Section 9-7. - Application procedures:
(a) General application requirements for all building and special use permits. Application for a building permit or special use permit for any telecommunications facility shall be made to the director by the person, company or organization that will own and operate the telecommunications facility. An application will not be considered until it is complete. The following information shall be submitted when applying for a building permit, special use permit or other permit or variance included in this ordinance and must be submitted for an application to be considered complete: (1) Basic information. a. Site plan or plans to scale specifying the location of telecommunications facilities, transmission building and/or other accessory uses, access, parking, fences, landscaped areas, and adjacent land uses. Applications shall contain both a paper location map and a digitized location map in a format compatible with the GIS software currently utilized by the City of North Charleston Information Technology Services Department. b. Landscape plan to scale indicating size, spacing and type of plantings required in section 9-6(A)(7). c. A description of anticipated maintenance needs for the telecommunications facility, including frequency of service, personnel needs, equipment needs, and traffic, noise, or safety impacts of such maintenance. d. Report from a qualified, independent engineer licensed in the State of South Carolina, documenting the following: i. Telecommunications facility height and design, including technical, engineering, economic, and other pertinent factors governing selection of the proposed design; ii. Evidence of structural integrity of the tower structure; and iii. Structural failure characteristics of the telecommunications facility and demonstration that site and setbacks are of adequate size to contain debris. e. The identity of a community liaison officer appointed by the applicant to resolve issues of concern to neighborhoods and residents relating to the construction and operation of the facility. Include name, address, telephone number, facsimile number and electronic mail address, if applicable. f. Identification of the geographic service area for the subject installation, including a map showing the site and the nearest or associated telecommunications facility sites within the network. Describe the distance between the telecommunications facility sites. Describe how this service area and this proposed telecommunications facility fit into and are necessary for the service network. g. Designation of which location preference, identified in Section V, above, the proposed facility is meeting. If the proposed location is not a preferred location 1 through 4 or is a disfavored site, describe: (a) what good faith efforts and measures were taken to secure each of these preferred location sites; (b) why such efforts were unsuccessful; and (c) how and why the proposed site is essential to meet service demands for the geographic service area and city-wide network. (2) Additional information requirements for towers: a. If the proposed site is zoned R-1 through R-3 or PDD and there are suitable alternative sites in the M-1, M-2, CRD and B-2 zoning districts, applicants must justify why those suitable alternate sites have not been proposed. The director will review with special care justifications that appeal only to undue expense and/or to undue difficulties in entering into a lease agreement. The director shall carefully weigh such claims, and the evidence presented in favor of them, against a project's negative impacts at the proposed site. b. Applicants must identify all existing towers within its geographic search area. Applicants must provide evidence of the lack of space on all suitable existing towers to locate the proposed antenna and of the lack of space on existing tower sites to construct a tower for the proposed antenna. If co-location on any such tower would result in less visual impact than the visual impact of the proposed tower, applicants must justify why such co-location is not being proposed. If co-location on any such tower would increase negative visual impact, then the applicant must so state and demonstrate. The director will review with special care justifications that appeal only to undue expense and/or to undue difficulties in entering into a lease agreement. The director shall carefully weigh such claims, and the evidence presented in favor of them, against a project's negative impacts as the proposed site. (3) In order to assist the City of North Charleston in providing a database of approved communications towers, written notification will be provided, by the applicant, to the zoning administrator, on a form approved by the city's MIS director, along with a map showing the site location and coordinates of the approved communications tower, prior to being issued a development permit. The required map shall be provided both in a hard copy and an electronic copy form. The electronic copy shall be submitted on a three and one-half (3-½) inch floppy computer disk. The communications towers locations shall be provided in South Carolina State Plane coordinates (Zone 3900, NAD 83, Feet) where possible. Where South Carolina State Plane references are not available, the spatial data shall be submitted with no specified projection in decimal degrees of longitude and latitude. Failure to submit all required GIS information will prevent a development permit from being issued for the project. (4) The applicant must provide any other information which may be requested by the director to fully evaluate and review the application and the potential impact of a proposed telecommunications facility. [(b)] Expedited review for building permits only. When a telecommunications facility will be a use as a right pursuant to Section IV of this ordinance and requires only a building permit and design review before it may be erected, the director will expedite review of the application and render a decision on the application within fifteen (15) business days after receipt of a complete application. [(c)] Special use permits. (1) A request for a special use permit shall be initiated by application to the director and handled in accordance with the special use permit provision of Section _____ of the Municipal Code. The zoning board of appeals may issue a special use permit under this section provided it shall have determined that all of the requirements in Section VI have been satisfied and, further, that the benefits of and need for the proposed tower are greater than any possible depreciating effects and damage to the neighboring properties. (2) In granting a special use permit, the zoning board of appeals may impose additional zoning conditions to the extent determined necessary to buffer or otherwise minimize adverse effects of the proposed tower or antenna on surrounding properties.
(Ord. No. 1998-52, 5-28-98; Ord. No. 1999-13, 2-25-99; Ord. No. 2000-086, 12-28-00; Ord. No. 2021-009, Exh. A, 2-25-2021)
Ask a question about North Charleston law
Corpus searches the North Charleston sections it holds and shows the ones that match, with their citations. Free, no sign-in.