For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 16-125 — Hazardous material incident cost recovery

Municipal Code of the City of Rock Hill, South Carolina (Codified through Ordinance No. 2026-49, adopted October 12, 2026. (Supp. No. 95, Update 1)) · Rock Hill Municipal Code § 16-125

Corpus is an independent public-information project, not the official City of Rock Hill website. Stable reference: corpuslaw.us/code/68fc1213-d5f1-434f-85af-c96c30c9e888

Sec. 16-125. - Hazardous material incident cost recovery.

(a) Intent and purpose. This section is intended to provide for recovery by the city, its agencies or agents, of this municipality within city limits, of unbudgeted costs incurred in response and recovery efforts related to hazardous material incidents. In addition, it is intended to provide for cost recovery for damages to natural resources, and government owned properties. (b) Jurisdiction. This section shall apply to the city limits of Rock Hill, South Carolina, in its entirety and such other areas where the city provides fire protection services by contract. (c) Definitions. (1) Cost(s) shall mean and include, but is not limited to those expenses that are extraordinary in nature, including those for which funds are not provided for in the city's annual budget: a. All costs incurred for response, containment and/or removal and disposal of hazardous materials or remedial actions to include costs associated with transportation and temporary storage of hazardous materials, including fire protection. b. All costs incurred for ensuring the safety of the public to include costs incurred for actions taken on and off the site of the hazardous material incident. c. Damages for injury to, destruction of, or loss of natural resources, as determined by the appropriate local, state or federal agency, including the reasonable costs of assessing such injury, destruction, or loss resulting from a hazardous material incident. d. Health care costs for persons or animals injured from a hazardous material incident or costs of any health assessment or health effects study carried out as a necessity resulting from a hazardous material incident. e. Labor, including benefits, overtime and administrative overhead for government employees. f. The costs of operating, maintaining, leasing, repairing and replacing equipment. g. Contract labor and equipment. h. Labor and equipment obtained by the city's agencies or agents, and the municipality. i. Materials, including but not limited to, personal protective equipment, absorbents, foams, neutralization agents, overpack drums, containers, decontamination equipment, monitoring equipment, and/or vehicles used in direct mitigation of any type of hazardous materials incident. j. Supervision of cleanup and abatement. (2) Hazardous material shall mean any substance material defined, listed, characterized, or classified as a hazardous material, hazardous substance, hazardous waste, or toxic substance according to any or all of the following: Title 40 Code of Federal Regulations Part 261 (Identification and Listing of Hazardous Wastes); Title 40 Code of Federal Regulations Part 302.1.4 (Designation of Hazard Substances); Title 40 Code of Federal Regulations Part 355, Appendices A and B (List of Extremely Hazardous Substances); and Title 49 Code of Federal Regulations parts 172.101 and 172.102 Hazardous Materials Table). Any chemical requiring a Material Safety Data Sheet (MSDS) as defined under the Federal Occupational Safety and Health Administration (OSHA) Hazard Communication Standard codified at 29 CFR. Part 1910.1200. (3) Hazardous material incident shall mean actual or threatened release of hazardous substances or material, including hazardous waste, which pose an imminent threat to the environment, and to health, safety or welfare of the population. (4) Hazardous substance includes any solution, mixture, or formulation containing hazardous material, or any material which, due to its chemical or physical characteristics, is determined by the city's agencies or agents to pose a substantial threat to the life, health, or safety of persons or property or to the environment. The term includes, but is not limited to, explosives, radioactive materials, petroleum products, gases, poisons, biologic agents, flammables and corrosives. (5) Municipality shall mean the city. (6) Natural resources shall mean land, fish, wildlife, biota, air, water, ground water, drinking water supplies, and other such resources belonging to, managed by, held in trust by, appertaining to, or otherwise controlled by the city's agencies, and the municipality. (7) Person shall mean an individual, firm, corporation, association, partnership, commercial entity, consortium, joint venture, governmental entity, or any other legal entity. (8) Recovery shall mean restoration to pre-event conditions. (9) Release shall mean the actual or threatened accidental or intentional, sudden or gradual spilling, leaking, pumping, pouring, emitting, emptying, discharging, injecting, escaping, leaching, dumping or disposing into the environment (including the abandonment or discarding of barrels, containers and other receptacles containing any hazardous material or substance or waste or pollutant or contaminant). (10) Response shall mean the provision of emergency and non-emergency assistance during or following an incident, for the purpose of reducing the likelihood of secondary damage. (11) Responsible party shall mean the person(s) whose act or omission caused a release; or, the person(s) who owned or had custody or control of the hazardous substances or waste at the time of such release without regard to fault or proximate cause; or, the person or persons who owned or had custody or control of the container which held he hazardous substance at the time or immediately prior to such release without regard to fault or proximate cause. (d) Hazardous materials incidents - liability for costs. (1) Liability for costs. Any responsible party as set forth above involved in a hazardous material incident shall be liable for the payment of all reasonable and necessary extraordinary and unbudgeted costs incurred by the city's agencies or agents, and the municipality for response to and mitigation of such an incident. (2) Remedies at law. This article does not preclude the city and preserves for the city of all available remedies at law, to include the provisions of this section or ordinance, against any responsible parties related to any release or hazardous material incident, to include those actions and remedies available under the U. S. Bankruptcy Code relating to such matters. (e) Collection and disbursement of funds for cost recovery. (1) Agent for collection. The city's finance department shall serve as the city's agent for collecting invoices and billing the responsible party for costs incurred. The city and agencies responding to a hazardous material incident or release in the city limits of Rock Hill according to the responsibilities set forth in this section or at the request of any applicable mutual aid agreement beneficiary are eligible to submit bills. (2) Procedure for submitting invoices. An invoice identifying eligible costs under this section shall be submitted to the city's finance department within a reasonable time after the cost is incurred or identified. Submitted invoices must include sufficient documentation for cost reimbursement (i.e. copies of time sheets for specific personnel, copies of bills for materials, equipment and supplies procured or used, etc.) Accepting invoices from agencies outside the city shall not incur liability to the city to pay costs from such agencies until payment is received by the city from the responsible party(s). (3) Method of payment. The city's finance department shall submit one or a series of consolidated invoices to the responsible party identifying agencies, agents or municipalities and their specific costs or reimbursements. The responsible party shall issue a certified check made payable to the city that responded and submitted an invoice. The checks will be sent to the city within 60 days of receiving a consolidated invoice. (f) Methods of enforcement. (1) Civil action. The city may enforce these provisions by civil action in a court of competent jurisdiction for the collection of any amounts due hereunder plus administrative collection costs, attorneys' fees, or for any other relief that may be appropriate. A certified copy of a judgment in favor of the city may be recorded in the public records and thereafter shall constitute a lien upon any real or personal property owned by such person(s) and such lien shall be co-equal with the lien of all state, district and municipal taxes superior in dignity to all other liens, titles, and claims until paid or extinguished. (2) Other remedies. This section shall not prohibit the city from pursuing any other remedy, whether civil or criminal, or from instituting any appropriate action or proceedings, including injunction in a court of competent jurisdiction. Nor shall the recovery of expenses under this section in any way release the various parties, or limit them from legal liability incurred as a result of hazardous material cleanup or abatement as defined under any local, state or federal rule or regulation. (g) Conflicts of other laws. Whenever the requirements or provisions of this section are in conflict with the requirements or provisions of any other lawfully adopted ordinance, the more restrictive requirements shall apply. Further, this section shall not restrict or replace cost recovery from funding sources available under state and federal regulations including but not limited to the Revolving Fund established under Section 311(K) of the Federal Water Pollution Trust Fund established under Comprehensive Environmental Response, Compensation and Liability Act (42 USC 9611). (h) Severability. It is the declared intent of the city that, if any section, subsection, sentence, clause, phrase, or provision of this section is held invalid or unconstitutional by a court of competent jurisdiction, such invalidity or unconstitutionality shall not be so construed as to tender invalid or unconstitutional the remaining provisions of this section. (i) Rules of construction. The provisions of this section shall be liberally construed so as to effectively carry out its interest of public health, safety and welfare of the citizens and residents of the city.

(Ord. No. 2005-31, § 2, 6-27-2005; Ord. No. 2014-42, §§ 1—6, 9-8-2014)

Ask a question about Rock Hill law

Corpus searches the Rock Hill sections it holds and shows the ones that match, with their citations. Free, no sign-in.