For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 10.10 — What cost of electric power plant and distribution system to include

Code of Ordinances, City of Chattanooga, Tennessee (Supp. No. 40: codified through Ordinance No. 14374, enacted June 16, 2026) · Chattanooga City Charter § 10.10

Corpus is an independent public-information project, not the official City of Chattanooga website. Stable reference: corpuslaw.us/code/a81aa355-f9cc-43cd-bb03-8d7a0d0b7dac

Sec. 10.10. - What cost of electric power plant and distribution system to include.

The cost of the electric power plant and distribution system shall be deemed to include all necessary expenses of preliminary surveys, estimates of costs and of revenues, and all the cost of acquiring such power plant and distribution system or of the construction thereof also the cost of all necessary or suitable property; rights-of-way, casements [easements] and franchises; and also to include interest in bonds issued under this Act maturing prior to and during the construction or acquisition of the plant for six (6) months thereafter, together with engineering and legal expenses, expenses for plans, specifications and surveys, administrative expenses and all such other expenses as may be necessary or incidental to the financing of, acquiring or constructing and equipping an electric power and distribution system as herein authorized, and the placing of such power plant and distribution system is [in] operation.

(Priv. Acts 1935, Ch. 455, § 6)

Ask a question about Chattanooga law

Corpus searches the Chattanooga sections it holds and shows the ones that match, with their citations. Free, no sign-in.