with requirements of the state highway department's standard specifications for highway construction and with the following additional provisions: (1) The minimum thickness of the base shall be five (5) inches. (2) The minimum compressive strength of the base as determined by tests on standard two-inch cylinders shall be three hundred (300) pounds per square inch. The cylinders shall be made using representative material from the roadway during the mixing operation. A minimum of two (2) cylinders per one thousand (1,000) linear feet of roadway or fraction thereof shall be made and tested. (3) All field tests and laboratory tests, including the necessary soil tests for determining the required cement content, base thickness, and compressive strength, shall be performed by a qualified laboratory or a qualified representative of the Portland Cement Association at no expense to the city; and further, copies of all test reports shall be submitted to the city engineer. (4) Work shall not be started on the base course until after the required cement content has been approved by the city engineer. (5) An asphaltic concrete surface course meeting the requirements of the state highway department's standard specifications for highway construction with a minimum thickness of one inch shall be used.
Ask a question about North Charleston law
Corpus searches the North Charleston sections it holds and shows the ones that match, with their citations. Free, no sign-in.