For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 29-139 — Additional construction requirements

Municipal Code of the City of Rock Hill, South Carolina (Codified through Ordinance No. 2026-49, adopted October 12, 2026. (Supp. No. 95, Update 1)) · Rock Hill Municipal Code § 29-139

Corpus is an independent public-information project, not the official City of Rock Hill website. Stable reference: corpuslaw.us/code/32584a98-b067-4472-af78-e94306816547

Sec. 29-139. - Additional construction requirements.

(a) No owner shall make connection of roof downspouts, roof leaders, foundation drains, areaway drains, or other sources which may convey or direct surface runoff or groundwater to a sewer or drain which in turn is connected directly or indirectly to either a private or public sewer. (b) Reserved. (c) The connection of the building sewer into the public sewer shall conform to the requirements of the building and plumbing codes or other applicable rules and regulations of the city. All such connections shall be made gastight and watertight and verified by proper testing. Any deviation from the prescribed procedures and materials must be approved by the director before installation. (d) An applicant for a building sewer permit shall notify the director when the building sewer is ready for inspection and connection to the public sewer. The testing and connection shall be made under the supervision of the director or his/her designee. (e) All excavations for building sewer installation shall be adequately guarded with barricades and lights so as to protect the public from hazard. Streets, sidewalks, parkways, and other public property disturbed in the course of the work shall be restored in a manner satisfactory to the city. The owner shall hold harmless the city and its employees and agents in event of accident or damage resulting from or in connection with the work. (f) When, as determined by the city, the public sewer main is within a reasonable distance of the building, the owner or his/her licensed utility contractor shall be responsible for the connection to the sewer main. Connection of the building sewer to the public sewer main shall only be made after first obtaining permission and right-of-way clearance from the city. Notwithstanding the above, this subsection (f) shall not apply in the case of a residential application where the owner pays the city a tap fee for completing the work either within the city's easement or to the limit of the public right(s)-of-way.

(Ord. No. 2020-41, § 3(Exh. A), 6-22-2020)

Ask a question about Rock Hill law

Corpus searches the Rock Hill sections it holds and shows the ones that match, with their citations. Free, no sign-in.