Sec. 10-133. - Required inspections.

The building official, upon notification, shall make the inspections set forth in subsections 10-133(a) through 10-133(j). (a) Footing and foundation inspection. Footing and foundation inspections shall be made after excavations for footings are complete and any required reinforcing steel is in place. For concrete foundations, any required forms shall be in place prior to inspection. Materials for the foundation shall be on the job, except where concrete is ready mixed in accordance with ASTM C 94, the concrete need not be on the job. (b) Concrete slab and under-floor inspection. Concrete slab and under-floor inspections shall be made after in-slab or under-floor reinforcing steel and building service equipment, conduit, piping accessories and other ancillary equipment items are in place, but before any concrete is placed or floor sheathing installed, including the subfloor. (c) Lowest floor elevation. In flood hazard areas, upon placement of the lowest floor, including the basement, and prior to further vertical construction, the elevation certification required in Section 1612.5 shall be submitted to the building official. (d) Floor framing inspection. For crawl space construction this is performed when the foundation walls are up, the girders and bands are in place and the required anchoring is in place. Any drainage system to be installed or required grading in the crawl space shall completed at this time. (e) Frame inspection. Framing inspections shall be made after the roof deck or sheathing, all framing, fire blocking and bracing are in place and pipes, chimneys and vents to be concealed are complete and the rough electrical, plumbing, heating wires, pipes and ducts are installed. (f) Exterior sheathing. Exterior sheathing shall be inspected after the exterior wall sheathing is applied and before any energy wrap, siding or brick is installed. This inspection can take place as a separate inspection or at the same time as the framing inspection. (g) Lath and gypsum board inspection. Lath and gypsum board that is part of a fire rated assembly or shear assembly shall be inspected after lathing and gypsum board, interior and exterior, is in place, but before any plastering is applied or gypsum board joints and fasteners are taped and finished. (h) Fire-resistant penetrations. Protection of joints and penetrations in fire-resistance-rated assemblies shall not be concealed from view until inspected and approved. (i) Energy efficiency inspections. Inspections shall be made to determine compliance with Chapter 13 and shall include, but not be limited to, inspections for: envelope insulation R and U values, fenestration U value, duct system R value, and HVAC and water-heating equipment efficiency. (j) Other inspections. In addition to the inspections specified above, the building official is authorized to make or require other inspections of any construction work to ascertain compliance with the provisions of this code and other laws that are enforced by the division of building/codes. (k) Special Inspection. Special inspections shall be regulated by the provisions of the section of International Building Code addressing special inspection requirements.

(Ord. No. 2008-26, § 3(Exh. A), 6-23-2008; Ord. No. 2014-42, §§ 1—6, 9-8-2014)