For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 29-403 — Additional policy requirements

Municipal Code of the City of Rock Hill, South Carolina (Codified through Ordinance No. 2026-49, adopted October 12, 2026. (Supp. No. 95, Update 1)) · Rock Hill Municipal Code § 29-403

Corpus is an independent public-information project, not the official City of Rock Hill website. Stable reference: corpuslaw.us/code/2c5b91e1-62d1-4e43-b091-c01f7cbe97cf

Sec. 29-403. - Additional policy requirements.

To comply with SCDHEC's R.61-58.7(F), the city's utilities department has developed a cross connection program to protect the potable water system. Standard operating procedures for testing and/or installation of backflow preventer assemblies: 1. Permits for the new/replacement testable backflow prevention assembly systems shall be obtained from the city's planning and development department. 2. All new low-hazard meter installations (domestic and irrigation) will have a non-testable dual check BFP device. The dual check devices will be replaced whenever the meters are replaced. 3. Installation to be inspected by the planning and development department. First test certification to be observed by the planning and development department. The planning and development department to enter test information into city's system. After devices are approved, the planning and development department shall send a release to the utilities department for meter installation. Customers will have the option to replace their testable irrigation device with a non-testable irrigation device by a licensed plumber at their expense. 4. Upon installation of the backflow prevention device, a copy of the initial certified test report shall be sent to the utilities department. 5. The owner is required to have an annual test performed for all testable backflow prevention assemblies by a certified tester. "Low hazard" residential lawn irrigation systems shall be tested every five years. A list of certified testers is developed and maintained by SCDHEC. A list of local approved certified testers is on file at the city's utilities department. The certified tester shall be required to return test results to the utilities department. 6. Notification process as follows: 30 days' notice 20-day warning notice Ten-day late (city has option to have device tested at customer's expense) Interruption of service 7. Nonconforming systems shall be given 60 days to comply with the current cross connection control program. Failure to comply with the cross connection control ordinance could result in utilities services interruption (electric, water and/or sewer). 8. The utilities department will archive all test records, administer and provide notice to customers who must maintain their testable backflow prevention assemblies to comply with SCDHEC's R.61-58.7(F) or similar provision.

(Ord. No. 2010-21, § 3(Exh. A), 4-12-2010; Ord. No. 2014-42, §§ 1—6, 9-8-2014; Ord. No. 2018-38, § 3(Exh. A), 6-25-2018)

Ask a question about Rock Hill law

Corpus searches the Rock Hill sections it holds and shows the ones that match, with their citations. Free, no sign-in.