For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 29-111 — Connection fees

Municipal Code of the City of Rock Hill, South Carolina (Codified through Ordinance No. 2026-49, adopted October 12, 2026. (Supp. No. 95, Update 1)) · Rock Hill Municipal Code § 29-111

Corpus is an independent public-information project, not the official City of Rock Hill website. Stable reference: corpuslaw.us/code/6be6a7ce-0fdb-468d-a534-a2403c3ffc45

Sec. 29-111. - Connection fees.

For sewer service connection, the city shall charge consumers the amounts or sums of money set forth in this section; the applicable sewer service connection charge shall be at the rate specifically in effect at the date of annexation. (1) Within city limits. The charge for connections within the corporate limits shall be as set out in the fee schedule in appendix A to this Code. (2) Beyond city limits. The charge for connections beyond the corporate limits shall be as set out in the fee schedule in appendix A to this Code. (3) I-77 corridor service area: a. Except for developed residential lots within the city, wherein existing published city policy shall govern, within the I-77 corridor service area there shall be a capacity tap fee in addition to the service connection fees set forth in subsections (1) and (2). Such fee shall be determined based upon an application setting forth the intended use of the tract. Any subsequent deviation between intended use and actual use shall require an adjustment. For each application, a capacity requirement shall be determined from a schedule on file with the city. The schedule shall list, for each use, a sewer capacity requirement in terms of residential capacity unit (RCUs). If a particular use is not listed on the schedule, the appropriate number of RCUs shall be computed using standard utility design criteria. After determination of the number of RCUs, that number of units shall be multiplied by the capacity tap charge for a single unit, as set forth in a schedule maintained by the planning department. b. If the capacity requirement of a user changes to a higher number of RCUs after payment of the original capacity tap fee, then an additional capacity tap fee, consisting of the differential RCUs multiplied by the charge for a single unit in force at that time, shall be due, even though no additional tap is needed. c. For wastewater generated outside the I-77 corridor service area but pumped into such service area's system, the same additional capacity tap fee shall be required, as determined by this subsection. d. The I-77 corridor service area map shall be on file and available for inspection in the city utilities department and the planning services or development services departments. (4) Red River Basin service area. a. Except for developed residential lots within the city, wherein existing published city policy shall govern, within the Red River Basin service area there shall be a capacity tap fee in addition to the service connection fees set forth in subsections (1) and (2) of this section. Such fee shall be determined based upon an application setting forth the intended use of the tract. Any subsequent deviation between intended use and actual use shall require an adjustment. For each application, a capacity requirement shall be determined from a schedule on file with the city. The schedule shall list, for each use, a sewer capacity requirement in terms of residential capacity units (RCUs). If a particular use is not listed on the schedule, the appropriate number of RCUs shall be computed using standard utility design criteria. After determination of the number of RCUs, that number of units shall be multiplied by the capacity tap charge for a single unit, as set forth in a schedule maintained by the planning department. b. If the capacity requirement of a user changes to a higher number of RCUs after payment of the original capacity tap fee, then an additional capacity tap fee, consisting of the differential RCUs multiplied by the charge for a single unit in force at that time, shall be due, even though no additional tap is needed. c. For wastewater generated outside the Red River Basin service area but pumped into such service area's system, the same additional capacity tap fee shall be required, as determined by this subsection (4). d. The Red River basin service area map shall be on file and available for inspection in the city utilities department and the planning and development department. (5) Rawlinson Road Basin service area: a. Except for developed residential lots within the city, wherein existing published city policy shall govern, within the Rawlinson Road Basin service area there shall be a capacity tap fee in addition to the service connection fees set forth in subsections (1) and (2). Such fee shall be determined based upon an application of this setting forth the intended use of the tract. Any subsequent deviation between intended use and actual use shall require an adjustment. For each application, a capacity requirement shall be determined from a schedule on file with the city. The schedule shall list, for each use, a sewer capacity requirement in terms of residential capacity units (RCUs). If a particular use is not listed on the schedule, the appropriate number of RCUs shall be computed using standard utility design criteria. After determination of the number of RCUs, that number of units shall be multiplied by the capacity tap charge for a single unit, as set forth in a schedule maintained by the planning department. b. If the capacity requirement of a user changes to a higher number of RCUs after payment of the original capacity tap fee, then an additional capacity tap fee, consisting of the differential RCUs multiplied by the charge for a single unit in force at that time, shall be due, even though no additional tap is needed. c. For wastewater generated outside the Rawlinson Road Basin service area but pumped into such service area's system, the same additional capacity tap fee shall be required, as determined by this subsection. d. The Rawlinson Road Basin service area map shall be on file and available for inspection in the city utilities department and the planning and development department. (6) Tools Fork Basin service area: a. Except for developed residential lots within the city, wherein existing published city policy shall govern, within the Tools Fork Basin service area there shall be a capacity tap fee in addition to the service connection fees set forth in subsections (1) and (2). Such fee shall be determined based upon an application of this setting forth the intended use of the tract. Any subsequent deviation between intended use and actual use shall require an adjustment. For each application, a capacity requirement shall be determined from a schedule on file with the city. The schedule shall list, for each use, a sewer capacity requirement in terms of residential capacity units (RCUs). If a particular use is not listed on the schedule, the appropriate number of RCUs shall be computed using standard utility design criteria. After determination of the number of RCUs, that number of units shall be multiplied by the capacity tap charge for a single unit, as set forth in a schedule maintained by the planning department. b. If the capacity requirement of a user changes to a higher number of RCUs after payment of the original capacity tap fee, then an additional capacity tap fee, consisting of the differential RCUs multiplied by the charge for a single unit in force at that time, shall be due, even though no additional tap is needed. c. For wastewater generated outside the Tools Fork Basin service area but pumped into such service area's system, the same additional capacity tap fee shall be required, as determined by this subsection. d. The Tools Fork Basin service area map shall be on file and available for inspection in the city utilities department and the planning and development department. (7) Pennington Road Basin service area: a. Except for developed residential lots within the city, wherein existing published city policy shall govern, within the Pennington Road Basin service area there shall be a capacity tap fee in addition to the service connection fees set forth in subsections (1) and (2). Such fee shall be determined based upon an application setting forth the intended use of the tract. Any subsequent deviation between intended use and actual use shall require an adjustment. For each application, a capacity requirement shall be determined from a schedule on file with the city. The schedule shall list, for each use, a sewer capacity requirement in terms of residential capacity unit (RCUs). If a particular use is not listed on the schedule, the appropriate number of RCUs shall be computed using standard utility design criteria. After determination of the number of RCUs, that number of units shall be multiplied by the capacity tap charge for a single unit, as set forth in a schedule maintained by the planning department. b. If the capacity requirement of a user changes to a higher number of RCUs after payment of the original capacity tap fee, then an additional capacity tap fee, consisting of the differential RCUs multiplied by the charge for a single unit in force at that time, shall be due, even though no additional tap is needed. c. For wastewater generated outside the Pennington Road Basin service area but pumped into such service area's system, the same additional capacity tap fee shall be required, as determined by this subsection. d. The Pennington Road Basin service area map shall be on file and available for inspection in the city utilities department and the planning services or development services departments. (8) Burgess Creek Basin service area: a. Except for developed residential lots within the city, wherein existing published city policy shall govern, within the Burgess Creek Basin service area there shall be a capacity tap fee in addition to the service connection fees set forth in subsections (1) and (2). Such fee shall be determined based upon an application setting forth the intended use of the tract. Any subsequent deviation between intended use and actual use shall require an adjustment. For each application, a capacity requirement shall be determined from a schedule on file with the city. The schedule shall list, for each use, a sewer capacity requirement in terms of residential capacity unit (RCUs). If a particular use is not listed on the schedule, the appropriate number of RCUs shall be computed using standard utility design criteria. After determination of the number of RCUs, that number of units shall be multiplied by the capacity tap charge for a single unit, as set forth in a schedule maintained by the planning department. b. If the capacity requirement of a user changes to a higher number of RCUs after payment of the original capacity tap fee, then an additional capacity tap fee, consisting of the differential RCUs multiplied by the charge for a single unit in force at that time, shall be due, even though no additional tap is needed. c. For wastewater generated outside the Burgess Creek Basin service area but pumped into such service area's system, the same additional capacity tap fee shall be required, as determined by this subsection. d. The Burgess Creek Basin service area map shall be on file and available for inspection in the city utilities department and the planning services or development services departments.

(Code 1981, § 29-44; Ord. No. 2006-09, § 3(Exh. A), 2-13-2006; Ord. No. 2008-64, § 3(Exh. A), 11-10-2008; Ord. No. 2014-42, §§ 1—6, 9-8-2014; Ord. No. 2014-50, § 3, 10-27-2014; Ord. No. 2018-37, § 3(Exh. A), 6-25-2018)

Ask a question about Rock Hill law

Corpus searches the Rock Hill sections it holds and shows the ones that match, with their citations. Free, no sign-in.