§ 10-363 — Duties and responsibilities of the building official
Municipal Code of the City of Rock Hill, South Carolina (Codified through Ordinance No. 2026-49, adopted October 12, 2026. (Supp. No. 95, Update 1)) · Rock Hill Municipal Code § 10-363
Corpus is an independent public-information project, not the official City of Rock Hill website. Stable reference: corpuslaw.us/code/89e44980-aa1c-486f-aa9a-55e76a3d06df
Sec. 10-363. - Duties and responsibilities of the building official.
Duties of the building official shall include, but not be limited to: (1) Permit review. Review all development permits to assure that the requirements of this article have been satisfied. (2) Requirements of federal and/or state permits. Review proposed development to assure that all necessary permits have been received from those governmental agencies from which approval is required by federal or state law, including section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C. 1334. (3) Watercourse alterations. a. Notify adjacent communities and the South Carolina Department of Natural Resources, Land Resources and Conservation Districts Division, State Coordinator for the National Flood Insurance Program, prior to any alteration or relocation of a watercourse, and submit evidence of such notification to the Federal Emergency Management Agency. b. In addition to the notifications required for watercourse alterations per subsection (3)a., written reports of maintenance records must be maintained to show that maintenance has been provided within the altered or relocated portion of said watercourse so that the flood-carrying capacity is not diminished. This maintenance must consist of a comprehensive program of periodic inspections, and routine channel clearing and dredging, or other related functions. The assurance shall consist of a description of maintenance activities, frequency of performance, and the local official responsible for maintenance performance. Records shall be kept on file for FEMA inspection. c. If the proposed project will impact the configuration of the watercourse, floodway, or base flood elevation for which a detailed flood insurance study has been developed, the applicant shall apply for and must receive approval for a conditional letter of map revision with the Federal Emergency Management Agency prior to the start of actual construction. d. Within 60 days of completion of an alteration of a watercourse, referenced in the certification requirements of section 10-362(b)(3), the applicant shall submit as-built certification, by a registered professional engineer, to the Federal Emergency Management Agency. (4) Floodway encroachments. Prevent encroachments within floodways unless the certification and flood hazard reduction provisions of section 10-366(5) are met. (5) Development proposals. Require development proposals for proposed developments prior to signing off on and CLOMRs or LOMRs. (6) Adjoining floodplains. Cooperate with neighboring communities with respect to the management of adjoining floodplains and/or flood-related erosion areas in order to prevent aggravation of existing hazards. (7) Notifying adjacent communities. Notify adjacent communities prior to permitting substantial commercial developments and large subdivisions to be undertaken in areas of special flood hazard and/or flood-related erosion hazards. (8) Certification requirements. a. Obtain and review actual elevation (in relation to mean sea level) of the lowest floor of all new or substantially improved structures, in accordance with administrative procedures outlined in section 10-362(b)(2). b. Obtain the actual elevation (in relation to mean sea level) to which the new or substantially improved structures have been floodproofed, in accordance with the floodproofing certification outlined in section 10-362(b)(1). c. When floodproofing is utilized for a particular structure, obtain certifications from a registered professional engineer or architect in accordance with the nonresidential construction requirements outlined in section 10-366(2). (9) Map interpretation. Where interpretation is needed as to the exact location of boundaries of the areas of special flood hazard (for example, where there appears to be a conflict between a mapped boundary and actual field conditions), make the necessary interpretation. The person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in this article. (10) Prevailing authority. Where a map boundary showing an area of special flood hazard and field elevations disagree, the base flood elevations for flood protection elevations (as found on an elevation profile, floodway data table, etc.) shall prevail. The correct information should be submitted to FEMA as per the map maintenance activity requirements outlined in section 10-366(7)b. (11) Use of best available data. When base flood elevation data or floodway data has not been provided in accordance with section 10-325, obtain, review, and reasonably utilize best available base flood elevation data and floodway data available from a federal, state, or other source, including data developed pursuant to the standards for subdivision proposals outlined in section 10-366(12), in order to administer the provisions of this article. Data from preliminary, draft, and final flood insurance studies constitutes best available data from a federal, state, or other source. Data must be developed using hydraulic models meeting the minimum requirement of NFIP-approved model. If an appeal is pending on the study in accordance with 44 CFR Ch. 1, Part 67.5 and 67.6, the data does not have to be used. (12) Special flood hazard area/topographic boundaries conflict. When the exact location of boundaries of the area's special flood hazards conflict with the current natural topography information at the site, the property owner may apply and be approved for a letter of map amendment (LOMA) by FEMA. The building official, in the permit file, will maintain a copy of the letter of map amendment issued from FEMA. (13) On-site inspections. Make on-site inspections of projects in accordance with the administrative procedures outlined in section 10-364(d). (14) Administrative notices. Serve notices of violations, issue stop work orders, revoke permits and take corrective actions in accordance with the administrative procedures in section 10-364. (15) Records maintenance. Maintain all records pertaining to the administration of this article and make these records available for public inspection. (16) Annexations and detachments. Notify the South Carolina Department of Natural Resources Land, Water and Conservation Division, within six months, of any annexations or detachments that include special flood hazard areas. The community must incorporate applicable maps from surrounding jurisdictions into this article within 90 days of date of the annexation. (17) Federally funded development. The President issued Executive Order 11988, Floodplain Management May 1977. E.O. 11988 directs federal agencies to assert a leadership role in reducing flood losses and losses to environmental values served by floodplains. Proposed developments must go through an eight-step review process. Evidence of compliance with the executive order must be submitted as part of the permit review process. (18) Substantial damage determination. Perform an assessment of damage from any origin to the structure using FEMA's Residential Substantial Damage Estimator (RSDE) software to determine if the damage equals or exceeds 50 percent of the market value of the structure before the damage occurred. (19) Substantial improvement determinations. Perform an assessment of permit applications for improvements or repairs to be made to a building or structure to determine if the work proposed will equal or exceed 50 percent of the market value of the structure before the improvement or repair is started. Cost of work counted for determining if and when substantial improvement to a structure occurs shall be cumulative for a period of five years. If the improvement project is conducted in phases the total of all cost associated with each phase, beginning with the issuance of the first permit, shall be utilized to determine whether "substantial improvement" will occur. a. Methods of market value determination. The market values shall be determined by one of the following methods: 1. The current assessed building value as determined by the county's assessor's office or the value of an appraisal performed by a licensed appraiser at the expense of the owner within the last six months; or 2. One or more certified appraisals from a registered professional licensed appraiser in accordance with the laws of South Carolina. The appraisal shall indicate actual replacement value of the building or structure in its pre-improvement condition, less depreciation for functionality and obsolescence and site improvements. The Marshall and Swift Residential Cost Handbook shall be used to determine costs for buildings or structures. 3. Real estate purchase contract within six months prior to the date of the application for a permit. (20) Reasonably safe from flooding. Review all permit applications to determine whether proposed building sites will be reasonably safe from flooding.
(Ord. No. 2017-15, § 3(Exh. A), 3-27-2017)
Ask a question about Rock Hill law
Corpus searches the Rock Hill sections it holds and shows the ones that match, with their citations. Free, no sign-in.
