Ch. 10 — Buildings and Building Regulations
Municipal Code of the City of Rock Hill, South Carolina (Codified through Ordinance No. 2026-49, adopted October 12, 2026. (Supp. No. 95, Update 1)) · Rock Hill Municipal Code App. A, ch. 10
Corpus is an independent public-information project, not the official City of Rock Hill website. Stable reference: corpuslaw.us/code/00437a9c-9b38-4590-a74b-439a118c3473
Chapter 10. - Buildings and Building Regulations
Chapter 10. Buildings and Building Regulations Zoning fees and other fees not listed in this Appendix may also apply. § 10-213. Permit fees. Building Permit fees: Total Valuation | Fee $1,000.00 and less | $35.00 $1,001.00 to $200,000.00 | $35.00 for the first $1,000.00 plus $5.00 for each additional $1,000.00 or portion thereof, to and including $200,000.00 $200,001.00 to $1,000,000.00 | $1,030.00 for the first $200,000.00 plus $3.00 for each additional $1,000.00 or portion thereof, to and including $1,000,000.00 $1,000,001.00 and above or portion thereof | $3,430.00 for the first $1,000,000.00, plus $2.00 for each additional $1,000.00 or portion thereof Building plan checking fee. When the valuation of the proposed construction exceeds $1,000.00 and a plan is required to be submitted, a plan checking fee shall be paid equal to 25 percent of the building fee as determined by the city fee schedule, with a maximum fee of $16,000.00. The listed plan checking fee includes up to two document review sessions. If three or more sessions are required, a plan resubmittal fee in the same amount as the initial plan checking fee up to a maximum of $1,000.00 will be charged for each subsequent submittal, unless city plan reviewers identify additional requirements after plan review comments were given to the applicant. Revision to approved building plans Single family detached: A new fee equaling the original permit fee up to a maximum of $100.00 will apply to each request for plan modification after the building plans are approved. All other building types: Major revision: .....$400.00 Minor revision: .....$200.00 "Major revisions" shall include structural modifications, life/safety changes, the review or alarm/sprinkler plans, and any other revision that the building official estimates will take more than one hour of staff time to complete. All other revisions shall be considered "minor revisions." All fees shall be per occurrence. Construction trailer permit: .....$50.00 Demolition permit fee: For the below fees, a basement counts as a story. Non-residential and multi-family: • Two stories and less: .....$150.00 • Three and more stories, for the first three stories, plus $25.00 each additional story: .....$200.00 Single-family residential: • Garage: .....$25.00 • Accessory building subject to building codes: .....$25.00 • One-story residence: .....$50.00 • Two-story or taller residence: .....$75.00 Involuntary demolition administrative fee, plus costs related to demolition: .....$1,500.00 Inspection fees: Projects often require multiple inspections, such as building, zoning, fire, infrastructure, landscaping, pretreatment, and historic. Rates listed are for each type of failed inspection. (For example, if a project fails its first inspection in topics related to building and zoning, the fee is $25.00 each, for a total of $50.00.) Reinspection fees will not be charged when an inspector does not identify a deficient item during an inspection that would not have been approved had they noticed it on a previous visit; although the item will be required to be corrected to meet regulation, the fee will be waived for the subsequent inspection to determine that the correction has been made. Residential: First failed inspection .....$25.00 Subsequent failed inspection (at the same site for the same violation), per occurrence .....$50.00 Final inspections: Failed final "all trades" inspection, per occurrence .....$100.00 Failed final infrastructure inspection, per occurrence .....$150.00 Failed final inspection besides "all trades" or infrastructure, per occurrence .....$50.00 Commercial: First failed inspection .....$50.00 Subsequent failed inspection (at the same site for same violation), per occurrence .....$100.00 Final inspections: Failed final "all trades" or infrastructure inspection, per occurrence .....$150.00 Failed final inspection besides "all trades" or infrastructure inspection, for first occurrence .....$75.00 For each subsequent occurrence .....$100.00 Zoning and building code compliance inspections for new business locations .....$50.00 Penalty for working without a permit. Where work for which a permit is required by the International Building Code is commenced before obtaining a permit therefore, the building official shall charge a double fee before issuance of the required permit. Payment of the extra charge and any delay in the issuance of the permit shall not affect the imposition of any penalty provided by law for violation of the International Building Code. Structure moving permit fee: .....$100.00 Tent permit fee: .....$35.00 Appeal to Construction and Fire Prevention Code Board of Appeals .....$25.00
(Ord. No. 2009-44, § 6(Exh. C), 10-12-2009; Ord. No. 2011-23, § 3, 6-27-2011; Ord. No. 2011-54, § 3(Exh. A), 12-11-2011; Ord. No. 2013-28, § 3(Exh. A), 6-24-2013; Ord. No. 2020-37, § 3(Exh. A), 6-22-2020; Ord. No. 2022-26, § 3(Exh. A), 6-27-2022; Ord. No. 2024-36, § 3(Exh. A), 6-24-2024; Ord. No. 2025-30, § 3(Exh. A), 6-23-2025)
Ask a question about Rock Hill law
Corpus searches the Rock Hill sections it holds and shows the ones that match, with their citations. Free, no sign-in.