Art. V — Stormwater Management Utility
Municipal Code of the City of Rock Hill, South Carolina (Codified through Ordinance No. 2026-49, adopted October 12, 2026. (Supp. No. 95, Update 1)) · Rock Hill Municipal Code App. A, art. V
Corpus is an independent public-information project, not the official City of Rock Hill website. Stable reference: corpuslaw.us/code/8efb67c5-a921-4809-a162-b333040d4735
Article V. - Stormwater Management Utility
Article V. Stormwater Management Utility § 29-314(b). Stormwater management utility fees. (1) Monthly single-family residential fees shall be: a. More than 10,000 square feet gross land area, $4.65. b. Less than or equal to 10,000 square feet gross land area, $3.83. (2) Monthly per dwelling unit multifamily residential fees shall be $3.83. (3) Monthly nonresidential property fees shall be: a) Undisturbed property as defined will be assigned a C-Factor of 0.00. The maximum monthly fee shall be $20.00. b) Undeveloped property as defined will be assigned a C-Factor of 0.1. c) For property one—10,000 square feet, the minimum monthly fee shall be $3.83 and the fee shall be calculated using the following formula: [(Number of ERUs × DWF × $2.08) + (acres or fraction × $1.44) + $0.28](1.2)(1.21)(1.094) d) For property 10,001—100,000 square feet, the minimum monthly fee shall be $4.65 and the fee shall be calculated using the following formula: [(Number of ERUs × DWF × $2.08) + (acres or fraction × $1.44) + $0.28](1.25)(1.21)(1.094) e) For property 100,001 square feet and greater, the minimum monthly fee shall be $4.65 and the fee shall be calculated using the following formula: [(Number of ERUs × DWF × $2.08) + (acres or fraction × $1.44) + $0.28](1.3)(1.21)(1.094) Initially, all nonresidential parcels of property of ten acres or less shall be assigned a runoff coefficient of 0.60. Runoff coefficients for all remaining properties shall be calculated on an individual basis. Those properties which have been assigned a runoff coefficient of 0.60 shall be systematically reviewed and adjusted up or down as appropriate. Chapter 30. Vehicles for Hire § 30-72. Fee for replacement taxicab tags .....5.00 § 30-101. Fee for taxicab driver's license .....10.00 § 30-125. Rate schedule for taxicabs. (a) No person licensed by the city as a taxicab operator or hereafter granted a license for such operation shall fix or charge a greater rate of fare than the following: (1) For the first 1/20 mile or fraction thereof not to exceed .....$3.00 (2) For each succeeding 1/20 mile, not to exceed .....$0.13 (3) For each one minute of waiting time, to include any traffic delay except as imposed by the city traffic control system, not to exceed .....$0.30 (4) Flat rate charge for each passenger over two traveling to the same destination, .....$1.00 Provided, however, that if the average price of premium, unleaded gasoline in the metropolitan area falls below $1.25 per gallon and remains below $1.25 per gallon for at least 30 consecutive days, then the flat rate charge of $1.00 shall be automatically changed to $0.75. § 30-158. ** Wrecker charges on police call. Maximum charge Class A wrecker (Light duty) .....$210.00 Maximum charge Class B wrecker (Medium duty) .....$300.00 Maximum charge Class C wrecker (Heavy duty) .....$420.00 Additional fee for use of go-jacks, maximum .....$27.50 Additional fee if vehicle has to be overturned off the road or extensive winching is required, maximum .....$27.50 Maximum additional fee for vehicle stored by wrecker service pursuant to section 30-158, per day, after first calendar day .....$38.00 Fee to reopen business after normal business hours (8:00 a.m.—5:00 p.m., Monday—Friday), maximum .....$47.50 Additional fee for vehicle notification after six days of storage, maximum .....$75.00 Use of crash wrap, when necessary, to secure/protect interior from elements, maximum per panel .....$25.00 Fees for wrecker companies requested by automobile owner shall not exceed the charges set forth herein. ** See S.C. Code Ann. Regs. 38-600 for Class Wrecker Definitions which are hereby incorporated and made a part of this Appendix A, Fee Schedule. Chapter 31. Zoning Building and building regulations fees and other fees not listed in this Appendix may also apply. § 31-6. Zoning fees. Antenna and/or co-location on existing tower .....$50.00 Board of historic review applications: Commercial: .....$300.00 Residential: .....$100.00 Staff level reviews of certificate of appropriateness applications if no building permit is required: .....$25.00 Civil plan review (also includes as-built drawing review): Two acres or less: .....$300.00 More than two acres: for the first two acres .....$300.00 plus $25.00 for each additional acre (Round up to the nearest whole acre) The listed civil plan review fee includes up to two document review sessions of civil plans and up to two document review sessions of as-built drawings. If three or more sessions are required of either civil plan review or as-built drawing review, a new fee will be charged for each subsequent submittal in the same amount as listed above, up to a maximum of $1,000.00 per occurrence, unless city plan reviewers identify additional requirements after plan review comments were given to the applicant. A new fee in the same amount as listed above also will apply to each request for plan modifications after the civil plans are approved. When these documents are submitted separately from the civil plan review sets, these fees shall apply: As-built plans .....$100.00 Erosion control/stormwater plans: .....$100.00 Flood Study: .....$300.00 Hydrologic Study: .....$300.00 Landscape and lighting plan: .....$100.00 Communication tower Commercial: .....$250.00 Non-commercial: .....$50.00 Encroachment request: Residential .....$25.00 Commercial .....$100.00 The listed fee includes up to two document review sessions. If three or more sessions are required, a new fee will be charged for each subsequent submittal in the same amount as listed above. Grading permit: Disturbed area fee Type A—Single residential lots and minor subdivision: New subdivision: .....$15.00 Infill: .....$15.00 Type B—Commercial/industrial/major residential subdivision: One acre or less: .....$250.00 More than one acre: per disturbed acre, (round up to the next whole acre) .....$250.00 Home based business permit: .....$50.00 Plan review fees: Fees for up to two review sessions for plan reviews that do not result in a permit or otherwise have a fee associated with the plan review. Residential: .....$25.00 Commercial: .....$50.00 Residential driveway/patio plan review: .....$25.00 Rezoning Request to rezone to district other than master planned district Five acres or less: .....$500.00 More than five acres: for the first five acres, $2,000.00 maximum .....$500.00 plus $50.00 for each additional acre (round up to the next whole acre) Request to rezone master planned district: Five acres or less: .....$1,000.00 More than five acres: for the first five acres; $2,500.00 maximum .....$1,000.00 plus $50.00 for each additional acre (round up to the next whole acre); Short-term rental permit application: .....$300.00 Short-term rental permit renewal application: .....$200.00 Site plan review: Commercial site plan review/paving application review: Two acres or less: (major or minor site plan) .....$300.00 More than two acres: for the first two acres; $1,000.00 maximum .....$300.00 plus $25.00 for each additional acres (round up to the next whole acre) The listed plan review fee includes up to two document review sessions. If three or more sessions are required, a new fee will be charged for each subsequent submittal in the same amount as listed above, unless city plan reviewers identify additional requirements after plan review comments were given to the applicant A new fee in the same amount as listed above also will apply to each request for plan modification after site plans are approved. Residential plan review (except for an individual singe family detached home or duplex) Two acres or less: (major or minor site plan) .....$300.00 More than two acres: for the first two acres; $1,000.00 maximum .....$300.00 plus $25.00 for each additional acre (round up to the next whole acre) The listed plan review fee includes up to two document review sessions. If three or more sessions are required, a new fee will be charged for each subsequent submittal in the same amount as listed above, unless city plan reviewers identify additional requirements after plan review comments were given to the applicant A new fee in the same amount as listed above also will apply to each request for plan modifications after site plans are approved. Subdivision review: Final plat review, for the first lot: .....$400.00 Plus $20.00 for each additional lot Temporary sign permit fee (annually, or as stated on the application): .....$100.00 Temporary use permit: .....$50.00 Traffic impact analysis review: .....$200.00 Zoning board of appeals applications: Residential: .....$100.00 Commercial: .....$300.00 No fee for appeals to the zoning board of appeals Zoning interpretation request: .....$25.00 Zoning compliance permit for accessory structures and fences that do not require a building permit: .....$20.00 Zoning verification letter: per parcel .....$25.00 Zoning interpretation request: .....$25.00
(Ord. No. 2008-30, § 3, 6-23-2008; Ord. No. 2008-32, § 3, 6-23-2008; Ord. No. 2009-05, § 4(Exh. B), 2-9-2009; Ord. No. 2010-30, §§ 3—5, 6-28-2010; Ord. No. 2010-44, § 5(Exh. B), 9-27-2010; Ord. No. 2011-20, §§ 3—5, 6-27-2011; Ord. No. 2011-28, § 6(Exh. C), 8-8-2011; Ord. No. 2013-50, § 5, 11-25-2013; Ord. No. 2014-25, § 6, 5-27-2014; Ord. No. 2014-32, § 3(Exh. A), 6-23-2014; Ord. No. 2014-42, §§ 1—6, 9-8-2014; Ord. No. 2015-13, § 3, 4-13-2015; Ord. No. 2015-25, § 3, 6-22-2015; Ord. No. 2015-26, § 3, 6-22-2015; Ord. No. 2015-32, § 3, 6-22-2015; Ord. No. 2016-37, § 3(Exh. A), 6-27-2016; Ord. No. 2016-38, § 3(Exh. A), 6-27-2016; Ord. No. 2016-42, § 3(Exh. A), 6-27-2016; Ord. No. 2017-38, § 3(Exh. A), 6-26-2017; Ord. No. 2017-39, § 3(Exh. A), 6-26-2017; Ord. No. 2018-34, § 3(Exh. A), 6-25-2018; Ord. No. 2018-35, § 3(Exh. A), 6-25-2018; Ord. No. 2018-50, § 4, 8-27-2018; Ord. No. 2019-31, § 3(Exh. A), 6-24-2019; Ord. No. 2020-35, § 3(Exh. A), 6-22-2020; Ord. No. 2020-36, § 3(Exh. A), 6-22-2020; Ord. No. 2021-17, § 5, 2-22-2021; Ord. No. 2021-43, § 3(Exh. A), 6-28-2021; Ord. No. 2022-27, § 4, 6-27-2022; Ord. No. 2022-29, § 3(Exh. A), 6-27-2022, eff. 7-1-2022; Ord. No. 2022-30, § 3(Exh. A), 6-27-2022, eff. 7-1-2022; Ord. No. 2022-31, § 3(Exh. A), 6-27-2022, eff. 7-1-2022; Ord. No. 2023-38, § 3(Exh. A), 6-26-2023, eff. 7-1-2023; Ord. No. 2023-39, § 3(Exh. A), 6-26-2023, eff. 7-1-2023; Ord. No. 2024-32, § 3(Exh. A), 6-24-2024; Ord. No. 2024-33, §§ 3(Exh. A), 4(Exh. B), 6-24-2024; Ord. No. 2024-42, § 4(Exh. B), 6-24-2024; Ord. No. 2025-25, § 3(Exh. A), 6-23-2025; Ord. No. 2026-32, § 4, 6-22-2026; Ord. No. 2026-38, § 3(Exh. A), 6-22-2026, eff. 7-1-2026) (Ord. No. 2001-44, §§ 3—5, 6-25-2001; Ord. No. 2001-45, §§ 3—6, 6-25-2001; Ord. No. 2001-47, §§ 3, 4, 6-25-2001; Ord. No. 2002-34, §§ 3—6, 6-24-2002; Ord. No. 2002-35, § 3, 6-24-2002; Ord. No. 2003-36, § 2, 6-23-2003; Ord. No. 2003-37, § 3, 6-23-2003; Ord. No. 2003-38, § 2, 6-23-2003; Ord. No. 2003-39, § 2, 6-23-2003; Ord. No. 2003-40, § 3, 6-23-2003; Ord. No. 2003-41, § 3, 6-23-2003; Ord. No. 2004-27, §§ 3—5, 6-28-2004; Ord. No. 2004-28, §§ 3—6, 6-28-2004; Ord. No. 2004-29, § 3, 6-28-2004; Ord. No. 2004-30, § 3, 6-28-2004; Ord. No. 2004-35, §§ 2, 4, 6-28-2004; Ord. No. 2004-36, § 3, 6-28-2004; Ord. No. 2004-56, § 3, 11-22-2004; Ord. No. 2004-59, § 3, 12-13-2004; Ord. No. 2005-11, § 3(Exh. A), 3-21-2005; Ord. No. 2005-44, § 3(Exh. A), 8-22-2005; Ord. No. 2005-70, § 3, 12-19-2005; Ord. No. 2006-02, § 4(Exh. B), 1-9-2006; Ord. No. 2006-36, § 3, 6-26-2006; Ord. No. 2006-37, § 3, 6-26-2006; Ord. No. 2006-47, § 5, 8-28-2006; Ord. No. 2007-33, §§ 3—5, 6-25-2007; Ord. No. 2007-34, § 4, 6-25-2007; Ord. No. 2007-35, § 3, 6-25-2007; Ord. No. 2008-45, § 3, 7-28-2008; Ord. No. 2009-05, § 4(Exh. B), 2-9-2009; Ord. No. 2009-15, § 4(Exh. B), 3-23-2009; Ord. No. 2014-28, § 4, 6-9-2014; Ord. No. 2018-29, § 4(Exh. B), 6-11-2018; Ord. No. 2023-49, § 3(Exh. A), 9-25-2023) (Ord. No. 2013-29, § 4(Exh. A), 6-24-2013; Ord. No. 2020-38, § 3(Exh. A), 6-22-2020; Ord. No. 2022-26, § 4(Exh. B), 6-27-2022; Ord. No. 2023-64, § 6, 11-27-2023; Ord. No. 2025-31, § 3(Exh. A), 6-23-2025)
Ask a question about Rock Hill law
Corpus searches the Rock Hill sections it holds and shows the ones that match, with their citations. Free, no sign-in.
