§ 31-313 — New Development and Redevelopment Requirements
Code of Ordinances, City of Chattanooga, Tennessee (Supp. No. 40: codified through Ordinance No. 14374, enacted June 16, 2026) · Chattanooga City Code § 31-313
Corpus is an independent public-information project, not the official City of Chattanooga website. Stable reference: corpuslaw.us/code/541df7cf-4972-4f12-bd03-79220b6a89e9
Sec. 31-313. - New Development and Redevelopment Requirements.
Permanent Best Management Practices Manual 1. Adoption. The City adopts the following publications, which are incorporated by reference in this ordinance as if fully set out herein: The City of Chattanooga Rainwater Management Guide ("RMG") and Landscape requirements, most current editions; and Tennessee Permanent Stormwater Management and Design Guidance Manual-1st Edition. ..... 2. The City's RMG includes a list of acceptable SCMs including the specific design performance criteria, operation and maintenance requirements for each stormwater practice and requirements to comply with the goals of the NPDES MS4 permit. In addition, the RMG includes acceptable methods of determining what constitutes "infeasibility" or "hardships" that would allow options to the SOV. Such acceptable methods will allow a developer to employ soil feasibility practices designed by the engineer to mimic nature as far as possible. This methodology will allow perc testing at the natural points of discharge as a general practice. If permeability is determined to be 0.5 inch/hour or less in the natural points of discharge where the RMG is to be achieved, then the developer may request that the site be determined to be impermeable, and, therefore, infiltration methods are infeasible in these areas of the property. The RMG includes City approved SCMs for permanent stormwater management including green infrastructure and water reuse SCMs. ..... 3. The City's RMG may be updated and expanded from time to time, upon the recommendation of the City Engineer, based on improvements in engineering, science, monitoring results and local maintenance experience, or changes in federal or state law or regulations. Stormwater facilities that are designed, constructed and maintained in accordance with these RMG criteria will be presumed to meet the minimum water quality performance standards. ..... 4 General design performance criteria for permanent stormwater management: ..... The following performance criteria shall be addressed for permanent stormwater management at all development sites: A. The City's stormwater management program, as described in the RMG, imposes requirements for new and redevelopment projects to manage stormwater runoff for volume management, water quality treatment, and peak rate control. LID, practices and strategies such as conservation, preservation, restoration, and green infrastructure measures are recommended to be used to meet stormwater management requirements. ..... B. The calculations for determining peak rate flows shall be used, at a minimum, for sizing all stormwater facilities. ..... C. The Small Site Control Method is applicable to non-CSS area, new and redevelopment projects disturbing between five thousand (5,000) square feet and one (1.0) acre. ..... i. Applicable projects proposing no increase to impervious surface are required to implement either volume or flow based TSS controls. ..... ii. Projects proposing to increase net impervious surface may implement one (1.0) inch baseline SOV, recognizing ten percent (10%) additive SOV deductions defined in NPDES permit TNS068063, if applicable, OR implement TSS treatment plus two (2) year through twenty-five (25) year frequency peak rate attenuation. ..... iii. TSS and SOV controls shall be designed and installed for the proposed impervious area(s). Peak rate attenuation (Q 2 through Q 25 ) is to mitigate any proposed net increases to impervious surface or discharge rates. ..... D. For projects greater than one (1) acre of disturbance or part of a larger plan of common development that will exceed one (1) acre of disturbance, all new developments and all redevelopment projects, in combination or alone, are required to incorporate runoff reduction measures designed, constructed and maintained, to manage (infiltrate, evapotranspire, harvest and/or use), at a minimum, the first one (1.0) inch of every rainfall event preceded by seventy-two (72) hours of no measurable precipitation, with no discharge from the project site to surface waters. This first inch of rainfall must be one hundred percent (100%) managed with no discharge to surface waters. The required volume to be managed is referred to as the "SOV" as calculated by the method set forth in the RMG. ..... i. All Redevelopment Projects shall be eligible for ten percent (10%) deduction from the one (1.0) inch SOV for each of the following criteria. Deductions are additive up to fifty percent (50%) maximum deduction. ..... 1. Redevelopment; ..... 2. Brownfield redevelopment; ..... 3. Density greater than seven (7) units per acre; ..... 4. Vertical density resulting in Floor to Area Ratio (FAR) of two (2) or alternately resulting in greater than eighteen (18) units per acre; ..... 5. Mixed Use and Transit Oriented Development within one- half (½) mile of an established transit route; ..... ii. The deductions in this paragraph shall not apply to New Development Projects. ..... E. Whenever the SOV from an applicable project area cannot be managed or achieved onsite, per City requirements, the applicant/owner shall provide appropriate documentation to the City, using approved methodology and in acceptable detail, why the SOV cannot be managed. See definitions for "infeasibility" and "hardships." ..... F. Where SOV is infeasible, one of the following options would be allowed, at the choice of the applicant: ..... • Option 1: Pay mitigation fee for unmet SOV (either credit coupons, fee in lieu or off-site mitigation), or • Option 2: Filter 2.1" rainfall through Modified Green Infrastructure SCM devices to remove a minimum of eighty percent (80%) TSS. With documented SOV infeasibilities, this option satisfies requirements without mitigation, i.e. no offsite SOV installation and/or fees in lieu; or • Option 3: Filter 3.1", one-year storm using approved SCMs to remove a minimum of 80% TSS such as various combinations of: extended detention pond (sized based on the runoff from the 3.1", one-year storm for 24-72 hour retention) and/or NJCAT verified proprietary TSS controls. With documented SOV infeasibilities, this option satisfies requirements without mitigation, i.e. no offsite SOV installation and/or fees in lieu. G. Applicable primary development sites must demonstrate compliance with flood control (peak attenuation) at all site outfalls AND secondary water quality requirements (TSS treatment) for those areas where it has been proven to be infeasible to achieve full SOV compliance. ..... H. The application of previously earned or acquired credit coupons on a primary site DOES NOT satisfy, equate to, or in any way reduce the site's TSS or peak attenuation requirements. ..... I. Projects that effectively manage the SOV from one hundred percent (100%) of the impervious area, through on-site installation, are assumed to have met all water quality (pollutant removal) requirements. ..... J. Guidance regarding infiltration testing methods, procedures, and design guidelines is provided by the City and the RMG. ..... 5. Limitations to the installation of runoff reduction measures include, but are not limited to physical site infeasibilities such as: ..... A. Where a potential for introducing pollutants into the groundwater exists, unless pretreatment is provided; ..... B. Where pre-existing soil contamination is present in areas subject to contact with infiltrated runoff; ..... C. Presence of sinkholes or other karst features; ..... D. Pre-development infiltrative capacity of soils must be taken into account in selection of runoff reduction measures. ..... E. High permanent groundwater table; ..... 6. Peak Flow Rate and Flood Control Standards ..... Applicable projects proposing land disturbances must implement measures to mitigate the post-development peak runoff rates to no greater than the existing development peak runoff rates for the two (2), five (5), ten (10), and twenty-five (25) year twenty- four (24) hour storm events. In addition to peak rate attenuation, one hundred (100) year storm event peak flow rates and maximum water surface elevations must be calculated per the RMG. A. CSS stormwater controls are based on whether the proposed development results in increases to either impervious surface or to stormwater discharge rates at all significant analysis points where site runoff leaves the property and negatively impacts other uses or properties. A site with an overall "net" impervious surface or discharge decrease may still be responsible for peak attenuation depending on the severity of discharges at individual analysis points. ..... The CSS control method requires attenuation of post-development peak stormwater runoff rates to no greater than existing conditions. This is required for the two (2), five (5), ten (10), and twenty-five (25) year twenty-four (24) hour storm events. Stormwater runoff entering CSS systems already receives primary treatment. Therefore, there are no additional on-site post-development (permanent) water quality treatment requirements, neither TSS nor SOV, for drainage areas discharging into CSS systems. Therefore, installing SOV in CSS areas, as another site's offsite mitigation location or to earn credit coupons is NOT recognized. B. Although SOV is not required in CSS areas, green infrastructure and SOV practices can directly reduce a site's peak runoff rates. CSS projects may utilize these practices, and quantify the benefits for flood control, per the RMG. ..... C. Detention or retention ponds, and other SCMs used for peak rate control only, shall be designed in accordance with the current edition of the Chattanooga Hamilton County BMP Manual and the RMG requirements on peak attenuation. ..... D. Projects on unmapped watercourses draining fifty (50) acres or more shall be investigated by a professional engineer. The elevation of the one hundred (100) year event flood level, as well as the elevations of proposed structures adjacent to setbacks (setbacks measured from the centerline of the unmapped watercourse) shall be determined and included in the final design. All flood investigations, on mapped and unmapped water courses, shall comply with the Federal Emergency Management Agency's (FEMA) design methodologies and must prohibit adverse flooding impacts to other properties. ..... 7. To protect stream channels from degradation, specific channel protection criteria shall be provided as prescribed in the RMG. ..... 8. Stormwater discharges to Critical Areas (see definition) with sensitive resources may be subject to additional performance criteria, or permitting requirements by state or federal agencies, such as TWRA, TVA, and USF&W, etc. ..... 9. Stormwater discharges from Hot Areas may require the application of specific structural SCMs, pollution prevention practices and or pre-treatment devices. Stormwater from Hot Areas land uses should not be directly infiltrated without pre-treatment. ..... 10. Easements. ..... A. Storm drainage easements shall be required where the conveyance, storage, or treatment of stormwater is identified on the stormwater management design plan, or where access is needed to structural or non- structural stormwater measures. ..... B. Easement widths shall be based on the type of drainage system component, size, and depth. ..... 11. As-Built Plans. ..... All applicants are required to submit as-built plans for permanent stormwater management facilities located on-site after final construction is completed. A. As Built Plans must show the final design specifications, meet the criteria per City requirements, and be sealed by a registered professional engineer, registered land surveyor, or registered landscape architect licensed in Tennessee. ..... B. A final inspection by the City is required before any performance bond or guarantee will be released. If the As Built Plans indicate deviation from design, then a professional engineer or landscape architect must prove performance of the SCM as installed. ..... C. The City shall have the discretion to adopt provisions for a partial pro-rata release of the performance security or bond on the completion of various stages of development. In addition, the certificate of occupancy shall not be granted until corrections to all SCMs have been made and accepted by the City. ..... 12. Grandfathering. ..... Projects issued Land Disturbing Permits for New Construction, Addition, Alteration, or Repair/Replacement to the City's Land Development Office before the close of business day November 30, 2014 and/or projects having a preliminary plat with approved construction documents submitted to the City's Land Development Office before the close of business day November 30, 2014, shall, be eligible for grandfathering under the City of Chattanooga's prior stormwater management regulations. A. Applicable out parcels served by previously permitted on-site, shared, or regional stormwater management facilities must comply with the requirements in effect at the time the master plan development was originally submitted and/or approved. ..... B. The applicant may not be able to rely solely on the information contained in any remaining City records. The burden of proof as to whether applicable outparcels are adequately served by existing controls is on the applicant. ..... C. After December 1, 2014, any proposed additional impervious surface, exceeding what was detailed in the original plans or study shall be considered significant redevelopment and managed using the runoff reduction standards in the RMG. ..... D. New runoff reduction standards are preferable. Therefore, no part of the grandfathering clause shall preclude the permittee from voluntarily constructing stormwater controls to the more beneficial, new standard. .....
(Ord. No. 12900, § 1, 2-3-15; Ord. No. 12985, § 2, 9-1-15; Ord. No. 13251, § 1, 11-28-17)
Ask a question about Chattanooga law
Corpus searches the Chattanooga sections it holds and shows the ones that match, with their citations. Free, no sign-in.
