For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 4-41 — Rules adopted

Code of Ordinances, City of Chattanooga, Tennessee (Supp. No. 40: codified through Ordinance No. 14374, enacted June 16, 2026) · Chattanooga City Code § 4-41

Corpus is an independent public-information project, not the official City of Chattanooga website. Stable reference: corpuslaw.us/code/d003623c-1c79-45f7-9e79-b83b9c1dbe89

Sec. 4-41. - Rules adopted.

The following rules, regulations, criteria and standards for air pollution control are hereby adopted: Rule 1. Title. These regulations shall be known and referred to as the "Chattanooga-Hamilton County Air Pollution Control Regulations." Rule 2. Regulations of Nitrogen Oxides. Rule 2.1. No person shall cause, suffer, allow or permit the emission of nitrogen oxides, expressed as nitrogen dioxide, from fuel-burning equipment which has design capacity of or in excess of two hundred fifty million (250,000,000) Btu's per hour, built or installed on and after January 1, 1973, in excess of the following: (1) One hundred sixty-five (165) ppm corrected to fifteen percent (15%) excess air when gaseous fossil fuel is fired (equivalent to two-tenths (0.20) pounds of nitrogen oxides, expressed as nitrogen dioxide, per million Btu heat input); (2) Two hundred twenty-seven (227) ppm corrected to fifteen percent (15%) excess air when liquid fossil fuel is fired (equivalent to three-tenths (0.30) pounds of nitrogen oxides, expressed as nitrogen dioxide, per million Btu heat input); (3) Five hundred twenty-five (525) ppm corrected to fifteen percent (15%) excess air when solid fossil fuel is fired (equivalent to seven-tenths (0.70) pounds of nitrogen oxides, expressed as nitrogen dioxide, per million Btu heat input). When different fossil fuels are burned simultaneously in any combination, the applicable standard shall be determined by proration (i.e., the allowable emission, expressed as nitrogen dioxide, shall be equal to the value obtained from the equation: A = S × (525) + L × (227) + G × (165) Where: S = fraction of total heat input derived from solid fossil fuel. L = fraction of total heat input derived from liquid fossil fuel. G = fraction of total heat input derived from gaseous fossil fuel. A = the emission limit in ppm. Rule 2.2. (Reserved). Rule 2.3. No person shall cause, suffer, allow or permit the emission of nitrogen oxides from any nitric acid plant built or installed on and after January 1, 1973, in excess of three (3) pounds (calculated as nitrogen dioxide) per ton of acid produced. Rule 2.4. No person shall cause, suffer, allow or permit the emission of nitrogen oxides in excess of three hundred (300) ppm from any source except fuel-burning equipment, which is regulated by Rule 2.1; nitric acid plants, which are regulated by Rule 2.2 and Rule 2.3; Portland cement plants, which are regulated by Rule 2.6; and emergency generators, which are regulated by Rule 2.7. Rule 2.5. All sampling of emissions from any source of nitrogen oxides and all analyses of samples to determine the amount of nitrogen oxides in such samples shall be conducted as specified by techniques promulgated by the board. Rule 2.6. No owner or operator of any Portland cement plant shall cause, suffer, allow or permit the emission of nitrogen oxides (NO x ) in excess of seven hundred and fifty (750) parts per million when averaged over any three (3) consecutive hour period. After April 30, 2007, the owner or operator of any Portland cement kiln subject to this rule shall not operate the kiln during May 1 through September 30 unless the kiln has installed and operates during May 1 through September 30 with at least one (1) of the following: (a) Low-NO x burners; (b) Mid-kiln system firing; (c) Alternative control techniques approved by the Director and the EPA and achieving the same emissions decreases as low-NO x burners or mid-kiln system firing; or (d) Reasonably available control technology approved by the Director and the EPA. By April 30, 2007, the owner or operator of a cement kiln subject to this rule shall provide the Director with a statement confirming that the kiln is subject to the rule and a report demonstrating compliance with the requirements of the rule. If compliance is achieved by the use of prescribed equipment, the compliance demonstration shall be a written certification that the equipment is installed and in use. By October 31, 2007, the owner or operator shall provide the Director a report documenting the NO x emissions for the period of May 1, 2007, through September 30, 2007. Beginning in 2008, an annual report documenting NO x emissions for May 1 through September 30 of each year shall be submitted to the director by October 31 of that year. The annual report shall include a certification that the kiln has continued to be in compliance with this rule as stated in the initial compliance certification. Rule 2.7. For the purposes of this rule, "emergency generator" is defined as a generator used when loss of primary electrical power occurs for reasons beyond the control of the source. In no event shall an emergency generator emitting in excess of one thousand five hundred (1,500) parts per million be operated for a period of time longer than five (5) consecutive days or more than a total of twenty (20) days in any calendar year, unless a source demonstrates to the director with clear and convincing evidence that reasonably unforeseeable events beyond the control of the source require use of the emergency generator for an additional period of time. The source shall maintain a written record of each loss of primary electrical power, including a record of the cause and a record of the duration of the loss. Such written record shall be retained for a period of not less than two (2) years and shall be available to the director upon request. Periodic start-up of an emergency generator to test proper functioning shall not be subject to these recordkeeping requirements. Rule 3. Visible Emission Regulations. Rule 3.1. No person shall cause, suffer, allow or permit visible emissions from any air contaminant source with an opacity in excess of twenty percent (20%) for an aggregate of more than five (5) minutes in any one (1) hour or more than twenty (20) minutes in any twenty-four (24) hour period; provided, however, that the time limitations as set forth in Rule 7.1 apply to incinerators, but all other provisions of Rule 3 shall apply to incinerators. Rule 3.3. It is expressly intended that in testing compliance with Rule 3.1 that visible emissions will be evaluated in terms of equivalent opacity and expressed as percent opacity. Rule 3.4. Visible emissions from fuel-burning equipment used exclusively to provide space heating in a building not containing more than two (2) dwelling units shall not be subject to the provisions of this Rule 3. Rule 3.5. Regardless of the visible emission limitation contained in this Rule 3, all sources identified in Rule 15, Rule 16, Rule 18, Rule 26, and Rule 27 in this section and in section 4-8(e) (Construction and modification permit, nonattainment areas) of this chapter shall comply with the visible emission limitations set pursuant to those rules or that section. Rule 3.6. Visible emissions from nonstack emission points at coke plants shall not be subject to the provisions of this Rule 3, but shall be subject to the opacity limitations of Rule 26.4. Rule 4. Regulation of the Importation, Sale, Transportation, Use or Consumption of Certain Fuels. Rule 4.1. It shall be unlawful for any persons to import, sell, offer for sale, expose for sale, exchange, deliver or transport for use and consumption in the city, or to use or consume in the city, any fuel containing in excess of four percent (4%) sulfur content by weight for fuel-burning equipment regulated under Rule 8 and Table 1. Fuels with sulfur contents greater than allowed in this rule may be burned, used and consumed, and may be delivered by any person to any user, provided such user utilizes methods or processes or a combination of methods or processes approved in writing by the director which will limit the emission of sulfur dioxide from the source to a quantity or rate not greater than that which would result from the use of a low sulfur fuel as specified in the first part of this rule. Any person who desires to sell, offer for sale, expose for sale, exchange, deliver or transport for use and consumption any fuel with sulfur content greater than allowed as hereinabove set forth upon the basis that the user utilizes methods or processes approved in writing by the director as hereinabove set forth must have in his possession at the time of sale, offer for sale, exposure for sale, exchange, delivery or transport an exact reproduced copy of the approval by the director as hereinabove provided for, which approval must at that time be valid, effective and unrevoked. Sale, offer for sale, exposure for sale, exchange, delivery or transport for use and consumption in the absence of such copy of such valid, effective and unrevoked written approval shall be prima facie a violation of this rule and the burden shall be upon the person charged to establish that written and effective approval had been extended by the director as hereinabove provided. Rule 4.2. To determine compliance with Rule 4.1 above, the board is authorized under this chapter to make, or obtain tests of fuel when it deems necessary to determine compliance. (1) An adequate supply of the fuel, ready for use, must be made available to the director to conduct whatever tests in accordance with A.S.M.E., P.T.C. 3.2-1954 he deems necessary. (2) Any person whose fuel is submitted to such tests must pay all expenses necessary to conduct the tests when found to be in violation. (3) Tests certified by a competent person approved by the director may be accepted by the director as the tests required by this rule. Rule 4.3. The provisions of Rule 4 shall become effective on and after October 14, 1970. Rule 4.4. The director or his representative may examine the weigh bills for all fuels delivered to and by all fossil fuel dealers by any means of transportation. Rule 5. Prohibition of Hand-Fired Fuel-Burning Equipment. Rule 5.1. All operation or use of hand-fired fuel-burning equipment with solid fuels is prohibited. Rule 5.2. Rule 5.1 shall not apply to fuel-burning equipment used exclusively for heating a dwelling designed and used for occupancy of less than three (3) families. Rule 6. Prohibition of Open Burning. Rule 6.1. No person shall cause, suffer, allow or permit open burning except as provided in Rule 6.3, 6.4, and 6.5. No person shall cause, suffer, allow or permit controlled burning except as provided in Rule 6.6. No person shall fail or refuse to take all reasonable and necessary steps and precautions to prevent open or controlled burning upon any premises owned, occupied or under the control of such person. No person shall fail or refuse to take all reasonable and necessary steps and precautions to extinguish or otherwise terminate and abate any open or controlled burning which has originated through any cause whatsoever upon any premises owned, occupied or under the control of such person or upon premises upon which such person is carrying out any operation or activity. Rule 6.2. No person shall conduct a salvage operation by open burning. Rule 6.3. Open Burning. Open burning of vegetation and raw, untreated, non-manufactured wood materials, thoroughly dried to facilitate efficient combustion while minimizing smoke caused by naturally occurring moisture contained in vegetative materials ("clean wood materials") may be permitted only in the months of October, November, December, January, February, March and April, provided that the following conditions are met: (1) An application shall be submitted to the director stating the reason why there is no other method of disposal, the amount of material to be burned, and the location of material to be burned; (2) A non-refundable application fee of seventy-five dollars ($75.00) shall be included with the application, which fee shall be collected by the Bureau and remitted to the City of Chattanooga finance officer as fiscal agent for the Board; (3) No burning shall occur until such inspection of the material as may be required by the bureau is conducted, a permit has been issued and the permit has been received by the applicant; (4) The size of the piles of material to be burned shall not exceed eight (8) feet by eight (8) feet by eight (8) feet and no pile shall be within one hundred (100) feet of the nearest structure or within fifty (50) feet of wooden or plastic fencing not owned by the permittee. No brush in excess of twelve (12) inches in diameter and no tree stumps shall be burned; (5) Burning may only be conducted on days of low air pollution potential, as determined by the Director. In addition, burning may not be allowed during periods of high winds, dry conditions, or low humidity, as determined by the Director; (6) Only clean fuel not containing garbage, rubber, tires, plastics, roofing materials, tar paper or other refuse shall be allowed for the startup of fires; (7) Burning will only be allowed during the following hours on days approved pursuant to subparagraph (5) above. The burning shall be completed by, and completely extinguished by, the end of the time period set forth below. Dirt shall not be used to attempt to extinguish the burning. No smoke or smoldering is allowed after the termination time; October 1 through November 3 | 9:00 a.m.—4:00 p.m. November 4 through December 31 | 9:00 a.m.—3:30 p.m. January 1 through February 15 | 9:00 a.m.—4:00 p.m. February 16 through March 13 | 9:00 a.m.—5:00 p.m. March 14 through April 30 | 9:00 a.m.—6:00 p.m. ;adv=6;Burning will not be deemed extinguished if smoke or smoldering is present or if dirt is used to cover a burn pile. (8) The burning must be attended at all times by a person 16 years or older who shall have adequate means of extinguishing the fire available and is capable of doing so; (9) The permit may be revoked or suspended at any time at the site where there is a violation of the permit conditions or of this Rule, with the right to a hearing before the director or the Air Pollution Control Board; (10) The permit must be kept at or near the burn site and be readily available for inspection; (11) The permit is not valid until signed by the applicant signifying that the permit conditions have been read and understood; (12) The person conducting the burning shall contact the local fire agency each day before burning; (13) Any permit issued will remain valid until the expiration date of the permit, unless revoked or suspended. (14) Burning is allowed only at the location set forth in the application and only for materials removed or generated from the burn site address. Burning of waste generated as a result of a commercial operation is prohibited. (15) Burning shall not be conducted where an obvious nuisance or safety hazard is present. Rule 6.4. Open Burning Exemptions. Open burning shall be allowed without compliance with Rule 6.3 only in the following specifically listed instances: (1) Fires used only for cooking of food or for ceremonial or recreational purposes (recreational fires are limited in size to three (3) feet in diameter and two (2) feet high), including barbecues and outdoor fireplaces, but only if such fires are fueled with clean fuel for that particular purpose (clean seasoned wood, gas, charcoal, wood pellets, or fire logs). Smoke or ash from cooking, ceremonial, or recreational fires shall not create a nuisance beyond the boundary of the property where the burning is occurring. Cooking, ceremonial, or recreational fires shall not be left unattended and shall be completely extinguished when the purpose of the fire is completed; (2) Fires set by or at the direction of responsible fire control agencies for the prevention, elimination or reduction of the spread of existing fires; (3) Safety flares and smokeless flares; except those for the combustion of waste gases. Flares for the combustion of waste gases shall comply with the permitting provisions of section 4-8 of this chapter and any other applicable requirement; (4) Open burning used solely for the purpose of warming persons who are in the out-of-doors performing work and conducting lawful activities, provided such fires use only clean, raw, untreated, non-manufactured wood, not containing garbage, rubber, plastics, roofing materials, tar paper, cardboard, paperboard or other refuse; (5) Operation of devices using open flames such as tar kettles, blow torches, cutting torches, portable heaters and other flame-producing equipment. Rule 6.5. Open Burning Exceptions. Open burning may be allowed without a permit in the following instances provided a written statement, such as is required in Rule 6.3(1), is filed with the director and written approval is given by the director: (1) Fires set for the training and instruction of public or private fire-fighting personnel, including those in civil defense provided such training is conducted in accordance with National Fire Protection Association standards; (2) Carrying out recognized Best Management Practices for Agriculture necessary for production of crops; (3) The director may allow open burning prohibited during the months of May, June, July, August and September upon a determination that such open burning is necessary to protect public health, safety or welfare of the people, or there are no reasonable alternatives, e.g. disposal of vegetative debris from storm damage. The action of the director shall be in writing. Rule 6.6. Controlled Burning. Clearing and burning of two (2) or more acres of vegetation within a one (1)-year period, including burning for silvicultural purposes, requires controlled burning and compliance with the following enumerated conditions. Controlled burning may be permitted by the Director only in the months of October, November, December, January, February, March and April. Controlled burning, other than for silvicultural purposes, requires the use a pit and an air curtain destructor. Burning for silvicultural purposes requires the use of special equipment designed for that purpose. (1) Controlled burning (other than burning for silvicultural purposes) requires the continuous use of a pit and an effective air curtain destructor to maintain the necessary air velocity to minimize to the absolute extent practical any emission of fly ash and/or smoke; (2) To obtain a controlled burning permit, a signed application shall be submitted to the director including the following: a. Complete plans and details of the method and equipment to be used for the control of such burning must be approved by the director before the permit shall issue; b. The names of those in charge of the equipment and those in charge of the site and how they may be contacted must be furnished; (3) A non-refundable application fee of six hundred twenty-five dollars ($625.00) shall be included with the application, which fee shall be collected by the Bureau and remitted to the City of Chattanooga finance officer as fiscal agent for the Board; (4) Written approval is received from the director in the form of a controlled burning permit with conditions determined by the director; (5) The pit shall be cleaned of ash on a daily basis; (6) Brush in the pit shall not be piled above the pit surface; (7) The persons in charge of the equipment shall notify the fire department serving the area in which the burning occurs at the beginning of each day's burn and the completion of each day's burn; (8) The person in charge of the equipment must have an operating telephone at the site at all times during operation of the equipment; (9) There shall be enough fuel at the site to maintain operation of the air curtain destructor without interruption; (10) Any modification to the pit design or location must be approved by the director prior to the modification; (11) The permit may be revoked or suspended at any time at the site where there is a violation of the permit or of this Rule, with the right to a hearing before the Director or the Air Pollution Control Board; (12) Burning will only be allowed during the following hours on days of low air pollution potential, as determined by the Director. In addition, burning may not be allowed during periods of high winds, dry conditions, or low humidity, as determined by the Director. The burning shall be completed by, and completely extinguished by, the end of the time period set forth below. Dirt shall not be used to attempt to extinguish the burning. No smoke or smoldering is allowed after the termination time; October 1 through November 3 | 9:00 a.m.—4:00 p.m. November 4 through December 31 | 9:00 a.m.—3:30 p.m. January 1 through February 15 | 9:00 a.m.—4:00 p.m. February 16 through March 13 | 9:00 a.m.—5:00 p.m. March 14 through April 30 | 9:00 a.m.—6:00 p.m. Burning will not be deemed extinguished if smoke or smoldering is present or if dirt is used to cover a burn pile. (13) The burning must be attended at all times; (14) The permit must be kept at or near the burn site and be readily available for inspection; (15) The permit is not valid until signed by the applicant signifying that the permit conditions have been read and understood; (16) Any permit issued will remain valid until the expiration date of the permit, unless revoked or suspended. (17) Applicant shall review the permit conditions with all parties that will be involved with the controlled burning process. Rule 7. Incinerator Regulation. Rule 7.1. No person shall cause, suffer, allow or permit discharge of a visible emission from any incinerator with an opacity equal to or in excess of twenty percent (20%) for an aggregate of more than three (3) minutes in any one (1) hour or more than twelve (12) minutes in any twenty-four (24) hour period. Rule 7.2. No person shall cause, suffer, allow or permit particulate emission from any incinerator in excess of one-tenth (0.1) pounds per one hundred (100) pounds charge or in excess of the following: Input (lbs. per hour) | Maximum Allowable Emissions (grains per std. dry cu. ft.) 0—5000 | 0.20 5001 and above | 0.15 Test results shall be calculated (1) to twelve percent (12%) carbon dioxide for products of combustion, (2) to standard conditions. This limitation shall be met when the incinerator is operating at full load. In measuring emissions from incinerators the carbon dioxide produced by combustion of any liquid or gaseous fuels shall be excluded from the calculation to a maximum of twelve percent (12%) carbon dioxide. Tests to determine compliance with this rule shall be conducted as provided in sections 4-3, 4-8, and 4-11 of this chapter. Rule 7.3. All incinerators constructed after October 14, 1969, shall be of the multiple chamber design consisting of three (3) or more refractory lined combustion furnaces connected in series and when operating shall (1) create a preignition temperature of eight hundred degrees (800°) Fahrenheit in the primary furnace and (2) maintain a temperature of fifteen hundred degrees (1,500°) Fahrenheit in the secondary furnace. Designs other than those outlined above shall be considered on an individual basis and will be exempt from these provisions, if such design results in performance which meets the standards set forth in Rules 7.1 and 7.2 above. Rule 7.4. Reserved. Rule 7.5. On and after March 1, 1973, the person in responsible charge of the operation of an incinerator (including a cremation system) must be licensed by the Bureau. Such license shall be issued only after a passing score is received on a standardized test to be devised and administered by the bureau. The bureau shall test persons on their knowledge of the principles of incineration, including but not necessarily limited to the subjects of preignition, firing and cleaning. The Bureau shall have the power to collect a one (1) time fee of one hundred dollars ($100.00) pursuant to the issuance of such license. Such fee shall be collected by the Bureau and remitted to the City of Chattanooga finance officer as fiscal agent for the Board. The Director shall have the authority to suspend or revoke such license if the person holding such license willfully or by reason of incompetence violates any provision of this chapter. No license issued in accordance with the provisions of this rule shall be assignable or transferable. The failure to issue a license, or suspension or revocation of such license, shall be an order or determination of the Director within the meaning of Section 4-18(e) of this chapter. Rule 7.6. The board has found that the ambient air quality standards for particulate matter are being violated in a portion of the city. The emission limitations for plants in existence prior to January 1, 1978, which are located in the particulate matter nonattainment area or which have a significant impact upon the particulate nonattainment area are to be found in Rule 26. The emission limitations that are found in Rule 26 are in addition to the limitations contained in this Rule 7. Rule 8. Fuel-Burning Equipment Regulations. Rule 8.1. No person shall cause, suffer, allow or permit the emission of air contaminants from fuel-burning equipment built or installed before January 1, 1973, in excess of that provided in Schedule 1 of Table 1 and the provisions of Rule 8.3. Rule 8.2. No person shall cause, suffer, allow or permit the emission of air contaminants from fuel-burning equipment built or installed on and after January 1, 1973, in excess of that provided in Schedule 2 of Table 1. Rule 8.3. The emission or escape into the open air of fly ash, particulate matter or other air contaminants, resulting from the combustion of fuel, from any fuel-burning equipment or from any stack connected thereto, in quantities exceeding the limits specified in Table 1 for the size of equipment involved is prohibited. The emission limitations specified in Table 1 are the maximum allowable emission in any consecutive sixty (60) minute period. The limitations, subject to linear interpolation, are to be conformed to when the fuel-burning equipment is operating at the maximum design heat input rating. The heat input rating of any unit discharging to a single stack shall be the maximum design input rating, including both heat available from burning of fuel and any sensible heat from materials introduced into the combustion zone at temperatures above the ambient air temperature. When two (2) or more fuel-burning units are connected to a single stack, the combined fuel-burning capacity of all units connected to the stack denotes the size of equipment in terms of Btu input for establishing the maximum allowable emission. When one (1) fuel-burning unit is connected to two (2) or more stacks, the heat input of the equipment shall be the criterion for the maximum allowable total emission from all stacks combined. Tests to determine compliance with this rule shall be conducted as provided in sections 4-3, 4-8 and 4-11 of this chapter. Rule 8.4. Fuel-burning equipment located in dwellings designed for not more than two (2) families are exempt from the operation of Rule 8. Rule 8.5. The board has found that the ambient air quality standards for particulate matter are being violated in a portion of the city. The emission limitations for plants in existence prior to January 1, 1978, which are located in the particulate matter nonattainment area or which have a significant impact upon the particulate nonattainment area are to be found in Rule 26. The emission limitations that are found in Rule 26 are in addition to the limitations contained in this Rule 8. TABLE 1 EMISSION LIMITATIONS FOR FUEL-BURNING EQUIPMENT Use the following formulas: Equipment Rating (10 6 Btu/hr.) | Maximum Allowable Particulate Emissions (lbs./hr.) Schedule 1 | Schedule 2 Below 10 | Q = 0.6 × B | Q = 0.6 × B 10 to 250 | Q = 1.09 × B 0.7406 | Q = 2.16 × B 0.4434 250 and above | Q = 1.09 × B 0.7406 | Q = 0.1 × B Where: Q = maximum allowable particulate emission in pounds per hour. B = the burning rate in 10 6 Btu/hr. Determine intermediate values by linear interpolation. Rule 9. Regulation of Visible Emissions from Internal Combustion Engines. Rule 9.1. No person shall cause, suffer, allow or permit the emission of visible air contaminants from any spark ignition engine of ten (10) brake horsepower or more: (1) For a period of time exceeding ten (10) seconds; or (2) After the vehicle has moved one hundred (100) yards or more from its initial starting point. Rule 9.2. No person shall cause, suffer, allow or permit the visible emission of air contaminants from a diesel type engine for a period of more than sixty (60) consecutive seconds in excess of twenty percent (20%) opacity. Rule 9.3. Responsibility for compliance with Rules 9.1 and 9.2 applies to the owner, the registered owner, the lessee and the operator, individually, and each shall be jointly or severally liable for violation of these rules and subject to the fines and penalties of this chapter. Rule 9.4. Reserved. Rule 9.5. Testing in the outdoor atmosphere of internal combustion engines which have been or are to be repaired will be allowed if such tests are performed on the premises of the repairing facility. Rule 9.6. No motor vehicle which is equipped with a pollution control device shall be modified or altered in any manner which will decrease its efficiency or effectiveness in the control of air pollution. Rule 9.7. No diesel engine which supplies motive power to a vehicle shall be allowed to idle more than five (5) consecutive minutes when the vehicle is not in motion, except when the vehicle is forced to remain motionless because of traffic conditions over which the operator has no control; provided, however, that any diesel engine which supplies motive power to a truck or locomotive shall be allowed to idle for more than five (5) consecutive minutes when it is at a distance in excess of five hundred (500) feet from the nearest residential, recreational, institutional, retail sales, hotel or educational premises. Rule 10. Process Emissions Regulations. Rule 10.1. All installations, operations or equipment, except fuel-burning equipment and incinerators, from which any air contaminant is, or may be, emitted or permitted to escape into the open air shall comply with the provisions of this rule. The emission limitations specified in Table 2 are the maximum allowable emissions in any consecutive sixty (60) minute period. Rule 10.2. No person shall cause, suffer, allow or permit emission from any air contaminant source built or installed before the first day of January, 1973, in excess of that provided in Schedule 1 of Table 2. Rule 10.3. No person shall cause, suffer, allow or permit emission from any air contaminant source built or installed on and after January 1, 1973, in excess of that provided in Schedule 2 of Table 2. Rule 10.4. Tests to determine compliance with this Rule 10 shall be conducted as provided in sections 4-3, 4-8 and 4-11 of this chapter; provided, however, that compliance with this Rule 10 does not exempt such persons from compliance with any other rule or section of this chapter applicable to emissions. Rule 10.5. The board has found that the ambient air quality standards for particulate matter are being violated in a portion of the city. The emission limitations for plants in existence prior to January 1, 1978, which are located in the particulate matter nonattainment area or which have a significant impact upon the particulate nonattainment are to be found in Rule 26 are in addition to the limitations contained in this Rule 10. Rule 10.6. Any other provision of this chapter notwithstanding, no person shall cause, suffer, allow or permit the discharge of particulate emissions from any asphalt plant with an input process weight rate greater than two hundred thousand (200,000) pounds per hour in excess of fifty-one and two-tenths (51.2) pounds per hour. Rule 10.7. Irrespective of the maximum allowable particulate emission limitations contained in Table 2 of this Rule 10, no person shall cause, suffer, allow or permit the discharge of particulate emissions from process equipment in excess of 0.25 grains per cubic foot of stack gases corrected to seventy degrees (70°) Fahrenheit and one (1) atmosphere. This Rule 10.7 shall not apply to vents from storage tanks for liquids. TABLE 2 PARTICULATE MATTER EMISSION LIMITATIONS FOR PROCESS EQUIPMENT Input Process Weight Lbs./hour | Input Process Weight Tons/hour | Maximum Allowable Emission Rate Schedule 1 *1 | Maximum Allowable Emission Rate Schedule 2 *2 50 | 0.025 | 0.346 | 0.36 100 | 0.05 | 0.551 | 0.55 200 | 0.10 | 0.877 | 0.86 400 | 0.20 | 1.40 | 1.32 600 | 0.30 | 1.83 | 1.70 800 | 0.40 | 2.22 | 2.03 1,000 | 0.50 | 2.58 | 2.34 1,500 | 0.75 | 3.38 | 3.00 2,000 | 1.00 | 4.10 | 3.59 2,500 | 1.25 | 4.76 | 4.12 3,000 | 1.50 | 5.38 | 4.62 3,500 | 1.75 | 5.96 | 5.08 4,000 | 2.00 | 6.52 | 5.52 5,000 | 2.50 | 7.58 | 6.34 6,000 | 3.00 | 8.56 | 7.09 7,000 | 3.50 | 9.49 | 7.81 8,000 | 4.00 | 10.4 | 8.50 9,000 | 4.50 | 11.2 | 9.10 10,000 | 5.00 | 12.0 | 9.70 12,000 | 6.00 | 13.6 | 10.9 16,000 | 8.00 | 16.5 | 13.0 18,000 | 9.00 | 17.9 | 14.0 20,000 | 10.00 | 19.2 | 15.0 30,000 | 15.00 | 25.2 | 19.2 40,000 | 20.00 | 30.5 | 23.0 50,000 | 25.00 | 35.4 | 26.4 60,000 | 30.00 | 40.0 | 29.6 70,000 | 35.00 | 41.3 | 30.6 80,000 | 40.00 | 42.5 | 31.2 90,000 | 45.00 | 43.6 | 31.8 100,000 | 50.00 | 44.6 | 32.4 120,000 | 60.00 | 46.3 | 33.3 140,000 | 70.00 | 47.8 | 34.2 160,000 | 80.00 | 49.0 | 34.9 200,000 | 100.00 | 51.2 | 36.1 1,000,000 | 500.00 | 69.0 | 46.7 2,000,000 | 1,000.00 | 77.6 | 52.3 6,000,000 | 3,000.00 | 92.7 | 62.3 * 1 Interpolation of the data in Schedule 1 for process weight rates up to sixty thousand (60,000) pounds per hour shall be accomplished by using the following equation: E = 4.10 P 0.67 . Interpolation and extrapolation of the data for process weight rates in excess of 60,000 lbs/hour shall be accomplished by using the following equation: E= 55.0 P 0.11 - 40 Where: E = Maximum allowable emission rate in lbs/hour P = Process weight rate in tons/hour * 2 Interpolation of the data in Schedule 2 for process weight rates up to sixty thousand (60,000) pounds per hour shall be accomplished by the use of the following equation: E = 3.59 P 0.62 Interpolation and extrapolation of the data for process weight rates in excess of sixty thousand (60,000) pounds per hour shall be accomplished by the use of the following equation: E = 17.31 P 0.16 Where: E = Maximum allowable emission rate in lbs/hour, and P = Process weight rate in tons per hour Rule 11. Regulation of Transporting and Material Handling in Open Air. Rule 11.1. No person shall cause or permit the handling, processing or storage of any material in the open air in a manner which allows or may allow particulate matter to become airborne which exceeds twenty percent (20%) opacity for more than three (3) minutes in any consecutive sixty-minute period, or more than twenty (20) minutes in any twenty-four (24) hour period. Rule 11.2. No person shall cause or permit a building or its appurtenances, a road, a driveway, a parking area or an open area to be constructed, used, repaired or demolished without applying all such reasonable measures as may be required to prevent particulate matter from becoming airborne. The director may require such reasonable measures as may be necessary to prevent particulate matter from becoming airborne including but not limited to paving or cleaning of roads, driveways and parking, areas; by the application of dust free surfaces; by the application of water; and by the planting and maintenance of vegetative ground cover. Rule 11.3. No person shall transport any material in the open air in a manner which allows or may allow particulate matter to become airborne beyond the boundary line of the property of the person doing the transporting. Rule 12. Regulation of Odors in the Ambient Air. Rule 12.1. Prohibited. No person or permitted business shall cause, keep or permit any material, substance or condition which is, or is likely to become, a public nuisance, by the emission of noxious odors, fumes, dusts, vapors, or gases that are offensive. Rule 12.2. Definition. Noxious Odor is the sensation of smell perceived as a result of olfactory stimulation. An odor is deemed offensive, and therefore a nuisance, when one-third (⅓) or more of a sample of persons exposed to it believe it to be objectionable in usual places of occupancy. The sample size is to be at least twenty-five (25) persons, or when fewer than twenty-five (25) are exposed, at least eight (8) persons believe it to be objectionable beyond the property's boundaries of the subject property. No person or permitted business shall cause, suffer, allow or permit emission such as to cause an "offensive" odor on or adjacent to residential, recreational, institutional, retail sales, hotel or educational premises. Rule 12.3. Odor Impacts. Odors from animals or fowl, animal or fowl manure or other animal or fowl-related substances shall constitute a nuisance as set forth within Rule 12.1 if the odor is deemed offensive at the property boundaries and any property owner or permitted business fails to comply with the applicable regulations and performance standards of the Food Safety and Inspection Service, U.S. Department of Agriculture at 9 CFR §416, 21 CFR §110, or other applicable federal standards after notice to a permitted business by the Air Pollution Control Board. Rule 12.4. Animal Care and Sanitation. Any animals or fowl within the city shall be kept in a clean, sanitary and healthful condition. Manure, animal waste or fecal matter, feathers, fur, hair or other animal or fowl debris shall not be allowed to accumulate on any public or private property or contaminate the city's storm water or sewer drainage systems and must comply with all performance standards of the Food Safety and Inspection Service, U.S. Department of Agriculture at 9 CFR §416, 21 CFR §110, or other applicable federal standards. Any such accumulation or contamination that is not in compliance with any valid issued permit is hereby declared to be a public nuisance. For the slaughter of poultry, all blood, feathers and offal shall be deposited in appropriate containers with a suitable top, and such containers shall be kept closed at all times, except when being filled or discharged as required by applicable federal standards. Nothing in this ordinance creates any private right of action or basis for a private civil action. Furthermore, nothing in this ordinance defines a nuisance for any private civil action. Rule 13. Regulation of Sulfur Oxides. Rule 13.1. No person shall cause, suffer, allow or permit the emission of gas containing sulfur dioxide from any source, except fuel-burning equipment, in excess of five hundred (500) ppm. Rule 13.2. No person shall cause, suffer, allow or permit the emission from fuel-burning equipment of sulfur dioxide gas in excess of four (4) pounds per million Btu of fuel consumed in the equipment. Rule 13.3. All sampling of exhaust gases from any source of sulfur dioxide, and all analyses of samples to determine the amount of sulfur dioxide in exhaust gases, shall be conducted as specified by techniques promulgated by the board. Rule 13.4. For the purposes of this Rule 13, all sulfur present in gaseous compounds and containing oxygen shall be deemed to be present as sulfur dioxide. Rule 13.5. Compliance with this Rule 13 shall not relieve a person from the requirements of Rule 12 or from the requirements of any other rules or provisions of this chapter. Rule 14. Nuisances. Rule 14.1. No person shall cause, suffer, allow or permit or fail to take reasonable steps to abate or terminate the discharge from any source whatsoever of air contaminants or other material which shall cause injury, detriment, nuisance or annoyance of the public or which endanger the comfort, repose, health or safety of the public or which cause or have a tendency to cause injury or damage to business or property. Rule 14.2. No person shall cause, suffer, allow or permit or fail to take reasonable steps to abate or terminate the discharge from any source whatsoever of air contaminants or water or steam or a combination of such which cause, or combine with natural elements to cause, the reduction of visibility across any road or thoroughfare to such an extent as to cause a hazard. Rule 14.3. Nothing in any other section of this chapter relating to regulation of emission or pollutants shall in any manner be construed as authorizing or legalizing the creation or maintenance of a nuisance as described in this Rule 14 or as may otherwise be deemed by law to be a nuisance. Rule 15. New Source Performance Standards and Standards for Landfills. Rule 15.1. The provisions of Title 40 Code of Federal Regulations Part 60 "Standards of Performance for New Stationary Sources," Subparts A, D, Da, Db, Dc, E, Ea, Eb, Ec, F, G, Ga, H, I, J, Ja, K, Ka, Kb, L, M, N, Na, O, P, Q, R, S, T, U, V, W, X, Y, Z, AA, AAa, BB, BBa, CC, DD, EE, GG, HH, KK, KKa, LL, MM, MMa, NN, PP, QQ, RR, SS, TT, UU, VV, VVa, WW, XX, AAA, BBB, DDD, FFF, GGG, GGGa, HHH, III, JJJ, KKK, LLL, NNN, OOO, PPP, QQQ, RRR, SSS, TTT, TTTa, UUU, VVV, WWW, XXX, AAAA, CCCC, EEEE, IIII, JJJJ, KKKK, LLLL, OOOO, OOOOa, QQQQ, and TTTT and Appendices A-1, A-2, A-3, A-4, A-5, A-6, A-7, A-8, B, C, D, F, and I (Revised as of July 1, 2023) are hereby incorporated by reference in Chapter 4 as requirements of this municipality pursuant to the provisions of T.C.A. § 68-201-115 and § 10-7-121. The following subparts and appendices are included: Subpart A— | General Provisions Subpart D— | Fossil-Fuel-Fired Steam Generators Subpart Da— | Electric Utility Steam Generating Units Subpart Db— | Industrial-Commercial-Institutional Steam Generating Units Subpart Dc— | Small Industrial-Commercial-Institutional Steam Generating Units Subpart E— | Incinerators Subpart Ea— | Municipal Waste Combustors for Which Construction is Commenced After December 20, 1989 and On or Before September 20, 1994 Subpart Eb— | Large Municipal Waste Combustors for Which Construction is Commenced After September 20, 1994 or for Which Modification or Reconstruction is Commenced After June 19, 1996 Subpart Ec— | Hospital/Medical/Infectious Waste Incinerators Subpart F— | Portland Cement Plants Subpart G— | Nitric Acid Plants Subpart Ga— | Nitric Acid Plants for Which Construction, Reconstruction, or Modification Commenced After October 14, 2011 Subpart H— | Sulfuric Acid Plants Subpart I— | Hot Mix Asphalt Facilities Subpart J— | Petroleum Refineries Subpart Ja— | Petroleum Refineries for Which Construction, Reconstruction, or Modification Commenced After May 14, 2007 Subpart K— | Storage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After June 11, 1973, and Prior to May 19, 1978 Subpart Ka— | Storage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After May 18, 1978, and Prior to July 23, 1984 Subpart Kb— | Volatile Organic Liquid Storage Vessels (Including Petroleum Liquid Storage Vessels) for Which Construction, Reconstruction, or Modification Commenced After July 23, 1984 Subpart L— | Secondary Lead Smelters Subpart M— | Secondary Brass and Bronze Production Plants Subpart N— | Primary Emissions from Basic Oxygen Process Furnaces for Which Construction is Commenced After June 11, 1973 Subpart Na— | Secondary Emissions from Basic Oxygen Process Steelmaking Facilities for Which Construction is Commenced After January 20, 1983 Subpart O— | Sewage Treatment Plants Subpart P— | Primary Copper Smelters Subpart Q— | Primary Zinc Smelters Subpart R— | Primary Lead Smelters Subpart S— | Primary Aluminum Reduction Plants Subpart T— | Phosphate Fertilizer Industry: Wet Process Phosphoric Acid Plants Subpart U— | Phosphate Fertilizer Industry: Superphosphoric Acid Plants Subpart V— | Phosphate Fertilizer Industry: Diammonium Phosphate Plants Subpart W— | Phosphate Fertilizer Industry: Triple Superphosphate Plants Subpart X— | Phosphate Fertilizer Industry: Granular Triple Superphosphate Storage Facilities Subpart Y— | Coal Preparation and Processing Plants Subpart Z— | Ferroalloy Production Facilities Subpart AA— | Steel Plants: Electric Arc Furnaces Constructed After October 21, 1974 and On or Before August 17, 1983 Subpart AAa— | Steel Plants: Electric Arc Furnaces and Argon-Oxygen Decarburization Vessels Constructed After August 17, 1983 Subpart BB— | Kraft Pulp Mills Subpart BBa— | Kraft Pulp Mill Affected Sources for Which Construction, Reconstruction, or Modification Commenced After May 23, 2013 Subpart CC— | Glass Manufacturing Plants Subpart DD— | Grain Elevators Subpart EE— | Surface Coating of Metal Furniture Subpart GG— | Stationary Gas Turbines Subpart HH— | Lime Manufacturing Plants Subpart KK— | Lead-Acid Battery Manufacturing Plants for Which Construction, Reconstruction, or Modification Commenced After January 14, 1980, and On or Before February 23, 2022 Subpart KKa— | Lead-Acid Battery Manufacturing Plants for Which Construction, Modification or Reconstruction Commenced After February 23, 2022 Subpart LL— | Metallic Mineral Processing Plants Subpart MM— | Automobile and Light Duty Truck Surface Coating Operations for Which Construction, Modification or Reconstruction Commenced After October 5, 1979, and On or Before May 18, 2022 Subpart MMa— | Automobile and Light Duty Truck Surface Coating Operations for Which Construction, Modification or Reconstruction Commenced After May 18, 2022 Subpart NN— | Phosphate Rock Plants Subpart PP— | Ammonium Sulfate Manufacture Subpart QQ— | Graphic Arts Industry: Publication Rotogravure Printing Subpart RR— | Pressure Sensitive Tape and Label Surface Coating Operations Subpart SS— | Industrial Surface Coating: Large Appliances Subpart TT— | Metal Coil Surface Coating Subpart UU— | Asphalt Processing and Asphalt Roofing Manufacture Subpart VV— | Equipment Leaks of VOC in the Synthetic Organic Chemicals Manufacturing Industry for Which Construction, Reconstruction, or Modification Commenced After January 5, 1981, and on or Before November 7, 2006 Subpart VVa— | Equipment Leaks of VOC in the Synthetic Organic Chemicals Manufacturing Industry for Which Construction, Reconstruction, or Modification Commenced After November 7, 2006 Subpart WW— | Beverage Can Surface Coating Industry Subpart XX— | Bulk Gasoline Terminals Subpart AAA— | New Residential Wood Heaters Subpart BBB— | Rubber Tire Manufacturing Industry Subpart DDD— | Volatile Organic Compound (VOC) Emissions from the Polymer Manufacturing Industry Subpart FFF— | Flexible Vinyl and Urethane Coating and Printing Subpart GGG— | Equipment Leaks of VOC in Petroleum Refineries for Which Construction, Reconstruction, or Modification Commenced After January 4, 1983, and on or Before November 7, 2006 Subpart GGGa— | Equipment Leaks of VOC in Petroleum Refineries for Which Construction, Reconstruction, or Modification Commenced After November 7, 2006 Subpart HHH— | Synthetic Fiber Production Facilities Subpart III— | Volatile Organic Compound (VOC) Emissions From the Synthetic Organic Chemical Manufacturing Industry (SOCMI) Air Oxidation Unit Processes Subpart JJJ— | Petroleum Dry Cleaners Subpart KKK— | Equipment Leaks of VOC From Onshore Natural Gas Processing Plants for Which Construction, Reconstruction, or Modification Commenced After January 20, 1984, and on or Before August 23, 2011 Subpart LLL— | SO2 Emissions From Onshore Natural Gas Processing for Which Construction, Reconstruction, or Modification Commenced After January 20, 1984, and on or Before August 23, 2011 Subpart NNN— | Volatile Organic Compound (VOC) Emissions From Synthetic Organic Chemical Manufacturing Industry (SOCMI) Distillation Operations Subpart OOO— | Nonmetallic Mineral Processing Plants Subpart PPP— | Wool Fiberglass Insulation Manufacturing Plants Subpart QQQ— | VOC Emissions From Petroleum Refinery Wastewater Systems Subpart RRR— | Volatile Organic Compound Emissions from Synthetic Organic Chemical Manufacturing Industry (SOCMI) Reactor Processes Subpart SSS— | Magnetic Tape Coating Facilities Subpart TTT— | Industrial Surface Coating: Surface Coating of Plastic Parts for Business Machines Subpart TTTa— | Industrial Surface Coating: Surface Coating of Plastic Parts for Business Machines for Which Construction, Reconstruction, or Modification Commenced After June 21, 2022 Subpart UUU— | Calciners and Dryers in Mineral Industries Subpart VVV— | Polymeric Coating of Supporting Substrates Facilities Subpart WWW— | Municipal Solid Waste Landfills That Commenced Construction, Reconstruction, or Modification on or After May 30, 1991, but Before July 18, 2014 Subpart XXX— | Municipal Solid Waste Landfills That Commenced Construction, Reconstruction, or Modification After July 17, 2014 Subpart AAAA— | Small Municipal Waste Combustion Units for Which Construction is Commenced After August 30, 1999 or for Which Modification or Reconstruction is Commenced After June 6, 2001 Subpart CCCC— | Commercial and Industrial Solid Waste Incineration Units Subpart EEEE— | Other Solid Waste Incineration Units for Which Construction is Commenced After December 9, 2004, or for Which Modification or Reconstruction is Commenced on or After June 16, 2006 Subpart IIII— | Stationary Compression Ignition Internal Combustion Engines Subpart JJJJ— | Stationary Spark Ignition Internal Combustion Engines Subpart KKKK— | Stationary Combustion Turbines Subpart LLLL— | New Sewage Sludge Incineration Units Subpart OOOO— | Crude Oil and Natural Gas Facilities for which Construction, Modification, or Reconstruction Commenced After August 23, 2011, and on or Before September 18, 2015 Subpart OOOOa— | Crude Oil and Natural Gas Facilities for which Construction, Modification or Reconstruction Commenced After September 18, 2015 Subpart QQQQ— | New Residential Hydronic Heaters and Forced-Air Furnaces Subpart TTTT— | Greenhouse Gas Emissions for Electric Generating Units Appendix A-1— | Test Methods 1 through 2F Appendix A-2— | Test Methods 2G through 3C Appendix A-3— | Test Methods 4 through 5I Appendix A-4— | Test Methods 6 through 10B Appendix A-5— | Test Methods 11 through 15A Appendix A-6— | Test Methods 16 through 18 Appendix A-7— | Test Methods 19 through 25E Appendix A-8— | Test Methods 26 through 30B Appendix B— | Performance Specifications Appendix C— | Determination of Emission Rate Change Appendix D— | Required Emission Inventory Information Appendix F— | Quality Assurance Procedures Appendix I— | Owner's Manuals and Temporary Labels for Wood Heaters Subject to Subparts AAA and QQQQ of Part 60 Rule 15.2. Wherever the term "Administrator" is used in the new source performance standards, the term "Chattanooga-Hamilton County Air Pollution Control Board or Director of the Chattanooga-Hamilton County Air Pollution Control Bureau" shall be substituted, where appropriate, for the purposes of Rule 15. Rule 15.3. Emissions Standards for Municipal Solid Waste Landfills. (a) Definitions. All terms defined in this rule shall have the meaning given them herein, and all terms not defined herein shall have the meaning given them in Section 4-2. (1) Existing municipal solid waste (MSW) landfill or existing MSW landfill means an entire disposal facility in a contiguous geographical space where household waste is placed in or on land for which construction, reconstruction or modification was commenced before the effective date of this ordinance. (It should be noted that federal regulations control for sources where construction, reconstruction or modification was commenced before the effective date of this ordinance.) An existing MSW landfill may also receive other types of wastes described in Subtitle D of the Resource Conservation and Recovery Act of 1976 (RCRA), as amended, (Title 42 U.S.C. § 6901 et seq.) such as commercial solid waste, nonhazardous sludge, conditionally exempt small quantity generator waste, and industrial solid waste. Portions of an existing MSW landfill may be separated by access roads. An existing MSW landfill may be publicly or privately owned. Physical or operational changes made to an existing MSW landfill solely to comply with these emission guidelines are not considered a modification or reconstruction and would not subject an existing MSW landfill to the requirements for a new MSW landfill. Activities required by or conducted pursuant to a remedial action pursuant to Title 42 U.S.C. § 9601 et seq. (CERCLA), Title 42 U.S.C. § 6901 et seq. (RCRA), or State remedial action are not considered construction, reconstruction, or modification for purposes of Rule 15.3. For purposes of obtaining an operating permit under Article III. of Chapter 4, Part 70 Source Regulation and Permits, the owner or operator of a MSW landfill subject to Rule 15.3 with a design capacity less than two million five hundred thousand (2,500,000) megagrams or two million five hundred thousand (2,500,000) cubic meters is not subject to the requirement to obtain an operating permit for the landfill under Article III unless the landfill is otherwise subject to Article III. For purposes of submitting a timely application for an operating permit under Article III. Part 70 Source Regulation and Permits, the owner or operator of a MSW landfill subject to Rule 15.3 with a design capacity greater than or equal to two million five hundred thousand (2,500,000) megagrams and two million five hundred thousand (2,500,000) cubic meters on the effective date of approval by U.S. EPA of Rule 15.3, and not otherwise subject to Article III, becomes subject to the requirements of Section 4-56(a)(i) or Title 40 CFR § 71.5(a)(1)(I) ninety (90) days after the effective date of such approval, even if the design capacity report is submitted earlier. (2) New municipal solid waste (MSW) landfill or new MSW landfill means an entire disposal facility in a contiguous geographical space where household waste is placed in or on land for which construction, reconstruction or modification was commenced on or after the effective date of this ordinance. Physical or operational changes made to an existing MSW landfill solely to comply with the provisions of Rule 15.3 that apply to an existing MSW landfill are not considered a modification or reconstruction and would not subject an existing MSW landfill to the requirements in Rule 15.3 for a new MSW landfill. Activities required by or conducted pursuant to a remedial action pursuant to Title 42 U.S.C. § 9601 et seq. (CERCLA), Title 42 U.S.C. § 6901 et seq. (RCRA), or State remedial action are not considered construction, reconstruction, or modification for purposes of Rule 15.3. For purposes of obtaining an operating permit under Article III. Part 70 Source Regulation and Permits, the owner or operator of a MSW landfill subject to Rule 15.3 with a design capacity less than two million five hundred thousand (2,500,000) megagrams or two million five hundred thousand (2,500,000) cubic meters is not subject to the requirement to obtain an operating permit for the landfill under Article III., unless the landfill is otherwise subject to Article III. For purposes of submitting a timely application for an operating permit under Article III. Part 70 Source Regulation and Permits, the owner or operator of a MSW landfill subject to Rule 15.3 with a design capacity greater than or equal to two and one-half (2.5) megagrams and two million five hundred thousand (2,500,000) cubic meters on the effective date of approval by U.S. EPA of Rule 15.3, and not otherwise subject to either Article III., becomes subject to the requirements of Section 4-56(a)(1)(i) ninety (90) days after the effective date of such approval, even if the design capacity report is submitted earlier. (3) Active Collection System means a gas collection system that uses gas mover equipment. (4) Active Landfill means a landfill in which solid waste is being placed or a landfill that is planned to accept waste in the future. (5) Closed Landfill means a landfill in which solid waste is no longer being placed, and in which no additional solid wastes will be placed without first filing a notification of modification as prescribed under Title 40 CFR § 60.7(a)(4), which has been incorporated by reference in Chapter 4. Once a notification of modification has been filed, and additional solid waste is placed in the landfill, the landfill is no longer closed. When a MSW landfill subject to Rule 15.3 is closed, the owner or operator is no longer subject to the requirement of maintaining a Part 70 operating permit under Article III of this ordinance for the landfill if the landfill is not otherwise subject to the requirements of Article III and if either of the following conditions are met: a. The landfill was never subject to the requirements for a control system under Rule 15.3(b)(2)b.3.; or b. The owner or operator meets the conditions for control system removal specified in Rule 15.3(b)(2)b.5. (6) Closure means that point in time when a landfill becomes a closed landfill. (7) Commercial Solid Waste means all types of solid waste generated by stores, offices, restaurants, warehouses, and other nonmanufacturing activities, excluding residential and industrial wastes. (8) Controlled Landfill means any landfill at which collection and control systems are required under Rule 15.3 as a result of the nonmethane organic compounds emission rate. The landfill is considered controlled at the time a collection and control system design plan is submitted in compliance with Rule 15.3(b)(2)b. (9) Design Capacity means the maximum amount of solid waste a landfill can accept, as indicated in terms of volume or mass in the most recent construction or operating permit issued by the State or local agency responsible for regulating the landfill plus any in-place waste not accounted for in the most recent permit. If the owner or operator chooses to convert the design capacity from volume to mass or from mass to volume to demonstrate its design capacity is less than two million five hundred thousand (2,500,000) Mg. [megagrams] or two million five hundred thousand (2,500,000) cubic meters, the calculation must include a site specific density, which must be recalculated annually. (10) Disposal Facility means all contiguous land and structures, other appurtenances, and improvements on the land used for the disposal of solid waste. (11) Emission Rate Cutoff means the threshold annual emission rate to which a landfill compares its estimated emission rate to determine if control under the regulation is required. (12) Enclosed Combustor means an enclosed firebox which maintains a relatively constant limited peak temperature generally using a limited supply of combustion air. An enclosed flare is considered an enclosed combustor. (13) Flare means an open combustor without enclosure or shroud. (14) Gas Mover Equipment means the equipment (i.e., fan, blower, compressor) used to transport landfill gas through the header system. (15) Household Waste means any solid waste (including garbage, trash, and sanitary waste in septic tanks) derived from households (including, but not limited to, single and multiple residences, hotels and motels, bunkhouses, ranger stations, crew quarters, campgrounds, picnic grounds, and day-use recreation areas). (16) Reserved. (17) Industrial Solid Waste means solid waste generated by manufacturing or industrial processes that is not a hazardous waste regulated under Subtitle C of the Resource Conservation and Recovery Act, Title 40 CFR Part 264 and Part 265. Such waste may include, but is not limited to, waste resulting from the following manufacturing processes: electric power generation; fertilizer/agricultural chemicals; food and related products/by-products; inorganic chemicals; iron and steel manufacturing; leather and leather products; nonferrous metals manufacturing/foundries; organic chemicals; plastics and resins manufacturing; pulp and paper industry; rubber and miscellaneous plastic products; stone, glass, clay, and concrete products; textile manufacturing; transportation equipment; and water treatment. This term does not include mining waste or oil and gas waste. (18) Interior Well means any well or similar collection component located inside the perimeter of the landfill waste. A perimeter well located outside the landfilled waste is not an interior well. (19) Landfill means an area of land or an excavation in which wastes are placed for permanent disposal, and that is not a land application unit, surface impoundment, injection well, or waste pile as those terms are defined under Title 40 CFR § 257.2, which has been incorporated by reference in Chapter 4. (20) Lateral Expansion means a horizontal expansion of the waste boundaries of an existing MSW landfill. A lateral expansion is not a modification unless it results in an increase in the design capacity of the landfill. (21) Modification means an increase in the permitted volume design capacity of the landfill by either horizontal or vertical expansion. (22) Municipal Solid Waste (MSW) Landfill or MSW Landfill means an entire disposal facility in a contiguous geographical space where household waste is placed in or on land. An MSW landfill may also receive other types of RCRA Subtitle D wastes (as defined in Title 40 CFR § 257.2, which has been incorporated by reference in Chapter 4) such as commercial solid waste, nonhazardous sludge, conditionally exempt small quantity generator waste, and industrial solid waste. Portions of an MSW landfill may be separated by access roads. An MSW landfill may be publicly or privately owned. An MSW landfill may be a new MSW landfill, an existing MSW landfill, or a lateral expansion. (23) Municipal Solid Waste Landfill Emissions or MSW Landfill Emissions means gas generated by the decomposition of organic waste deposited in an MSW landfill or derived from the evolution of organic compounds in the waste. (24) NMOC means nonmethane organic compounds, as measured according to the provisions of Rule 15.3(d). (25) Nondegradable Waste means any waste that does not decompose through chemical breakdown or microbiological activity. Examples are, but are not limited to, concrete, municipal waste combustor ash, and metals. (26) Passive Collection System means a gas collection system that solely uses positive pressure within the landfill to move the gas rather than using gas mover equipment. (27) Sludge means any solid, semisolid, or liquid waste generated from a municipal, commercial, or industrial wastewater treatment plant, water supply treatment plant, or air pollution control facility, exclusive of the treated effluent from a wastewater treatment plant. (28) Solid waste means any garbage, sludge from a wastewater treatment plant, water supply treatment plant, or air pollution control facility and other discarded material, including solid, liquid, semisolid, or contained gaseous material resulting from industrial, commercial, mining, and agricultural operations, and from community activities, but does not include solid or dissolved material in domestic sewage, or solid or dissolved materials in irrigation return flows or industrial discharges that are point sources subject to permits under Title 33 U.S.C. § 1342, or source, special nuclear, or by-product material as defined by the Atomic Energy Act of 1954, as amended (Title 42 U.S.C. § 2011 et seq.) (29) Sufficient density means any number, spacing, and combination of collection system components, including vertical wells, horizontal collectors, and surface collectors, necessary to maintain emission and migration control as determined by measures of performance set forth in Rule 15.3. (30) Sufficient extraction rate means a rate sufficient to maintain a negative pressure at all wellheads in the collection system without causing air infiltration, including any wellheads connected to the system as a result of expansion or excess surface emissions, for the life of the blower. (b) Emission Standards. (1) Each owner or operator of an existing MSW landfill or a new MSW landfill having a design capacity less than two million five hundred thousand (2,500,000) megagrams by mass or two million five hundred thousand (2,500,000) cubic meters by volume shall submit an initial design capacity report to the Director as provided in Rule 15.3(g)(1). The landfill may calculate design capacity in either megagrams or cubic meters for comparison with the exemption values. Any density conversions shall be documented and submitted with the report. Submittal of the initial design capacity report shall fulfill the requirements of Rule 15.3 except as provided for in Rule 15.3(b)(1) and (2). a. The owner or operator shall submit to the Director an amended design capacity report, as provided for in Rule 15.3(g)(1)c. b. When an increase in the maximum design capacity of a landfill exempted from the provisions of Rule 15.3(b)(2) through Rule 15.3(i) on the basis of the design capacity exemption in Rule 15.3(b)(1) results in a revised maximum design capacity equal to or greater than two million five hundred thousand (2,500,000) megagrams and two million five hundred thousand (2,500,000) cubic meters, the owner or operator shall comply with the provision of Rule 15.3(b)(2). (2) Each owner or operator of an MSW landfill having a design capacity equal to or greater than two million five hundred thousand (2,500,000) megagrams and two million five hundred thousand (2,500,000) cubic meters, shall either comply with Rule 15.3(b)(2)b. or calculate an NMOC emission rate for the landfill using the procedures specified in Rule 15.3(d). The NMOC emission rate shall be recalculated annually, except as provided in Rule 15.3(g). The owner or operator of an MSW landfill subject to Rule 15.3 with a design capacity greater than or equal to two million five hundred thousand (2,500,000) megagrams and two million five hundred thousand (2,500,000) cubic meters is subject to Article III. of Chapter 4 entitled Part 70 Source Regulation and Permits. a. If the calculated NMOC emission rate is less than fifty (50) megagrams per year, the owner or operator shall: 1. Submit an annual emission report to the Director, except as provided for in Rule 15.3(g)(2)a.2.; and 2. Recalculate the NMOC emission rate annually using the procedures specified in Rule 15.3(d)(1)a. until such time as the calculated NMOC emission rate is equal to or greater than fifty (50) megagrams per year, or the landfill is closed. (i) If the NMOC emission rate, upon recalculation required in Rule 15.3(b)(2)a.2., is equal to or greater than fifty (50) megagrams per year, the owner or operator shall install a collection and control system in compliance with Rule 15.3(b(2)b. (ii) If the landfill is permanently closed, a closure notification shall be submitted to the Director and the Administrator as provided for in Rule 15.3(g)(4). b. If the calculated NMOC emission rate is equal to or greater than fifty (50) megagrams per year, the owner or operator shall: 1. Submit a collection and control system design plan prepared by a professional engineer to the Director within one (1) year after the submittal of an initial or annual NMOC report pursuant to Rule 15.3(g)(2) reporting this NMOC emission rate: (i) The collection and control system as described in the plan shall meet the design requirements of Rule 15.3(b)(2)b.2. (ii) The collection and control system design plan shall include any alternatives proposed by the owner or operator to the operational standards, test methods, procedures, compliance measures, monitoring, recordkeeping or reporting provisions of Rule 15.3(c) through (h). (iii) The collection and control system design plan shall either conform with specifications for active collection systems outlined in Rule 15.3(i) or include a demonstration to the Director's satisfaction of the sufficiency of the alternative provisions to Rule 15.3(i). (iv) The Director shall review the information submitted under Rule 15.3(b)(2)b.1.(i), (ii) and (iii) and either approve it, disapprove it, or request that additional information be submitted. Because of the many site-specific factors involved with landfill gas system design, alternative systems may be necessary. A wide variety of system designs are possible, such as vertical wells, combination horizontal and vertical collection systems, or horizontal trenches only, leachate collection components, and passive systems. 2. Install a collection and control system that captures the gas generated within the landfill as required under Rule 15.3(b)(2)b.2.(i) or b.2.(ii) and (b)(2)b.3. within thirty (30) months after the first annual report in which the emission rate equals or exceeds fifty (50) megagrams per year, unless Tier 2 or Tier 3 sampling demonstrates that the emission rate is less than fifty (50) megagrams per year, as specified in Rule 15.3(g)(3)a. or b. (i) An active collection system shall: (A) Be designed to handle the maximum expected gas flow rate from the entire area of the landfill that warrants control over the intended use period of the gas control or treatment system equipment; (B) Collect gas from each area, cell, or group of cells in the landfill in which the initial solid waste has been placed for a period of: (aa) Five (5) years or more if active; or (bb) Two (2) years or more if closed or at final grade; (C) Collect gas at a sufficient extraction rate; (D) Be designed to minimize off-site migration of subsurface gas. (ii) A passive collection system shall: (A) Comply with the provisions specified in Rule 15.3(b)(2)b.2.(i)(A), (B), and (D). (B) Be installed with liners on the bottom and all sides in all areas in which gas is to be collected. The liners shall be installed as required under Title 40 CFR § 258.40, which has been incorporated by reference in Chapter 4. 3. Route all the collected gas to a control system that complies with the requirements in either Rule 15.3(b)(2)b.3.(i), (ii) or (iii). (i) An open flare designed and operated in accordance with Title 40 CFR § 60.18, which has been incorporated by reference in Chapter 4; (ii) A control system designed and operated to reduce NMOC by ninety-eight (98) weight percent, or, when an enclosed combustion device is used for control, to either reduce NMOC by ninety-eight (98) weight percent or reduce the outlet NMOC concentration to less than 20 parts per million by volume, dry basis as hexane at three (3) percent oxygen. The reduction efficiency or parts per million by volume shall be established by an initial performance test to be completed no later than one hundred eighty (180) days after the initial startup of this approved control system using the test methods specified in Rule 15.3(d)(4). (A) If a boiler or process heater is used as the control device, the landfill gas stream shall be introduced into the flame zone. (B) The control device shall be operated within the parameter ranges established during the initial or most recent performance test. The operating parameters to be monitored are specified in Rule 15.3(f). (iii) Route the collected gas to a treatment system that processes the collected gas for subsequent sale or use. All emissions from any atmospheric vent from the gas treatment system shall be subject to the requirements of Rule 15.3(b)(2)b.3.(i) or (ii). 4. Operate the collection and control device installed to comply with Rule 15.3 in accordance with the provisions of Rule 15.3(c), (e) and (f). 5. The collection and control system may be capped or removed provided that all the conditions of Rule 15.3(b)(2)b.5.(i), (ii), and (iii) are met: (i) The landfill shall be a closed landfill as defined in Rule 15.3(a)(5). A closure report shall be submitted to the Director and Administrator as provided in Rule 15.3(g)(4). (ii) The collection and control system shall have been in operation a minimum of fifteen (15) years; and (iii) Following the procedures specified in Rule 15.3(d)(2), the calculated NMOC gas produced by the landfill shall be less than fifty (50) megagrams per year on three successive test dates. The test dates shall be no less than ninety (90) days apart, and no more than one hundred eighty (180) days apart. (3) Control of emissions from an existing MSW landfill is required and compliance with permitting requirements for Part 70 sources, contained in Article III of Chapter 4 of the Chattanooga City Code, is required if the existing landfill meets the following three (3) conditions: a. The landfill has accepted waste at any time since November 8, 1987, or had additional design capacity available for future waste deposition; b. The landfill has a design capacity greater than or equal to two million five hundred thousand (2,500,000) megagrams and two million five hundred thousand (2,500,000) cubic meters. The landfill may calculate design capacity in either megagrams or cubic meters for comparison with the exemption values. Any density conversions shall be documented and submitted with the report; and c. The landfill has a nonmethane organic compound emission rate of fifty (50) megagrams per year or more. (4) For the purposes of obtaining an operating permit under Article III. of Chapter 4, Part 70 Source Regulation and Permits, the owner or operator of a MSW landfill subject to Rule 15.3 with a design capacity less than two million five hundred thousand (2,500,000) megagrams or two million five hundred thousand (2,500,000) cubic meters is not subject to the requirement to obtain an operating permit for the landfill under Article III, unless the landfill is otherwise subject to Article III. For purposes of submitting a timely application for an operating permit under Article III., the owner or operator of a MSW landfill subject to Rule 15.3 with a design capacity greater than or equal to two million five hundred thousand (2,500,000) megagrams and two million five hundred thousand (2,500,000) cubic meters, and not otherwise subject to Article III., becomes subject to the requirements of Section 4-56(a)(1), regardless of when the design capacity report is actually submitted, no later than: a. Ninety (90) days after [the effective date of this ordinance] for MSW landfills that commenced construction, modification or reconstruction before [the effective date of this ordinance]; b. Ninety (90) days after the date of commenced construction, modification, or reconstruction for MSW landfills that commence construction, modification, or reconstruction on or after [the effective date of this ordinance]. (5) When a MSW landfill subject to Rule 15.3 is closed, the owner or operator is no longer subject to the requirement to maintain an operating permit under Article III. for the landfill if the landfill is not otherwise subject to the requirements of Article III. and if either of the following conditions are met: a. The landfill was never subject to the requirement for a control system under Rule 15.3; or b. The owner or operator meets the conditions for control system removal specified in Rule 15.3 (b)(2)b.5. (c) Operational Standards for Collection and Control Systems. Each owner or operator of an MSW landfill gas collection system used to comply with the provisions of Rule 15.3(b)(2)b.2. shall: (1) Operate the collection system such that gas is collected from each area, cell, or group of cells in the MSW landfill in which solid waste has been in place for: a. Five (5) years or more if active; or b. Two (2) years or more if closed or at final grade; (2) Operate the collection system with negative pressure at each wellhead except under the following conditions: a. A fire or increased well temperature. The owner or operator shall record instances when positive pressure occurs in efforts to avoid a fire. These records shall be submitted with the annual reports as provided in Rule 15.3(g)(6)a.; b. Use of a geomembrane or synthetic cover. The owner or operator shall develop acceptable pressure limits in the design plan; c. A decommissioned well. A well may experience a static positive pressure after shutdown to accommodate for declining flows. All design changes shall be approved by the Director. (3) Operate each interior wellhead in the collection system with a landfill gas temperature less than Fifty-five degrees (55°) Celsius and with either a nitrogen level less than twenty percent (20%) or an oxygen level less than five percent (5%). The owner or operator may establish a higher operating temperature. nitrogen, or oxygen value at a particular well. A higher operating value demonstration shall show supporting data that the elevated parameter does not cause fires or significantly inhibit anaerobic decomposition by killing methanogens. a. The nitrogen level shall be determined using Method 3C as described in Section 4-3(c) of Chapter 4, unless an alternative test method is established as allowed by Rule 15.3(b)(2)b.1. b. Unless an alternative test method is established as allowed by Rule15.3(b)(2)b.1., the oxygen shall be determined by an oxygen meter using Method 3A as described in Section 4-3(c) of Chapter 4 except that: 1. The span shall be set so that the regulatory limit is between twenty percent (20%) and fifty percent (50%) of the span; 2. A data recorder is not required; 3. Only two (2) calibration gases are required, a zero and span, and ambient air may be used as the span; 4. A calibration error check is not required; 5. The allowable sample bias, zero drift, and calibration drift are ± ten percent (10%). (4) Operate the collection system so that the methane concentration is less than five hundred (500) parts per million above background at the surface of the landfill. To determine if this level is exceeded, the owner or operator shall conduct surface testing around the perimeter of the collection area and along a pattern that traverses the landfill at thirty (30) meter intervals and where visual observations indicate elevated concentrations of landfill gas, such as distressed vegetation and cracks or seeps in the cover. The owner or operator may establish an alternative traversing pattern that ensures equivalent coverage. A surface monitoring design plan shall be developed that includes a topographical map with the monitoring route and the rationale for any site-specific deviations from the thirty (30) meter intervals. Areas with steep slopes or other dangerous areas may be excluded from the surface testing. (5) Operate the system such that all collected gases are vented to a control system designed and operated in compliance with Rule 15.3(b)(2)b.3. In the event the collection or control system is inoperable, the gas mover system shall be shut down and all valves in the collection and control system contributing to venting of the gas to the atmosphere shall be closed within one (1)hour. (6) Operate the control or treatment system at all times when the collected gas is routed to the system. (7) If monitoring demonstrates that the operational requirements in Rule 15.3(c)(2), (3) or (4) are not met, corrective action shall be taken as specified in Rule 15.3(e)(1)c., d. and e. or Rule 15.3(e)(3). If corrective actions are taken as specified in Rule 15.3(e), the monitored exceedance is not a violation of the operational requirements of Rule 15.3(c). (d) Test Methods and Procedures. (1) a. The landfill owner or operator shall calculate the NMOC emission rate using either the equation provided in Rule 15.3(d)(1)a.1. or the equation provided in Rule 15.3(d)(1)a.2. Both equations may be used if the actual year-to-year solid waste acceptance rate is known, as specified in Rule 15.3(d)(1)a.1., for part of the life of the landfill and the actual year-to-year solid waste acceptance rate is unknown, as specified in Rule 15.3(d)(1)a.2., for part of the life of the landfill. The values to be used in both equations are five-hundredths (0.05) per year for k, one hundred seventy (170) cubic meters per megagram for L 0 , and four thousand (4,000) parts per million by volume as hexane for the C NMOC . For landfills located in geographical areas with a thirty (30) year annual average precipitation of less than twenty-five (25) inches, as measured at the nearest representative official meteorologic site, the k value to be used is two-hundredths (0.02) per year. 1. The following equation shall be used if the actual year-to-year solid waste acceptance rate is known: n M NMOC | = Σ 2 k L 0 M i (e- kt i ) (C NMOC ) (3.6 × 10 -9 ) i=1 where, M NMOC | = | Total NMOC emission rate from the landfill, megagrams per year k | = | Methane generation rate constant, year -1 L 0 | = | Methane generation potential, cubic meters per megagram solid waste M i | = | Mass of solid waste in the i th section, megagrams t i | = | Age of the i th section, years C NMOC | = | Concentration of NMOC, parts per million by volume as hexane 3.6 × 10 -9 | = | Conversion factor The mass of nondegradable solid waste may be subtracted from the total mass of solid waste in a particular section of the landfill when calculating the value for M i if the documentation of the nature and amount of such wastes is maintained. 2. The following equation shall be used if the actual year-to-year solid waste acceptance rate is unknown: M NMOC | = | 2L 0 R (e -ke - e -kt ) (C NMOC ) (3.6 × 10 -9 ) where, M NMOC | = | Mass emission rate of NMOC, megagrams per year L 0 | = | Methane generation potential, cubic meters per megagram solid waste R | = | Average annual acceptance rate, megagrams per year k | = | Methane generation rate constant, year -1 t | = | Age of landfill, years C NMOC | = | Concentration of NMOC, parts per million by volume as hexane c | = | Time since closure, years. For active landfill c = 0 and e -kc = 1 3.6 × 10 -9 | = | Conversion factor The mass of nondegradable solid waste may be subtracted from the total mass of solid waste in a particular section of the landfill when calculating a value for R, if documentation of the nature and amount of such wastes is maintained. b. Tier 1. The owner or operator shall compare the calculated NMOC mass emission rate to the standard of fifty (50) megagrams per year. 1. If the NMOC emission rate calculated in Rule 15.3(d)(1)a. is less than fifty (50) megagrams per year, then the landfill owner shall submit an emission rate report as provided in Rule 15.3(g)(2)a. and shall recalculate the NMOC mass emission rate annually as required by Rule 15.3(b)(2)a. 2. If the calculated NMOC emission rate is equal to or greater than fifty (50) megagrams per year, then the landfill owner shall either comply with Rule 15.3(b)(2)b. or determine a site-specific NMOC concentration and recalculate the NMOC emission rate using the procedures provided in Rule 15.3(d)(1)c. c. Tier 2. The landfill owner or operator shall determine the NMOC concentration using the following sampling procedure. The landfill owner or operator shall install at least two (2) sample probes per hectare of landfill surface that has retained waste for at least two (2) years. If the landfill is larger than twenty-five (25) hectares in area, only fifty (50) samples are required. The sample probes should be located to avoid known areas of nondegradable solid waste. The owner or operator shall collect and analyze one (1) sample of landfill gas from each probe to determine the NMOC concentration using Title 40 CFR Part 60, Appendix A, Method 25C or Method 18, which have been incorporated by reference in Chapter 4 and are described in Section 4-3(c). If using Method 18 of Appendix A, the minimum list of compounds to be tested shall be those published in the Fifth Edition January 1995 U.S. Environmental Protection Agency Compilation of Air Pollutant Emission Factors (AP-42). If composite sampling is used, equal volumes shall be taken from each sample probe. If more than the required number of samples are taken, all samples shall be used in the analysis. The landfill owner or operator shall divide the NMOC concentration from Method 25C of Appendix A of Title 40 CFR Part 60 by six (6) to convert from C NMOC as carbon to C NMOC as hexane. 1. The landfill owner or operator shall recalculate the NMOC mass emission rate using the equations provided in Rule 15.3(d)(1)a.1. or a.2. and using the average NMOC concentration from the collected samples instead of the default value in the equation provided in Rule 15.3(d)(1)a. 2. If the resulting mass emission rate calculated using the site-specific NMOC concentration is equal to or greater than fifty (50) megagrams per year, then the landfill owner or operator shall either comply with Rule 15.3(b)(2)b., or determine the site-specific methane generation rate constant and recalculate the NMOC emission rate using the site-specific methane generation rate using the procedure specified in Rule 15.3(d)(1)d. 3. If the resulting NMOC mass emission rate is less than fifty (50) megagrams per year, the owner or operator shall submit a periodic estimate of the emission rate report as provided in Rule 15.3(g)(2)a. and retest the site-specific NMOC concentration every five (5) years using the methods specified in Rule 15.3(d). d. Tier 3. The site-specific methane generation rate constant shall be determined using the procedures provided in Method 2E of Appendix A of Title 40 CFR Part 60, which has been incorporated by reference in Chapter 4 and is described in Section 4-3(c). The landfill owner or operator shall estimate the NMOC mass emission rate using equations in Rule 15.3(d)(1)a.1. or a.2. and using a site-specific methane generation rate constant k, and the site-specific NMOC concentration as determined in Rule 15.3(d)(1)c. instead of the default values provided in Rule 15.3(d)(1)a. The landfill owner or operator shall compare the resulting NMOC mass emission rate to the standard of fifty (50) megagrams per year. 1. If the NMOC mass emission rate as calculated using the site-specific methane generation rate and concentration of NMOC is equal to or greater than fifty (50) megagrams per year, the owner or operator shall comply with Rule 15.3(b)(2)b. 2. If the NMOC mass emission rate is less than fifty (50) megagrams per year, then the owner or operator shall submit a periodic emission rate report as provided in Rule 15.3(g)(2) and shall recalculate the NMOC mass emission rate annually, as provided in Rule 15.3(g)(2) using the equations in Rule 15.3(d)1)a. and using the site-specific methane generation rate constant and NMOC concentration obtained in Rule 15.3(d)(1)c. The calculation of the methane generation rate constant is performed only once, and the value obtained from this test shall be used in all subsequent annual NMOC emission rate calculations. e. The owner or operator may use other methods to determine the NMOC concentration or a site-specific k as an alternative to the methods required in Rule 15.3(d)(1)c. and d. if the method has been approved by the Administrator. (2) After the installation of a collection and control system in compliance with Rule 15.3(e), the owner or operator shall calculate the NMOC emission rate for purposes of determining when the system can be removed as provided in Rule 15.3(b)(2)b.5. using the following equation: M NMOC | = | 1.89 × 10 -3 Q LFG C NMOC where, M NMOC | = | mass emission rate of NMOC, megagrams per year Q LFG | = | flow rate of landfill gas, cubic meters per minute C NMOC | = | NMOC concentration, parts per million by volume as hexane a. The flow rate of landfill gas, Q LFG , shall be determined by measuring the total landfill gas flow rate at the common header pipe that leads to the control device using a gas flow measuring device calibrated according to the provisions of Section 4 of Method 2E of Appendix A of Title 40 CFR Part 60, which has been incorporated by reference in Chapter 4 and is described in Section 4-3(c). b. The average NMOC concentration, C NMOC , shall be determined by collecting and analyzing landfill gas sampled from the common header pipe before the gas moving or condensate removal equipment using the procedures in Method 25C or Method 18 of Appendix A of Title 40 CFR Part 60, which have been incorporated by reference in Chapter 4 and are described at Section 4-3(c). If using Method 18, the minimum list of compounds to be tested shall be those published in the Fifth Edition January 1995 U.S. Environmental Protection Agency Compilation of Air Pollutant Emission Factors (AP-42). The sample location on the common header pipe shall be before any condensate removal or other gas refining units. The landfill owner or operator shall divide the NMOC concentration from Method 25C by six (6) to convert from C NMOC as carbon to C NMOC as hexane. c. The owner or operator may use another method to determine landfill gas flow rate and NMOC concentration if the method has been approved by the Administrator. (3) When calculating emissions for PSD purposes, the owner or operator of each MSW landfill subject to the provisions of Rule 15.3 shall estimate the NMOC emission rate for comparison to the PSD major source and significance levels in Section 4-41, Rule 18 using AP-42 or other measurement procedures approved in advance by the Director. (4) For the performance test required in Rule 15.3(b)(2)b.3.(ii), Method 25C or Method 18 of Appendix A of Title 40 CFR Part 60, which have been incorporated by reference in Chapter 4 and are described at Section 4-3(c), shall be used to determine compliance with the ninety-eight (98) weight-percent efficiency or the twenty (20) ppmv outlet concentration level, unless another method to demonstrate compliance has been approved by the Administrator. If using Method 18 of Appendix A of Title 40 CFR Part 60, the minimum list of compounds to be tested shall be those published in the Fifth Edition January 1995 U.S. Environmental Protection Agency Compilation of Air Pollutant Emission Factors (AP-42). The following equation shall be used to calculate efficiency: Control Efficiency | = | (NMOC in - NMOC out )/(NMOC in ) where, NMOC in | = | Mass of NMOC entering control device NMOC out | = | Mass of NMOC exiting control device (e) Compliance Provisions. (1) Except as provided in Rule 15.3(b)(2)b.1.(ii), the specified methods in Rule 15.3(e)(1)a. through f. shall be used to determine whether the gas collection system is in compliance with Rule 15.3(b)(2)b.2. a. For the purposes of calculating the maximum expected gas generation flow rate from the landfill to determine compliance with Rule 15.3(b)(2)b.2.(i)(A), one (1) of the following equations shall be used. The k and L 0 kinetic factors should be those published in the Fifth Edition January, 1995 U.S. Environmental Protection Agency Compilation of Air Pollutant Emission Factors (AP-42) or other site- specific values demonstrated to be appropriate and approved by the Director. If k has been determined as specified in Rule 15.3(d)(1)d., the value of k determined from the test shall be used. A value of no more than fifteen (15) years shall be used for the intended use period of the gas mover equipment. The active life of the landfill is the age of the landfill plus the estimated number of years until closure. 1. For sites with unknown year-to-year solid waste acceptance rate: Q M | = | 2L 0 R (e -kc - e -kt ) where, Q M | = | Maximum expected gas generation flow rate, cubic meters per year L 0 | = | Methane generation potential, cubic meters per megagram solid waste R | = | Average annual acceptance rate, megagrams per year k | = | Methane generation rate constant, year -1 t | = | Age of the landfill at equipment installation plus the time the owner or operator intends to use the gas mover equipment or active life of the landfill, whichever is less. If the equipment is installed after closure, t is the age of the landfill at installation, years c | = | Time since closure, years (for an active landfill c = 0 and e -kc = 1) 2. For sites with known year-to-year solid waste acceptance rate: n Q M | = | Σ 2 k L 0 M i (e -kt i) i=1 where, Q M | = | Maximum expected gas generation flow rate, cubic meters per year k | = | Methane generation rate constant, year -1 L 0 | = | Methane generation potential, cubic meters per megagram solid waste M i | = | Mass of solid waste in the i th section, megagrams t i | = | Age of the i th section, years 3. If a collection and control system has been installed, actual flow data may be used to project the maximum expected gas generation flow rate instead of, or in conjunction with, the equations in Rule 15.3(e)(1)a.1. and a.2. If the landfill is still accepting waste, the actual measured flow data will not equal the maximum expected gas generation rate, so calculations using the equations in Rule 15.3(e)(1)a.1. and a.2. or other methods shall be used to predict the maximum expected gas generation rate over the intended period of use of the gas control system equipment. b. For the purposes of determining sufficient density of gas collectors for compliance with Rule 15.3(b)(2)b.2.(i)(B), the owner or operator shall design a system of vertical wells, horizontal collectors, or other collection devices, satisfactory to the Director, capable of controlling and extracting gas from all portions of the landfill sufficient to meet all operational and performance standards. c. For the purpose of demonstrating whether the gas collection system flow rate is sufficient to determine compliance with Rule 15.3(b)(2)b.2.(i)(C), the owner or operator shall measure gauge pressure in the gas collection header at each individual well monthly. If a positive pressure exists, action shall be initiated to correct the exceedance within five (5) calendar days, except for the three (3) conditions allowed under Rule 15.3(c)(2). If negative pressure cannot be achieved without excess air infiltration within fifteen (15) calendar days of the first measurement, the gas collection system shall be expanded to correct the exceedance within one hundred twenty (120) days of the initial measurement of positive pressure. Any attempted corrective measure shall not cause exceedances of other operational or performance standards. An alternative timeline for correcting the exceedance may be submitted to the Director for approval. d. Owners or operators are not required to expand the system as required in Rule 15.3(e)(1)c. during the first one hundred eighty (180) days after gas collection system start-up. e. For the purpose of identifying whether excess air infiltration into the landfill is occurring, the owner or operator shall monitor each well monthly for temperature and nitrogen or oxygen as provided in Rule 15.3(c)(3). If a well exceeds one (1) of these operating parameters, action shall be initiated to correct the exceedance within five (5) calendar days. If correction of the exceedance cannot be achieved within fifteen (15) calendar days of the first measurement, the gas collection system shall be expanded to correct the exceedance within one hundred twenty (120) days of the initial exceedance. Any attempted corrective measure shall not cause exceedances of other operational or performance standards. An alternative timeline for correcting the exceedance may be submitted to the Director for approval. f. An owner or operator seeking to demonstrate compliance with Rule 15.3 (b)(2)b.2.(i)(D) through the use of a collection system not conforming to the specifications provided in Rule 15.3(i) shall provide information satisfactory to the Director as specified in Rule 15.3(b)(2)b.1.(iii) demonstrating that offsite migration is being controlled. (2) For purposes of compliance with Rule 15.3(c)(1), each owner or operator of a controlled landfill shall place each well or design component as specified in the approved design plan as provided in Rule 15.3(b)(2)b.1. Each well shall be installed no later than sixty (60) days after the date on which the initial solid waste has been in place for a period of: a. 5 years or more if active; or b. 2 years or more if closed or at final grade. (3) The following procedures shall be used for compliance with the surface methane operational standard as provided in Rule 15.3(c)(4). a. After installation of the collection system, the owner or operator shall monitor surface concentrations of methane along the entire perimeter of the collection area and along a pattern that traverses the landfill at thirty (30) meter intervals (or a site-specific established spacing) for each collection area on a quarterly basis using an organic vapor analyzer, flame ionization detector, or other portable monitor meeting the specifications provided in Rule 15.3(e)(4). b. The background concentration shall be determined by moving the probe inlet upwind and downwind outside the boundary of the landfill at a distance of at least thirty (30) meters from the perimeter wells. c. Surface emission monitoring shall be performed in accordance with Section 4.3.1 of Method 21 of Appendix A of Title 40 CFR Part 60, which has been incorporated by reference in Chapter 4 and is described in Section 4-3(c) except that the probe inlet shall be placed within five (5) to ten (10) centimeters of the ground. Monitoring shall be performed during typical meteorological conditions. d. Any reading of five hundred (500) parts per million or more above background at any location shall be recorded as a monitored exceedance and the actions specified in Rule 15.3(e)(3)d.1. through 5. shall be taken. As long as the specified actions are taken, the exceedance is not a violation of the operational requirements of Rule 15.3(c)(4). 1. The location of each monitored exceedance shall be marked and the location recorded. 2. Cover maintenance or adjustments to the vacuum of the adjacent wells to increase the gas collection in the vicinity of each exceedance shall be made and the location shall be re-monitored within ten (10) calendar days of detecting the exceedance. 3. If the re-monitoring of the location shows a second exceedance, additional corrective action shall be taken and the location shall be monitored again within ten (10) days of the second exceedance. If the re-monitoring shows a third exceedance for the same location, the action specified in Rule 15.3(e)(3)d.5. shall be taken, and no further monitoring of that location is required until the action specified in Rule 15.3(e)(3)d.5. has been taken. 4. Any location that initially showed an exceedance but has a methane concentration less than five hundred (500) ppm methane above background at the ten (10) day re-monitoring specified in Rule 15.3(e)(3)d.2. or d.3. shall be re-monitored one (1) month from the initial exceedance. If the l-month re-monitoring shows a concentration less than five hundred (500) parts per million above background, no further monitoring of that location is required until the next quarterly monitoring period. If the l-month re-monitoring shows an exceedance, the actions specified in Rule 15.3(e)(3)d.3. or d.5. shall be taken. 5. For any location where monitored methane concentration equals or exceeds five hundred (500) parts per million above background three times within a quarterly period, a new well or other collection device shall be installed within one hundred twenty (120) calendar days of the initial exceedance. An alternative remedy to the exceedance, such as upgrading the blower, header pipes or control device, and a corresponding timeline for installation may be submitted to the Director for approval. e. The owner or operator shall implement a program to monitor for cover integrity and implement cover repairs as necessary on a monthly basis. (4) Each owner or operator seeking to comply with the provisions in Rule 15.3(e)(3) shall comply with the following instrumentation specifications and procedures for surface emission monitoring devices: a. The portable analyzer shall meet the instrument specifications provided in Section 3 of Method 21 of Appendix A of Title 40 CFR Part 60, which has been incorporated by reference in Chapter 4 and is described at Section 4-3(c)(3), except that "methane" shall replace all references to VOC. b. The calibration gas shall be methane, diluted to a nominal concentration of five hundred (500) parts per million in air. c. To meet the performance evaluation requirements in Section 3.1.3 of Method 21 of Appendix A of Title 40 CFR Part 60, the instrument evaluation procedures of Section 4.4 of Method 21 of Appendix A shall be used. d. The calibration procedures provided in Section 4.2 of Method 21 of Appendix A of Title 40 CFR Part 60 shall be followed immediately before commencing a surface monitoring survey. (5) The provisions of Rule 15.3 apply at all times, except during periods of start-up, shutdown or malfunction, provided that the duration of start-up, shutdown or malfunction shall not exceed five (5) days for collection systems and shall not exceed one (1) hour for treatment or control devices. A log of all start-ups, shutdown and malfunctions must be maintained on site. (f) Monitoring of Operations. Except as provided in Rule 15.3(b)(2)b.1.(ii): (1) Each owner or operator seeking to comply with Rule 15.3(b)(2)b.2.(i)(A) for an active gas collection system shall install a sampling port and a thermometer, other temperature measuring device, or an access port for temperature measurements at each wellhead and: a. Measure the gauge pressure in the gas collection header on a monthly basis as provided in Rule 15.3(e)(1)c.; and b. Monitor nitrogen or oxygen concentration in the landfill gas on a monthly basis as provided in Rule 15.3(e)(1)e.; and c. Monitor temperature of the landfill gas on a monthly basis as provided in Rule 15.3(e)(1)e. (2) Each owner or operator seeking to comply with Rule 15.3(b)(2)b.3. by using an enclosed combustor shall calibrate, maintain, and operate according to the manufacturer's specifications, the following equipment: a. A temperature monitoring device equipped with a continuous recorder and having a minimum accuracy of ± one percent (1%) of the temperature being measured expressed in degrees Celsius or ± one-half-degrees (0.5°) Celsius, whichever is greater. A temperature monitoring device is not required for boilers or process heaters with design heat input capacity greater than forty-four (44) megawatts. b. A device that records flow to or bypass of the control device. The owner or operator shall either: 1. Install, calibrate, and maintain a gas flow rate measuring device that shall record the flow to the control device at least every fifteen (15) minutes; or 2. Secure the bypass line valve in the closed position with a car-seal or a lock-and-key type configuration. A visual inspection of the seal or closure mechanism shall be performed at least once every month to ensure that the valve is maintained in the closed position and that the gas flow is not diverted through the bypass line. (3) Each owner or operator seeking to comply with Rule 15.3(b)(2)b.3. by using an open flare shall install, calibrate, maintain, and operate according to the manufacturer's specifications the following equipment: a. A heat sensing device, such as an ultraviolet beam sensor or thermocouple, at the pilot light or the flame itself to indicate the continuous presence of a flame. b. A device that records flow to or bypass of the flare. The owner or operator shall either: 1. Install, calibrate, and maintain a gas flow rate measuring device that shall record the flow to the control device at least fifteen (15) minutes; or 2. Secure the bypass line valve in the closed position with a car-seal or a lock-and-key type configuration. A visual inspection of the seal or closure mechanism shall be performed at least once every month to ensure that the valve is maintained in the closed position and that the gas flow is not diverted through the bypass line. (4) Each owner or operator seeking to demonstrate compliance with Rule 15.3(b)(2)b.3. by using a device other than an open flare or an enclosed combustor shall provide information satisfactory to the Director as provided in Rule 15.3(b)(2)b.1.(ii) describing the operation of the control device, the operating parameters that would indicate proper performance, and appropriate monitoring procedures. The Director shall review the information and either approve it, or request that additional information be submitted. The Director may specify additional appropriate monitoring procedures. (5) Each owner or operator seeking to install a collection system that does not meet the specifications in Rule 15.3(i) or seeking to monitor alternative parameters to those required by Rule 15.3(c) through (f) shall provide information satisfactory to the Director as provided in Rule 15.3(b)(2)b.1.(ii) and (iii) describing the design and operation of the collection system, the operating parameters that would indicate proper performance, and appropriate monitoring procedures. The Director may specify additional appropriate monitoring procedures. (6) Each owner or operator seeking to demonstrate compliance with Rule 15.3(e)(3) shall monitor surface concentrations of methane according to the instrument specifications and procedures provided in Rule 15.3(e)(4). Any closed landfill that has no monitored exceedances of the operational standard in three (3) consecutive quarterly monitoring periods may skip to annual monitoring. Any methane reading of five hundred (500) ppm or more above background detected during the annual monitoring returns the frequency for that landfill to quarterly monitoring. (g) Reporting Requirements. Except as provided in Rule 15.3(b)(2)b.1.(ii): (1) Each owner or operator subject to the requirements of Rule 15.3 shall submit an initial design capacity report to the Director. a. The initial design capacity report shall fulfill the requirements of the notification of the date construction is commenced as required under Title 40 CFR § 60.7(a)(1), which has been incorporated by reference in Chapter 4, and shall be submitted no later than ninety (90) days after [the effective date of Rule 15.3] by each existing MSW landfill. The initial design capacity report for a new MSW landfill shall be submitted no later than ninety (90) days after the date of commencement of construction, reconstruction, or modification as defined in Rule 15.3(a)(21), for landfills that commence construction, modification, or reconstruction on or after [the effective date of this ordinance]. b. The initial design capacity report shall contain the following information: 1. A map or plot of the landfill, providing the size and location of the landfill, and identifying all areas where solid waste may be landfilled according to the permit issued by the State or local agency responsible for regulating the landfill; 2. The maximum design capacity of the landfill. Where the maximum design capacity is specified in the permit issued by the State or local, agency responsible for regulating the landfill, a copy of the permit specifying the maximum design capacity may be submitted as part of the report. If the maximum design capacity of the landfill is not specified in the permit, the maximum design capacity shall be calculated using good engineering practices. The calculations shall be provided, along with the relevant parameters as part of the report. The Director may request other reasonable information as may be necessary to verify the maximum design capacity of the landfill. c. An amended design capacity report shall be submitted to the Director providing notification of an increase in the design capacity of the landfill, within ninety (90) days of an increase in the maximum design capacity of the landfill to or above two million five hundred thousand (2,500,000) megagrams and two million five hundred thousand (2,500,000) cubic meters. This increase in design capacity may result from an increase in the permitted volume of the landfill or an increase in the density as documented in the annual recalculation required in Rule 15.3(h)(6). (2) Each owner or operator subject to the requirements of Rule 15.3 shall submit an NMOC emission rate report to the Director initially and annually thereafter, except as provided for in Rule 15.3(g)(2)a.2. or c. The Director may request such additional information as may be necessary to verify the reported NMOC emission rate. a. The NMOC emission rate report shall contain an annual or five (5) year estimate of the NMOC mission rate calculated using the formula and procedures provided in Rule 15.3(d)(1) or (2) as applicable. 1. The initial NMOC emission rate report shall be submitted within ninety (90) days after [the effective date of Rule 15.3] by each existing MSW landfill, and within ninety (90) days after the commencement of construction, modification, or reconstruction by each new MSW landfill maybe combined with the initial design capacity report required in Rule 15.3(g)(1) and shall be submitted no later than indicated in Rule 15.3(g)(2)a.1. Subsequent NMOC emission rate reports shall be submitted annually thereafter, except as provided for in Rule 15.3(g)(2)a.2. and Rule 15.3(g)(2)c. 2. If the estimated NMOC emission rate as reported in the annual report to the Director is less than fifty (50) megagrams per year in each of the next five (5) consecutive years, the owner or operator may elect to submit an estimate of the NMOC emission rate for the next five (5) year period in lieu of the annual report. This estimate shall include the current amount of solid waste-in-place and the estimated waste acceptance rate for each year of the five (5) years for which an NMOC emission rate is estimated. All data and calculations upon which this estimate is based shall be provided to the Director. This estimate shall be revised at least once every five (5) years. If the actual waste acceptance rate exceeds the estimated waste acceptance rate in any year reported in the five (5) year estimate, a revised five (5) year estimate shall be submitted to the Director. The revised estimate shall cover the five (5) year period beginning with the year in which the actual waste acceptance rate exceeded the estimated waste acceptance rate. b. The NMOC emission rate report shall include all the data, calculations, sample reports and measurements used to estimate the annual or five (5) year emissions. c. Each owner or operator subject to the requirements of Rule 15.3 is exempted from the requirements of Rule 15.3(g)(2)a. and b., after the installation of a collection and control system in compliance with Rule 15.3(b)(2)b., during such time as the collection and control system is in operation and in compliance with Rule 15.3(c) and (e). (3) Each owner or operator subject to the provisions of Rule 15.3(b)(2)b.1. shall submit a collection and control system design plan to the Director within one (1) year of the first report, required under Rule 15.3(g)(2), in which the emission rate equals or exceeds fifty (50) megagrams per year, except as follows: a. If the owner or operator elects to recalculate the NMOC emission rate after Tier 2 NMOC sampling and analysis as provided in Rule 15.3(d)(1)c. and the resulting rate is less than fifty (50) megagrams per year, annual periodic reporting shall be resumed, using the Tier 2 determined site-specific NMOC concentration, until the calculated emission rate is equal to or greater than fifty (50) megagrams per year or the landfill is closed. The revised NMOC emission rate report, with the recalculated emission rate based on NMOC sampling and analysis, shall be submitted within one hundred eighty (180) days of the first calculated exceedance of fifty (50) megagrams per year. b. If the owner or operator elects to recalculate the NMOC emission rate after determining a site-specific methane generation rate constant (k) as provided in Tier 3 in Rule 15.3(d)(1)d., and the resulting NMOC emission rate is less than fifty (50) megagrams per year, annual periodic reporting shall be resumed. The resulting site-specific methane generation rate constant (k) shall be used in the emission rate calculation until such time as the emissions rate calculation results in an exceedance. The revised NMOC emission rate report based on the provisions of Rule 15.3(d)(1)d. and the resulting site-specific methane generation rate constant (k) shall be submitted to the Director within one (1) year of the first calculated emission rate exceeding fifty (50) megagrams per year. (4) Each owner or operator of a controlled landfill shall submit a closure report to the Director and the Administrator within thirty (30) days of waste acceptance cessation. The Director or the Administrator may request additional information as may be necessary to verify that permanent closure has taken place in accordance with the requirements of Title 40 CFR § 258.60, which has been incorporated by reference in Chapter 4. If a closure report has been submitted to the Director and the Administrator, no additional wastes may be placed in the landfill without filing a notification of modification as described under Title 40 CFR § 60.7 (a)(4), which has been incorporated by reference in Chapter 4. (5) Each owner or operator of a controlled landfill shall submit an equipment removal report to the Director thirty (30) days prior to removal or cessation of operation of the control equipment. a. The equipment removal report shall contain all of the following items: 1. A copy of the closure report submitted in accordance with Rule 15.3(g)(4); 2. A copy of the initial performance test report demonstrating that the fifteen (15) year minimum control period has expired; and 3. Dated copies of three (3) successive NMOC emission rate reports demonstrating that the landfill is no longer producing fifty (50) megagrams or greater of NMOC per year. b. The Director may request such additional information as may be necessary to verify that all of the conditions for removal in Rule 15.3(b)(2)b.5. have been met. (6) Each owner or operator of a landfill seeking to comply with Rule 15.3(b)(2)b. using an active collection system designed in accordance with Rule 15.3(b)(2)b.2. shall submit to the Director annual reports of the recorded information required by Rule 15.3(g)(6)a. through f. The initial annual report shall be submitted within one hundred eighty (180) days of installation and start-up of the collection and control system or within one hundred eighty (180) days of the date of adoption of Rule 15.3 for existing collection systems, and shall include the initial performance test report required under Title 40 CFR § 60.8, which has been incorporated by reference in Chapter 4. For enclosed combustion devices and flares, reportable exceedances are defined under Rule 15.3(h)(3). a. Value and length of time for exceedance of applicable parameters monitored under Rule 15.3(f)(1), (2), (3), and (4). b. Description and duration of all periods when the gas stream is diverted from the control device through a bypass line or the indication of bypass flow as specified under Rule 15.3(f). c. Description and duration of all periods when the control device was not operating for a period exceeding one (1) hour and length of time the control device was not operating. d. All periods when the collection system was not operating in excess of five (5) days. e. The location of each exceedance of the five hundred (500) parts per million methane concentration as provided in Rule 15.3(c)(4) and the concentration recorded at each location for which an exceedance was recorded in the previous month. f. The date of installation and the location of each well or collection system expansion added pursuant to Rule 15.3(e)(1)c., (e)(2), and (e)(3)d. (7) Each owner or operator seeking to comply with Rule 15.3(b)(2)b.3. shall include the following information with the initial performance test report required under Title 40 CFR § 60.8, which has been incorporated by reference in Chapter 4: a. A diagram of the collection system showing collection system positioning including all wells, horizontal collectors, surface collectors, or other gas extraction devices, including the locations of any areas excluded from collection and the proposed sites for the future collection system expansion; b. The data upon which the sufficient density of wells, horizontal collectors, surface collectors, or other gas extraction devices and the gas mover equipment sizing are based; c. The documentation of the presence of asbestos or nondegradable material for each area from which collection wells have been excluded based on the presence of asbestos or nondegradable material; d. The sum of the gas generation flow rates for all areas from which collection wells have been excluded based on nonproductivity and the calculations of gas generation flow rate for each excluded area; e. The provisions for increasing gas mover equipment capacity with increased gas generation flow rate, if the present gas mover equipment is inadequate to move the maximum flow rate expected over the life of the landfill; and f. The provisions for the control of off-site migration. (h) Recordkeeping Requirements. (1) Except as provided in Rule 15.3(b)(2)b.1., each owner or operator of an MSW landfill subject to the provisions of Rule 15.3(b)(2) shall keep for at least five (5) years up-to-date, readily accessible, on-site records of the design capacity report which triggered Rule 15.3(b)(2), the current amount of solid waste in-place, and the year-by-year waste acceptance rate. Off-site records may be maintained if they are retrievable within four (4) hours. Either paper copy or electronic formats are acceptable. (2) Except as provided in Rule 15.3(b)(2)b.1.(ii), each owner or operator of a controlled landfill shall keep up-to-date, readily accessible records for the life of the control equipment of the data listed in Rule 15.3(h)(2)a. through d. as measured during the initial performance test or compliance determination. Records of subsequent tests or monitoring shall be maintained for a minimum of five (5) years. Records of the control device vendor specifications shall be maintained until removal. a. Where an owner or operator subject to the provisions of Rule 15.3 seeks to demonstrate compliance with Rule 15.3(b)(2)b.2.: 1. The maximum expected gas generation flow rate as calculated in Rule 15.3(e)(1)a. The owner or operator may use another method to determine the maximum gas generation flow rate, if the method has been approved by the Director. 2. The density of wells, horizontal collectors, surface collectors, or other gas extraction devices determined using the procedures specified in Rule 15.3(i)(1)a. b. Where an owner or operator subject to the provisions of Rule 15.3 seeks to demonstrate compliance with Rule 15.3(b)(2)b.3. through use of an enclosed combustion device other than a boiler or process heater with a design heat input capacity greater than forty-four (44) megawatts: 1. The average combustion temperature measured at least every fifteen (15) minutes and averaged over the same time period of the performance test. 2. The percent reduction of NMOC determined as specified in Rule 15.3(b)(2)b.3. achieved by the control device. c. Where an owner or operator subject to the provisions of Rule 15.3 seeks to demonstrate compliance with Rule 15.3(b)(2)b.3.(ii)(A) through use of a boiler or process heater of any size: a description of the location at which the collected gas vent stream is introduced into the boiler or process heater over the same time period of the performance testing. d. Where an owner or operator subject to the provisions of Rule 15.3 seeks to demonstrate compliance with Rule 15.3(b)(2)b.3.(ii)(A) through use of an open flare: the flare type (i.e., steam-assisted, air-assisted, or nonassisted), all visible emission readings, heat content determination, flow rate or bypass flow rate measurements, and exit velocity determinations made during the performance test as specified in Title 40 CFR § 60.18, which has been incorporated by reference in Chapter 4, continuous records of the flare pilot flame or flare flame monitoring, and records of all periods of operations during which the pilot flame of the flare flame is absent. (3) Except as provided in Rule 15.3(b)(2)b.1.(ii), each owner or operator of a controlled landfill subject to the provisions of Rule 15.3 shall keep for five (5) years up-to-date, readily accessible continuous records of the equipment operating parameters specified to be monitored in Rule 15.3(f) as well as up-to-date, readily accessible records for periods of operation during which the parameter boundaries established during the most recent performance test are exceeded. a. The following constitute exceedances that shall be recorded and reported under Rule 15.3(g)(6): 1. For enclosed combustors except for boilers and process heaters with design heat input capacity of forty-four (44) megawatts (150 million British thermal unit per hour) or greater, all three (3) hour periods of operation during which the average combustion temperature was more than twenty-eight degrees (28°) Celsius below the average combustion temperature during the most recent performance test at which compliance with Rule 15.3(b)(2)b.3. was determined. 2. For boilers or process heaters, whenever there is a change in the location at which the vent stream is introduced into the flame zone as required under Rule 15.3(b)(2)b.3.(ii)(A). b. Each owner or operator subject to the provisions of Rule 15.3 shall keep up-to date, readily accessible continuous records of the indication of flow to the control device or the indication of bypass flow or records of monthly inspections of car-seals or lock-and-key configurations used to seal bypass lines, specified under Rule 15.3(f). c. Each owner or operator subject to the provisions of Rule 15.3 who uses a boiler or process heater with a design heat input capacity of forty-four (44) megawatts or greater to comply with Rule 15.3(b)(2)b.3. shall keep an up-to-date, readily accessible record of all periods of operation of the boiler or process heater. (Examples of such records could include records of steam use, fuel use, or monitoring data collected pursuant to other State, local, or Federal regulatory requirements.) d. Each owner or operator seeking to comply with the provisions of Rule 15.3 by use of an open flare shall keep up-to-date, readily accessible continuous records of the flame or flare pilot flame monitoring specified under Rule 15.3(f), and up-to-date, readily accessible records of all periods of operation in which the flame or flare pilot flame is absent. (4) Except as provided in Rule 15.3(b)(2)b.1.(ii), each owner or operator subject to the provisions of Rule 15.3 shall keep for the life of the collection system an up-to-date, readily accessible plot map showing each existing and planned collector in the system and providing a unique identification location label for each collector. a. Each owner or operator subject to the provisions of Rule 15.3 shall keep up-to-date, readily accessible records of the installation date and location of all newly installed collectors as specified under Rule 15.3(e)(2). b. Each owner or operator subject to the provisions of Rule 15.3 shall keep readily accessible documentation of the nature, date of deposition, amount, and location of asbestos-containing or nondegradable waste excluded from collection as provided in Rule 15.3(i)(1)c.1. as well as any nonproductive areas excluded from collection as provided in Rule 15.3(i)(1)c.2. (5) Except as provided in Rule 15.3(b)(2)b.1.(ii), each owner or operator subject to the provisions of Rule 15.3 shall keep for at least five (5) years up-to-date, readily accessible records of all collection and control system exceedances of the operational standards outlined in Rule 15.3(c), the reading in the subsequent month whether or not the second reading is an exceedance, and the location of each exceedance. (6) Landfill owners or operators who convert design capacity from volume to mass or mass to volume to demonstrate that landfill design capacity is less than two million five hundred thousand (2,500,000) megagrams or two million five hundred thousand (2,500,000) cubic meters, as provided in the definition of "design capacity" in Rule 15.3(a), shall keep readily accessible, on-site records of the annual recalculation of site-specific density, design capacity, and the supporting documentation. Off-site records may be maintained if they are retrievable within four (4) hours. Either paper copy or electronic formats are acceptable. (i) Specifications for Active Collection Systems. (1) Each owner or operator seeking to comply with Rule 15.3(b)(2)b.1. shall site active collection wells, horizontal collectors, surface collectors, or other extraction devices at a sufficient density throughout all gas producing areas using the following procedures unless alternative procedures have been approved by the Director as provided in Rule 15.3(b)(2)b.1.(iii) and (iv): a. The collection devices within the interior and along the perimeter areas shall be certified to achieve comprehensive control of surface gas emissions by a professional engineer. The following issues shall be addressed in the design: depths of refuse, refuse gas generation rates and flow characteristics, cover properties, gas system expandability, leachate and condensate management, accessibility, compatibility with filling operations, integration with closure end use, air intrusion control, corrosion resistance, fill settlement, and resistance to the refuse decomposition heat. b. The sufficient density of gas collection devices determined in Rule 15.3(i)(1)a. shall address landfill gas migration issues and augmentation of the collection system through the use of active or passive systems at the landfill perimeter or exterior. c. The placement of gas collection devices determined in Rule 15.3(i)(1)a. shall control all gas producing areas, except as provided by Rule 15.3(i)(1)c.1. and c.2. 1. Any segregated area of asbestos or nondegradable material may be excluded from collection if documented as provided under Rule 15.3(h)(4). The documentation shall provide the nature, date of deposition, location and amount of asbestos or nondegradable material deposited in the area, and shall be provided to the Director upon request. 2. Any nonproductive area of the landfill may be excluded from control, provided that the total of all excluded areas can be shown to contribute less than one percent (1%) of the total amount of NMOC emissions from the landfill. The amount, location, and age of the material shall be documented and provided to the Director upon request. A separate NMOC emissions estimate shall be made for each section proposed for exclusion, and the sum of all such sections shall be compared to the NMOC emissions estimate for the entire landfill. Emissions from each section shall be computed using the following equation: Q i | = | 2 k L 0 M i (e -kti ) (C NMOC ) (3.6 × 10 -9 ) where, Q i | = | NMOC emission rate from the i th section, megagrams per year k | = | Methane generation rate constant, year -1 L 0 | = | Methane generation potential, cubic meters per megagram solid waste M i | = | Mass of the degradable solid waste in the i th section, megagrams t i | = | Age of the solid waste in the i th section, years C NMOC | = | Concentration of nonmethane organic compounds, parts per million by volume 3.6 × 10 -9 | = | Conversion factor 3. The values for k and C NMOC determined in field testing shall be used, if field testing has been performed in determining the NMOC emission rate or the radii of influence (the distance from the well center to a point in the landfill where the pressure gradient applied by the blower or compressor approaches zero). If field testing has not been performed, the default values for k, L 0 and C NMOC provided in Rule 15.3(d)(1)a. or the alternative values from Rule 15.3(d)(1)e. shall be used. The mass of nondegradable solid waste contained within the given section may be subtracted from the total mass of the section when estimating emissions provided the nature, location, age, and amount of the nondegradable material is documented as provided in Rule 15.3(i)(1)c.1. (2) Each owner or operator seeking to comply with Rule 15.3(b)(2)b.1.(i) shall construct the gas collection devices using the following equipment or procedures: a. The landfill gas extraction components shall be constructed of polyvinyl chloride (PVC), high density polyethylene (HDPE) pipe, fiberglass, stainless steel, or other nonporous corrosion resistant material of suitable dimensions to: convey projected amounts of gases; withstand installation, static, and settlement forces; and withstand planned overburden or traffic loads. The collection system shall extend as necessary to comply with emission and migration standards. Collection devices such as wells and horizontal collectors shall be perforated to allow gas entry without head loss sufficient to impair performance across the intended extent of control. Perforations shall be situated with regard to the need to prevent excessive air infiltration. b. Vertical wells shall be placed so as not to endanger underlying liners and shall address the occurrence of water within the landfill. Holes and trenches constructed for piped wells and horizontal collectors shall be of sufficient cross-section so as to allow for their proper construction and completion including, for example, centering of pipes and placement of gravel backfill. Collection devices shall be designed so as not to allow indirect short circuiting of air into the cover or refuse into the collection system or gas into the air. Any gravel used around pipe perforations should be of a dimension so as not to penetrate or block perforations. c. Collection devices may be connected to the collection header pipes below or above the landfill surface. The connector assembly shall include a positive closing throttle valve, any necessary seals and couplings, access couplings and at least one (!) sampling port. The collection devices shall be constructed of PVC, HDPE, fiberglass, stainless steel, or other nonporous material of suitable thickness. (3) Each owner or operator seeking to comply with Rule 15.3(b)(2)b.1.(i) shall convey the landfill gas to a control system in compliance with Rule 15.3(b)(2)b.3. through the collection header pipe(s). The gas mover equipment shall be sized to handle the maximum gas generation flow rate expected over the intended use period of the gas moving equipment using the following procedures: a. For existing collection systems, the flow data shall be used to project the maximum flow rate. If no flow data exists, the procedures in Rule 15.3(i)(3)b. shall be used. b. For new collection systems, the maximum flow rate shall be determined in accordance with Rule 15.3(e)(1)a. Rule 15.4 The provisions of Title 40 Code of Federal Regulations Part 62 "Approval and Promulgation of State Plans for Designated Facilities and Pollutants," Subpart OOO "Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction On or Before July 17, 2014 and Have Not Been Modified or Reconstructed Since July 17, 2014" (Revised as of July 1, 2023) is hereby incorporated by reference in Chapter 4 as requirements of this municipality pursuant to the provisions of T.C.A. § 68-201-115 and § 10-7-121. Rule 16. Emission Standards for Hazardous Air Pollutants Other Than Asbestos. Rule 16.1. The provisions of Title 40 Code of Federal Regulations Part 61 "National Emissions Standards for Hazardous Air Pollutants," Subparts A, B, C, D, E, F, H, I, J, K, L, N, O, P, Q, R, T, V, W, Y, BB, and FF and Appendices A, B, C, D, and E (Revised as of July 1, 2023) are hereby incorporated by reference in Chapter 4 as requirements of this municipality pursuant to the provisions of T.C.A. § 68-201-115 and § 10-7-121. The following subparts and appendices are included: Subpart A— | General Provisions Subpart B— | Radon Emissions From Underground Uranium Mines Subpart C— | Beryllium Subpart D— | Beryllium Rocket Motor Firing Subpart E— | Mercury Subpart F— | Vinyl Chloride Subpart H— | Emissions of Radionuclides Other Than Radon From Department of Energy Facilities Subpart I— | Radionuclide Emissions From Federal Facilities Other Than Nuclear Regulatory Commission Licensees and Not Covered by Subpart H Subpart J— | Equipment Leaks (Fugitive Emission Sources) of Benzene Subpart K— | Radionuclide Emissions From Elemental Phosphorus Plants Subpart L— | Benzene Emissions from Coke By-Product Recovery Plants Subpart N— | Inorganic Arsenic Emissions From Glass Manufacturing Plants Subpart O— | Inorganic Arsenic Emissions From Primary Copper Smelters Subpart P— | Inorganic Arsenic Emissions From Arsenic Trioxide and Metallic Arsenic Production Facilities Subpart Q— | Radon Emissions From Department of Energy Facilities Subpart R— | Radon Emissions From Phosphogypsum Stacks Subpart T— | Radon Emissions From the Disposal of Uranium Mill Tailings Subpart V— | Equipment Leaks (Fugitive Emission Sources) Subpart W— | Radon Emissions From Operating Mill Tailings Subpart Y— | Benzene Emissions From Benzene Storage Vessels Subpart BB— | Benzene Emissions From Benzene Transfer Operations Subpart FF— | Benzene Waste Operations Appendix A— | National Emission Standards for Hazardous Air Pollutants, Compliance Status Information Appendix B— | Test Methods Appendix C— | Quality Assurance Procedures Appendix D— | Methods for Estimating Radionuclide Emissions Appendix E— | Compliance Procedures Methods for Determining Compliance With Subpart I Rule 16.2. Wherever the term "Administrator" is used in the national emission standards for hazardous air pollutants, the term "Chattanooga-Hamilton County Air Pollution Control Board or Director of the Chattanooga-Hamilton County Air Pollution Control Bureau" shall be substituted, where appropriate, for the purposes of Rule 16. Rule 16.3. Where the term "construction permit" is used, the term "installation permit" shall be substituted for the purposes of Rule 16.1. Rule 16.4. Where the term "commenced" is used, it shall have the meaning of the word "commence" in Section 4-2 of this Chapter. Rule 16.5. Emission Standards for Source Categories. (a) (Reserved). (b) No emission standard or other requirement in Rule 16 shall be interpreted, construed, or applied to diminish or replace the requirements of a more stringent emission limitation or other applicable requirement in this chapter for a source category. (c) The provisions of Title 40 Code of Federal Regulations Part 63 "National Emissions Standards for Hazardous Air Pollutants for Source Categories," Subparts A, B, C, D, F, G, H, I, J, L, M, N, O, Q, R, S, T, U, W, X, Y, AA, BB, CC, DD, EE, GG, HH, II, JJ, KK, LL, MM, NN, OO, PP, QQ, RR, SS, TT, UU, VV, WW, XX, YY, CCC, DDD, EEE, GGG, HHH, III, JJJ, LLL, MMM, NNN, OOO, PPP, QQQ, RRR, TTT, UUU, VVV, XXX, AAAA, CCCC, DDDD, EEEE, FFFF, GGGG, HHHH, IIII, JJJJ, KKKK, MMMM, NNNN, OOOO, PPPP, QQQQ, RRRR, SSSS, TTTT, UUUU, VVVV, WWWW, XXXX, YYYY, ZZZZ, AAAAA, BBBBB, CCCCC, DDDDD, EEEEE, FFFFF, GGGGG, HHHHH, IIIII, JJJJJ, KKKKK, LLLLL, MMMMM, NNNNN, PPPPP, QQQQQ, RRRRR, SSSSS, TTTTT, UUUUU, WWWWW, YYYYY, ZZZZZ, BBBBBB, CCCCCC, DDDDDD, EEEEEE, FFFFFF, GGGGGG, HHHHHH, JJJJJJ, LLLLLL, MMMMMM, NNNNNN, OOOOOO, PPPPPP, QQQQQQ, RRRRRR, SSSSSS, TTTTTT, VVVVVV, WWWWWW, XXXXXX, YYYYYY, ZZZZZZ, AAAAAAA, BBBBBBB, CCCCCCC, DDDDDDD, EEEEEEE, and HHHHHHH and Appendices A, B, C, D, and E (Revised as of July 1, 2023) are hereby incorporated by reference in Chapter 4 as requirements of this municipality pursuant to the provisions of T.C.A. § 68-201-115 and § 10-7-121. The following subparts and appendices are included: The following subparts are included: Subpart A— | General Provisions Subpart B— | Requirements for Control Technology Determinations for Major Sources in Accordance With Clean Air Act Sections, Sections 112(g) and 112(j) Subpart C— | List of Hazardous Air Pollutants, Petitions Process, Lesser Quantity Designations, Source Category List Subpart D— | Regulations Governing Compliance Extensions for Early Reductions of Hazardous Air Pollutants Subpart F— | Organic Hazardous Air Pollutants From the Synthetic Organic Chemical Manufacturing Industry Subpart G— | Organic Hazardous Air Pollutants From the Synthetic Organic Chemical Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater Subpart H— | Organic Hazardous Air Pollutants for Equipment Leaks Subpart I— | Organic Hazardous Air Pollutants for Certain Processes Subject to the Negotiated Regulation for Equipment Leaks Subpart J— | Polyvinyl Chloride and Copolymers Production Subpart L— | Coke Oven Batteries Subpart M— | Perchloroethylene Air Emission Standards for Dry Cleaning Facilities Subpart N— | Chromium Emissions From Hard and Decorative Chromium Electroplating and Chromium Anodizing Tanks Subpart O— | Ethylene Oxide Emission Standards for Sterilization Facilities Subpart Q— | Industrial Process Cooling Towers Subpart R— | Gasoline Distribution Facilities (Bulk Gasoline Terminals and Pipeline Breakout Stations) Subpart S— | Pulp and Paper Industry Subpart T— | Halogenated Solvent Cleaning Subpart U— | Group I Polymers and Resins Subpart W— | Epoxy Resins Production and Non-Nylon Polyamides Production Subpart X— | Secondary Lead Smelting Subpart Y— | Marine Tank Vessel Loading Operations Subpart AA— | Phosphoric Acid Manufacturing Plants Subpart BB— | Phosphate Fertilizers Production Plants Subpart CC— | Petroleum Refineries Subpart DD— | Off-Site Waste and Recovery Operations Subpart EE— | Magnetic Tape Manufacturing Operations Subpart GG— | Aerospace Manufacturing and Rework Facilities Subpart HH— | Oil and Natural Gas Production Facilities Subpart II— | Shipbuilding and Ship Repair (Surface Coating) Subpart JJ— | Wood Furniture Manufacturing Operations Subpart KK— | Printing and Publishing Industry Subpart LL— | Primary Aluminum Reduction Plants Subpart MM— | Chemical Recovery Combustion Sources at Kraft, Soda, Sulfite, and Stand-Alone Semichemical Pulp Mills Subpart NN— | Wool Fiberglass Manufacturing at Area Sources Subpart OO— | Tanks - Level 1 Subpart PP— | Containers Subpart QQ— | Surface Impoundments Subpart RR— | Individual Drain Systems Subpart SS— | Closed Vent Systems, Control Devices, Recovery Devices and Routing to a Fuel Gas System or a Process Subpart TT— | Equipment Leaks - Control Level 1 Subpart UU— | Equipment Leaks - Control Level 2 Standards Subpart VV— | Oil-Water Separators and Organic-Water Separators Subpart WW— | Storage Vessels (Tanks) - Control Level 2 Subpart XX— | Ethylene Manufacturing Process Units: Heat Exchange Systems and Waste Operations Subpart YY— | Generic Maximum Achievable Control Technology Standards Subpart CCC— | Steel Pickling - HCl Process Facilities and Hydrochloric Acid Regeneration Plants Subpart DDD— | Mineral Wool Production Subpart EEE— | Hazardous Waste Combustors Subpart GGG— | Pharmaceuticals Production Subpart HHH— | Natural Gas Transmission and Storage Facilities Subpart III— | Flexible Polyurethane Foam Production Subpart JJJ— | Group IV Polymers and Resins Subpart LLL— | Portland Cement Manufacturing Industry Subpart MMM— | Pesticide Active Ingredient Production Subpart NNN— | Wool Fiberglass Manufacturing Subpart OOO— | Manufacture of Amino Phenolic Resins Subpart PPP— | Polyether Polyols Production Subpart QQQ— | Primary Copper Smelting Subpart RRR— | Secondary Aluminum Production Subpart TTT— | Primary Lead Smelting Subpart UUU— | Petroleum Refineries: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Subpart VVV— | Publicly Owned Treatment Works Subpart XXX— | Ferroalloys Production: Ferromanganese and Silicomanganese Subpart AAAA— | Municipal Solid Waste Landfills Subpart CCCC— | Manufacturing of Nutritional Yeast Subpart DDDD— | Plywood and Composite Wood Products Subpart EEEE— | Organic Liquids Distribution (Non-Gasoline) Subpart FFFF— | Miscellaneous Organic Chemical Manufacturing Subpart GGGG— | Solvent Extraction for Vegetable Oil Production Subpart HHHH— | Wet-Formed Fiberglass Mat Production Subpart IIII— | Surface Coating of Automobiles and Light-Duty Trucks Subpart JJJJ— | Paper and Other Web Coating Subpart KKKK— | Surface Coating of Metal Cans Subpart MMMM— | Surface Coating of Miscellaneous Metal Parts and Products Subpart NNNN— | Surface Coating of Large Appliances Subpart OOOO— | Printing, Coating, and Dyeing of Fabrics and Other Textiles Subpart PPPP— | Surface Coating of Plastic Parts and Products Subpart QQQQ— | Surface Coating of Wood Building Products Subpart RRRR— | Surface Coating of Metal Furniture Subpart SSSS— | Surface Coating of Metal Coil Subpart TTTT— | Leather Finishing Operations Subpart UUUU— | Cellulose Products Manufacturing Subpart VVVV— | Boat Manufacturing Subpart WWWW— | Reinforced Plastic Composites Production Subpart XXXX— | Rubber Tire Manufacturing Subpart YYYY— | Stationary Combustion Turbines Subpart ZZZZ— | Stationary Reciprocating Internal Combustion Engines Subpart AAAAA— | Lime Manufacturing Plants Subpart BBBBB— | Semiconductor Manufacturing Subpart CCCCC— | Coke Ovens: Pushing, Quenching, and Battery Stacks Subpart DDDDD— | Major Sources: Industrial, Commercial, and Institutional Boilers and Process Heaters Subpart EEEEE— | Iron and Steel Foundries Subpart FFFFF— | Integrated Iron and Steel Manufacturing Facilities Subpart GGGGG— | Site Remediation Subpart HHHHH— | Miscellaneous Coating Manufacturing Subpart IIIII— | Mercury Cell Chlor-Alkali Plants Subpart JJJJJ— | Brick and Structural Clay Products Manufacturing Subpart KKKKK— | Clay Ceramics Manufacturing Subpart LLLLL— | Asphalt Processing and Asphalt Roofing Manufacturing Subpart MMMMM— | Flexible Polyurethane Foam Fabrication Operations Subpart NNNNN— | Hydrochloric Acid Production Subpart PPPPP— | Engine Test Cells Stands Subpart QQQQQ— | Friction Materials Manufacturing Facilities Subpart RRRRR— | Taconite Iron Ore Processing Subpart SSSSS— | Refractory Products Manufacturing Subpart TTTTT— | Primary Magnesium Refining Subpart UUUUU— | Coal- and Oil-Fired Electric Utility Steam Generating Units Subpart WWWWW— | Hospital Ethylene Oxide Sterilizers Subpart YYYYY— | Area Sources: Electric Arc Furnace Steelmaking Facilities Subpart ZZZZZ— | Iron and Steel Foundries Area Sources Subpart BBBBBB— | Gasoline Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities Subpart CCCCCC— | Gasoline Dispensing Facilities Subpart DDDDDD— | Polyvinyl Chloride and Copolymers Production Area Sources Subpart EEEEEE— | Primary Copper Smelting Area Sources Subpart FFFFFF— | Secondary Copper Smelting Area Sources Subpart GGGGGG— | Primary Nonferrous Metals Area Sources - Zinc, Cadmium, and Beryllium Subpart HHHHHH— | Paint Stripping and Miscellaneous Surface Coating Operations at Area Sources Subpart JJJJJJ— | Industrial, Commercial, and Institutional Boilers Area Sources Subpart LLLLLL— | Acrylic and Modacrylic Fibers Production Area Sources Subpart MMMMMM— | Carbon Black Production Area Sources Subpart NNNNNN— | Chemical Manufacturing Area Sources: Chromium Compounds Subpart OOOOOO— | Flexible Polyurethane Foam Production and Fabrication Area Sources Subpart PPPPPP— | Lead Acid Battery Manufacturing Area Sources Subpart QQQQQQ— | Wood Preserving Area Sources Subpart RRRRRR— | Clay Ceramics Manufacturing Area Sources Subpart SSSSSS— | Glass Manufacturing Area Sources Subpart TTTTTT— | Secondary Nonferrous Metals Processing Area Sources Subpart VVVVVV— | Chemical Manufacturing Area Sources Subpart WWWWWW— | Area Source Standards for Plating and Polishing Operations Subpart XXXXXX— | Area Source Standards for Nine Metal Fabrication and Finishing Source Categories Subpart YYYYYY— | Area Sources: Feroalloys Production Facilities Subpart ZZZZZZ— | Area Source Standards for Aluminum, Copper, and Other Nonferrous Foundries Subpart AAAAAAA— | Area Sources: Asphalt Processing and Asphalt Roofing Manufacturing Subpart BBBBBBB— | Area Sources: Chemical Preparations Industry Subpart CCCCCCC— | Area Sources: Paints and Allied Products Manufacturing Subpart DDDDDDD— | Area Sources: Prepared Feeds Manufacturing Subpart EEEEEEE— | Gold Mine Ore Processing and Production Area Source Category Subpart HHHHHHH— | Polyvinyl Chloride and Copolymers Production Appendix A— | Test Methods Appendix B— | Sources Defined for Early Reduction Provisions Appendix C— | Determination of the Fraction Biodegraded (F bio ) in a Biological Treatment Unit Appendix D— | Alternative Validation Procedure for EPA Waste and Wastewater Methods Appendix E— | Monitoring Procedure for Nonthoroughly Mixed Open Biological Treatment Systems at Kraft Pulp Mills Under Unsafe Sampling Conditions (d) If the owner or operator of a source category has executed an enforceable agreement with the U.S. EPA Administrator pursuant to the Title 42 U.S.C. Section 7412(i)(5) [Early Reductions Program] that contains more stringent requirements or more stringent emissions limitations than would otherwise be applicable under this Rule, any certificate of operation issued to the source shall include the requirements and emissions limitations contained in that agreement, unless the source is subsequently released from said enforceable agreement and such release is confirmed in a writing signed by the U.S. EPA Administrator, or designee, and submitted to the Director. (e) No source shall emit any hazardous air pollutant in excess of any emissions limitation or contrary to any standard, prohibition or requirement contained in a certificate of operation, effective for new source categories beginning with initial operation and effective for existing source categories as expeditiously as practicable, but not later than the date determined by the U.S. EPA Administrator in a standard promulgated in Title 40 Code of Federal Regulations Part 63, which has been incorporated by reference in Chapter 4, or such other compliance date as would apply under Title 42 U.S.C. 7412(i) [Early Reductions Program]. Rule 16.6. (Reserved) Rule 16.7. The words, phrases and terms defined in Title 40 Code of Federal Regulations Part 63, its subparts, and its appendices shall be used only for the purpose of interpreting and administering Rule 16 and shall not be used to otherwise alter or vary in any way the definitions provided in Section 4-2 of this chapter. Rule 16.8. Where the term "Administrator" is used in the national emission standards for hazardous air pollutants for source categories, the term "Director of the Chattanooga-Hamilton County Air Pollution Control Bureau" shall be substituted for the purposes of this chapter, where appropriate, except at Title 40 Code of Federal Regulations Part 63.325(c), except at Title 40 Code of Federal Regulations Part 61.102(b); 61.104(a)(1)(xv); and 61.107(b)(3)(iv). Rule 16.9. Reserved. Rule 16.10. Maximum Achievable Control Technology Pollution Control Determinations (a) Applicability. This rule applies to any owner or operator who constructs or reconstructs a major source of hazardous air pollutants unless the major source in question has been specifically regulated or exempted from regulation under a standard issued pursuant to Section 112(d), Section 112(h), or Section 112(j) of the Clean Air Act and promulgated in Title 40 Code of Federal Regulations Part 63, or unless the owner or operator of such major source has been issued all required air pollution control permits for such construction or reconstruction project before the effective date of this ordinance. Rule 16.10 does not apply to electric utility steam generating units. Rule 16.10 does not apply to stationary sources that are within the following source categories, which have been deleted from the source category list by promulgations pursuant to Section 112(c)(9) of the Clean Air Act: (1) asbestos processing area source category; 60 FR 61550-551 November 30, 1995 (2) Chromium chemicals manufacturing, lead acid battery manufacturing, non-stainless steel manufacturing—electric arc furnace operation; stainless steel manufacturing—electric arc furnace operation; and wood treatment; 61 FR 28200-02 June 4, 1996. Rule 16.10 does not apply to research and development activities, as defined in Rule 16.10(b). (b) Definitions. Terms used in Rule 16.10 that are not defined in Rule 16.10(b) have the meaning given to them in Section 4-2. (1) Affected source means the stationary source or group of stationary sources fabricated (on site), erected, or installed meets the definition of "construct a major source" or the definition of "reconstruct a major source" contained in Rule 16.10(b). (2) Affected States are all States (1) Whose air quality may be affected and that are contiguous to Hamilton County, Tennessee, where a determination is made in accordance with Rule 16.10; or (2) Whose air quality may be affected and that are within 50 miles of the major source for which a determination is made in accordance with Rule 16.10. (3) Available information means, for purposes of identifying control technology options for the affected source, information contained in the following information sources as of the date of approval of the determination made in accordance with Rule 16.10: a. A relevant proposed regulation, including all supporting information; b. Background information documents for a draft or proposed regulation; c. Data and information available for the Control Technology Center developed pursuant to Section 113 of the Clean Air Act; d. Data and information contained in the Aerometric Informational Retrieval System including information in the MACT data base; e. Any additional information that can be expeditiously provided by the Administrator; and f. For the purpose of determinations in accordance with Rule 16.10, any additional information provided by the applicant or others, and any additional information considered available by the Director. (4) Construct a major source means: a. To fabricate, erect, or install at any greenfield site a stationary source, or group of stationary sources, which is located within a contiguous area and under common control and which emits or has the potential to emit ten (10) tons per year of any individual hazardous air pollutant or twenty-five (25) tons per year or more of any combination of hazardous air pollutants, or b. To fabricate, erect or install at any developed site a new process or production unit which in and of itself emits or has the potential to emit ten (10) tons per year of any individual hazardous air pollutant or twenty-five (25) tons per year or more of any combination of hazardous air pollutants, unless the process or production unit satisfies criteria in paragraphs b.1. through b.6. of this definition. 1. All hazardous air pollutants emitted by the process or production unit that would otherwise be controlled under the requirements of Rule 16.10 will be controlled by emission control equipment which was previously installed at the same site as the process or production unit; and 2. (i) The Director has determined within a period of five (5) years prior to the fabrication, erection, or installation of the process or production unit that the existing emission control equipment represented best available control technology (BACT), lowest achievable emission rate (LAER) pursuant to Title 40 CFR Part 51 or Part 52, BACT for hazardous air pollutants based on the air pollution control ordinance for the category of pollutants which includes those hazardous air pollutants to be emitted by the process or production unit; or (ii) The Director determines that the control of hazardous air pollutant emissions provided by the existing equipment will be equivalent to that level of control currently achieved by other well-controlled similar sources (i.e., equivalent to the level of control that would be provided by a current BACT, LAER, or BACT for hazardous air pollutants determination); and 3. The Director determines that the percent control efficiency for emissions of hazardous air pollutants from all sources to be controlled by the existing control equipment will be equivalent to the percent control efficiency provided by the control equipment prior to the inclusion of the new process or production unit; and 4. The Director has provided notice and an opportunity for public comment concerning the determination that criteria described in Rule 16.10(b) definition of "construct a major source" described above apply and concerning the continued adequacy of any prior BACT, LAER, or BACT for hazardous air pollutants determination; and 5. If any commenter has asserted that a prior BACT, LAER, or BACT for hazardous air pollutants determination is no longer adequate, the Director has determined that the level of control required by that prior determination remains adequate; and 6. Any emission limitations, work practice requirements, or other terms and conditions upon which the above determinations by the Director are applicable requirements in accordance with Section 504(a) of the Clean Air Act and either have been incorporated into any existing Part 70 permit for the affected source or will be incorporated into any existing Part 70 permit for the affected source or will be incorporated into such permit upon issuance. (5) Control technology means measures, processes, methods, systems, or techniques to limit the emission of hazardous air pollutants through process changes, substitution of materials or other modifications that: a. Reduce the quantity of, or eliminate emissions of, such pollutants through process changes, substitution of materials or other modifications; b. Enclose systems or processes to eliminate emissions; c. Collect, capture or treat such pollutants when released from a process, stack, storage or fugitive emissions point; d. Are design, equipment, work practice, or operational standards (including requirements for operator training or certification) as provided in Section 112(h) of the Clean Air Act; or e. Are a combination of paragraphs a. through d. of this definition. (6) Electric utility steam generating unit means any fossil fuel fired combustion unit of more than twenty-five (25) megawatts that serves a generator that produces electricity for sale. A unit that cogenerates steam and electricity and supplies more than one-third (⅓) of its potential electric output capacity and more than twenty-five (25) megawatts electric output to any utility power distribution system for sale shall be considered an electric utility steam generating unit. (7) Greenfield site means a contiguous area under common control that is an undeveloped site. (8) List of Source Categories means the Source Category List required by Section 112(c) of the Clean Air Act. (9) Maximum achievable control technology (MACT) emission limitation for new sources means the emission limitation which is not less stringent than the emission limitation achieved in practice by the best controlled similar source, and which reflects the maximum degree of reduction in emissions that the Director or the Board, taking into consideration the cost of achieving such emission reduction, and any non-air quality health and environmental impacts and energy requirements, determines is achievable by the constructed or reconstructed major source. (10) Notice of MACT Approval means a document issued by the Director containing all federally enforceable conditions necessary to enforce the application and operation of MACT or other control technologies such that the MACT emission limitation is met. (11) Process or production unit means any collection of structures and/or equipment, that processes assembles, applies, or otherwise uses material inputs to produce or store an intermediate or final product. A single facility may contain more than one (1) process or production unit. (12) Reconstruct a major source means the replacement of components at an existing process or production unit that in and of itself emits or has the potential to emit ten (10) tons per year of any individual hazardous air pollutant or twenty-five (25) tons per year of any combination of hazardous air pollutants, whenever: a. The fixed capital cost of the new components exceeds fifty percent (50%) of the fixed capital cost that would be required to construct a comparable process or production unit; and b. It is technically and economically feasible for the reconstructed major source to meet the applicable maximum achievable control technology emission limitation for new sources established under Rule 16.10. (13) Research and development activities means activities conducted at a research or laboratory facility whose primary purpose is to conduct research and development into new processes and products, where such source is operated under the close supervision of technically trained personnel and is not engaged in the manufacture of products for sale or exchange for commercial profit, except where such sales do not exceed two percent (2%) of the gross receipts of the source for which it is conducting the research and development. (14) Similar source means a stationary source or process that has comparable emissions and is structurally similar in design and capacity to a constructed or reconstructed major source such that the source could be controlled using the same control technology. (c) Prohibition. After the effective date of this ordinance, no person may begin actual construction or reconstruction of a major source of hazardous air pollutants in this municipality unless: (1) The major source in question has been specifically regulated or exempted from regulation under a standard issued pursuant to Section 112(d), Section 112(h), or Section 112(j) promulgated in Title 40 Code of Federal Regulations Part 63, which has been incorporated by reference in Chapter 4, and the owner and operator has fully complied with all procedures and requirements for preconstruction review established by that standard, including any applicable requirements set forth in Subpart A—General Provisions of Part 63; or (2) The Director or the Board has made a final and effective case-by-case determination pursuant to Rule 16.10 such that emissions from the constructed or reconstructed major source will be controlled to a level no less stringent than the maximum achievable control technology emission limitation for new sources. (d) Maximum Achievable Control Technology (MACT) Determinations for Constructed and Reconstructed Major Sources. (1) Applicability. The requirements of Rule 16.10 apply to an owner or operator who constructs or reconstructs a major source of one (1) or more hazardous air pollutants subject to a case-by-case determination of maximum achievable control technology pursuant to Rule 16.10(c). (2) Requirements for Constructed and Reconstructed Major Sources. When a case-by-case determination of MACT is required by Rule 16.10(c), the owner and operator shall obtain from the Director an approved MACT determination according to one (1) of the review options contained in Rule 16.10(d)(3). (3) Review Options. a. When the Director requires the owner or operator to obtain, or revise, a permit issued pursuant to Article III. of Chapter 4 entitled Part 70 Source Regulation and Permits before construction or reconstruction of the major source, or when the Director allows the owner or operator at its discretion to obtain or revise such a permit before construction or reconstruction, and the owner or operator elects that option, the owner or operator shall follow the administrative procedures in Article III. Part 70 Source Regulation and Permits. b. When an owner or operator is not required to obtain or revise a Part 70 Source Permit before construction or reconstruction, the owner or operator (unless the owner or operator voluntarily follows the process to obtain a Part 70 Permit) shall either, at the discretion of the Director: 1. Apply for and obtain a Notice of MACT Approval according to the procedures outlined in Rule 16.10 Rule 16.10(d)(6)-(8); or 2. Apply for a MACT determination under any other administrative procedures for preconstruction review and approval established by the Director or the Board which provide for public participation in the determination, and ensure that no person may begin actual construction or reconstruction of a major source in the City of Chattanooga unless the MACT emission limitation for new sources will be met. c. When applying for a Part 70 Permit, an owner or operator may request approval of case-by-case MACT determinations for alternative operating scenarios. Approval of such determinations satisfies the requirements of Section 112(g) of the Clean Air Act of each such scenario. d. Regardless of the review process, the MACT emission limitation and requirements established shall be effective as required by Rule 16.10(d)(10) consistent with the principles established in Rule 16.10(d)(4), and supported by the information listed in Rule 16.10(d)(5). The owner or operator shall comply with the requirements in Rule 16.10(d)(5) and with all applicable requirements in Title 40 CFR Part 63, Subpart A, which has been incorporated by reference in Chapter 4. (4) Principles of MACT Determinations. The following general principles shall govern preparation by the owner or operator of each permit application or other application requiring a case-by-case MACT determination concerning construction or reconstruction of a major source, and all subsequent review of and actions taken concerning such an application by the Board or Director: a. The MACT emission limitation or MACT requirements recommended by the applicant and approved by the Board or Director shall not be less stringent than the emission control which is achieved in practice by the best controlled similar source, as determined by the Board or Director. b. Based upon available information, as defined in Rule 16.10, the MACT emission limitation and control technology (including any requirements under Rule 16.10(d)(4)c. recommended by the applicant and approved by the Board and Director shall achieve the maximum degree of reduction in emissions of hazardous air pollutants which can be achieved by utilizing those control technologies that can be identified from the available information, taking into consideration the costs of achieving such emission reduction and any non-air quality health and environmental impacts and energy requirements associated with the emission reduction. c. The applicant may recommend a specific design, equipment, work practice, or operational standard, or a combination thereof, and the Director may approve such a standard if the Director specifically determines that it is not feasible to prescribe or enforce an emission limitation under the criteria set forth in Section 112(h) of the Clean Air Act. d. If the Administrator has either proposed a relevant emission standard pursuant to Section 112(d) or Section 112(h) of the Clean Air Act or adopted a presumptive MACT determination for the source category which includes the constructed or reconstructed major source, then the MACT requirements applied to the constructed or reconstructed major source shall take into consideration those MACT emission limitations and requirements of the proposed standard or presumptive MACT determination. (5) Application Requirements For a Case-By-Case MACT Determination. a. An application for a MACT determination [whether a Part 70 permit application, an application for a Notice of MACT Approval, or other document specified by the Board or Director under Rule 16.10(d)(3)b.2.] shall specify a control technology selected by the owner or operator that, if properly operated and maintained, will meet the MACT emission limitation or standard as determined according to the principles set forth in Rule 16.10(d)(4). b. In each instance where a constructed or reconstructed major source would require additional control technology or a change in control technology, the application for a MACT determination shall contain the following information: 1. The name and address (physical location) of the major source to be constructed or reconstructed; 2. A brief description of the major source to be constructed or reconstructed and identification of any listed source category or categories in which it is included; 3. The expected commencement date for the construction or reconstruction of the major source; 4. The expected completion date for construction or reconstruction of the major source; 5. The anticipated date of start-up for the constructed or reconstructed major source; 6. The hazardous air pollutants emitted by the constructed or reconstructed major source, and the estimated emission rate for each such hazardous air pollutant, to the extent this information is needed by the Board or the Director to determine MACT; 7. Any federally enforceable emission limitations applicable to the constructed or reconstructed major source; 8. The maximum and expected utilization of capacity of the constructed or reconstructed major source, and the associated uncontrolled emission rates for that source, to the extent this information is needed by the Board or the Director to determine MACT; 9. The controlled emissions for the constructed or reconstructed major source in tons/year at expected and maximum utilization of capacity, to the extent this information is needed by the Board or Director to determine MACT; 10. A recommended emission limitation for the constructed or reconstructed major source consistent with the principles set forth in Rule 16.10(d)(4); 11. The selected control technology to meet the recommended MACT emission limitation, including technical information on the design, operation, size, estimated control efficiency of the control technology (and the manufacturer's name, address, telephone number, and relevant specifications and drawings, if requested by the Board or the Director); 12. Supporting documentation including documentation of alternative control technologies considered by the applicant to meet the emission limitation, and analysis of cost and non-air quality health environmental impacts or energy requirements for the selected control technology; and 13. Any other relevant information required pursuant to Title 40 CFR Part 63, Subpart A, which has been incorporated by reference in Chapter 4. c. In each instance where the owner or operator contends that a constructed or reconstructed major source will be in compliance, upon startup, with case-by-case MACT under Rule 16.10 without a change in control technology, the application for a MACT determination shall contain the following information: 1. The information described in Rule 16.10(d)(5)b.1.-b.10.; and 2. Documentation of the control technology in place. (6) Administrative Procedures for Review of the Notice of MACT Approval. a. The Director will notify the owner or operator in writing, within forty-five (35) days after the date the application is first received, as to whether the application for a MACT determination is complete or whether additional information is required. b. The Director will initially approve the recommended MACT emission limitation and other terms set forth in the application, or the Board or Director will notify the owner or operator in writing of its intent to disapprove the application, within thirty (30) calendar days after the owner or operator is notified in writing that the application is complete. c. The owner or operator may present, in writing, within sixty (60) calendar days after receipt of notice of the Director's intent to disapprove the application, additional information or arguments pertaining to, or amendments to, the application for consideration by the Board or Director before it decides whether to finally disapprove the application. d. The Director will either initially approve or issue a final disapproval of the application within ninety (90) days after it notifies the owner or operator of an intent to disapprove or within thirty (30) days after the date additional information is received from the owner or operator, whichever is earlier. e. A final determination by the Director to disapprove any application will be in writing and will specify the grounds on which the disapproval is based. If any application is finally disapproved, the owner or operator may appeal to the Board or may submit a subsequent application concerning construction or reconstruction of the same major source, provided that the subsequent application has been amended in response to the stated grounds for the prior disapproval. f. An initial decision to approve an application for a MACT determination will be set forth in the Notice of MACT Approval as described in Rule 16.10(d)(7). (7) Notice of MACT Approval. a. The notice of MACT Approval will contain a MACT emission limitation (or a MACT work practice standard if the Board or Director determines it is not feasible to prescribe or enforce an emission standard) to control the emissions of hazardous air pollutants. The MACT emission limitation or standard will be determined by the Board or Director and will conform to the principles set forth in Rule 16.10(d)(4). b. The Notice of MACT Approval will specify any notification, operation and maintenance, performance testing, monitoring, reporting and record keeping requirements. The Notice of MACT Approval shall include: 1. In addition to the MACT emission limitation or MACT work practice standard established under Rule 16.10, additional emission limits, production limits, operational limits or other terms and conditions necessary to ensure practical enforceability of the MACT emission limitation; 2. Compliance certifications, testing, monitoring, reporting and record keeping requirements that are consistent with the requirements of § 4-57; 3. In accordance with Section 114(a)(3) of the Clean Air Act, monitoring shall be capable of demonstrating continuous compliance during the applicable reporting period. Such monitoring data shall be of sufficient quality to be used as a basis for enforcing all applicable requirements established under Rule 16.10, including emission limitations; 4. A statement requiring the owner or operator to comply with all applicable requirements contained in Title 40 CFR Part 63, Subpart A. c. All provisions contained in the Notice of MACT Approval shall be practically enforceable upon the effective date of issuance of such notice, as provided by Rule 16.10(d)(10). d. The Notice of MACT Approval shall expire if construction or reconstruction has not commenced within eighteen (18) months after issuance, unless the Board or Director has granted an extension, which shall not exceed an additional twelve (12) months. (8) Opportunity for Public Comment on the Notice of MACT Approval. a. The Board or Director will provide opportunity for public comment on the Notice of MACT Approval, including, at a minimum: 1. Availability for public inspection in at least one (1) location in the area affected of the information submitted by the owner or operator and of the Board or Director's initial decision to approve the application; 2. A thirty (30) day period for submittal of public comment; and 3. A notice by prominent advertisement in the area affected of the location of the source information and initial decision specified in Rule 16.10(d)(8)a.1. b. At the discretion of the Board or Director, the Notice of MACT Approval setting forth the initial decision to approve the application may become final automatically at the end of the comment period if no adverse comments are received. If adverse comments are received, the Board or Director shall have thirty (30) days after the end of the comment period to make any necessary revisions in its analysis and decide whether to finally approve the application. (9) EPA Notification. The Board or Director shall send a copy of the final Notice of MACT Approval, notice of approval of a Part 70 permit application incorporating a MACT determination (in those instances where the owner or operator either is required or elects to obtain such a permit before construction or reconstruction), or other notice of approval issued pursuant to Rule 16.10(d)(3)b.2. to the Administrator through the appropriate Regional Office, and to all other State air pollution control agencies having jurisdiction in affected States. (10) Effective Date. The effective date of a MACT determination shall be the date the Notice of MACT Approval becomes final, the date of issuance of a Part 70 permit incorporating a MACT determination [in those instances where the owner or operator either is required or elects to obtain such a permit before construction or reconstruction], or the date any other notice of approval issued pursuant to Rule 16.10(d)(3)b.2. of this section becomes final. (11) Compliance date. On and after the date of start-up, a constructed or reconstructed major source which is subject to Rule 16.10 shall be in compliance with all applicable requirements specified in the MACT determination. (12) Compliance with MACT determinations. a. An owner or operator of a constructed or reconstructed major source that is subject to a MACT determination shall comply with all requirements in the final Notice of MACT Approval, the Part 70 permit (in those instances where the owner or operator either is required or elects to obtain such a permit before construction or reconstruction), or any other final notice of approval issued pursuant to Rule 16.10(c)(3)b.2., including but not limited to any MACT emission limitation or MACT work practice standard, and any notification, operation and maintenance, performance testing, monitoring, reporting, and recordkeeping requirements. b. An owner or operator of a constructed or reconstructed major source which has obtained a MACT determination shall be deemed to be in compliance with Section 112(g)(2)(B) of the Clean Air Act only to the extent that the constructed or reconstructed major source is in compliance with all requirements set forth in the final Notice of MACT Approval, the Part 70 permit (in those instances where the owner or operator either is required or elects to obtain such a permit before construction or reconstruction), or any other final notice of approval issued pursuant to Rule 16.10(d)(3)b.2. Any violation of such requirements by the owner or operator shall be deemed to be a violation of the prohibition on construction or reconstruction in Section 112(g)(2)(B) for whatever period the owner or operator is determined to be in violation of such requirements, and shall subject the owner or operator to appropriate enforcement action under the Clean Air Act. (13) Reporting to the Administrator. Within sixty (60) days after the issuance of a final Notice of MACT Approval, a Part 70 permit incorporating a MACT determination (in those instances where the owner or operator either is required or elects to obtain such a permit before construction or reconstruction), or any other final notice of approval issued pursuant to Rule 16.10(d)(3)b.2., the Director shall provide a copy of such notice to the Administrator, and shall provide a summary in a compatible electronic format for inclusion in the MACT data base. (e) Requirements for Constructed or Reconstructed Major Sources Subject to a Subsequently Promulgated MACT Standard or MACT Requirement. (1) If the Administrator promulgated an emission standard under Section 112(d) or Section 112(h) of the Clean Air Act or the Board or Director issues a determination under Section 112(j) of the Clean Air Act that is applicable to a stationary source or group of sources which would be deemed to be a constructed or reconstructed major source under Rule 16.10 before the date that the owner or operator has obtained a final and legally effective MACT determination under any of the review options available pursuant to Rule 16.10(d), the owner or operator of the source(s) shall comply with the promulgated standard or determination rather than any MACT determination under Section 112(g) of the Clean Air Act by the Board or Director, and the owner or operator shall comply with the promulgated standard by the compliance date in the promulgated standard. (2) If the Administrator promulgates an emission standard under Section 112(d) or Section 112(h) of the Clean Air Act or the Board or Director makes a determination under Section 112(j) of the Clean Air Act that is applicable to a stationary source or group of sources which was deemed to be a constructed or reconstructed major source under Rule 16.10 and has been subject to a prior case-by-case MACT determination pursuant to Rule 16.10(d), and the owner and operator obtained a final and legally effective case-by-case MACT determination prior to the promulgation date of such emission standard, then the Board or Director shall (if the initial Part 70 permit has not yet been issued) issue an initial operating permit which incorporates the emission standard or determination, or shall (if the initial Part 70 permit has been issued) revise the operating permit according to the reopening procedures in Article III of Chapter 4, to incorporate the emission standard or determination. a. If the Administrator has included in the emission standard established under Section 112(d) or Section 112(h) of the Clean Air Act a specific compliance date for those sources which have obtained a final and legally effective MACT determination under Rule 16.10 and which have submitted the information required by Rule 16.10(d) to the EPA before the close of the public comment period for the standard established under Section 112(d) of the Act, such date shall assure that the owner or operator shall comply with the promulgated standard as expeditiously as practicable, but not longer than eight (8) years after such standard is promulgated. In that event, the Board or Director shall incorporate the applicable compliance date in the Part 70 permit. b. If no compliance date has been established in the promulgated Section 112(d) or 112(h) standard or Section 112(j) determination, for those sources which have obtained a final and legally effective MACT determination under Rule 16.10, then the Board or Director shall establish a compliance date in the permit that assures that the owner or operator shall comply with the promulgated standard or determination as expeditiously as practicable, but not longer than eight (8) years after such standard is promulgated or a Section 112(j) determination is made. (3) Notwithstanding the requirements of paragraphs (1) and (2) above, if the Administrator promulgates an emission standard under Section 112(d) or Section 112(h) of the Clean Air Act or the Board or Director issues a determination under Section 112(j) of the Act that is applicable to a stationary source or group of sources which was deemed to be a constructed or reconstructed major source under Rule 16.10 and which is the subject of a prior case-by-case MACT determination pursuant to Rule 16.10(d), and the level of control required by the emission standard issued under Section 112(d) or Section 112(h) or the determination issued under Section 112(j) of the Act is less stringent than the level of control required by any emission limitation or standard in the prior MACT determination, the Board or Director is not required to incorporate any less stringent terms of the promulgated standard in the Part 70 permit applicable to such source(s) and may in its discretion consider any more stringent provisions of the prior MACT determination to be applicable legal requirements when issuing or revising such an operating permit. Rule 17. Emission Standard for Asbestos. Title 40 Code of Federal Regulations Part 763, Subpart E "Asbestos-Containing Materials in Schools," Appendix E "Interim Method of the Determinations of Asbestos in Bulk Insulation Samples" (Revised as of July 1, 2023) is hereby incorporated by reference in Chapter 4 as a requirement of this municipality pursuant to the provisions of T.C.A. § 68-201-115 and § 10-7-121. Rule 17.1. Definitions. All terms that are used in this rule and are not defined below are given the same meaning as in Section 4-2. (1) Active waste disposal site means any disposal site other than an inactive site. (2) Adequately wet means to sufficiently mix or penetrate with liquid to prevent the release of particulates. If visible emissions are observed coming from asbestos-containing material, then that material has not been adequately wetted. However, the absence of visible emissions is not sufficient evidence of being adequately wetted. (3) Asbestos means the asbestiform varieties of serpentinite (chrysotile), riebeckite (crocidolite), cummingtonite-grunerite, anthophyllite, and actinolite-tremolite. (4) Asbestos-containing waste materials means mill tailings or any waste that contains commercial asbestos and is generated by a source subject to the provisions of this subpart. This term includes filters from control devices, friable asbestos waste material, and bags or other similar packaging contaminated with commercial asbestos. As applied to demolition and renovation operations, this term also includes regulated asbestos-containing material waste and materials contaminated with asbestos including disposable equipment and clothing. (5) Asbestos mill means any facility engaged in converting, or in any intermediate step in converting, asbestos ore into commercial asbestos. outside storage of asbestos material is not considered a part of the asbestos mill. (6) Asbestos tailings means any solid waste that contains asbestos and is a product of asbestos mining or milling operations. (7) Asbestos waste from control devices means any waste material that contains asbestos and is collected by a pollution control device. (8) Category I nonfriable asbestos-containing material (ACM) means asbestos-containing packing, gaskets, resilient floor covering, and asphalt roofing products containing more than one percent (1%) asbestos as determined using the method specified in Title 40 CFR Part 763, Subpart E, Appendix E, Section 1 "Polarized Light Microscopy," which has been incorporated by reference in Chapter 4. (9) Category II nonfriable ACM means any material, excluding Category I nonfriable ACM, containing more than one percent (1%) asbestos as determined using the method specified in Title 40 CFR Part 763, Subpart E, Appendix E, Section 1 "Polarized Light Microscopy," which has been incorporated by reference in Chapter 4, that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure. (10) Commercial asbestos means any material containing asbestos that is extracted from ore and has value because of its asbestos content. (11) Cutting means to penetrate with a sharp-edged instrument and includes sawing, but does not include shearing, slicing. (12) Demolition means the wrecking or taking out of any load-supporting structural member of a facility together with any related handling operations or the intentional burning of any facility. (13) Emergency renovation operation means a renovation operation that was not planned but results from a sudden, unexpected event that, if not immediately attended to, presents a safety or public health hazard, is necessary to protect equipment from damage, or is necessary to avoid imposing an unreasonable financial burden. This term includes operations necessitated by nonroutine failures of equipment. (14) Fabricating means any processing (e.g., cutting, sawing, drilling) of a manufactured product that contains commercial asbestos, with the exception of processing at temporary sites (field fabricating) for the construction or restoration of facilities. In the case of friction products, fabricating includes bonding, debonding, grinding, sawing, drilling, or other similar operations performed as part of fabricating. (15) Facility means any institutional, commercial, public, industrial, or residential structure, installation, or building (including any structure, installation, or building containing condominiums or individual dwelling units operated as a residential cooperative, but excluding residential buildings having four or fewer dwelling units); any ship; and any active or inactive waste disposal site. For purposes of this definition, any building, structure, or installation that contains a loft used as a dwelling is not considered a residential structure, installation, or building. Any structure, installation or building that was previously subject to this Rule is not excluded, regardless of its current use or function. (16) Facility component means any part of a facility including equipment. (17) Friable asbestos material means any material containing more than one percent (1%) asbestos as determined using the method specified in Title 40 CFR Part 763, Subpart E, Appendix E, Section 1 "Polarized Light Microscopy," which has been incorporated by reference in Chapter 4, that, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure. If the asbestos content is less than ten percent (10%) as determined by a method other than point counting by polarized light microscopy (PLM), verify the asbestos content by point counting using PLM. (18) Fugitive source means any source of emissions not controlled by an air pollution control device. (19) Glove bag means a sealed compartment with attached inner gloves used for the handling of asbestos-containing materials. Properly installed and used, glove bags provide a small work area enclosure typically used for small-scale asbestos stripping operations. Information on glove-bag installation, equipment and supplies, and work practices is contained in Title 29 CFR Part 1926, Subpart Z, § 1926.1101 "Asbestos." (20) Grinding means to reduce to powder or small fragments and includes mechanical chipping or drilling. (21) In poor condition means the binding of the material is losing its integrity as indicated by peeling, cracking, or crumbling of the material. (22) Inactive waste disposal site means any disposal site or portion of it where additional asbestos-containing waste material has not been deposited within the past year. (23) Installation means any building or structure or any group of buildings or structures at a single demolition or renovation site that are under the control of the same owner or operator (or owner or operator under common control). (24) Leak-tight means that solids or liquids cannot escape or spill out. It also means dust-tight. (25) Malfunction, for the purposes of Rule 17, means any sudden and unavoidable failure of air pollution control equipment or process equipment or of a process to operate in a normal or usual manner so that emissions of asbestos are increased. Failures of equipment shall not be considered malfunctions if they are caused in any way by poor maintenance, careless operation, or any other preventable upset condition, equipment breakdown, or process failure. (26) Manufacturing means the combining of commercial asbestos—or, in the case of woven friction products, the combining of textiles containing commercial asbestos—with any other material(s), including commercial asbestos, and the processing of this combination into a product. Chlorine production is considered a part of manufacturing. (27) Natural barrier means a natural object that effectively precludes or deters access. Natural barriers include physical obstacles such as cliffs, lakes or other large bodies of water, deep and wide ravines, and mountains. Remoteness by itself is not a natural barrier. (28) Nonfriable asbestos-containing material means any material containing more than one percent (1%) asbestos as determined using the method specified in Title 40 CFR Part 763, Subpart E, Appendix E, Section 1 "Polarized Light Microscopy," which has been incorporated by reference in Chapter 4, that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure. (29) Nonscheduled renovation operation means a renovation operation necessitated by the routine failure of equipment, which is expected to occur within a given period based on past operating experience, but for which an exact date cannot be predicted. (30) Outside air means the air outside buildings and structures, including, but not limited to, the air under a bridge or in an open air ferry dock. (31) Owner or operator of a demolition or renovation activity means any person who owns, leases, operates, controls, or supervises the facility being demolished or renovated or any person who owns, leases, operates, controls, or supervises the demolition or renovation operation, or both. (32) Particulate asbestos material means finely divided particles of asbestos or material containing asbestos. (33) Planned renovation operations means a renovation operation, or a number of such operations, in which some RACM will be removed or stripped within a given period of time and that can be predicted. Individual nonscheduled operations are included if a number of such operations can be predicted to occur during a given period of time based on operating experience. (34) Regulated asbestos-containing material (RACM) means (a) friable material, (b) Category I nonfriable ACM that has become friable, (c) Category I nonfriable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading, or (d) Category II nonfriable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition or renovation operations regulated by this Rule. (35) Remove means to take out RACM or facility components that contain or are covered with RACM from any facility. (36) Renovation means altering a facility or one (1) or more facility components in any way, including the stripping or removal of RACM from a facility component even if temporary. Operations in which load-supporting structural members are wrecked or taken out are demolitions. (37) Resilient floor covering means asbestos-containing floor tile, including asphalt and vinyl floor tile, and sheet vinyl floor covering containing more than one percent (1%) asbestos as determined using the method specified in Title 40 CFR Part 763, Subpart E, Appendix E, Section 1 "Polarized Light Microscopy," which has been incorporated by reference in Chapter 4. (38) Roadways means surfaces on which vehicles travel. This term includes public and private highways, roads, streets, parking areas, and driveways. (39) Strip means to take off RACM from any part of a facility or facility components. (40) Structural member means any load supporting member of a facility, such as beams and load supporting walls; or any nonload-supporting member, such as ceilings and nonload-supporting walls. (41) Visible emissions means any emissions, which are visually detectable without the aid of instruments, coming from RACM or asbestos-containing waste material, or from any asbestos milling, manufacturing, or fabricating operation. This does not include condensed, uncombined water vapor. (42) Waste generator means any owner or operator of a source covered by this Rule whose act or process produces asbestos-containing waste material. (43) Waste shipment record means the shipping document, required to be originated and signed by the waste generator, used to track and substantiate the disposition of asbestos-containing waste material. (44) Working day means Monday through Friday and includes holidays that fall on any of the days Monday through Friday. Rule 17.2. Standard for asbestos mills. (1) Each owner or operator of an asbestos mill shall either discharge no visible emissions to the outside air from that asbestos mill, including fugitive sources, or use the methods specified by Rule 17.12 to clean emissions containing particulate asbestos material before they escape to, or are vented to, the outside air. (2) Each owner or operator of an asbestos mill shall meet the following requirements: a. Monitor each potential source of asbestos emissions from any part of the mill facility, including air cleaning devices, process equipment, and buildings that house equipment for material processing and handling, at least once a day, during daylight hours, for visible emissions to the outside air during periods of operation. The monitoring shall be by visual observation of at least fifteen (15) seconds duration per source of emissions. b. Inspect each air cleaning device at least once each week for proper operation and for changes that signal the potential for malfunction, including, to the maximum extent possible without dismantling other than opening the device, the presence of tears, holes, and abrasions in filter bags and for dust deposits on the clean side of bags. For air cleaning devices that cannot be inspected on a weekly basis according to this paragraph, submit to the Director, and revise as necessary, a written maintenance plan to include, at a minimum, the following: 1. Maintenance schedule. 2. Recordkeeping plan. c. Maintain records of the results of visible emissions monitoring and air cleaning device inspections using a format similar to that shown in Figures 1 and 2 (copies of which shall be maintained in the office of the Chattanooga-Hamilton County Air Pollution Control Board) OR (attached hereto and incorporated herein by reference) and include the following: 1. Date and time of each inspection. 2. Presence or absence of visible emissions. 3. Condition of fabric filters, including presence of any tears, holes, and abrasions. 4. Presence of dust deposits on clean side of fabric filters. 5. Brief description of corrective actions taken, including date and time. 6. Daily hours of operation for each air cleaning device. d. Furnish upon request, and make available at the affected facility during normal business hours for inspection by the Director, all records required under this Rule. e. Retain a copy of all monitoring and inspection records for at least two (2) years. f. Submit quarterly a copy of visible emission monitoring records to the Director if visible emissions occurred during the report period. Quarterly reports shall be postmarked by the thirtieth (30th) day following the end of the calendar quarter. Rule 17.3. Standard for roadways. No person may construct or maintain a roadway with asbestos tailings or asbestos-containing material on that roadway, unless, for asbestos tailings: (1) It is a temporary roadway on an area of asbestos ore deposits (asbestos mine); or (2) It is a temporary roadway at an active asbestos mill site and is encapsulated with a resinous or bituminous binder. The encapsulated road surface must be maintained at a minimum frequency of once per year to prevent dust emissions; or (3) It is encapsulated in asphalt concrete meeting the specifications contained in section 401 of Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-85, 1985, or their equivalent. Rule 17.4. Standards for manufacturing. (1) Applicability. This standard applies to the following manufacturing operations using commercial asbestos: a. The manufacture of cloth, cord, wicks, tubing, tape, twine, rope, thread, yarn, roving, lap, or other textile materials; b. The manufacture of cement products; c. The manufacture of fireproofing and insulating materials; d. The manufacture of friction products; e. The manufacture of paper, millboard, and felt; f. The manufacture of floor tile; g. The manufacture of paints, coatings, caulks, adhesives, and sealants; h. The manufacture of plastics and rubber materials; i. The manufacture of chlorine utilizing asbestos diaphragm technology; j. The manufacture of shotgun shell wads; and k. The manufacture of asphalt concrete. (2) Standard. Each owner or operator of any of the manufacturing operations to which Rule 17.4 applies shall: a. Either discharge no visible emissions to the outside air from these operations or from any building or structure in which they are conducted or from any other fugitive sources; or b. Use the methods specified by Rule 17.12 to clean emissions from these operations containing particulate asbestos material before they escape to, or are vented to, the outside air; and shall also c. Monitor each potential source of asbestos emissions from any part of the manufacturing facility, including air cleaning devices, process equipment, and buildings housing material processing and handling equipment, at least once each day during daylight hours for visible emissions to the outside air during periods of operation. The monitoring shall be by visual observation of at least fifteen (15) seconds duration per source of emissions. d. Inspect each air cleaning device at least once each week for proper operation and for changes that signal the potential for malfunctions, including, to the maximum extent possible without dismantling other than opening the device, the presence of tears, holes, and abrasions in filter bags and for dust deposits on the clean side of bags. For air cleaning devices that cannot be inspected on a weekly basis according to this paragraph, submit to the Director, and revise as necessary, a written maintenance plan to include, at a minimum, the following: 1. Maintenance schedule; and 2. Recordkeeping plan. e. Maintain records of the results of visible emission monitoring and air cleaning device inspections using a format similar to that shown in Figures 1 and 2 and include the following: 1. Date and time of each inspection; 2. Presence or absence of visible emissions; 3. Condition of fabric filters, including presence of any tears, holes and abrasions; 4. Presence of dust deposits on clean side of fabric filters; 5. Brief description of corrective actions taken, including date and time; and 6. Daily hours of operation for each air cleaning device. f. Furnish, upon request, and make available at the affected facility during normal business hours for inspection by the Director or a representative of the Director, all records required under Rule 17.4. g. Retain a copy of all monitoring and inspection records for at least two (2) years. h. Submit quarterly a copy of the visible emission monitoring records to the Director if visible emissions occurred during the reporting period. Quarterly reports shall be postmarked by the thirtieth (30th) day following the end of the calendar quarter. Rule 17.5. Standard for demolition and renovation. (1) Applicability. To determine which requirements of paragraphs (1), (2), and (3) of Rule 17.5 apply to the owner or operator of a demolition or renovation activity and prior to the commencement of the demolition or renovation, the owner or operator is required to have the affected facility or part of the facility where the demolition or renovation operation will occur thoroughly inspected for the presence of asbestos, including Category I and Category II nonfriable ACM. Any asbestos survey conducted by or for the owner or operator to determine the applicability of Rule 17.5 shall be conducted by a qualified person who has complied with the training requirements of paragraph (3)h. The requirements of paragraphs (2) and (3) of Rule 17.5 apply to each owner or operator of a demolition or renovation activity, including the removal of RACM as follows: a. In a facility being demolished, all the requirements of paragraphs (2) and (3) of this section apply, except as provided in paragraph (1)(c) of Rule 17.5, if the combined amount of RACM is: 1. At least eighty (80) linear meters (two hundred sixty (260) linear feet) on pipes or at least fifteen (15) square meters (one hundred sixty (160) square feet) on other facility components, or 2. At least one (1) cubic meter (thirty-five (35) cubic feet) removed from facility components where the length or area could not be measured previously. b. In a facility being demolished, only the notification requirements of paragraphs (2)a., (2)b., (2)c.,1. and 4., and (2)d.1. through 7. and 9. through 16. of Rule 17.5 apply, if the combined amount of RACM is 1. Less than eighty (80) linear meters (two hundred sixty (260) linear feet) on pipes and less than fifteen (15) square meters (one hundred sixty (160) square feet) on other facility components, and 2. Less than one (1) cubic meter (thirty-five (35) cubic feet) removed from facility components where the length or area could not be measured previously or there is no asbestos. These notification requirements apply to all demolition projects, even if no RACM has been identified by the owner or operator. c. If the facility is being demolished under an order of a State or local government agency, issued because the facility is structurally unsound and in danger of imminent collapse, only the requirements of paragraphs (2)a., (2)b., (2)c.3, (2)d. (except (2)d.8), and (3)d. through i. of Rule 17.5 apply. d. In a facility being renovated, including any individual nonscheduled renovation operation, all the requirements of paragraphs (2) and (3) of Rule 17.5 apply if the combined amount of RACM to be stripped, removed, dislodged, cut, drilled, or similarly disturbed is 1. At least eighty (80) linear meters (two hundred sixty (260) linear feet) on pipes or at least fifteen (15) square meters (one hundred sixty (160) square feet) on facility components, or 2. At least one (1) cubic meter (thirty-five (35) cubic feet) removed from facility components where the length or area could not be measured previously. 3. To determine whether paragraph (1)d. of Rule 17.5 applies to planned renovation operations involving individual nonscheduled operations, predict the combined additive amount of RACM to be removed or stripped during a calendar year of January 1 through December 31. 4. To determine whether paragraph (1)d. of Rule 17.5 applies to emergency renovation operations, estimate the combined amount of RACM to be removed or stripped as a result of the sudden, unexpected event that necessitated the renovation. e. Courtesy notification. The owner or operator of a renovation activity at any facility being renovated that is not described in paragraph (1)d. of Rule 17.5 shall provide the Director with a written courtesy notification on a form specified by the Director and available from the Bureau before any renovation activity begins. None of the requirements of paragraphs (2) and (3) of Rule 17.5 are applicable to such renovations. A fee of two hundred dollars ($200.00) shall be included with the notification, which fee shall be collected by the Bureau and remitted to the City of Chattanooga finance officer as fiscal agent for the Board. (2) Notification requirements. Each owner or operator of a demolition or renovation activity to which Rule 17.5 applies shall: a. Provide the Director with written notice of intention to demolish or renovate on a form specified by the Director and available from the Bureau. In addition, Section 4-8(f) contains requirements for building demolition or renovation permits and related permit fees, including requirements applicable to all demolition projects and to certain renovation projects. b. Update the notice, as necessary, including when the amount of asbestos affected changes by at least twenty percent (20%). c. Assure receipt by the Director of written notice as follows: 1. At least ten (10) working days before asbestos stripping or removal work or any other activity begins (such as site preparation that would break up, dislodge or similarly disturb asbestos material), if the operation is described in paragraphs (1)a. and d. (except (1)d.3. and (1)d.4.) of Rule 17.5. 2. At least ten (10) working days before any demolition operation described in paragraph (1)b. begins. 3. At least thirty (30) working days before the end of the calendar year preceding the year for which notice is being given for renovations described in paragraph (1)d.3. of Rule 17.5. 4. As early as possible before, but not later than the following working day, if the operation is a demolition according to paragraph (1)c. of Rule 17.5 or if the operation is a renovation described in paragraph (1)d.4. of Rule 17.5. 5. For asbestos stripping or removal work in a demolition or renovation operation, described in paragraphs (1)a. or (1)d. (except (1)d.3. and (1)d.4.) of Rule 17.5, and for a demolition described in paragraph (1)b. of Rule 17.5, that will begin on a date other than the one contained in the original notice, notice of the new start date must be provided to the Director as follows: (i) When the asbestos stripping or removal operation or demolition operation covered by Rule 17.5 will begin after the date contained in the notice, the Director shall be notified of the new start date as soon as possible before, and no later than, the original start date. (ii) When the asbestos stripping or removal operation or demolition operation covered by Rule 17.5 will begin on a date earlier than the date contained in the notice, the Director shall be notified of the new start date at least ten (10) working days before the asbestos stripping or removal operation or demolition operation begins. d. Include the following in the notice: 1. An indication of whether the notice is the original or a revised notification; 2. Name, address, and telephone number of the facility owner or operator and the asbestos removal contractor (if applicable) and/or the demolition contractor (if applicable); 3. Type of operation: (i) Demolition without friable asbestos present; (ii) Demolition with friable asbestos present; (iii) Removal of friable asbestos without demolition; (iv) Emergency demolition; (v) Court ordered demolition; or (vi) Other; 4. Description of the facility or affected part of the facility including the size (square meters [square feet] and number of floors), age, and present and prior use of the facility; 5. (Reserved) 6. Estimate of the approximate amount of RACM to be removed from the facility in terms of length of pipe in linear meters (linear feet), surface area in square meters (square feet) on other facility components, or volume in cubic meters (cubic feet) if off the facility components. Also, estimate the approximate amount of Category I and Category II nonfriable ACM in the affected part of the facility that will not be removed before demolition; 7. Location and street address (including city and building number or name and floor or room number, if appropriate) of the facility being demolished or renovated; 8. Scheduled starting and completion dates of asbestos work (or any other activity, such as site preparation that would break up, dislodge, or similarly disturb asbestos material) in a demolition or renovation; planned renovation operations involving individual nonscheduled operations shall only include the beginning and ending dates of the report period as described in paragraph (1)d.3. of Rule 17.5; 9. Scheduled starting and completion dates of demolition or renovation; 10. (Reserved) 11. (Reserved) 12. Name and location of the waste disposal site where the asbestos-containing waste material will be deposited; 13. On and after January 1, 1993, a certification that at least one (1) person trained as required by paragraph (3)h. of Rule 17.5 will supervise the stripping and removal described by this notification; 14. For facilities described in paragraph (1)c. of Rule 17.5, the name, title, and authority of the State or local government representative who has ordered the demolition, the date that the order was issued, and the date on which the demolition was ordered to begin or was ordered to be completed. A copy of the order shall be attached to the notification; 15. For emergency renovations described in paragraph (1)d.4. of Rule 17.5, the date and hour that the emergency occurred, a description of the sudden, unexpected event, and an explanation of how the event caused an unsafe condition, or would cause equipment damage or an unreasonable financial burden; 16. Description of procedures to be followed in the event that unexpected RACM is found or Category II nonfriable ACM becomes crumbled, pulverized, or reduced to powder; 17. Name, address, and telephone number of the waste transporter; and 18. Attach any required asbestos survey, including a diagram showing the location of all identified ACM. (3) Procedures for asbestos emission control. Each owner or operator of a demolition or renovation activity to whom Rule 17.5 applies, according to paragraph (1) of Rule 17.5, shall comply with the following procedures: a. Remove all RACM from a facility being demolished or renovated before any activity begins that would break up, dislodge, or similarly disturb the material or preclude access to the material for subsequent removal. RACM need not be removed before demolition if: 1. It is Category I nonfriable ACM that is not in poor condition and is not friable; 2. It is on a facility component that is encased in concrete or other similarly hard material and is adequately wet whenever expected during demolition; 3. It was not accessible for testing and was, therefore, not discovered until after demolition began and, as a result of the demolition, the material cannot be safely removed. If not removed for safety reasons, the exposed RACM and any asbestos-contaminated debris must be treated as asbestos-containing waste material and adequately wet at all times until disposed of; or 4. It is Category II nonfriable ACM and the probability is low that the materials will become crumbled, pulverized, or reduced to powder during demolition. b. When a facility component that contains, is covered with, or is coated with RACM is being taken out of the facility as a unit or in sections: 1. Adequately wet all RACM exposed during cutting or disjoining operations; and 2. Carefully lower each unit or section to the floor and to ground level, not dropping, throwing, sliding, or otherwise damaging or disturbing the RACM. c. When RACM is stripped from a facility component while it remains in place in the facility, adequately wet the RACM during the stripping operation. 1. In renovation operations, wetting is not required if: (i) The owner or operator has obtained prior written approval from the Director based on a written application that wetting to comply with this paragraph would unavoidably damage equipment or present a safety hazard; and (ii) The owner or operator uses one (1) of the following emission control methods: (A) A local exhaust ventilation and collection system designed and operated to capture the particulate asbestos material produced by the stripping and removal of the asbestos materials. The system must exhibit no visible emissions to the outside air or be designed and operated in accordance with the requirements in Rule 17.12; (B) A glove-bag system designed and operated to contain particulate asbestos material produced by the stripping of the materials; or (C) Leak-tight wrapping to contain all RACM prior to dismantlement. 2. In renovation operations where wetting would result in equipment damage or a safety hazard, and the methods allowed in paragraph (3)c.1. of Rule 17.5 cannot be used, another method may be used after written approval from the Director based upon a determination that it is equivalent to wetting in controlling emissions or to the methods allowed in paragraph (3)c.1. of Rule 17.5. 3. A copy of the Director's written approval shall be kept at the worksite and made available for inspection. d. After a facility component covered with, coated with, or containing RACM has been taken out of the facility as a unit or in sections pursuant to paragraph (3)b. of Rule 17.5, it shall be stripped or contained in leak-tight wrapping, except as described in paragraph (3)e. of Rule 17.5. If stripped, either: 1. Adequately wet the RACM during stripping; or 2. Use a local exhaust ventilation and collection system designed and operated to capture the particulate asbestos material produced by the stripping. The system must exhibit no visible emissions to the outside air or be designed and operated in accordance with the requirements in Rule 17.12. e. For large facility components such as reactor vessels, large tanks, and steam generators, but not beams (which must be handled in accordance with paragraphs (3)b., c., and d. of Rule 17.5), the RACM is not required to be stripped if the following are met: 1. The component is removed, transported, stored, disposed of, or reused without disturbing or damaging the RACM; 2. The component is encased in a leak-tight wrapping; and 3. The leak-tight wrapping is labeled according to Rule 17.9 (4)a.1., and 3. during all loading and unloading operations and during storage. f. For all RACM, including material that has been removed or stripped: 1. Adequately wet the material and ensure that it remains wet until collected and contained or treated in preparation for disposal in accordance with Rule 17.10; 2. Carefully lower the material to the ground and floor, not dropping, throwing, sliding, or damaging or disturbing the material; 3. Transport the material to the ground via leak-tight chutes or containers if it has been removed or stripped more than fifty (50) feet above ground level and was not removed as units or in sections; 4. RACM contained in leak-tight wrapping that has been removed in accordance with paragraphs (3)d. and (3)c.1.(ii)(c) of Rule 17.5 need not be wetted. g. When the temperature at the point of wetting is below zero degrees (0°) Celsius (thirty-two degrees (32°) Fahrenheit): 1. The owner or operator need not comply with paragraph (3)b.1. and the wetting provisions of paragraph (3)c. of Rule 17.5. 2. The owner or operator shall remove facility components containing, coated with, or covered with RACM as units or in sections to the maximum extent possible. 3. During periods when wetting operations are suspended due to freezing temperatures, the owner or operator must record the temperature in the area containing the facility components at the beginning, middle, and end of each workday and keep daily temperature records available for inspection by the Director during normal business hours at the demolition or renovation site. The owner or operator shall retain the records for at least two (2) years. h. On and after January 1, 1993, no RACM shall be stripped, removed, or otherwise handled or disturbed at a facility regulated by Rule 17.5 unless at least one on-site representative, such as a foreman or management-level person or other authorized representative, trained in the provisions of Rule 17.5 and the means of complying with them, is present. Every two (2) years, the trained on-site individual shall receive refresher training in the provisions of Rule 17.5. The required training shall include as a minimum: applicability; notifications; material identification; control procedures for removals including, at least, wetting, local exhaust ventilation, negative pressure enclosures, glove-bag procedures, and High Efficiency Particulate Air (HEPA) filters; waste disposal work practices; reporting and recordkeeping; and asbestos hazards and worker protection. Evidence that the required training has been completed shall be posted and made available for inspection by the Director at the demolition or renovation site. i. For facilities described in paragraph (1)c. of Rule 17.5, adequately wet the portion of the facility that contains RACM during the operation. j. If a facility is demolished by intentional burning, all RACM including Category I and Category II nonfriable ACM must be removed in accordance with Rule 17.5 before burning. k. Any person conducting an asbestos survey or engaged in the removal of asbestos at a facility within Tennessee is required to be in possession of either a valid and appropriate asbestos accreditation certificate or valid and appropriate asbestos accreditation photo identification card as issued by the State of Tennessee in accordance with Chapter 1200-01-20 "Asbestos Accreditation Requirements" of the Rules of the Tennessee Department of Health and Tennessee Department of Environment and Conservation. Such accreditation certificate or identification card shall be made available for inspection by representatives or designees of the Director upon request at the facility. Rule 17.6. Standard for spraying. The owner or operator of an operation in which asbestos-containing materials are spray applied shall comply with the following requirements: (1) For spray-on application on buildings, structures, pipes, and conduits, do not use material containing more than one percent (1%) asbestos as determined using the method specified in Title 40 CFR Part 763, Subpart E, Appendix E, Section 1 "Polarized Light Microscopy," which has been incorporated by reference in Chapter 4, except as provided in paragraph (3) of Rule 17.6. (2) For spray-on application of materials that contain more than one percent (1%) asbestos as determined using the method specified in Title 40 CFR Part 763, Subpart E, Appendix E, Section 1 "Polarized Light Microscopy," which has been incorporated by reference in Chapter 4, on equipment and machinery, except as provided in paragraph (3) of Rule 17.6: a. Notify the Director at least twenty (20) days before beginning the spraying operation. Include the following information in the notice: 1. Name and address of owner or operator; 2. Location of spraying operation; 3. Procedures to be followed to meet the requirements of this paragraph. b. Discharge no visible emissions to the outside air from spray-on application of the asbestos-containing material or use the methods specified by Rule 17.12 to clean emissions containing particulate asbestos material before they escape to, or are vented to, the outside air. (3) The requirements of paragraphs (1) and (2) of Rule 17.6 do not apply to the spray-on application of materials where the asbestos fibers in the materials are encapsulated with a bituminous or resinous binder during spraying and the materials are not friable after drying. Rule 17.7. Standards for fabricating. (1) Applicability. This rule applies to the following fabricating operations using commercial asbestos: a. The fabrication of cement building products; b. The fabrication of friction products, except those operations that primarily install asbestos friction materials on motor vehicles; and c. The fabrication of cement or silicate board for ventilation hoods; ovens; electrical panels; laboratory furniture, bulkheads, partitions, and ceilings for marine construction; and flow control devices for the molten metal industry. (2) Standard. Each owner or operator of any of the fabricating operations to which Rule 17.7 applies shall either: a. Either discharge no visible emissions to the outside air from any of the operations or from any building or structure in which they are conducted or from any other fugitive sources; or b. Use the methods specified by Rule 17.12 to clean emissions containing particulate asbestos material before they escape to, or are vented to, the outside air; and shall also c. Monitor each potential source of asbestos emissions from any part of the fabricating facility, including air cleaning devices, process equipment, and buildings that house equipment for material processing and handling, at least once each day, during daylight hours, for visible emissions to the outside air during periods of operation. The monitoring shall be by visual observation of at least fifteen (15) second duration per source of emissions. d. Inspect each air cleaning device at least once each week for proper operation and for changes that signal the potential for malfunctions, including, to the maximum extent possible without dismantling other than opening the device, the presence of tears, holes, and abrasions in filter bags and for dust deposits on the clean side of bags. For air cleaning devices that cannot be inspected on a weekly basis according to this paragraph, submit to the Director, and revise as necessary, a written maintenance plan to include, at a minimum, the following: 1. Maintenance schedule; and 2. Recordkeeping plan. e. Maintain records of the results of visible emission monitoring and air cleaning device inspections using a format similar to that shown in Figures 1 and 2 and include the following: 1. Date and time of each inspection; 2. Presence or absence of visible emissions; 3. Condition of fabric filters, including presence of any tears, holes, and abrasions; 4. Presence of dust deposits on clean side of fabric filters; 5. Brief description of corrective actions taken, including date and time; and 6. Daily hours of operation for each air cleaning device. f. Furnish upon request and make available at the affected facility during normal business hours for inspection by the Director, all records required under Rule 17.7. g. Retain a copy of all monitoring and inspection records for at least two (2) years. h. Submit quarterly a copy of the visible emission monitoring records to the Director if visible emissions occurred during the report period. Quarterly reports shall be postmarked by the thirtieth (30th) day following the end of the calendar quarter. Rule 17.8. Standard for insulating materials. No owner or operator of a facility may install or reinstall on a facility component any insulating materials that contain commercial asbestos if the materials are either molded and friable or wet-applied and friable after drying. The provisions of Rule 17.8 do not apply to spray-applied insulating materials regulated under Rule 17.6. Rule 17.9. Standard for waste disposal for asbestos mills. Each owner or operator of any source covered under the provisions of Rule 17.2 shall: (1) Deposit all asbestos-containing waste material at a waste disposal site operated in accordance with the provisions of Rule 17.14; and (2) Discharge no visible emissions to the outside air from the transfer of control device asbestos waste to the tailings conveyor, or use the method specified by Rule 17.12 to clean emissions containing particulate asbestos material before they escape to, or are vented to, the outside air. Dispose of the asbestos waste from control devices in accordance with Rule 17.10 or paragraph (3) of Rule 17.9; and (3) Discharge no visible emissions to the outside air during the collection, processing, packaging, or on-site transporting of any asbestos-containing waste material, or use one (1) of the disposal methods specified in paragraphs (3)a. or b. of Rule 17.9, as follows: a. Use a wetting agent as follows: 1. Adequately mix all asbestos-containing waste material with a wetting agent recommended by the manufacturer of the agent to effectively wet dust and tailings, before depositing the material at a waste disposal site. Use the agent as recommended for the particular dust by the manufacturer of the agent. 2. Discharge no visible emissions to the outside air from the wetting operation or use the methods specified by Rule 17.12 to clean emissions containing particulate asbestos material before they escape to, or are vented to, the outside air. 3. Wetting may be suspended when the ambient temperature at the waste disposal site is less than minus nine and one-half degrees (-9.5°) Celsius (fifteen degrees (15°) Fahrenheit), as determined by an appropriate measurement method with an accuracy of ± one degree (1°) Celsius (± two degrees (2°) Fahrenheit). During periods when wetting operations are suspended, the temperature must be recorded at least at hourly intervals, and records must be retained for at least two (2) years in a form suitable for inspection. b. Use an alternative emission control and waste treatment method that has received prior written approval by the Administrator of the U.S. Environmental Protection Agency pursuant to 40 CFR 61.149(c)(2). The owner or operator shall provide the Director with a photocopy of the written approval. To obtain approval for an alternative method, a written application must be submitted to the Director demonstrating that the following criteria are met: 1. The alternative method will control asbestos emissions equivalent to currently required methods; 2. The suitability of the alternative method for the intended application; 3. The alternative method will not violate other regulations; and 4. The alternative method will not result in increased water pollution, land pollution, or occupational hazards. (4) When waste is transported by vehicle to a disposal site: a. Mark vehicles used to transport asbestos-containing waste material during the loading and unloading of the waste so that the signs are visible. The markings must: 1. Be displayed in such a manner and location that a person can easily read the legend; 2. Conform to the following requirements for fifty-one (51) centimeters by thirty-six (36) centimeters (twenty (20) inches by fourteen (14) inches) upright format signs: Caution signs. Standard color of the background shall be yellow; and the panel, black with yellow letters. Any letters used against the yellow background shall be black. The colors shall be those of opaque glossy samples as specified in Table 1 of American National Standard Z53.1-1967; and 3. Display the following legend in the lower panel with letter sizes and styles of a visibility at least equal to those specified in Rule 17.9. Legend | Notation DANGER | 2.5 cm (1 inch) Sans Serif Gothic or Block ASBESTOS DUST HAZARD | 2.5 cm (1 inch) Sans Serif Gothic or Block CANCER AND LUNG DISEASE HAZARD | 1.9 cm (¾ inch) Sans Serif Gothic or Block Authorized Personnel Only | 14 point Gothic Spacing between any two (2) lines must be at least equal to the height of the upper of the two (2) lines. b. For off-site disposal, provide a copy of the waste shipment record, described in paragraph (5)a. of Rule 17.9, to the disposal site owner or operator at the same time as the asbestos-containing waste material is delivered to the disposal site. (5) For all asbestos-containing waste material transported off the facility site: a. Maintain asbestos waste shipment records, using a form similar to that shown in Figure 3 (a copy of which may be obtained from the Chattanooga-Hamilton County Air Pollution Control Board) OR (a copy of which is attached hereto and incorporated herein by reference), and include the following information: 1. The name, address, and telephone of the waste generator; 2. The name and address of the local, State, or EPA Regional agency responsible for administering the asbestos NESHAP program; 3. The quantity of the asbestos-containing material in cubic meters (cubic yards); 4. The name and telephone number of the disposal site operator; 5. The name and physical site location of the disposal site; 6. The date transported; 7. The name, address, and telephone number of the transporter(s); and 8. A certification that the contents of this consignment are fully and accurately described by proper shipping name and are classified, packed, marked, and labeled, and are in all respects in proper condition for transport by highway according to applicable international and government regulations. b. For waste shipments where a copy of the waste shipment record, signed by the owner or operator of the designated disposal site, is not received by the waste generator within thirty-five (35) days of the date the waste was accepted by the initial transporter, contact the transporter and/or the owner or operator of the designated disposal site to determine the status of the waste shipment. c. Report in writing to the Director and also to any other officer or agency where required by local, state, or federal law covering the waste generator if a copy of the waste shipment record, signed by the owner or operator of the designated waste disposal site, is not received by the waste generator within forty-five (35) days of the date the waste was accepted by the initial transporter. Include in the report the following information: 1. A copy of the waste shipment record for which a confirmation of delivery was not received, and 2. A cover letter signed by the waste generator explaining the efforts taken to locate the asbestos waste shipment and the results of those efforts. d. Retain a copy of all waste shipment records, including a copy of the waste shipment record signed by the owner or operator of the designated waste disposal site, for at least two (2) years. (6) Furnish upon request, and make available for inspection by the Director, all records required under Rule 17.9. Rule 17.10. Standard for waste disposal for manufacturing, fabricating, demolition, renovation, and spraying operations. Each owner or operator of any source covered under the provisions of Rules 17.4, 17.5, 17.6, and 17.7 shall comply with the following provisions: (1) Discharge no visible emissions to the outside air during the collection, processing (including incineration), packaging, or transporting of any asbestos-containing waste material generated by the source, or use one (1) of the emission control and waste treatment methods specified in paragraphs (1)a. through d. of Rule 17.10. a. Adequately wet asbestos-containing waste material as follows: 1. Mix control device asbestos waste to form a slurry; adequately wet other asbestos-containing waste material; and 2. Discharge no visible emissions to the outside air from collection, mixing, wetting, and handling operations, or use the methods specified by Rule 17.12 to clean emissions containing particulate asbestos material before they escape to, or are vented to, the outside air; and 3. After wetting, seal all asbestos-containing waste material in leak-tight containers while wet; or, for materials that will not fit into containers without additional breaking, put materials into leak-tight wrapping; and 4. Label the containers or wrapped materials specified in paragraphs (1)a.3. of Rule 17.10 using warning labels specified by Occupational Safety and Health Standards of the Department of Labor, occupational Safety and Health Administration under 29 CFR 1910.1001(j)(2) or 1926.58(k)(2)(iii). The labels shall be printed in letters of sufficient size and contrast so as to be readily visible and legible. 5. For asbestos-containing waste material to be transported off the facility site, label containers or wrapped materials with the name of the waste generator and the location at which the waste was generated. b. Process asbestos-containing waste material into nonfriable forms as follows: 1. Form all asbestos-containing waste material into nonfriable pellets or other shapes; 2. Discharge no visible emissions to the outside air from collection and processing operations, including incineration, or use the method specified by Rule 17.12 to clean emissions containing particulate asbestos material before they escape to, or are vented to, the outside air. c. For facilities demolished where the RACM is not removed prior to demolition according to Rule 17.5(3)a.1., 2., 3., and 4. or for facilities demolished according to Rule 17.5(3)i., adequately wet asbestos-containing waste material at all times after demolition and keep wet during handling and loading for transport to a disposal site. Asbestos-containing waste materials covered by Rule 17.10 do not have to be sealed in leak-tight containers or wrapping but may be transported and disposed of in bulk. d. Use an alternative emission control and waste treatment method that has received prior approval by the Administrator of the U.S. Environmental Protection Agency pursuant to 40 CFR 61.150(a)(4) according to the procedure described in Rule 17.9(3)b. The owner or operator shall provide the Director with a photocopy of the written approval. e. As applied to demolition and renovation, the requirements of paragraph (1) of Rule 17.10 do not apply to Category I nonfriable ACM waste and Category II nonfriable ACM waste that did not become crumbled, pulverized, or reduced to powder. (2) All asbestos-containing waste material shall be deposited as soon as is practical by the waste generator at: a. A waste disposal site operated in accordance with the provisions of Rule 17.14 or b. An EPA-approved site that converts RACM and asbestos-containing waste material into nonasbestos (asbestos-free) material according to the provisions of Rule 17.15. c. The requirements of paragraph (2) of Rule 17.10 do not apply to Category I nonfriable ACM that is not RACM. (3) Mark vehicles used to transport asbestos-containing waste material during the loading and unloading of waste so that the signs are visible. The markings must conform to the requirements of Rule 17.9(4)a.1., 2., and 3. (4) For all asbestos-containing waste material transported off the facility site: a. Maintain waste shipment records, using a form similar to that shown in Figure 3, and include the following information: 1. The name, address, and telephone number of the waste generator; 2. The name and address of the local, State, or EPA Regional office responsible for administering the asbestos NESHAP program; 3. The approximate quantity in cubic meters (cubic yards); 4. The name and telephone number of the disposal site operator; 5. The name and physical site location of the disposal site; 6. The date transported; 7. The name, address, and telephone number of the transporter; and 8. A certification under oath that the contents of this consignment are fully and accurately described by proper shipping name and are classified, packed, marked, and labeled, and are in all respects in proper condition for transport by highway according to applicable international and government regulations. b. Provide a copy of the waste shipment record, described in paragraph (4)a. of Rule 17.10, to the disposal site owners or operators at the same time as the asbestos-containing waste material is delivered to the site. c. For waste shipments where a copy of the waste shipment record, signed by the owner or operator of the designated site, is not received by the waste generator within thirty-five (35) days of the date the waste was accepted by the initial transporter, contact the transporter and/or the owner or operator of the designated disposal site to determine the status of the waste shipment. d. Report in writing to the Director and also to any other officer or agency where required by local, state, or federal law covering the waste generator if a copy of the waste shipment record, signed by the owner or operator of the designated waste disposal site, is not received by the waste generator within forty-five (35) days of the date the waste was accepted by the initial transporter. Include in the report the following information: 1. A copy of the waste shipment record for which a confirmation of delivery was not received, and 2. A cover letter signed by the waste generator explaining the efforts taken to locate the asbestos waste shipment and the results of those efforts. e. Retain a copy of all waste shipment records, including a copy of the waste shipment record signed by the owner or operator of the designated waste disposal site, for at least two (2) years. (5) Furnish upon request, and make available for inspection by the Director, all records required under Rule 17.10. Rule 17.11. Standard for inactive waste disposal sites for asbestos mills and manufacturing and fabricating operations. Each owner or operator of any inactive waste disposal site that was operated by sources covered under Rules 17.2, 17.4, or 17.7 and received deposits of asbestos-containing waste material generated by the sources, shall: (1) Comply with one (1) of the following: a. Either discharge no visible emissions to the outside air from an inactive waste disposal site subject to this paragraph; or b. Cover the asbestos-containing waste material with at least fifteen (15) centimeters (six (6) inches) of compacted nonasbestos-containing material, and grow and maintain a cover of vegetation on the area adequate to prevent exposure of the asbestos-containing waste material. In any chert area where vegetation is impossible to maintain, at least eight (8) additional centimeters (three (3) inches) of well-graded, nonasbestos crushed rock may be placed on top of the chert and maintained to prevent emissions; or c. Cover the asbestos-containing waste with at least sixty (60) centimeters (two (2) feet) of compacted nonasbestos-containing material, and maintain it to prevent the exposure of the asbestos-containing waste; or d. For inactive waste disposal sites for asbestos tailings, a resinous or petroleum-based dust suppression agent that effectively binds dust to control surface air emissions may be used instead of the methods in paragraphs (1)a., b., and c. of Rule 17.11. Use the agent in the manner and frequency recommended for the particular asbestos tailings by the manufacturer of the dust suppression agent to achieve and maintain dust control, obtain prior written approval of the Director to use other equally effective dust suppression agents. For purposes of Rule 17.11, any used, spent, or other waste oil is not considered a dust suppression agent. (2) Unless a natural barrier adequately deters access by the general public, install and maintain warning signs and fencing as follows, or comply with paragraph (1)b. or (1)c. of Rule 17.11. a. Display warning signs at all entrances and at intervals of 100 m (328 feet) or less along the property line of the site or along the perimeter of the sections of the site where asbestos-containing waste material was deposited. The warning signs must: 1. Be posted in such a manner and location that a person can easily read the legend; and 2. Conform to the following requirements for fifty-one (51) centimeters by thirty-six (36) centimeters (twenty (20) inches by fourteen (14) inches) upright format: signs specified in 29 CFR 1910.145(d); Caution signs. Standard color of the background shall be yellow; and the panel, black with yellow letters. Any letters used against the yellow background shall be black. The colors shall be those of opaque glossy samples as specified in Table 1 of American National Standard Z53.1-1967; and 3. Display the following legend in the lower panel with letter sizes and styles of a visibility at least equal to those specified in this paragraph. Legend | Notation ASBESTOS WASTE DISPOSAL SITE | 2.5 cm (1 inch) Sans Serif Gothic or Block DO NOT CREATE DUST | 1.9 cm (¾ inch) Sans Serif Gothic or Block BREATHING ASBESTOS IS HAZARDOUS TO YOUR HEALTH | 14 point Gothic Spacing between any two (2) lines must be at least equal to the height of the upper of the two (2) lines. b. Fence the perimeter of the site in a manner adequate to deter access by the general public. c. When requesting a determination on whether a natural barrier adequately deters public access, supply information enabling the Director to determine whether a fence or a natural barrier adequately deters access by the general public. (3) The owner or operator may use an alternative control method that has received prior approval of the Administrator of the U.S. Environmental Protection Agency pursuant to 40 CFR 61.151(c) rather than comply with the requirements of paragraph (1) or (2) of Rule 17.11. The owner or operator shall provide the Director with a photocopy of the written approval. (4) Notify the Director in writing at least forty-five (35) days prior to excavating or otherwise disturbing any asbestos-containing waste material that has been deposited at a waste disposal site under Rule 17.11, and follow the procedures specified in the notification. If the excavation will begin on a date other than the one (1) contained in the original notice, notice of the new start date must be provided to the Director at least ten (10) working days before excavation begins and in no event shall excavation begin earlier than the date specified in the original notification. Include the following information in the notice: a. Scheduled starting and completion dates; b. Reason for disturbing the waste; c. Procedures to be used to control emissions during the excavation, storage, transport, and ultimate disposal of the excavated asbestos-containing waste material. If deemed necessary, the Director may require changes in the emission control procedures to be used; and d. Location of any temporary storage site and the final disposal site. (5) On or before the site becomes inactive, record, in accordance with State law, an instrument in the chain of title of the facility property that would normally be examined in a title search, that will in perpetuity notify any potential purchaser of the property that: a. The land has been used for the disposal of asbestos-containing waste material; b. The survey plot and record of the location and quantity of asbestos-containing waste disposed of within the disposal site required in Rule 17.14(6) have been filed with the Director; and c. The site is subject to 40 CFR part 61, subpart M. Rule 17.12. Air cleaning. (1) The owner or operator who uses air cleaning, as specified in Rules 17.2(1); 17.4(2)b.; 17.5(3)c.1.(ii)(A); 17.5(3)d.2.; 17.6(2)b.; 17.7(2)b.; 17.9(2); 17.9(3)a.2.; 17.10(1)a.2.; 17.10(1)b.2.; and 17.15(5) shall: a. Use fabric filter collection devices, except as noted in paragraph (b) of Rule 17.12, doing all of the following: 1. Ensuring that the airflow permeability, as determined by ASTM Method D737-75, does not exceed 9 m 3 /min/m 2 (30 ft 3 /min/ft 2 ) for woven fabrics or 11 3 /min/m 2 (35 ft 3 /min/ft 2 ) for felted fabrics, except that 12 m 3 /min/m 2 (40 ft 3 /min/ft 2 ) for woven and 14 m 3 /min/m 2 (45 ft 3 /min/ft 2 ) for felted fabrics is allowed for filtering air from asbestos ore dryers; and 2. Ensuring that felted fabric weighs at least four hundred seventy-five (475) grams per square meter (fourteen (14) ounces per square yard) and is at least one and six-tenths (1.6) millimeter (one-sixteenth ( 1/16 ) inch) thick throughout; and 3. Avoiding the use of synthetic fabrics that contain fill yarn other than that which is spun. b. Properly install, use, operate, and maintain all air-cleaning equipment authorized by Rule 17.12. Bypass devices may be used only during upset or emergency conditions and then only for so long as it takes to shut down the operation generating the particulate asbestos material. c. For fabric filter collection devices, provide for easy inspection for faulty bags. (2) There are the following exceptions to paragraph (1)a.: a. If the use of fabric creates a fire or explosion hazard, or the Director determines that a fabric filter is not feasible, the Director may authorize as a substitute the use of wet collectors designed to operate with a unit contacting energy of at least nine and ninety-five-hundredths (9.95) kilopascals (forty (40) inches water gage pressure). b. Use a HEPA filter that is certified to be at least ninety-nine and ninety-seven-hundredths (99.97) percent efficient for three-tenths (0.3) micron particles. c. The Administrator of the U.S. Environmental Protection Agency pursuant to 40 CFR 61.152(b)(3) may authorize the use of filtering equipment other than described in paragraphs (1)a. and (2)a. and b. of Rule 17.13 if the owner or operator demonstrates to the Administrator's satisfaction that it is equivalent to the described equipment in filtering particulate asbestos material. The owner or operator shall provide the Director with a photocopy of the written authorization. Rule 17.13. Reporting. (1) Any new source to which Rule 17 applies (with the exception of sources subject to Rules 17.3, 17.5, 17.6, and 17.8) which has an initial startup date preceding the effective date of this revision, shall provide the following information to the Director delivered within ninety (90) days of the effective date. In the case of a new source that does not have an initial startup date preceding the effective date, the information shall be delivered within ninety (90) days of the initial startup date. Any owner or operator of an existing source shall deliver the following information to the Director within ninety (90) days of the effective date of this subpart unless the owner or operator of the existing source has previously provided this information to the Director. Any changes in the information provided by any existing source shall be delivered to the Director within thirty (30) days after the change. Facsimile transmission is not acceptable. a. A description of the emission control equipment used for each process; and 1. If the fabric device uses a woven fabric, the airflow permeability in m 3 /min/m 2 and; if the fabric is synthetic, whether the fill yarn is spun or not spun; and 2. If the fabric filter device uses a felted fabric, the density in g/m 2 , the minimum thickness in inches, and the airflow permeability in m 3 /min/m 2 . b. If a fabric filter device is used to control emissions, 1. The airflow permeability in m 3 /min/m 2 (ft 3 /min/ft 2 ) if the fabric filter device uses a woven fabric, and, if the fabric is synthetic, whether the fill yarn is spun or not spun; and 2. If the fabric filter device uses a felted fabric, the density in g/m 2 (oz/yd 2 ), the minimum thickness in millimeters (inches), and the airflow permeability in m 3 /min/m 2 (ft 3 /min/ft 2 ). c. If a HEPA filter is used to control emissions, the certified efficiency. d. For sources subject to Rules 17.9 and 17.10: 1. A brief description of each process that generates asbestos-containing waste material; and 2. The average volume of asbestos-containing waste material disposed of, measured in m 3 /day (yd 3 /day); and 3. The emission control methods used in all stages of waste disposal; and 4. The type of disposal site or incineration site used for ultimate disposal, the name of the site operator, and the name and location of the disposal site. e. For sources subject to Rules 17.11 and 17.14: 1. A brief description of the site; and 2. The method or methods used to comply with the standard, or alternative procedures to be used. (2) The information required by Rule 17.13(1) must accompany the information submitted to the Administrator of U.S. EPA pursuant to Title 40 CFR Part 61, Subpart A, § 61.10 "Source reporting and waiver request," which has been incorporated by reference in Chapter 4. Active waste disposal sites subject to Rule 17.14 shall also comply with this provision. The information described in Rule 17.13 must be reported using the format required by the Bureau. Rule 17.14. Standard for active waste disposal sites. Each owner or operator of an active waste disposal site that receives asbestos-containing waste material from a source covered under Rules 17.9, 17.10, or 17.15 shall meet the requirements of this rule: (1) Either there must be no visible emissions to the outside air from any active waste disposal site where asbestos-containing waste material has been deposited, or the requirements of paragraph (3) or (4) of Rule 17.14 must be met. (2) Unless a natural barrier adequately deters access by the general public, either warning signs and fencing must be installed and maintained as follows, or the requirements of paragraph (3)a. of Rule 17.14 must be met. a. Warning signs must be displayed at all entrances and at intervals of one hundred (100) meters (three hundred thirty (330) feet) or less along the property line of the site or along the perimeter of the sections of the site where asbestos-containing waste material is deposited. The warning signs must: 1. Be posted in such a manner and location that a person can easily read the legend; and 2. Conform to the requirements of fifty-one (51) centimeters by thirty-six (36) centimeters (twenty (20) inches by fourteen (14) inches) upright format signs: Caution signs. Standard color of the background shall be yellow; and the panel, black with yellow letters. Any letters used against the yellow background shall be black. The colors shall be those of opaque glossy samples as specified in Table 1 of American National Standard Z53.1-1967; and 3. Display the following legend in the lower panel with letter sizes and styles of a visibility at least equal to those specified in Rule 17.14. Legend | Notation ASBESTOS WASTE DISPOSAL SITE | 2.5 cm (1 inch) Sans Serif Gothic or Block DO NOT CREATE DUST | 1.9 cm (3/4 inch) Sans Serif Gothic or Block BREATHING ASBESTOS IS HAZARDOUS TO YOUR HEALTH | 14 point Gothic Spacing between any two (2) lines must be at least equal to the height of the upper of the two (2) lines. b. The perimeter of the disposal site must be fenced in a manner adequate to deter access by the general public. c. Upon request and supply of appropriate information, the Director will determine whether a fence or a natural barrier adequately deters access by the general public. (3) Rather than meet the no visible emission requirement of paragraph (1) of Rule 17.14, at the end of each operating day, or at least once every twenty-four (24) hour period while the site is in operation, the asbestos-containing waste material that has been deposited at the site during the operating day or previous twenty-four (24) hour period shall: a. Be covered with at least fifteen (15) centimeters (six (6) inches) of compacted nonasbestos-containing material, or b. Be covered with a resinous or petroleum-based dust suppression agent that effectively binds dust and controls wind erosion. Such an agent shall be used in the manner and frequency recommended for the particular dust by the dust suppression agent manufacturer to achieve and maintain dust control. Other equally effective dust suppression agents may be used upon prior approval by the Director. For the purposes of Rule 17.14, any used, spent, or other waste oil is not considered a dust suppression agent. (4) Rather than meet the no visible emission requirement of paragraph (1) of Rule 17.14, use an alternative emissions control method that has received prior written approval by the Administrator of the U.S. Environmental Protection Agency pursuant to 40 CFR 61.154(d) according to the procedures described in Rule 17.9(3)b. The owner or operator shall provide the Director with a photocopy of the written approval. (5) For all asbestos-containing waste material received, the owner or operator of the active waste disposal site shall: a. Maintain waste shipment records, using a form similar to that shown in Figure 3, and include the following information: 1. The name, address, and telephone number of the waste generator; 2. The name, address, and telephone number of the transporter(s); 3. The quantity of the asbestos-containing waste material in cubic meters (cubic yards); 4. The presence of improperly enclosed or uncovered waste, or any asbestos-containing waste material not sealed in leak-tight containers. Report in writing to the Director and also to any other officer or agency where required by local, state or federal law covering the waste generator (identified in the waste shipment record), and, if different, the local, State, or EPA Regional office responsible for administering the asbestos NESHAP program for the disposal site, by the following working day, the presence of a significant amount of improperly enclosed or uncovered waste. Submit a copy of the waste shipment record along with the report; and 5. The date of the receipt. b. As soon as possible and no longer than thirty (30) days after receipt of the waste, send a copy of the signed waste shipment record to the waste generator. c. Upon discovering a discrepancy between the quantity of waste designated in the waste shipment records and the quantity actually received, attempt to reconcile the discrepancy with the waste generator. If the discrepancy is not resolved within fifteen (15) days after receiving the waste, immediately report in writing to the Director and also to any other officer or agency where required by local, state, or federal law covering the waste generator (identified in the waste shipment record), and, if different, the local, State, or EPA Regional office responsible for administering the asbestos NESHAP for the disposal site. Describe the discrepancy and attempts to reconcile it, and submit a copy of the waste shipment record along with the report. d. Retain a copy of all records and reports required by this paragraph for at least two (2) years. (6) Maintain, until closure, records of the location, depth and area, and quantity in cubic meters (cubic yards) of asbestos-containing waste material within the disposal site on a map or diagram of the disposal area. (7) Upon closure, comply with all the provisions of Rule 17.11. (8) Submit to the Director, upon closure of the facility, a copy of records of asbestos waste disposal locations and quantities. (9) Furnish upon request, and make available during normal business hours for inspection by the Director, all records required under Rule 17.14. (10) Notify the Director in writing at least forty-five (35) days prior to excavating or otherwise disturbing any asbestos-containing waste material that has been deposited at a waste disposal site and is covered. If the excavation will begin on a date other than the one (1) contained in the original notice, notice of the new start date must be provided to the Director at least ten (10) working days before excavation begins and in no event shall excavation begin earlier than the date specified in the original notification. Include the following information in the notice: a. Scheduled starting and completion dates; b. Reason for disturbing the waste; c. Procedures to be used to control emissions during the excavation, storage, transport, and ultimate disposal of the excavated asbestos-containing waste material. If deemed necessary, the Administrator may require changes in the emission control procedures to be used; and d. Location of any temporary storage site and the final disposal site. Rule 17.15. Standard for operations that convert asbestos-containing waste material into nonasbestos (asbestos-free) material. Each owner or operator of an operation that converts RACM and asbestos-containing waste material into nonasbestos (asbestos-free) material shall: (1) Obtain the prior written approval of the Administrator of the U.S. Environmental Protection Agency pursuant to 40 CFR 61.155(a) to construct the facility. The owner or operator shall provide the Director with a photocopy of the written approval. To obtain approval, the owner or operator shall provide the Administrator with the following information: a. Application to construct pursuant to Section 4-840 CFR 61.07. b. In addition to the information requirements of 40 CFR 61.07(b)(3), a 1. Description of waste feed handling and temporary storage. 2. Description of process operating conditions. 3. Description of the handling and temporary storage of the end product. 4. Description of the protocol to be followed when analyzing output materials by transmission electron microscopy. c. Performance test protocol, including provisions for obtaining information required under paragraph (2) of Rule 17.15. d. The Administrator of the U.S. Environmental Protection Agency may require that a demonstration of the process be performed prior to approval of the application to construct. (2) Conduct a start-up performance test. Test results shall include: a. A detailed description of the types and quantities of nonasbestos material, RACM, and asbestos-containing waste material processed, e.g., asbestos cement products, friable asbestos insulation, plaster, wood, plastic, wire, etc. The test feed is to include the full range of materials that will be encountered in actual operation of the process; b. Results of analyses, using polarized light microscopy, that document the asbestos content of the wastes processed; c. Results of analyses, using transmission electron microscopy, that document that the output materials are free of asbestos. Samples for analysis are to be collected as eight (8) hour composite samples (one (1) two hundred (200) gram [seven (7) ounce] sample per hour), beginning with the initial introduction of RACM or asbestos-containing waste material and continuing until the end of the performance test; d. A description of operating parameters, such as temperature and residence time, defining the full range over which the process is expected to operate to produce nonasbestos (asbestos-free) materials. Specify the limits for each operating parameter within which the process will produce nonasbestos (asbestos-free) materials; and e. The duration of the test. (3) During the initial ninety (90) days of operation, a. Continuously monitor and log the operating parameters identified during start-up performance tests that are intended to ensure the production of nonasbestos (asbestos-free) output material. b. Monitor input materials to ensure that they are consistent with the test feed materials described during start-up performance tests in paragraph (2)a. of Rule 17.15. c. Collect and analyze samples, taken as ten (10) day composite samples (one (1) two hundred (200) gram [seven (7) ounce] sample collected every 8 hours of operation) of all output material for the presence of asbestos. Composite samples may be for fewer than ten (10) days. Transmission electron microscopy shall be used to analyze the output material for the presence of asbestos. During the initial ninety (90) day period, all output materials must be stored on-site until analysis shows the material to be asbestos-free or disposed of as asbestos-containing waste material in accordance with Rule 17.10. (4) After the initial ninety (90) days of operation, a. Continuously monitor and record the operating parameters identified during start-up performance testing and any subsequent performance testing. Any output produced during a period of deviation from the range of operating conditions established to ensure the production of nonasbestos (asbestos-free) output materials shall be: 1. Disposed of as asbestos-containing waste material in accordance with Rule 17.10 or 2. Recycled as waste feed during process operation within the established range of operating conditions, or 3. Stored temporarily on-site in a leak-tight container until analyzed for asbestos content. Any product that is not asbestos-free shall be either disposed of as asbestos-containing waste material or recycled as waste feed to the process. b. Collect and analyze monthly composite samples (one (1) two hundred (200) gram [seven (7) ounce] sample collected every eight (8) hours of operation) of the output material. Transmission electron microscopy shall be used to analyze the output material for the presence of asbestos. (5) Discharge no visible emissions to the outside air from any part of the operation, or use the methods specified by Rule 17.12 to clean emissions containing particulate asbestos material before they escape to, or are vented to, the outside air. (6) Maintain records on-site and include the following information: a. Results of start-up performance testing and all subsequent performance testing, including operating parameters, feed characteristic, and analyses of output materials. b. Results of the composite analyses required during the initial ninety (90) days of operation under Rule 17.15(3). c. Results of the monthly composite analyses required under Rule 17.15(4). d. Results of the continuous monitoring and logs of process operating parameters under Rules 17.15(3) and (4). e. The information on waste shipments received as required in Rule 17.14(5). f. For output materials where no analyses were performed to determine the presence of asbestos, record the name and location of the purchaser or disposal site to which the output materials were sold or deposited, and the date of sale or disposal. g. Retain records required by paragraph (6) of Rule 17.15 for at least two (2) years. (7) Submit the following reports to the Administrator: a. A report for each analysis of product composite samples performed during the initial ninety (90) days of operation. b. A quarterly report, including the following information concerning activities during each consecutive three (3) month period: 1. Results of analyses of monthly product composite samples; 2. A description of any deviation from the operating parameters established during performance testing, the duration of the deviation, and steps taken to correct the deviation; 3. Disposition of any product produced during a period of deviation, including whether it was recycled, disposed of as asbestos-containing waste material, or stored temporarily on-site until analyzed for asbestos content; 4. The information on waste disposal activities as required in Rule 17.14(6). (8) Nonasbestos (asbestos-free) output material is not subject to any of the provisions of Rule 17. Output materials in which asbestos is detected, or output materials produced when the operating parameters deviated from those established during the start-up performance testing, unless shown by transmission electron microscopy analysis to be asbestos-free, shall be considered to be asbestos-containing waste and shall be handled and disposed of according to Rules 17.10 and 17.14 or reprocessed while all of the established operating parameters are being met. Rule 18. Prevention of Significant Deterioration of Air Quality. Rule 18.1. General provisions. (a) The requirements of this Rule apply to the construction of any new major stationary source [as defined in Rule 18.2(hh)] or any project at an existing major stationary source in an area designated as attainment or unclassifiable under Sections 107(d)(1)(A)(ii) or (iii) of the Federal Clean Air Act. No major stationary source or major modification will be subject to this rule with respect to a particular pollutant if the owner or operator demonstrates that the major source or major modification is located in an area designated nonattainment with respect to that pollutant, in which event other rules in this chapter would apply. (b) The requirements of Rule 18.9 through 18.17 apply to the construction of any new major stationary source or the major modification of any existing major stationary source, except as this Rule otherwise provides. (c) No person shall cause or allow the beginning of actual construction of a new major stationary source or major modification to which the requirements of Rules 18.9 through 18.17(d) apply without a permit that states that the major stationary source or major modification will meet those requirements. The Director has authority to issue any such permit. (d) The requirements of this Rule will be applied in accordance with the principles set out in paragraphs d(1) through d(5) below: (1) Except as otherwise provided in Rule 18.1(e), and consistent with the definition of major modification contained in Rule 18.2(ff), a project is a major modification for a regulated NSR pollutant if it causes two (2) types of emissions increases—a significant emissions increase [as defined in Rule 18.2(aaa)], and a significant net emissions increase [as defined in Rule 18.2(jj) and Rule 18.2(zz)]. The project is not a major modification if it does not cause a significant emissions increase. If the project causes a significant emissions increase, then the project is a major modification only if it also results in a significant net emissions increase. (2) The procedure for calculating (before beginning actual construction) whether a significant emissions increase (i.e., the first step of the process) will occur depends upon the type of emissions units being modified, according to Rule 18.1(d)(3) through (5). The procedure for calculating (before beginning actual construction) whether a significant net emissions increase will occur at the major stationary source (i.e., the second step of the process) is contained in the definition in Rule 18.2(jj). Regardless of any such preconstruction projections, a major modification results if the project causes a significant emissions increase and a significant net emissions increase. (3) Actual-to-projected-actual applicability test for projects that only involve existing emissions units. A significant emissions increase of a regulated NSR pollutant is projected to occur if the sum of the difference between the projected actual emissions [as defined in Rule 18.2(rr)] and the baseline actual emissions [as defined in Rule 18.2(d)(1) and (2)], for each existing emissions unit, equals or exceeds the significant amount for that pollutant [as defined in Rule 18.2(zz)]. (4) Actual-to-potential test for projects that only involve construction of a new emissions unit(s). A significant emissions increase of a regulated NSR pollutant is projected to occur if the sum of the difference between the potential to emit [as defined in Rule 18.2(mm)] from each new emissions unit following completion of the project and the baseline actual emissions [as defined in Rule 18.2(d)(3)] of these units before the project equals or exceeds the significant amount for that pollutant [as defined in Rule 18.2(zz)]. (5) Hybrid test for projects that involve multiple types of emissions units. A significant emissions increase of a regulated NSR pollutant is projected to occur if the sum of the emissions increases for each emissions unit, using the method specified in paragraphs 18.1(d)(3) and (4) of this section as applicable with respect to each emissions unit, for each type of emissions unit equals or exceeds the significant amount for that pollutant (as defined in paragraph 18.2(zz) of this section). (e) For any major stationary source for a "plantwide applicability limitation (PAL)" [as defined in Rule 18.21(b)(5)] for a regulated New Source Review (NSR) pollutant [as defined in Rule 18.2(uu)], the major stationary source shall comply with the requirements under Rule 18.21. Rule 18.2. Definitions. For the purposes of this Rule: (a) Actual emissions. (1) Actual emissions means the actual rate of emissions of a regulated NSR pollutant from an emissions unit, as determined in accordance with Rule18.2(a)(2) through (a)(4) except that this definition shall not apply for calculating whether a significant emissions increase has occurred, or for establishing a plantwide applicability limitation (PAL) under Rule 18.21. Instead, Rule 18.2(rr) and Rule 18.2(d) shall apply for those purposes. (2) In general, actual emissions as of a particular date shall equal the average rate, in tons per year, at which the unit actually emitted the pollutant during a consecutive twenty-four (24) month period which precedes the particular date and which is representative of normal source operation. The Director shall allow the use of a different time period upon a determination that it is more representative of normal source operation. Actual emissions shall be calculated using the unit's actual operating hours, production rates, and types of materials processed, stored, or combusted during the selected time period. (3) The Director may presume that source-specific allowable emissions for the unit are equivalent to the actual emissions of the unit. (4) For any emissions unit that has not begun normal operations on the particular date, actual emissions shall equal the potential to emit of the unit on that date. (b) Adverse impact on visibility means visibility impairment which interferes with the management, protection, preservation or enjoyment of the visitor's visual experience of the Federal Class I area. This determination must be made on a case-by-case basis taking into account the geographic extent, intensity, duration, frequency and time of visibility impairment, and how these factors correlate with (1) times of visitor use of the Federal Class I area, and (2) the frequency and timing of natural conditions that reduce visibility. (c) Allowable emissions means the emissions rate of a stationary source calculated using the maximum rated capacity of the source (unless the source is subject to federally enforceable limits which restrict the operating rate, or hours of operation, or both) and the most stringent of the following: (1) The applicable standards as set forth in 40 CFR Parts 60 and 61; (2) The applicable local portion of the State Implementation Plan emissions limitation, including those with a future compliance date; or (3) The emissions rate specified as a federally enforceable permit condition, including those with a future compliance date. (d) Baseline actual emissions means the rate of emissions, in tons per year, of a regulated NSR pollutant, as determined in accordance Rule 18.2(d)(1) through (d)(4). (1) For any existing electric utility steam generating unit, baseline actual emissions means the average rate, in tons per year, at which the unit actually emitted the pollutant during any consecutive twenty-four (24) month period selected by the owner or operator within the five (5) year period immediately preceding when the owner or operator begins actual construction of the project. The Director shall allow the use of a different time period upon a determination that it is more representative of normal source operation. a. The average rate shall include fugitive emissions to the extent quantifiable, and emissions associated with startups, shutdowns, and malfunctions. b. The average rate shall be adjusted downward to exclude any non-compliant emissions that occurred while the source was operating above any emission limitation that was legally enforceable during the consecutive twenty-four (24) month period. c. For a regulated NSR pollutant, when a project involves multiple emissions units, one (1) consecutive twenty-four (24) month period must be used to determine the baseline actual emissions for the emissions units being changed. However, the Director is authorized to allow the use of multiple, pollutant specific consecutive twenty-four (24) month baselines in determining the magnitude of a significant net emissions increase and the applicability of major new source review requirements if all of the following conditions are met: 1. Construction of a new source or modification would become subject to major new source review if a single two (2) year baseline is used for all pollutants; 2. One or more pollutants were emitted during such 2-year period in amounts that were less than otherwise permitted for reasons other than operations at a lower production or utilization rate; Qualifying examples include, but are not limited to, the voluntary use of: (i). a cleaner fuel than otherwise permitted in a fuel burning operation (e.g., natural gas instead of coal in a multi-fuel boiler); (ii). a coating with a lower VOC content than otherwise permitted in a coating operation; (iii) a voluntary improvement in the control efficiency of an air pollution control device or the voluntary addition of a control device where one (1) did not exist before, and (iv). alternate production methods, raw materials, or products that result in lower emissions of one (1) or more pollutants. 3. Use of alternate two (2) year baselines for the pollutants described in sub-item 2 above would result in the construction of the new source or modification not being subject to major new source review. 4. The use of the multiple baselines is not prohibited by any applicable provision of the US EPA's new source review regulations. The burden for demonstrating that these conditions are met is upon the permit applicant. The demonstration and the Director's approval will be made a part of the permit record. d. The average rate shall not be based on any consecutive 24-month period for which there is inadequate information for determining annual emissions, in tons per year, and for adjusting this amount if required by Rule 18.2(d)(1)b. (2) For an existing emissions unit (other than an electric utility steam generating unit), baseline actual emissions means the average rate, in tons per year, at which the emissions unit actually emitted the pollutant during any consecutive twenty-four (24) month period selected by the owner or operator within the ten (10) year period immediately preceding either the date the owner or operator begins actual construction of the project, or the date a complete permit application is received by the Director for a permit required under this Rule, whichever is earlier, except that the ten (10) year period shall not include any period earlier than November 15, 1990. a. The average rate shall include fugitive emissions to the extent quantifiable, and emissions associated with startups, shutdowns, and malfunctions. b. The average rate shall be adjusted downward to exclude any non-compliant emissions that occurred while the source was operating above an emission limitation that was legally enforceable during the consecutive twenty-four (24) month period. c. The average rate shall be adjusted downward to exclude any emissions that would have exceeded an emission limitation with which the major stationary source must currently comply, had such major stationary source been required to comply with such limitations during the consecutive twenty-four (24) month period. However, if an emission limitation is part of a maximum achievable control technology standard that the U.S. EPA Administrator proposed or promulgated under 40 CFR Part 63, the baseline actual emissions need only be adjusted if the State or the Chattanooga-Hamilton County Air Pollution Control Bureau has taken credit for such emissions reductions in an attainment demonstration or maintenance plan consistent with the requirements of 40 CFR §51.165(a)(3)(ii)(G). d. For a regulated NSR pollutant, when a project involves multiple emissions units one (1) consecutive twenty-four (24) month period must be used to determine the baseline actual emissions for the emissions units being changed. However, the Director is authorized to allow the use of multiple, pollutant specific consecutive twenty-four (24) month baselines in determining the magnitude of a significant net emissions increase and the applicability of major new source review requirements if all of the following conditions are met: 1. Construction of a new source or modification would become subject to major new source review if a single two (2) year baseline is used for all pollutants; 2. One or more pollutants were emitted during such (2) year period in amounts that were less than otherwise permitted for reasons other than operations at a lower production or utilization rate; Qualifying examples include, but are not limited to, the voluntary use of: (i) a cleaner fuel than otherwise permitted in a fuel burning operation (e.g., natural gas instead of coal in a multi-fuel boiler); (ii) a coating with a lower VOC content than otherwise permitted in a coating operation; (iii) a voluntary improvement in the control efficiency of an air pollution control device or the voluntary addition of a control device where one (1) did not exist before, and (iv) alternate production methods, raw materials, or products that result in lower emissions of one (1) or more pollutants. 3. Use of alternate two (2) year baselines for the pollutants described in sub-item 2 above would result in the construction of the new source or modification not being subject to major new source review. 4. The use of the multiple baselines is not prohibited by any applicable provision of the US EPA's new source review regulations. The burden for demonstrating that these conditions are met is upon the permit applicant. The demonstration and the Director's approval will be made a part of the permit record. e. The average rate shall not be based on any consecutive 24-month period for which there is inadequate information for determining annual emissions, in tons per year, and for adjusting this amount if required by Rule 18.2(d)(2)b. and (2)c. (3) For a new emissions unit, the baseline actual emissions for purposes of determining the emissions increase that will result from the initial construction and operation of such unit shall equal zero; and thereafter, for all other purposes, shall equal the unit's potential to emit. (4) For a PAL for a stationary source, the baseline actual emissions shall be calculated for existing electric utility steam generating units in accordance with the procedures contained in Rule 18.2(d)(1), for other existing emissions units in accordance with the procedures contained in Rule 18.2(d)(2), and for a new emissions unit in accordance with the procedures contained in Rule 18.2(d)(3). (e) Baseline area (1) Baseline area means any intrastate area (and every part thereof) designated as attainment or unclassifiable under Section 107(d)(1)(A)(ii) or (iii) of the Federal Clean Air Act in which the major source or major modification establishing the minor source baseline date would construct or would have an air quality impact equal to or greater than 1 μg/m 3 (annual average) for SO 2 , NO 2 , or PM 10 ; or equal to or greater than 0.3 μg/m 3 (annual average) for PM 2.5 . (2) Area redesignations under Section 107(d)(1) (D) or (E) of the federal Clean Air Act cannot intersect or be smaller than the area of impact of any major stationary source or major modification which: a. Establishes a minor source baseline date; or b. Is subject to this Rule and would be constructed in the same state as the state proposing the redesignation. (3) Any baseline area established originally for the TSP increments shall remain in effect and shall apply for purposes of determining the amount of available PM 10 increments, except that such baseline area shall not remain in effect if the Director rescinds the corresponding minor source baseline date in accordance with Rule 18.2(gg)(4). (f) Baseline concentration (1) Baseline concentration means that ambient concentration level that exists in the baseline area at the time of the applicable minor source baseline date. A baseline concentration is determined for each pollutant for which a minor source baseline date is established and shall include: a. The actual emissions, as defined in Rule 18.2(a), representative of sources in existence on the applicable minor source baseline date, except as provided in 18.2(f)(2) below ; and b. The allowable emissions of major stationary sources that commenced construction before the major source baseline date, but were not in operation by the applicable minor source baseline date. (2) The following will not be included in the baseline concentration and will affect the applicable maximum allowable increase(s): a. Actual emissions, as defined in Rule 18.2(a), from any major stationary source on which construction commenced after the major source baseline date; and b. Actual emissions increases and decreases, as defined in Rule 18.2(a), at any stationary source occurring after the minor source baseline date. (g) Begin actual construction means, in general, initiation of physical on-site construction activities on an emissions unit which are of a permanent nature. Such activities include, but are not limited to, installation of building supports and foundations, laying underground pipework and construction of permanent storage structures. With respect to a change in method of operations, this term refers to those on-site activities other than preparatory activities which mark the initiation of the change. (h) Best available control technology means an emissions limitation (including a visible emission standard) based on the maximum degree of reduction for each regulated NSR pollutant which would be emitted from any proposed major stationary source or major modification which the reviewing authority, on a case-by-case basis, taking into account energy, environmental, and economic impacts and other costs, determines is achievable for such source or modification through application of production processes or available methods, systems, and techniques, including fuel cleaning or treatment or innovative fuel combustion techniques for control of such pollutant. In no event shall application of best available control technology result in emissions of any pollutant which would exceed the emissions allowed by any applicable standard under Rules 15 and 16 (or 40 CFR Parts 60 and 61). If the reviewing authority determines that technological or economic limitations on the application of measurement methodology to a particular emissions unit would make the imposition of an emissions standard infeasible, a design, equipment, work practice, operational standard, or combination thereof, may be prescribed instead to satisfy the requirement for the application of best available control technology. Such standard shall, to the degree possible, set forth the emissions reduction achievable by implementation of such design, equipment, work practice or operation, and shall provide for compliance by means which achieve equivalent results. (i) Building, structure, facility, or installation means all of the pollutant-emitting activities which belong to the same industrial grouping, are located on one (1) or more contiguous or adjacent properties, and are under the control of the same person (or persons under common control) except the activities of any vessel. Pollutant-emitting activities shall be considered as part of the same industrial grouping if they belong to the same "Major Group" (i.e., which have the same first two (2) digit code) as described in the Standard Industrial Classification Manual, 1972, as amended by the 1977 Supplement (U. S. Government Printing Office stock numbers 4101-0066 and 003-005-00176-0, respectively). (j) Clean coal technology means any technology, including technologies applied at the pre combustion, combustion, or post combustion stage, at a new or existing facility which will achieve significant reductions in air emissions of sulfur dioxide or oxides of nitrogen associated with the utilization of coal in the generation of electricity, or process steam which was not in widespread use as of November 15, 1990. (k) Clean coal technology demonstration project means a project using funds appropriated under the heading "Department of Energy-Clean Coal Technology," up to a total amount of two billion five hundred million ($2,500,000,000.00) for commercial demonstration of clean coal technology, or similar projects funded through appropriations for the Environmental Protection Agency. The Federal contribution for a qualifying project shall be at least twenty (20) percent of the total cost of the demonstration project. (l) (Reserved) (m) Commence as applied to construction of a major stationary source or major modification means that the owner or operator has all necessary preconstruction approvals or permits and either has: (1) Begun, or caused to begin, a continuous program of actual on-site construction of the source, to be completed within a reasonable time; or (2) Entered into binding agreements or contractual obligations, which cannot be cancelled or modified without substantial loss to the owner or operator, to undertake a program of actual construction of the source to be completed within a reasonable time. (n) Complete means, in reference to an application for a permit, that the application contains all of the information necessary for processing the application. Designating an application complete for purposes of permit processing does not preclude the reviewing authority from requesting or accepting any additional information. (o) Construction means any physical change or change in the method of operation (including fabrication, erection, installation, demolition, or modification of an emissions unit) that would result in a change in emissions. (p) Continuous emissions monitoring system (CEMS) means all of the equipment that may be required to meet the data acquisition and availability requirements of this Rule, to sample, condition (if applicable), analyze, and provide a record of emissions on a continuous basis. (q) Continuous emissions rate monitoring system (CERMS) means the total equipment required for the determination and recording of the pollutant mass emissions rate (in terms of mass per unit of time). (r) Continuous parameter monitoring system (CPMS) means all of the equipment necessary to meet the data acquisition and availability requirements of this Rule, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, O 2 or CO 2 concentrations), and to record average operational parameter value(s) on a continuous basis. (s) Electric utility steam generating unit means any steam electric generating unit that is constructed for the purpose of supplying more than one-third (⅓) of its potential electric output capacity and more than twenty-five (25) MW electrical output to any utility power distribution system for sale. Any steam supplied to a steam distribution system for the purpose of providing steam to a steam-electric generator that would produce electrical energy for sale is also considered in determining the electrical energy output capacity of the affected facility. (t) Emissions unit means any part of a stationary source that emits or would have the potential to emit any regulated NSR pollutant and includes an electric utility steam generating unit as defined in Rule 18.2(s). For purposes of this Rule, there are two (2) types of emissions units as described in this Rule 18.2(t) as follows: (1) A new emissions unit is any emissions unit that is (or will be) newly constructed and that has existed for less than two (2) years from the date such emissions unit first operated. (2) An existing emissions unit is any emissions unit that does not meet the requirements in Rule18.2(t)(1) above. A replacement unit, as defined in Rule 18.2(vv), is an existing emissions unit. (u) Federal Land Manager means, with respect to any lands in the United States, the Secretary of the department with authority over such lands. (v) Federally enforceable means all limitations and conditions which are enforceable by the U.S. EPA Administrator, including those requirements developed pursuant to 40 CFR Parts 60 and 61, requirements within any applicable local portion of the State Implementation Plan, any permit requirements established pursuant to this Rule, including operating permits issued under an EPA-approved program that is incorporated into the local portion of the State Implementation Plan and expressly requires adherence to any permit issued under such program. (w) (Reserved) (x) Fugitive emissions means those emissions which could not reasonably pass through a stack, chimney, vent, or other functionally equivalent opening. (y) (Reserved) (z) High terrain means any area having an elevation 900 feet or more above the base of the stack of a source. (aa) Indian Governing Body means the governing body of any tribe, band, or group of Indians subject to the jurisdiction of the United States and recognized by the United States as possessing power of self-government. (bb) Indian Reservation means any federally recognized reservation established by Treaty, Agreement, executive order, or act of Congress. (cc) Innovative control technology means any system of air pollution control that has not been adequately demonstrated in practice, but would have a substantial likelihood of achieving greater continuous emissions reduction than any control system in current practice or of achieving at least comparable reductions at lower cost in terms of energy, economics, or nonair quality environmental impacts. (dd) Low terrain means any area other than high terrain. (ee) Lowest achievable emission rate (LAER) is as defined in Section 4-2 of this chapter. (ff) Major Modification (1) Major Modification means any physical change in or change in the method of operation of a major stationary source that would result in: a significant emissions increase [as defined in Rule 18.2(aaa)] of a regulated NSR pollutant [as defined in Rule 18.2(uu)]; and a significant net emissions increase of that pollutant from the major stationary source. (2) Any significant emissions increase [as defined in Rule 18.2(aaa)] from any emissions units or net emissions increase [as defined in Rule18.2(jj)] at a major stationary source that is significant for volatile organic compounds or NO X shall be considered significant for ozone. (3) A physical change or change in the method of operation shall not include: a. Routine maintenance, repair, and replacement. b. Use of an alternative fuel or raw material by reason of an order under Sections 2 (a) and (b) of the Energy Supply and Environmental Coordination Act of 1974 (or any superseding legislation) or by reason of a natural gas curtailment plant pursuant to the Federal Power Act; c. Use of an alternative fuel by reason of an order or rule under Section 125 of the Federal Clean Air Act; d. Use of an alternative fuel at a steam generating unit to the extent that the fuel is generated from municipal solid waste; e. Use of an alternative fuel or raw material by a stationary source which: 1. The source was capable of accommodating before January 6, 1975, unless such change would be prohibited under any federally enforceable permit condition which was established after January 6, 1975 pursuant to this Rule or under regulations approved pursuant to 40 CFR Part 51, Subpart 1; or 2. The source is approved to use under any permit issued under this Rule; f. An increase in the hours of operation or in the production rate, unless such change would be prohibited under any federally enforceable permit condition which was established after January 6, 1975, pursuant to this Rule or under regulations approved pursuant to 40 CFR Part 51, Subpart I, or 40 CFR §51.166. g. Any change in ownership at a stationary source. h. The installation, operation, cessation, or removal of a temporary clean coal technology demonstration project, provided that the project complies with: 1. The local portion of the State Implementation Plan for the State in which the project is located, and 2. Other requirements necessary to attain and maintain the national ambient air quality standards during the project and after it is terminated. i. The installation or operation of a permanent clean coal technology demonstration project that constitutes repowering, provided that the project does not result in an increase in the potential to emit of any regulated pollutant emitted by the unit. This exemption shall apply on a pollutant-by-pollutant basis. j. The reactivation of a very clean coal-fired electric utility steam generating unit. k. This definition shall not apply with respect to a particular regulated NSR pollutant when the major stationary source is complying with the requirements under Rule 18.21 for a plantwide applicability limitation (PAL) for that pollutant. Instead, the definition in Rule 18.21(b)(8) shall apply. (gg) Major source baseline date and minor source baseline date (1) Major source baseline date means: a. In the case of PM 10 and sulfur dioxide, January 6, 1975; b. In the case of nitrogen dioxide, February 8, 1988; and c. In the case of PM 2.5 , October 20, 2011. (2) "Minor source baseline date" means the earliest date after the trigger date on which a major stationary source or a major modification subject to this Rule submits a complete application under the relevant regulations. The trigger date is: a. In the case of PM 10 and sulfur dioxide, August 7, 1977; b. In the case of nitrogen dioxide, February 8, 1988; and c. In the case of PM 2.5 , October 20, 2011. (3) The baseline date is established for each pollutant for which increments or other equivalent measures have been established if: a. The area in which the proposed source or modification would construct is designated as attainment or unclassifiable under Section 107(d)(1)(A)(ii) or (iii) of the Federal Clean Air Act for the pollutant on the date of its complete application under this Rule, and b. In the case of a major stationary source, the pollutant would be emitted in significant amounts, or, in the case of a major modification, there would be a significant net emissions increase of the pollutant. (4) Any minor source baseline date established originally for the TSP increments shall remain in effect and shall apply for purposes of determining the amount of available PM 10 increments, except that the Director shall rescind a minor source baseline date where it can be shown, to the satisfaction of the Director, that the emissions increase from the major stationary source, or net emissions increase from the major modification, responsible for triggering that date did not result in a significant amount of PM 10 emissions. (hh) Major stationary source (1) Major stationary source means: a. Any of the following stationary sources of air pollutants which emits, or has the potential to emit, one hundred (100) tons per year or more of any regulated NSR pollutant: fossil fuel-fired steam electric plants of more than two hundred fifty million (250,000,000) British thermal units per hour heat input, coal cleaning plants (with thermal dryers), kraft pulp mills, Portland cement plants, primary zinc smelters, iron and steel mill plants, primary aluminum ore reduction plants, primary copper smelters, municipal incinerators capable of charging more than fifty (50) tons of refuse per day, hydrofluoric, sulfuric, and nitric acid plants, petroleum refineries, lime plants, phosphate rock processing plants, coke oven batteries, sulfur recovery plants, carbon black plants (furnace process), primary lead smelters, fuel conversion plants, sintering plants, secondary metal production plants, chemical process plants, fossil fuel boilers (or combinations thereof) totaling more than two hundred fifty million (250,000,000) British thermal units per hour heat input, petroleum storage and transfer units with a total storage capacity exceeding three hundred thousand (300,000) barrels, taconite ore processing plants, glass fiber processing plants, and charcoal production plants; b. Notwithstanding the stationary source size specified in Rule 18.2(hh)(1)(a), any stationary source which emits, or has the potential to emit, two hundred fifty (250) tons per year or more of a regulated NSR pollutant; or c. Any physical change that would occur at a stationary source not otherwise qualifying under Rule 18.2(hh) as a major stationary source, if the changes would constitute a major stationary source by itself. (2) A major stationary source that is major for volatile organic compounds or NOx shall be considered major for ozone. (3) The fugitive emissions of a stationary source shall not be included in determining for any of the purposes of this Rule whether it is a major stationary source, unless the source belongs to one (1) of the following categories of stationary sources: a. Coal cleaning plants (with thermal dryers); b. Kraft pulp mills; c. Portland cement plants; d. Primary zinc smelters; e. Iron and steel mills; f. Primary aluminum ore reduction plants; g. Primary copper smelters; h. Municipal incinerators capable of charging more than fifty (50) tons of refuse per day; i. Hydrofluoric, sulfuric, or nitric acid plants; j. Petroleum refineries; k. Lime plants; l. Phosphate rock processing plants; m. Coke oven batteries; n. Sulfur recovery plants; o. Carbon black plants (furnace process); p. Primary lead smelters; q. Fuel conversion plants; r. Sintering plants; s. Secondary metal production plants; t. Chemical process plants; u. Fossil-fuel boilers (or combination thereof) totaling more than two hundred fifty million (250,000,000) British thermal units per hour heat input; v. Petroleum storage and transfer units with a total storage capacity exceeding three hundred thousand (300,000) barrels; w. Taconite ore processing plants; x. Glass fiber processing plants; y. Charcoal production plants; z. Fossil fuel-fired steam electric plants of more than two hundred fifty million (250,000,000) British thermal units per hour heat input; and aa. Any other stationary source category which, as of August 7, 1980, is being regulated under Section 111 or 112 of the Federal Clean Air Act. (ii) Necessary preconstruction approvals or permits means those permits or approvals required under Federal air quality control laws and regulations and those air quality control laws and regulations which are part of the applicable local portion of the State Implementation Plan. (jj) Net emissions increase (1) A net emissions increase means, with respect to any regulated NSR pollutant emitted by a major stationary source, the amount by which the sum of the following exceeds zero: a. The increase in emissions from a particular physical change or change in the method of operation at a stationary source as calculated pursuant to Rule 18.1(d); and b. Any other increases and decreases in actual emissions at the major stationary source that are contemporaneous with the particular change and are otherwise creditable. Baseline actual emissions for calculating increases and decreases under this Rule 18.2(jj)(1)b. shall be determined as provided in Rule 18.2(d), except that Rule 18.2(d)(1)(c) and (d)(2)(d) shall not apply. (2) An increase or decrease in actual emissions is contemporaneous with the increase from the particular change only if it occurs between: a. The date five years before construction on the particular change commences; and b. The date that the increase from the particular change occurs. (3) An increase or decrease in actual emissions is creditable only if the Director has not relied on it in issuing a permit for the source under this Rule, which permit is in effect when the increase in actual emissions from the particular change occurs. (4) An increase or decrease in actual emissions of sulfur dioxide, particulate matter, or nitrogen oxides that occurs before the applicable minor source baseline date is creditable only if it is required to be considered in calculating the amount of maximum allowable increases remaining available. (5) An increase in actual emissions is creditable only to the extent that the new level of actual emissions exceeds the old level. (6) A decrease in actual emissions is creditable only to the extent that: a. The old level of actual emissions or the old level of allowable emissions, whichever is lower, exceeds the new level of actual emissions; b. It is enforceable as a practical matter at and after the time that actual construction on the particular change begins; and c. It has approximately the same qualitative significance for public health and welfare as that attributed to the increase from the particular change. (7) (Reserved) (8) An increase that results from a physical change at a source occurs when the emissions unit on which construction occurred becomes operational and begins to emit a particular pollutant. Any replacement unit that requires shakedown becomes operational only after a reasonable shakedown period, not to exceed one hundred eighty (180) days. (9) Rule 18.2(a)(2) shall not apply for determining creditable increases and decreases. (kk) (Reserved) (ll) (Reserved) (mm) Potential to emit means the maximum capacity of a stationary source to emit a pollutant under its physical and operational design. Any physical or operational limitation on the capacity of the source to emit a pollutant, including air pollution control equipment and restrictions on hours of operation or on the type or amount of material combusted, stored, or processed, shall be treated as part of its design if the limitation or the effect it would have on emissions is federally enforceable. Secondary emissions do not count in determining the potential to emit of a stationary source. (nn) Predictive emissions monitoring system (PEMS) means all of the equipment necessary to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, O 2 or CO 2 concentrations), and calculate and record the mass emissions rate (for example, lb/hr) on a continuous basis. (oo) Prevention of Significant Deterioration (PSD) program means the major source preconstruction permit program under this Rule or a major source preconstruction permit program that has been approved by the U.S. EPA Administrator and incorporated into the local portion of the State Implementation Plan pursuant to 40 CFR §51.166 to implement the requirements of that section. Any permit issued under such a program is a major NSR (new source review) permit. (pp) (Reserved) (qq) Project means a physical change in, or change in the method of operation of, an existing major stationary source. (rr) Projected actual emissions (1) Projected actual emissions means the maximum annual rate, in tons per year, at which an existing emissions unit is projected to emit a regulated NSR pollutant in any one (1) of the five (5) years (twelve (12) month period) following the date the unit resumes regular operation after the project, or in any one (1) of the ten (10) years following that date, if the project involves increasing the emissions unit's design capacity or its potential to emit that regulated NSR pollutant and full utilization of the unit would result in a significant emissions increase or a significant net emissions increase at the major stationary source. (2) In determining the projected actual emissions in accordance with Rule 18.2(rr)(1) above and before beginning actual construction, the owner or operator of the major stationary source: a. Shall consider all relevant information, including but not limited to, historical operational data, the company's own representations, the company's expected business activity and the company's highest projections of business activity, the company's filings with the Chattanooga-Hamilton County Air Pollution Control Bureau or with State or Federal regulatory authorities, and compliance plans under the approved local portion of the State Implementation Plan; and b. Shall include fugitive emissions to the extent quantifiable and emissions associated with startups, shutdowns, and malfunctions; and c. Shall exclude, in calculating any increase in emissions that results from the particular project, that portion of the unit's emissions following the project that an existing unit could have accommodated during the consecutive twenty-four (24) month period used to establish the baseline actual emissions under Rule 18.2(d) and that are also unrelated to the particular project, including any increased utilization due to product demand growth; or d. In lieu of using the method set out in paragraphs a. through c. above, may elect to use the emissions unit's potential to emit, in tons per year, as defined in Rule 18.2(mm). (ss) Reactivation of a very clean coal-fired electric utility steam generating unit means any physical change or change in the method of operation associated with the commencement of commercial operations by a coal-fired utility unit after a period of discontinued operation where the unit: (1) Has not been in operation for the two-year period prior to the enactment of the Federal Clean Air Act Amendments of 1990, and the emissions from such unit continue to be carried in the permitting authority's emissions inventory at the time of enactment; (2) Was equipped prior to shut-down with a continuous system of emissions control that achieves a removal efficiency for sulfur dioxide of no less than eighty-five (85) percent and a removal efficiency for particulates of no less than ninety-eight (98) percent; (3) Is equipped with low-NO X burners prior to the time of commencement of operations following reactivation; and (4) Is otherwise in compliance with the requirements of the Federal Clean Air Act. (tt) Reasonably available control technology (RACT) is as defined in section 4-2 of this chapter. (uu) Regulated NSR pollutant, for purposes of this Rule, means the following: (1) Any pollutant for which a national ambient air quality standard has been promulgated by the U.S. EPA Administrator. This includes, but is not limited to, the following: a. PM 2.5 emissions and PM 10 emissions shall include gaseous emissions from a source or activity which condense to form particulate matter at ambient temperatures. On or after January 1, 2011, such condensable particulate matter shall be accounted for in applicability determinations and in establishing emissions limitations for PM 2.5 and PM 10 in PSD permits. Compliance with emissions limitations for PM 2.5 and PM 10 issued prior to this date shall not be based on condensable particulate matter unless required by the terms and conditions of the permit or the applicable implementation plan. Applicability determinations made prior to this date without accounting for condensable particulate matter shall not be considered in violation of this section unless the applicable implementation plan required condensable particulate matter to be included; b. Any pollutant identified under this paragraph 18.2(uu)(1)b. as a constituent or precursor to a pollutant for which a national ambient air quality standard has been promulgated. Precursors identified by the Administrator for purposes of NSR are the following: 1. Volatile organic compounds and nitrogen oxides are precursors to ozone in all attainment and unclassifiable areas. 2 Sulfur dioxide is a precursor to PM 2.5 in all attainment and unclassifiable areas. 3. Nitrogen oxides are presumed to be precursors to PM 2.5 in all attainment and unclassifiable areas, unless the State demonstrates to the Administrator's satisfaction or EPA demonstrates that emissions of nitrogen oxides from sources in a specific area are not a significant contributor to that area's ambient PM 2.5 concentrations. 4. Volatile organic compounds are presumed not to be precursors to PM 2.5 in any attainment or unclassifiable area, unless the State demonstrates to the Administrator's satisfaction or EPA demonstrates that emissions of volatile organic compounds from sources in a specific area are a significant contributor to that area's ambient PM 2.5 concentrations. (2) Any pollutant that is subject to any standard promulgated under section 111 of the Federal Clean Air Act; (3) Any Class I or II substance subject to a standard promulgated under or established by Title VI of the Federal Clean Air Act; or (4) Reserved (5) Any pollutant that otherwise is subject to regulation under the Federal Clean Air Act; except that any or all hazardous air pollutants either listed in Section 112 of the Federal Clean Air Act or added to the list pursuant to Section 112(b)(2) of the Federal Clean Air Act, which have not been delisted pursuant to Section 112(b)(3) of the Federal Clean Air Act, are not regulated NSR pollutants unless the listed hazardous air pollutant is also regulated as a constituent or precursor of a general pollutant listed under Section 108 of the Federal Clean Air Act. (vv) Replacement unit means an emissions unit for which all the criteria listed in Rule 18.2(vv)(1) through (4) below are met. No creditable emission reductions shall be generated from shutting down the existing emissions unit that is replaced. (1) The emissions unit is a reconstructed unit within the meaning of 40 CFR §60.15(b)(1), or the emissions unit completely takes the place of an existing emissions unit. (2) The emissions unit is identical to or functionally equivalent to the replaced emissions unit. (3) The replacement does not alter the basic design parameters [as discussed in Rule 18.22] of the process unit. (4) The replaced emissions unit is permanently removed from the major stationary source, otherwise permanently disabled, or permanently barred from operation by a permit that is enforceable as a practical matter. If the replaced emissions unit is brought back into operation, it shall constitute a new emissions unit. (ww) Repowering (1) Repowering means replacement of an existing coal-fired boiler with one (1) of the following clean coal technologies: atmospheric or pressurized fluidized bed combustion, integrated gasification combined cycle, magnetohydrodynamics, direct and indirect coal-fired turbines, integrated gasification fuel cells, or as determined by the U.S. EPA Administrator, in consultation with the Secretary of Energy, a derivative of one (1) or more of these technologies, and any other technology capable of controlling multiple combustion emissions simultaneously with improved boiler or generation efficiency and with significantly greater waste reduction relative to the performance of technology in widespread commercial use as of November 15, 1990. (2) Repowering shall also include any oil and/or gas-fired unit which has been awarded clean coal technology demonstration funding as of January 1, 1991, by the Department of Energy. (3) The Director shall give expedited consideration to permit applications for any source that satisfies the requirements of this subsection and is granted an extension under Section 409 of the Federal Clean Air Act. (xx) Reviewing authority means the Chattanooga-Hamilton County Air Pollution Control Bureau. (yy) Secondary emissions means emissions which would occur as a result of the construction or operation of a major stationary source or major modification, but do not come from the major stationary source or major modification itself. Secondary emissions include emissions from any offsite support facility which would not be constructed or increase its emissions except as a result of the construction or operation of the major stationary source or major modification. Secondary emissions do not include any emissions which come directly from a mobile source, such as emissions from the tailpipe of a motor vehicle, from a train, or from a vessel. (1) Emissions from ships or trains coming to or from the new or modified stationary source; and (2) Emissions from any offsite support facility which would not otherwise be constructed or increase its emissions as a result of the construction or operation of the major stationary source or major modification. (zz) Significant (1) Significant means, in reference to a net emissions increase or the potential of a source to emit any of the following pollutants, a rate of emissions that would equal or exceed any of the following rates: Pollutant and Emissions Rate Carbon monoxide: 100 tons per year (tpy) Nitrogen oxides: 40 tpy Sulfur dioxide: 40 tpy Particulate matter: 25 tpy of particulate matter emissions PM 10 : 15 tpy PM 2.5 : 10 tpy of direct PM 2.5 emissions; 40 tpy of sulfur dioxide emissions; 40 tpy of nitrogen oxide emissions unless demonstrated not to be a PM 2.5 precursor under Rule 18.2(uu) of this section Ozone: 40 tpy of volatile organic compounds or NO X Lead: 0.6 tpy Fluorides: 3 tpy Sulfuric acid mist: 7 tpy Hydrogen sulfide (H2S): 10 tpy Total reduced sulfur (including H2S): 10 tpy Reduced sulfur compounds (including H2S): 10 tpy Municipal waste combustor organics (measured as total tetra- through octa-chlorinated dibenzo-p-dioxins and dibenzofurans): 3.2 × 10 −6 megagrams per year (3.5 × 10 −6 tons per year) Municipal waste combustor metals (measured as particulate matter): 14 megagrams per year (15 tons per year) Municipal waste combustor acid gases (measured as sulfur dioxide and hydrogen chloride): 36 megagrams per year (40 tons per year) Municipal solid waste landfills emissions (measured as nonmethane organic compounds): 45 megagrams per year (50 tons per year) (2) Significant means, in reference to a net emissions increase or the potential of a source to emit a regulated NSR pollutant that Rule 18.2(zz)(1) does not list, any emissions rate. (3) Notwithstanding Rule 18.2(zz)(1), significant means any emissions rate or any net emissions increase associated with a major stationary source or major modification, which would construct within ten (10) kilometers of a Class I area, and have an impact on such area equal to or greater than 1 μg/m 3 , (twenty-four (24) hour average). (aaa) Significant emissions increase means, for a regulated NSR pollutant, an increase in emissions that is significant [as defined in Rule 18.2(zz)] for that pollutant. (bbb) Stationary source means any building, structure, facility, or installation which emits or may emit a regulated NSR pollutant. (ccc) Temporary clean coal technology demonstration project means a clean coal technology demonstration project that is operated for a period of five (5) years or less, and which complies with the local portion of the State Implementation Plans for the State in which the project is located and other requirements necessary to attain and maintain the national ambient air quality standards during the project and after it is terminated. (ddd) (Reserved) (eee) Volatile organic compounds (VOC) is as defined in section 4-2 of this chapter. Rule 18.3. Ambient air increments. In areas designated as Class I, II or III, increases in pollutant concentration over the baseline concentration shall be limited to the following: Pollutant | Maximum Allowable Increase (micrograms per cubic meter) Class I Areas Particulate matter-PM 2.5 Annual arithmetic mean | 1 24-hr maximum | 2 Particulate matter-PM 10 Annual arithmetic mean | 4 24-hr maximum | 8 Sulfur dioxide Annual arithmetic mean | 2 24-hr maximum | 5 3-hr maximum | 25 Nitrogen dioxide Annual arithmetic mean | 2.5 Class II Areas Particulate Matter-PM 2.5 Annual arithmetic mean | 4 24-hr maximum | 9 Particulate Matter-PM 10 Annual arithmetic mean | 17 24-hr maximum | 30 Sulfur dioxide Annual arithmetic mean | 20 24-hr maximum | 91 3-hr maximum | 512 Nitrogen dioxide Annual arithmetic mean | 25 Class III Areas Particulate Matter-PM 2.5 Annual arithmetic mean | 8 24-hr maximum | 18 Particulate Matter-PM 10 Annual arithmetic mean | 34 24-hr maximum | 60 Sulfur dioxide Annual arithmetic mean | 40 24-hr maximum | 182 3-hr maximum | 700 Nitrogen dioxide Annual arithmetic mean | 50 For any period other than an annual period, the applicable maximum allowable increase may be exceeded during one (1) such period per year at any one (1) location. For the purposes of this Rule, the following classifications shall apply: Area Classification | Designated Area Class I Areas | Great Smoky Mountains National Park Joyce Kilmer Slickrock National Wilderness Area Cohutta Wilderness Area Class II Areas | Remainder of State Class III Areas | None Rule 18.4. Ambient air ceilings. No concentration of a pollutant shall exceed: (a) The concentration permitted under the national secondary ambient air quality standard, or (b) The concentration permitted under the national primary ambient air quality standard, whichever concentration is lowest for the pollutant for a period of exposure. Rule 18.5. Restrictions on area classifications. (a) All of the following areas which were in existence on August 7, 1977, shall be Class I areas and may not be redesignated: (1) International parks, (2) National wilderness areas which exceed 5,000 acres in size, (3) National memorial parks which exceed 5,000 acres in size, and (4) National parks which exceed 6,000 acres in size. (b) Areas which were redesignated as Class I under regulations promulgated before August 7, 1977, shall remain Class I, but may be redesignated as provided in this Rule. (c) Any other area, unless otherwise specified in the legislation creating such an area, is initially designated Class II, but may be redesignated as provided in this Rule. (d) The following areas may be redesignated only as Class I or II: (1) An area which as of August 7, 1977, exceeded 10,000 acres in size and was a national monument, a national primitive area, a national preserve, a national recreational area, a national wild and scenic river, a national wildlife refuge, a national lakeshore or seashore; and (2) A national park or national wilderness area established after August 7, 1977, which exceeds ten thousand (10,000) acres in size. Rule 18.6. (Reserved) Rule 18.7. Stack heights. (a) The degree of emission limitation required for control of any air pollutant under this Rule shall not be affected in any manner by: (1) So much of the stack height of any source as exceeds good engineering practice, or (2) Any other dispersion technique. (b) Rule 18.7 shall not apply with respect to stack heights in existence before December 31, 1970, or to dispersion techniques implemented before then. Rule 18.8. Exemptions. (a) The requirements of Rules 18.9 through 18.17 shall not apply to a particular major stationary source or major modification, if: (1) (Reserved) (2) (Reserved) (3) (Reserved) (4) (Reserved) (5) (Reserved) (6) The source or modification would be a nonprofit health or nonprofit educational institution, or a major modification would occur at such an institution, and the governor of the state in which the source or modification would be located requests that it be exempt from those requirements; or (7) The source or modification would be a major stationary source or major modification only if fugitive emissions, to the extent quantifiable, are considered in calculating the potential to emit of the stationary source or modification and the source does not belong to any of the following categories: a. Coal cleaning plants (with thermal dryers); b. Kraft pulp mills; c. Portland cement plants; d. Primary zinc smelters; e. Iron and steel mills; f. Primary aluminum ore reduction plants; g. Primary copper smelters; h. Municipal incinerators capable of charging more than fifty (50) tons of refuse per day; i. Hydrofluoric, sulfuric, or nitric acid plants; j. Petroleum refineries; k. Lime plants; l. Phosphate rock processing plants; m. Coke oven batteries; n. Sulfur recovery plants; o. Carbon black plants (furnace process); p. Primary lead smelters; q. Fuel conversion plants; r. Sintering plants; s. Secondary metal production plants; t. Chemical process plants; u. Fossil-fuel boilers (or combination thereof) totaling more than two hundred fifty million (250,000,000) British thermal units per hour heat input; v. Petroleum storage and transfer units with a total storage capacity exceeding three hundred thousand (300,000) barrels; w. Taconite ore processing plants; x. Glass fiber processing plants; y. Charcoal production plants; z. Fossil fuel-fired steam electric plants of more than two hundred fifty million (250,000,000) British thermal units per hour heat input; aa. Any other stationary source category which, as of August 7, 1980, is being regulated under Sections 111 or 112 of the Federal Clean Air Act; or (8) The source is a portable stationary source which has previously received a permit under this Rule, and a. The owner or operator proposes to relocate the source and emissions of the source at the new location would be temporary; and b. The emissions from the source would not exceed its allowable emissions; and c. The emissions from the source would impact no Class I area and no area where an applicable increment is known to be violated; and d. Reasonable notice is given to the Director prior to the relocation identifying the proposed new location and the probable duration of operation at the new location. Such notice shall be given to the Director not less than ten (10) days in advance of the proposed relocation unless a different time duration is previously approved by the Director. (9) (Reserved) (10) (Reserved). (b) The requirements of Rules 18.9 through 18.17 shall not apply to a major stationary source or major modification with respect to a particular pollutant if the owner or operator demonstrates that, as to that pollutant, the source or modification is located in an area designated as nonattainment under Section 107 of the Federal Clean Air Act. (c) The requirements of Rules 18.10, 18.12 and 18.14 shall not apply to a major stationary source or major modification with respect to a particular pollutant, if the allowable emissions of that pollutant from the source, or the net emissions increase of that pollutant from the modification: (1) Would impact no Class I area and no area where an applicable increment is known to be violated, and (2) Would be temporary. (d) The requirements of Rules 18.10, 18.12 and 18.14 as they relate to any maximum allowable increase for a Class II area shall not apply to a major modification at a stationary source that was in existence on March 1, 1978, if the net increase in allowable emissions of each regulated NSR pollutant from the modification after the application of best available control technology would be less than fifty (50) tons per year. (e) The Director may exempt a stationary source or modification from the requirements of Rule 18.12, with respect to monitoring for a particular pollutant if: (1) The emissions increase of the pollutant from the new source or the net emissions increase of the pollutant from the modification would cause, in any area, air quality impacts less than the following amounts: Carbon monoxide .....575 μg/m3, 8-hour average; Nitrogen dioxide .....14 μg/m3, annual average; Particulate matter .....10 μg/m3of PM10, 24-hour average; Sulfur dioxide .....13 μg/m3, 24-hour average; Lead .....0.1 μg/m3, 3-month average; Fluorides .....0.25 μg/m3, 24-hour average; Total reduced sulfur .....10 μg/m3, 1-hour average; Hydrogen sulfide .....0.2 μg/m3, 1-hour average; Reduced sulfur compounds .....10 μg/m3, 1-hour average; Ozone ..... No de minimis air quality level is provided for ozone. However, any net increase of one hundred (100) tons per year or more of volatile organic compounds or nitrogen oxides subject to PSD would be required to perform an ambient impact analysis including the gathering of ambient air quality data); or (2) The concentrations of the pollutant in the area that the source or modification would affect are less than the concentrations in Rule 18.8 (e)(1) above, or the pollutant is not listed in Rule 18.8 (e)(1) above. (f) (Reserved) (g) (Reserved) (h) (Reserved) (i) (Reserved) (j) (Reserved) (k) The requirements of Rule 18.10(b) shall not apply to a stationary source or modification with respect to any maximum allowable increase for nitrogen oxides if the owner or operator of the source or modification submitted an application for a permit under this Rule before the provisions embodying the maximum allowable increase took effect as part of the applicable implementation plan and the Director subsequently determined that the application as submitted before that date was complete. (l) The requirements in Rule 18.10(b) shall not apply to a stationary source or modification with respect to any maximum allowable increase for PM 10 if (i) the owner or operator of the source or modification submitted an application for a permit under this Rule before the provisions embodying the maximum allowable increases for PM 10 took effect in an implementation plan to which this Rule applies, and (ii) the Director subsequently determined that the application as submitted before that date was otherwise complete. Instead, the requirements of Rule 18.10(b) shall apply with respect to the maximum allowable increases for TSP as in effect on the date the application was submitted. Rule 18.9. Control technology review. (a) A major stationary source or major modification shall meet each applicable emissions limitation under the local portion of the State Implementation Plan and each applicable emissions standard and standard of performance under 40 CFR Parts 60 and 61. (b) A new major stationary source shall apply best available control technology for each regulated NSR pollutant that it would have the potential to emit in significant amounts. (c) A major modification shall apply best available control technology for each regulated NSR pollutant for which it would result in a significant net emissions increase at the source. This requirement applies to each proposed emissions unit at which a net emissions increase in the pollutant would occur as a result of a physical change or change in the method of operation in the unit. (d) For phased construction projects, the determination of best available control technology shall be reviewed and modified as appropriate at the latest reasonable time which occurs no later than eighteen (18) months prior to commencement of construction of each independent phase of the project. At such time, the owner or operator of the applicable stationary source may be required to demonstrate the adequacy of any previous determination of best available control technology for the source. Rule 18.10. Source impact analysis. The owner or operator of the proposed source or modification shall demonstrate that allowable emission increases from the proposed source or modification, in conjunction with all other applicable emissions increases or reductions (including secondary emissions), would not cause or contribute to air pollution in violation of: (a) Any national ambient air quality standard in any air quality control region; or (b) Any applicable maximum allowable increase over the baseline concentration in any area. Rule 18.11. Air quality models. (a) All estimates of ambient concentrations required under this Rule shall be based on applicable air quality models, data bases, and other requirements specified in appendix W of 40 CFR Part 51 (Guideline on Air Quality Models). (b) Where an air quality model specified in appendix W of 40 CFR Part 51 (Guideline on Air Quality Models) is inappropriate, the model may be modified or another model substituted. Such a modification or substitution of a model may be made on a case-by-case basis or, where appropriate, on a generic basis for a specific state program. Written approval of the U.S. EPA Administrator must be obtained for any modification or substitution. In addition, use of a modified or substituted model must be subject to notice and opportunity for public comment under procedures developed in accordance with Rule 18.16. Rule 18.12. Air quality analysis. (a) Preapplication analysis. (1) Any application for a permit under this Rule shall contain an analysis of ambient air quality in the area that the major stationary source or major modification would affect for each of the following pollutants: a. For the source, each pollutant that it would have the potential to emit in a significant amount; b. For the modification, each pollutant for which it would result in a significant net emissions increase. (2) With respect to any such pollutant for which no National Ambient Air Quality Standard exists, the analysis shall contain such air quality monitoring data as the Director determines is necessary to assess ambient air quality for that pollutant in any area that the emissions of that pollutant would affect. (3) With respect to any such pollutant (other than nonmethane hydrocarbons) for which such a standard does exist, the analysis shall contain continuous air quality monitoring data gathered for purposes of determining whether emissions of that pollutant would cause or contribute to a violation of the standard or any maximum allowable increase. (4) In general, the continuous air quality monitoring data that is required shall have been gathered over a period of at least one (1) year and shall represent at least the year preceding receipt of the application, except that, if the Director determines that a complete and adequate analysis can be accomplished with monitoring data gathered over a period shorter than one (1) year (but not to be less than four (4) months), the data that is required shall have been gathered over at least that shorter period. (5) (Reserved) (6) The owner or operator of a proposed stationary source or modification of volatile organic compounds who satisfies all conditions of 40 CFR Part 51 Appendix S, Section IV may provide post-approval monitoring data for ozone in lieu of providing preconstruction data as required under Rule 18.12 (a). (7) (Reserved) (8) With respect to any requirements for air quality monitoring of PM 10 the owner or operator of the source or modification shall use a monitoring method approved by the Director and shall estimate the ambient concentrations of PM 10 using the data collected by such approved monitoring method in accordance with estimating procedures approved by the Director. (b) Post-construction monitoring. The owner or operator of a major stationary source or major modification shall, after construction of the stationary source or modification, conduct such ambient monitoring as the Director determines is necessary to determine the effect emissions from the stationary source or modification may have, or are having, on air quality in any area. (c) Operations of monitoring stations. The owner or operator of a major stationary source or major modification shall meet the requirements of Appendix B to 40 CFR Part 58 during the operation of monitoring stations for purposes of satisfying Rule 18.12. Rule 18.13. Source information. The owner or operator of a proposed source or modification shall submit all information necessary to perform any analysis or make any determination required under this Rule. (a) With respect to a source or modification to which Rules 18.9, 18.11, 18.13 and 18.15 apply, such information shall include: (1) A description of the nature, location, design capacity, and typical operating schedule of the source or modification, including specifications and drawings showing its design and plant layout; (2) A detailed schedule for construction of the source or modification; (3) A detailed description as to what system of continuous emission reduction is planned for the source or modification, emission estimates, and any other information necessary to determine that best available control technology would be applied. (b) Upon request of the Director, the owner or operator shall also provide information on: (1) The air quality impact of the source or modification, including meteorological and topographical data necessary to estimate such impact; and (2) The air quality impacts, and the nature and extent of any or all general commercial, residential, industrial, and other growth which has occurred since August 7, 1977, in the area the source or modification would affect. Rule 18.14. Additional impact analyses. (a) The owner or operator shall provide an analysis of the impairment to visibility, soils and vegetation that would occur as a result of the source or modification and general commercial, residential, industrial and other growth associated with the source or modification. The owner or operator need not provide an analysis of the impact on vegetation having no significant commercial or recreational value. (b) The owner or operator shall provide an analysis of the air quality impact projected for the area as a result of general commercial, residential, industrial and other growth associated with the source or modification. (c) Visibility monitoring. The Director may require monitoring of visibility in any Federal Class I area near the proposed new stationary source for major modification for such purposes and by such means as the Director deems necessary and appropriate. Rule 18.15. Sources impacting Federal Class I areas - additional requirements (a) Notice to EPA. The Director shall transmit to the EPA Region 4 Administrator a copy of each permit application relating to a major stationary source or major modification and provide notice to the EPA Region 4 Administrator of every action related to the consideration of such permit. (b) Notice to Federal Land Managers. The Director shall provide written notice of any permit application for a proposed major stationary source or major modification, the emissions from which may affect a Class I area, to the Federal Land Manager and the Federal official charged with direct responsibility for management of any lands within any such area. Such notification shall include a copy of all information relevant to the permit application and shall be given within thirty (30) days of receipt and at least sixty (60) days prior to any public hearing on the application for a permit to construct. Such notification shall include an analysis of the proposed source's anticipated impacts on visibility in the Federal Class I area. The Director shall also provide the Federal Land Manager and such Federal officials with a copy of the preliminary determination required under Rule 18.16, and shall make available to them any materials used in making that determination, promptly after the Director makes such determination. Finally, the Director shall also notify all affected Federal Land Managers within thirty (30) days of receipt of any advance notification of any such permit application. (c) Federal Land Manager. The Federal Land Manager and the Federal official charged with direct responsibility for management of such lands have an affirmative responsibility to protect the air quality related values (including visibility) of such lands and to consider, in consultation with the Director, whether a proposed source or modification will have an adverse impact on such values. (d) Visibility analysis. The Director shall consider any analysis performed by the Federal Land Manager, provided within thirty (30) days of the notification required by Rule 18.15(b), that shows that a proposed new major stationary source or major modification may have an adverse impact on visibility in any Federal Class I area. Where the Director finds that such an analysis does not demonstrate to the satisfaction of the Director that an adverse impact on visibility will result in the Federal Class I area, the Director must, in the notice of public hearing on the permit application, either explain his decision or give notice as to where the explanation can be obtained. (e) Denial—impact on air quality related values. The Federal Land Manager of any such lands may demonstrate to the Director that the emissions from a proposed source or modification would have an adverse impact on the air quality-related values (including visibility) of those lands, notwithstanding that the change in air quality resulting from emissions from such source or modification would not cause or contribute to concentrations which would exceed the maximum allowable increases for a Class I area. If the Director concurs with such demonstration, then he shall not issue the permit. (f) Class I variances. The owner or operator of a proposed source or modification may demonstrate to the Federal Land Manager that the emissions from such source or modification would have no adverse impact on the air quality related values of any such lands (including visibility), notwithstanding that the change in air quality resulting from emissions from such source or modification would cause or contribute to concentrations which would exceed the maximum allowable increases for a Class I area. If the Federal Land Manager concurs with such demonstration and he so certifies, the Director may: Provided, That the applicable requirements of this Rule are otherwise met, issue the permit with such emission limitations as may be necessary to assure that emissions of sulfur dioxide, particulate matter, and nitrogen oxides would not exceed the following maximum allowable increases over minor source baseline concentration for such pollutants: Pollutant | Maximum Allowable Increase (micrograms per cubic meter) Particulate matter-PM 2.5 Annual arithmetic mean | 4 24-hr maximum | 9 Particulate matter-PM 10 Annual arithmetic mean | 17 24-hr maximum | 30 Sulfur dioxide Annual arithmetic mean | 20 24-hr maximum | 91 3-hr maximum | 325 Nitrogen dioxide Annual arithmetic mean | 25 (g) Sulfur dioxide variance by Governor with Federal Land Manager's concurrence. The owner or operator of a proposed source or modification which cannot be approved under Rule 18.15(f) may demonstrate to the Governor that the source cannot be constructed by reason of any maximum allowable increase for sulfur dioxide for a period of twenty-four (24) hours or less applicable to any Class I area and, in the case of Federal mandatory Class I areas, that a variance under this clause would not adversely affect the air quality related values of the area (including visibility). The Governor, after consideration of the Federal Land Manager's recommendation (if any) and subject to his concurrence, may, after notice and public hearing, grant a variance from such maximum allowable increase. If such variance is granted, the Director shall issue a permit to such source or modification pursuant to Rule 18.15(i), provided that the applicable requirements of this Rule are otherwise met. (h) Variance by the Governor with the President's concurrence. In any case where the Governor recommends a variance in which the Federal Land Manager does not concur, the recommendations of the Governor and the Federal Land Manager shall be transmitted to the President. The President may approve the Governor's recommendation if he finds that the variance is in the national interest. If the variance is approved, the Director shall issue a permit pursuant to the requirements of Rule 18.15(i), provided that the applicable requirements of this Rule are otherwise met. (i) Emission limitations for Presidential or gubernatorial variance. In the case of a permit issued pursuant to Rules 18.15(g) or (h), the source or modification shall comply with such emission limitations as may be necessary to assure that emissions of sulfur dioxide from the source or modification would not (during any day on which the otherwise applicable maximum allowable increases are exceeded) cause or contribute to concentrations which would exceed the following maximum allowable increases over the baseline concentration and to assure that such emissions would not cause or contribute to concentrations which exceed the otherwise applicable maximum allowable increases for periods of exposure of twenty-four (24) hours or less for more than eighteen (18) days, not necessarily consecutive, during any annual period: Period of Exposure | Maximum Allowable Increase (micrograms per cubic meter) Terrain Areas Low | High 24-hr maximum | 36 | 62 3-hr maximum | 130 | 221 Rule 18.16. Public participation. (a) The Director shall notify any applicant under the PSD rule within thirty (30) days after receipt of an application as to the completeness or any deficiency in the application or information submitted. In the event of such a deficiency, the date of receipt of the application shall be the date on which the Director received all required information. (b) Within one year after receipt of a complete application, the Director shall: (1) Make a preliminary determination whether construction should be approved, approved with conditions, or disapproved. (2) Make available in at least one location in the jurisdiction of the permitting authority a copy of all materials the applicant submitted, a copy of the preliminary determination, and a copy or summary of other materials, if any, considered in making the preliminary determination. (3) Notify the public, by publication as an electronic notice (e-notice) on the Bureau website for the duration of the public comment period and by other means designated by the Director, if necessary, of the preliminary determination, the degree of increment consumption that is expected from the source or modification, and the opportunity for comment at a public hearing as well as through written public comment. The notice shall include the draft permit, information on how to access the administrative record for the draft permit, and information on how to request and/or attend a public hearing on the draft permit. (4) Send a copy of the notice of public comment to the applicant, the U.S. EPA Administrator, the State of Tennessee, the State of Alabama, the State of Georgia, the chief executives of the city and county where the source would be located; the regional land use planning agency, and any State, Federal Land Manager, or Indian Governing body whose lands may be affected by emissions from the source or modification. (5) Provide opportunity for a public hearing for interested persons to appear and submit written or oral comments on the air quality impact of the source, alternatives to it, the control technology required, and other appropriate considerations. (6) Consider all written comments submitted within a time specified in the notice of public comment and all comments received at any public hearing(s) in making a final decision on the approvability of the application. The director shall make all comments available for public inspection at the same location where preconstruction information relating to the proposed source or modification was available. (7) Make a final determination whether construction should be approved, approved with conditions, or disapproved. (8) Notify the applicant in writing of the final determination and make such notification available for public inspection at the same location where the reviewing authority made available preconstruction information and public comments relating to the source. Rule 18.17. Source obligation. (a) Any owner or operator who constructs or operates a source or modification not in accordance with the application submitted pursuant to this Rule or with the terms of any approval to construct, or any owner or operator of a source or modification subject to this Rule who commences construction after the effective date of these regulations without applying for and receiving approval hereunder, shall be subject to appropriate enforcement action. (b) Approval to construct shall become invalid if construction is not commenced within eighteen (18) months after receipt of such approval, if construction is discontinued for a period of eighteen (18) months or more, or if construction is not completed within a reasonable time. The Director may extend the eighteen (18) month period upon a satisfactory showing that an extension is justified. This provision does not apply to the time period between construction of the approved phases of a phased construction project; each phase must commence construction within eighteen (18) months of the projected and approved commencement date. (c) Approval to construct shall not relieve any owner or operator of the responsibility to comply fully with applicable provisions of the local portion of the State Implementation Plan and any other requirements under local, State, or Federal law. (d) At such time that a particular source or modification becomes a major stationary source or major modification solely by virtue of a relaxation in any enforceable limitation which was established after August 7, 1980, on the capacity of the source or modification otherwise to emit a pollutant, such as a restriction on hours of operation, then the requirements Rule 18.9 through 8.18 shall apply to the source or modification as though construction had not yet commenced on the source or modification. (e) (Reserved) (f) The provisions of this Rule 18.17(f) apply to projects at an existing emissions unit at a major stationary source (other than at a source with a plantwide applicability limitation (PAL)) in circumstances where there is a reasonable possibility, within the meaning of Rule 18.17(f)(6), that a project that is not a part of a major modification may result in a significant emissions increase of such pollutant, and the owner or operator elects to use the method specified in Rule 18.2(rr)(2)a. through (rr)(2)c. for calculating projected actual emissions. (1) Before beginning actual construction of the project, the owner or operator shall document and maintain a record of the following information: a. A description of the project; b. Identification of the emissions unit(s) whose emissions of a regulated NSR pollutant could be affected by the project; and c. A description of the applicability test used to determine that the project is not a major modification for any regulated NSR pollutant, including the baseline actual emissions, the projected actual emissions, the amount of emissions excluded under Rule 18.2(rr)(2)c. and an explanation for why such amount was excluded, and any netting calculations, if applicable. (2) If the emissions unit is an existing electric utility steam generating unit, before beginning actual construction, the owner or operator shall provide a copy of the information set out in Rule 18.17(f)(1) to the Director. Nothing in this Rule 18.17(f)(2) shall be construed to require the owner or operator of such a unit to obtain any determination from the Director before beginning actual construction. However the source remains subject to Section 4-58 of this chapter requiring the appropriate modification of the Part 70 operating permit. (3) The owner or operator shall monitor the emissions of any regulated NSR pollutant that could increase as a result of the project and that is emitted by any emissions unit identified in Rule 18.17(f)(1)b.; and calculate and maintain a record of the annual emissions, in tons per year on a calendar year basis, for a period of five (5) years following resumption of regular operations after the change, or for a period of ten (10) years following resumption of regular operations after the change if the project increases the design capacity of or potential to emit that regulated NSR pollutant at such emissions unit. (4) If the unit is an existing electric utility steam generating unit, the owner or operator shall submit a report to the Director within sixty (60) days after the end of each year during which records must be generated under Rule 18.17(f)(3) setting out the unit's annual emissions during the calendar year that preceded submission of the report. (5) If the unit is an existing unit other than an electric utility steam generating unit, the owner or operator shall submit a report to the Director if the annual emissions, in tons per year, from the project identified in Rule 18.17(f)(1), exceed the baseline actual emissions (as documented and maintained pursuant to Rule 18.17(f)(1)c.), by a significant amount [as defined in Rule 18.2(zz)] for that regulated NSR pollutant, and if such emissions differ from the preconstruction projection as documented and maintained pursuant to Rule 18.17(f)(1)c. Such report shall be submitted to the Director within sixty (60) days after the end of such year. The report shall contain the following: a. The name, address and telephone number of the major stationary source; b. The annual emissions as calculated pursuant to Rule 18.17(f)(3) and c. Any other information that the owner or operator wishes to include in the report (e.g., an explanation as to why the emissions differ from the preconstruction projection). (6) A "reasonable possibility" under this Rule 18.17(f) occurs when the owner or operator calculates the project to result in either: a. A projected actual emissions increase of at least 50 percent of the amount that is a "significant emissions increase," as defined under Rule 18.2(aaa) (without reference to the amount that is a significant net emissions increase), for the regulated NSR pollutant; or b. A projected actual emissions increase that, added to the amount of emissions excluded under Rule 18.2(rr)(2)c, sums to at least fifty (50) percent of the amount that is a "significant emissions increase," as defined under Rule 18.2(aaa) (without reference to the amount that is a significant net emissions increase), for the regulated NSR pollutant. For a project for which a reasonable possibility occurs only within the meaning of Rule 18.17(f)(6)b., and not also within the meaning of Rule 18.17(f)(6)a., then provisions in Rule 18.17(f)(2) through (5) do not apply to the project. (g) The owner or operator of the source shall make the information required to be documented and maintained pursuant to Rule 18.17(f) available for review upon a request for inspection by the Director or the general public pursuant to the requirements contained in forty (40) CFR §70.4(b)(3)(viii). Rule 18.18. Environmental impact statements. Whenever any proposed source or modification is subject to action by a Federal Agency which might necessitate preparation of an environmental impact statement pursuant to the National Environmental Policy Act (42 U.S.C. §4321), review by the Director conducted pursuant to this Rule shall be coordinated with the broad environmental reviews under that Act and under Section 309 of the Federal Clean Air Act to the maximum extent feasible and reasonable. Rule 18.19. Innovative control technology. (a) An owner or operator of a proposed major stationary source or major modification may request the Director in writing no later than the close of the comment period under Rule 18.16 to approve a system of innovative control technology. (b) The Director with the consent of the governor(s) of the affected state(s) may determine that the source or modification may employ a system of innovative control technology, if: (1) The proposed control system would not cause or contribute to an unreasonable risk to public health, welfare, or safety in its operation or function; (2) The owner or operator agrees to achieve a level of continuous emissions reduction equivalent to that which would have been required under Rule 18.9(b) by a date specified by the Director. Such date shall not be later than four (4) years from the time of startup or seven (7) years from permit issuance; (3) The source or modification would meet the requirements of Rule 18.9 and 18.10 based on the emissions rate that the stationary source employing the system of innovative control technology would be required to meet on the date specified by the Director; (4) The source or modification would not before the date specified by the Director: a. Cause or contribute to a violation of an applicable national ambient air quality standard; or b. Impact any area where an applicable increment is known to be violated; and (5) All other applicable requirements including those for public participation have been met. (6) The provisions of Rule 18.15 (relating to Class I areas) have been satisfied with respect to all periods during the life of the source or modification. (c) The Director shall withdraw any approval to employ a system of innovative control technology made under this Rule, if: (1) The proposed system fails by the specified date to achieve the required continuous emissions reduction rate; or (2) The proposed system fails before the specified date so as to contribute to an unreasonable risk to public health, welfare, or safety; or (3) The Director decides at any time that the proposed system is unlikely to achieve the required level of control or to protect the public health, welfare, or safety. (d) If a source or modification fails to meet the required level of continuous emission reduction within the specified time period or the approval is withdrawn in accordance with Rule 18.19(c), the Director may allow the source or modification up to an additional three (3) years to meet the requirement for the application of best available control technology through use of a demonstrated system of control. Rule 18.20. Permit rescission. (a) Any permit issued pursuant to this rule or a prior version of this rule shall remain in effect, unless and until it expires or is rescinded. (b) Any owner or operator of a stationary source or modification who holds a permit for the source or modification which was issued pursuant to this Rule as in effect on July 30, 1987, or any earlier version, may request that the Director rescind the permit or a particular portion of the permit. (c) The Director shall grant an application for rescission if the application shows that this Rule would not apply to the source or modification. (d) If the Director rescinds a permit under this Rule, the public shall be given adequate notice of the rescission. Publication of an announcement of rescission as an electronic notice (e-notice) on the Bureau website for a period of sixty (60) days prior to the rescission and by other means designated by the Director, if necessary, shall be considered adequate notice. Rule 18.21. Actuals Plantwide Applicability Limitations (PALs). The provisions in Rule 18.21(a) through (o) shall govern actuals Plantwide Applicability imitations (PALs): (a) Applicability. (1) The Director may approve the use of an actuals plantwide applicability limitation (PAL)for any existing major stationary source if the PAL meets the requirements of Rule 18.21. The term "PAL" shall mean "actuals PAL" [as defined in Rule 18.21(b)(1)] throughout Rule 18.21. (2) Any physical change in or change in the method of operation of a major stationary source that maintains its total source-wide emissions below the plantwide applicability limitation (PAL) level, meets the requirements in Rule 18.21, and complies with the PAL permit: a. Is not a major modification for the plantwide applicability limitation (PAL) pollutant; b. Does not have to be approved through the PSD program; and c. Is not subject to the provisions in Rule18.17(d) (restrictions on relaxing enforceable emission limitations that the major stationary source used to avoid applicability of the major New Source Review program). (3) Except as provided under Rule 18.21(a)(2)c., a major stationary source shall continue to comply with all applicable local, state, or federal requirements, emission limitations, and work practice requirements that were established prior to the effective date of the plantwide applicability limitation (PAL). (b) Definitions. For the purposes of Rule 18.21, the definitions in this Rule 18.21apply. When a term is not defined in this rule, it shall have the meaning given in Rule 18.2 or in the Federal Clean Air Act. (1) Actuals PAL for a major stationary source means a plantwide applicability limitation (PAL) based on the baseline actual emissions [as defined in Rule 18.2(d)] of all emissions units [as defined in Rule 18.2(t)] that emit or have the potential to emit the PAL pollutant. (2) Allowable emissions means "allowable emissions" as defined in Rule 18.2(c), except as this definition is modified according to Rule 18.21(b)(2)a. and b. below: a. The allowable emissions for any emissions unit shall be calculated considering any emission limitations that are enforceable as a practical matter on the emissions unit's potential to emit. b. An emissions unit's potential to emit shall be determined using the definition in Rule 18.2(mm), except that the words "or enforceable as a practical matter" should be added after "federally enforceable." (3) Small emissions unit means an emissions unit that emits or has the potential to emit the plantwide applicability limitation (PAL) pollutant in an amount less than the significant level for that PAL pollutant, as defined in Rule 18.2(zz) or in the Federal Clean Air Act, whichever is lower. (4) Major emissions unit means: a. Any emissions unit that emits or has the potential to emit 100 tons per year or more of the plantwide applicability limitation (PAL) pollutant in an attainment area; or b. Any emissions unit that emits or has the potential to emit the PAL pollutant in an amount that is equal to or greater than the major source threshold for the PAL pollutant as defined by the Federal Clean Air Act for nonattainment areas. For example, in accordance with the definition of major stationary source in Section 182(c) of the Federal Clean Air Act, an emissions unit would be a major emissions unit for VOC if the emissions unit is located in a serious ozone nonattainment area and it emits or has the potential to emit fifty (50) or more tons of VOC per year. (5) Plantwide applicability limitation (PAL) means an emission limitation expressed in tons per year, for a pollutant at a major stationary source, that is enforceable as a practical matter and established source-wide in accordance with Rule 18.21. (6) PAL effective date generally means the date of issuance of the plantwide applicability limitation (PAL) permit. However, the PAL effective date for an increased PAL is the date any emissions unit that is part of the plantwide applicability limitation (PAL) major modification becomes operational and begins to emit the PAL pollutant. (7) PAL effective period means the period beginning with the plantwide applicability limitation (PAL) effective date and ending ten (10) years later. (8) PAL major modification means, notwithstanding Rule 18.2(ff) and (jj) (the definitions for major modification and net emissions increase), any physical change in or change in the method of operation of the plantwide applicability limitation (PAL) source that causes it to emit the PAL pollutant at a level equal to or greater than the PAL. (9) PAL permit means the major New Source Review permit, the minor New Source Review permit, or the State or local operating permit under a program that is approved into the local portion of the State Implementation Plan, or the Part 70 operating permit issued by the Director that establishes a plantwide applicability limitation (PAL) for a major stationary source. (10) PAL pollutant means the pollutant for which a plantwide applicability limitation (PAL) is established at a major stationary source. (11) Significant emissions unit means an emissions unit that emits or has the potential to emit a PAL pollutant in an amount that is equal to or greater than the significant level (as defined in Rule 18.2(zz) or in the Federal Clean Air Act, whichever is lower) for that PAL pollutant, but less than the amount that would qualify the unit as a major emissions unit as defined in Rule 18.21(b)(4). (c) Permit application requirements. As part of a permit application requesting a plantwide applicability limitation (PAL), the owner or operator of a major stationary source shall submit the following information to the Director for approval: (1) A list of all emissions units at the source designated as small, significant or major based on their potential to emit. In addition, the owner or operator of the source shall indicate which, if any, local, state, or federal applicable requirements, emission limitations, or work practices apply to each unit. (2) Calculations of the baseline actual emissions (with supporting documentation). Baseline actual emissions are to include emissions associated not only with operation of the unit, but also emissions associated with startup, shutdown, and malfunction. (3) The calculation procedures that the major stationary source owner or operator proposes to use to convert the monitoring system data to monthly emissions and annual emissions based on a twelve (12) month rolling total for each month as required by Rule 18.21(m)(1). (d) General requirements for establishing plantwide applicability limitations (PALs). (1) The Director is allowed to establish a plantwide applicability limitation (PAL) at a major stationary source, provided that at a minimum, the requirements Rule 18.21 are met. a. The plantwide applicability limitation (PAL) shall impose an annual emission limitation in tons per year that is enforceable as a practical matter, for the entire major stationary source. For each month during the PAL effective period after the first twelve (12) months of establishing a PAL, the major stationary source owner or operator shall show that the sum of the monthly emissions from each emissions unit under the PAL for the previous twelve (12) consecutive months is less than the PAL (a twelve (12) month average, rolled monthly). For each month during the first eleven (11) months from the PAL effective date, the major stationary source owner or operator shall show that the sum of the preceding monthly emissions from the PAL effective date for each emissions unit under the PAL is less than the PAL. b. The PAL shall be established in a PAL permit that meets the public participation requirements in Rule 18.21(e). c. The PAL permit shall contain all the requirements in Rule 18.21(g). d. The PAL shall include fugitive emissions, to the extent quantifiable, from all emissions units that emit or have the potential to emit the PAL pollutant at the major stationary source. e. Each PAL shall regulate emissions of only one (1) pollutant. f. Each PAL shall have a PAL effective period of ten (10) years. g. The owner or operator of the major stationary source with a PAL shall comply with the monitoring, recordkeeping, and reporting requirements provided in Rule 18.21(l), (m), and (n) for each emissions unit under the PAL through the PAL effective period. (2) At no time (during or after the PAL effective period) are emissions reductions of a PAL pollutant that occur during the PAL effective period creditable as decreases for purposes of offsets under 40 CFR §51.165(a)(3)(ii) unless the level of the PAL is reduced by the amount of such emissions reductions and such reductions would be creditable in the absence of the PAL. (e) Public participation requirements for plantwide applicability limitations (PALs). Plantwide applicability limitations (PALs) for existing major stationary sources shall be established, renewed, or increased through a procedure that is consistent with 40 CFR §51.160, 40 CFR §51.161, and this chapter. This includes the requirement that the Director provide the public with notice of the proposed approval of a PAL permit and at least a thirty (30) day period for submittal of public comment. The Director must address all material comments before taking final action on the permit. (f) Setting the ten (10) year actuals PAL level. (1) Except as provided in Rule 18.21(f)(2), the plan shall provide that the actuals PAL level for a major stationary source shall be established as the sum of the baseline actual emissions [as defined in Rule 18.2(d)] of the PAL pollutant for each emissions unit at the source; plus an amount equal to the applicable significant level for the PAL pollutant under Rule 18.2(zz) or under the Federal Clean Air Act, whichever is lower. When establishing the actuals PAL level, for a PAL pollutant, only one (1) consecutive twenty-four (24) month period must be used to determine the baseline actual emissions for all existing emissions units. However, a different consecutive twenty-four (24) month period may be used for each different PAL pollutant. Emissions associated with units that were permanently shut down after this twenty-four (24) month period must be subtracted from the plantwide applicability limitation (PAL) level. The reviewing authority shall specify a reduced PAL level(s) (in tons/yr) in the PAL permit to become effective on the future compliance date(s) of any applicable local, state, or federal regulatory requirement(s) that the reviewing authority is aware of prior to issuance of the PAL permit. For instance, if the source owner or operator will be required to reduce emissions from industrial boilers in half from baseline emissions of sixty (60) ppm NO X to a new rule limit of thirty (30) ppm, then the permit shall contain a future effective PAL level that is equal to the current PAL level reduced by half of the original baseline emissions of such unit(s). (2) For newly constructed units (which do not include modifications to existing units) on which actual construction began after the twenty-four (24) month period, in lieu of adding the baseline actual emissions as specified in Rule 18.21(f)(1), the emissions must be added to the PAL level in an amount equal to the potential to emit of the units. (g) Contents of the plantwide applicability limitation (PAL) permit. The PAL permit must contain, at a minimum, the information in (1) through (10) below: (1) The PAL pollutant and the applicable source-wide emission limitation in tons per year. (2) The PAL permit effective date and the expiration date of the plantwide applicability limitation (PAL) [PAL effective period]. (3) Specification in the PAL permit that if a major stationary source owner or operator applies to renew a PAL in accordance with Rule 18.21(j) before the end of the PAL effective period, then the PAL shall not expire at the end of the PAL effective period. It shall remain in effect until a revised PAL permit is issued by a reviewing authority. (4) A requirement that emission calculations for compliance purposes must include emissions from startups, shutdowns, and malfunctions. (5) A requirement that, once the PAL expires, the major stationary source is subject to the requirements of Rule 18.21(i). (6) The calculation procedures that the major stationary source owner or operator shall use to convert the monitoring system data to monthly emissions and annual emissions based on a twelve (12) month rolling total as required by Rule 18.21(m)(1). (7) A requirement that the major stationary source owner or operator monitor all emissions units in accordance with the provisions of Rule 18.21(l). (8) A requirement to retain the records required by Rule 18.21(m) on site. Such records may be retained in an electronic format. (9) A requirement to submit the reports required under Rule 18.21(n) by the required deadlines. (10) Any other requirements that the Director deems necessary to implement and enforce the PAL. (h) Plantwide applicability limitation (PAL) effective period and reopening of the PAL permit. The requirements in Rule 18.22(h)(1) and Rule 18.22(h)(2) apply to actuals PALs. (1) PAL effective period. The Director shall specify a plantwide applicability limitation (PAL) effective period of ten (10) years. (2) Reopening of the plantwide applicability limitation (PAL) permit. a. During the plantwide applicability limitation (PAL) effective period, the Director must reopen the PAL permit to: 1. Correct typographical/calculation errors made in setting the PAL or reflect a more accurate determination of emissions used to establish the PAL; 2. Reduce the PAL if the owner or operator of the major stationary source creates creditable emissions reductions for use as offsets under 40 CFR §51.165(a)(3)(ii); and 3. Revise the PAL to reflect an increase in the PAL as provided under Rule 18.21(k). b. The Director shall have discretion to reopen the PAL permit for the following: 1. Reduce the PAL to reflect newly applicable Federal requirements (for example, New Source Performance Standards) with compliance dates after the PAL effective date; 2. Reduce the PAL consistent with any other requirement, that is enforceable as a practical matter, and that the State may impose on the major stationary source under the local portion of the State Implementation Plan; and 3. Reduce the PAL if the reviewing authority determines that a reduction is necessary to avoid causing or contributing to a National Ambient Air Quality Standard (NAAQS) or Prevention of Significant Deterioration of Air Quality (PSD) increment violation, or to an adverse impact on an air quality related value that has been identified for a Federal Class I area by a Federal Land Manager and for which information is available to the general public. c. Except for the permit reopening in Rule 18.22(h)(2)a.1 for the correction of typographical/calculation errors that do not increase the PAL level, all other reopenings shall be carried out in accordance with the public participation requirements of Rule 18.21(e). (i) Expiration of a plantwide applicability limitation (PAL). Any plantwide applicability limitation (PAL) that is not renewed in accordance with the procedures in Rule 18.21(j) shall expire at the end of the PAL effective period, and the requirements in Rule 18.21(i)(1) through (5) shall apply. (1) Each emissions unit (or each group of emissions units) that existed under the PAL shall comply with an allowable emission limitation under a revised permit established according to the procedures Rule 18.21(i)(1)a. and b. a. Within the time frame specified for PAL renewals in Rule 18.21(j)(2), the major stationary source shall submit a proposed allowable emission limitation for each emissions unit (or each group of emissions units, if such a distribution is more appropriate as decided by the Director) by distributing the PAL allowable emissions for the major stationary source among each of the emissions units that existed under the PAL. If the PAL had not yet been adjusted for an applicable requirement that became effective during the PAL effective period, as required by Rule 18.22(j)(5) such distribution shall be made as if the PAL had been adjusted. b. The Director shall decide whether and how the PAL allowable emissions will be distributed and issue a revised permit incorporating allowable limits for each emissions unit, or each group of emissions units, as the Director determines is appropriate. (2) Each emissions unit(s) shall comply with the allowable emission limitation on a twelve (12) month rolling basis. The Director may approve the use of monitoring systems (source testing, emission factors, etc.) other than continuous emissions monitoring system (CEMS) [as defined in Rule 18.2(p)]; continuous emissions rate monitoring system (CERMS) [as defined in Rule 18.2(q)]; predictive emissions monitoring system (PEMS) [as defined in Rule 18.2(nn)]; or continuous parameter monitoring system (CPMS) [as defined in Rule 18.2(r)]; to demonstrate compliance with the allowable emission limitation. (3) Until the Director issues the revised permit incorporating allowable limits for each emissions unit, or each group of emissions units, as required by Rule 18.21(i)(1)b. the source shall continue to comply with a source-wide, multi-unit emissions cap equivalent to the level of the plantwide applicability limitation (PAL) emission limitation. (4) Any physical change or change in the method of operation at the major stationary source will be subject to major New Source Review requirements if such change meets the definition of major modification Rule 18.2(ff). (5) The major stationary source owner or operator shall continue to comply with any local, state, or federal applicable requirements (Best Available Control Technology, Reasonably Available Control Technology, New Source Performance Standards, etc.) that may have applied either during the plantwide applicability limitation (PAL) effective period or prior to the PAL effective period except for those emission limitations that had been established pursuant to Rule18.17(d), but were eliminated by the PAL in accordance with the provisions in Rule 18.21(a)(2)c. (j) Renewal of a plantwide applicability limitation (PAL). (1) The Director shall follow the procedures specified in Rule 18.21(e) in approving any request to renew a plantwide applicability limitation (PAL) for a major stationary source, and shall provide both the proposed PAL level and a written rationale for the proposed PAL level to the public for review and comment. During such public review, any person may propose a PAL level for the source for consideration by the Director. (2) Application deadline. A major stationary source owner or operator shall submit a timely application to the Director to request renewal of a plantwide applicability limitation (PAL). A timely application is one (1) that is submitted at least six (6) months prior to, but not earlier than eighteen (18) months from, the date of permit expiration. This deadline for application submittal is to ensure that the permit will not expire before the permit is renewed. If the owner or operator of a major stationary source submits a complete application to renew the PAL within this time period, then the PAL shall continue to be effective until the revised permit with the renewed PAL is issued. (3) Application requirements. The application to renew a plantwide applicability limitation (PAL) permit shall contain the information required by a. through d. below. a. The information required in Rule 18.21(c)(1) through (3). b. A proposed PAL level. c. The sum of the potential to emit of all emissions units under the PAL (with supporting documentation). d. Any other information the owner or operator wishes the Director to consider in determining the appropriate level for renewing the PAL. (4) PAL adjustment. In determining whether and how to adjust the plantwide applicability limitation (PAL), the director shall consider the options outlined in Rule 18.21(j)(4)a. and b. below. However, in no case may any such adjustment fail to comply with Rule 18.21(j)(4)c. a. If the emissions level calculated in accordance with Rule18.21(f) is equal to or greater than 80 percent of the PAL level, the Director may renew the PAL at the same level without considering the factors set forth in Rule 18.21(j)(4)b. below; or b. The Director may set the PAL at a level that he or she determines to be more representative of the source's baseline actual emissions, or that he or she determines to be more appropriate considering air quality needs, advances in control technology, anticipated economic growth in the area, desire to reward or encourage the source's voluntary emissions reductions, or other factors as specifically identified by the Director in his or her written rationale. c. Notwithstanding Rule18.21(j)(4)a. and b. above: 1. If the potential to emit of the major stationary source is less than the PAL, the Director shall adjust the PAL to a level no greater than the potential to emit of the source; and 2. The Director shall not approve a renewed PAL level higher than the current PAL, unless the major stationary source has complied with the provisions of Rule 18.21(k) (increasing a PAL). (5) If the compliance date for a State or Federal requirement that applies to the PAL source occurs during the PAL effective period, and if the Director has not already adjusted for such requirement, the PAL shall be adjusted at the time of PAL permit renewal or Part 70 operating permit renewal, whichever occurs first. (k) Increasing a plantwide applicability limitation (PAL) during the PAL effective period. (1) The Director may increase a plantwide applicability limitation (PAL) emission limitation only if the major stationary source complies with the provisions in a. through d. below. a. The owner or operator of the major stationary source shall submit a complete application to request an increase in the PAL limit for a PAL major modification. Such application shall identify the emissions unit(s) contributing to the increase in emissions so as to cause the major stationary source's emissions to equal or exceed its PAL. b. As part of this application, the major stationary source owner or operator shall demonstrate that the sum of the baseline actual emissions of the small emissions units, plus the sum of the baseline actual emissions of the significant and major emissions units assuming application of Best Available Control Technology (BACT) equivalent controls, plus the sum of the allowable emissions of the new or modified emissions unit(s) exceeds the PAL. The level of control that would result from BACT equivalent controls on each significant or major emissions unit shall be determined by conducting a new BACT analysis at the time the application is submitted, unless the emissions unit is currently required to comply with a BACT or Lowest Achievable Emissions Rate (LAER) requirement that was established within the preceding ten (10) years. In such a case, the assumed control level for that emissions unit shall be equal to the level of BACT or LAER with which that emissions unit must currently comply. c. The owner or operator obtains a major New Source Review (NSR) permit for all emissions unit(s) identified in Rule 18.21(k)(1)a., regardless of the magnitude of the emissions increase resulting from them (that is, no significant levels apply). These emissions unit(s) shall comply with any emissions requirements resulting from the major NSR process (for example, BACT), even though they have also become subject to the PAL or continue to be subject to the PAL. d. The PAL permit shall require that the increased PAL level shall be effective on the day any emissions unit that is part of the PAL major modification becomes operational and begins to emit the PAL pollutant. (2) The Director shall calculate the new PAL level as the sum of the allowable emissions for each modified or new emissions unit, plus the sum of the baseline actual emissions of the significant and major emissions units [assuming application of BACT equivalent controls as determined in accordance with Rule 18.21(k)(1)b.] plus the sum of the baseline actual emissions of the small emissions units. (3) The PAL permit shall be revised to reflect the increased PAL level pursuant to the public notice requirements of Rule 18.21(e). (l) Monitoring requirements for plantwide applicability limitations (PALs). (1) General requirements. a. Each plantwide applicability limitation (PAL) permit must contain enforceable requirements for the monitoring system that accurately determines plantwide emissions of the PAL pollutant in terms of mass per unit of time. Any monitoring system authorized for use in the PAL permit must be based on sound science and meet generally acceptable scientific procedures for data quality and manipulation. Additionally, the information generated by such system must meet minimum legal requirements for admissibility in a judicial proceeding to enforce the PAL permit. b. The PAL monitoring system must employ one or more of the four general monitoring approaches meeting the minimum requirements set forth in Rule 18.21(l)(2)a. through d. and must be approved by the Director. c. Notwithstanding Rule 18.21(l)(1)b. an alternative monitoring approach that meets the requirements of Rule18.21(l)(1)a. can be employed if approved by the Director. d. Failure to use a monitoring system that meets the requirements of this Rule renders the PAL invalid. (2) Minimum performance requirements for approved monitoring approaches. The following are acceptable general monitoring approaches when conducted in accordance with the minimum requirements in Rule 18.21(l)(3) through Rule 18.21(l)(9): a. Mass balance calculations for activities using coatings or solvents; b. Continuous emissions monitoring system (CEMS) [as defined in Rule 18.2(p)]; c. Continuous parameter monitoring system (CPMS) [as defined in Rule 18.2(r)] or predictive emissions monitoring system (PEMS) [as defined in Rule 18.2(nn)]; and d. Emission factors. (3) Mass balance calculations. An owner or operator using mass balance calculations to monitor PAL pollutant emissions from activities using coating or solvents shall meet the following requirements: a. Provide a demonstrated means of validating the published content of the PAL pollutant that is contained in or created by all materials used in or at the emissions unit; b. Assume that the emissions unit emits all of the PAL pollutant that is contained in or created by any raw material or fuel used in or at the emissions unit, if it cannot otherwise be accounted for in the process; and c. Where the vendor of a material or fuel, which is used in or at the emissions unit, publishes a range of pollutant content from such material, the owner or operator must use the highest value of the range to calculate the PAL pollutant emissions unless the Director determines there is site-specific data or a site-specific monitoring program to support another content within the range. (4) Continuous Emissions Monitoring System (CEMS). An owner or operator using a continuous emissions monitoring system (CEMS) [as defined in Rule 18.2(p)] to monitor plantwide applicability limitation (PAL) pollutant emissions shall meet the following requirements: a. CEMS must comply with applicable Performance Specifications found in 40 CFR Part 60, Appendix B; and b. CEMS must sample, analyze and record data at least every 15 minutes while the emissions unit is operating. (5) Continuous Parameter Monitoring System (CPMS) or Predictive Emissions Monitoring System (PEMS). An owner or operator using a continuous parameter monitoring system (CPMS) [as defined in Rule 18.2(r)] or a predictive emissions monitoring system (PEMS) [as defined in Rule 18.2(nn)] to monitor plantwide applicability limitation (PAL) pollutant emissions shall meet the following requirements: a. The CPMS or the PEMS must be based on current site-specific data demonstrating a correlation between the monitored parameter(s) and the PAL pollutant emissions across the range of operation of the emissions unit; and b. Each CPMS or PEMS must sample, analyze, and record data at least every fifteen (15) minutes, or at another less frequent interval approved by the Director, while the emissions unit is operating. (6) Emission factors. An owner or operator using emission factors to monitor plantwide applicability limitation (PAL) pollutant emissions shall meet the following requirements: a. All emission factors shall be adjusted, if appropriate, to account for the degree of uncertainty or limitations in the factors' development; b. The emissions unit shall operate within the designated range of use for the emission factor, if applicable; and c. If technically practicable, the owner or operator of a significant emissions unit that relies on an emission factor to calculate PAL pollutant emissions shall conduct validation testing to determine a site-specific emission factor within six (6) months of PAL permit issuance, unless the Director determines that testing is not required. (7) A source owner or operator must record and report maximum potential emissions without considering enforceable emission limitations or operational restrictions for an emissions unit during any period of time that there is no monitoring data, unless another method for determining emissions during such periods is specified in the plantwide applicability limitation (PAL) permit. (8) Notwithstanding the requirements in Rule18.21(l)(3) through (7), where an owner or operator of an emissions unit cannot demonstrate a correlation between the monitored parameter(s) and the plantwide applicability limitation (PAL) pollutant emissions rate at all operating points of the emissions unit, the Director shall, at the time of permit issuance: a. Establish default value(s) for determining compliance with the PAL based on the highest potential emissions reasonably estimated at such operating point(s); or b. Determine that operation of the emissions unit during operating conditions when there is no correlation between monitored parameter(s) and the PAL pollutant emissions is a violation of the PAL. (9) Re-validation. All data used to establish the plantwide applicability limitation (PAL) pollutant must be re-validated through performance testing or other scientifically valid means approved by the Director. Such testing must occur at least once every five (5) years after issuance of the PAL. (m) Recordkeeping requirements. (1) The plantwide applicability limitation (PAL) permit shall require an owner or operator to retain a copy of all records necessary to determine compliance with any requirement of Rule 18.21 and of the PAL, including a determination of each emissions unit's twelve (12) month rolling total emissions, for five (5) years from the date of such record. (2) The plantwide applicability limitation (PAL) permit shall require an owner or operator to retain a copy of the following records for the duration of the PAL effective period plus five (5) years: a. A copy of the PAL permit application and any applications for revisions to the PAL; and b. Each annual certification of compliance pursuant to the requirements for the Part 70 operating permit program and the data relied on in certifying the compliance. (n) Reporting and notification requirements. The owner or operator shall submit semi-annual monitoring reports and prompt deviation reports to the Director in accordance with the applicable Part 70 operating permit program. The reports shall meet the requirements in Rule 18.21(n)(1) through (3) below: (1) Semi-annual report. The semi-annual report shall be submitted to the Director within thirty (30) days of the end of each reporting period. This report shall contain the information required by a. through g. below: a. The identification of owner and operator and the permit number. b. Total annual emissions (tons/year) based on a twelve (12) month rolling total for each month in the reporting period recorded pursuant to Rule 18.21(m). c. All data relied upon, including, but not limited to, any Quality Assurance or Quality Control data, in calculating the monthly and annual plantwide applicability limitation (PAL) pollutant emissions. d. A list of any emissions units modified or added to the major stationary source during the preceding six (6) month period. e. The number, duration, and cause of any deviations or monitoring malfunctions (other than the time associated with zero and span calibration checks), and any corrective action taken. f. A notification of a shutdown of any monitoring system, whether the shutdown was permanent or temporary, the reason for the shutdown, the anticipated date that the monitoring system will be fully operational or replaced with another monitoring system, and whether the emissions unit monitored by the monitoring system continued to operate, and the calculation of the emissions of the pollutant or the number determined by method included in the permit, as required by Rule 18.21(l)(7). g. A signed statement under oath by the responsible official (as defined in Section 4-53 of this chapter) certifying the truth, accuracy, and completeness of the information provided in the report. It shall constitute a certification under T.C.A. § 68-201-112. (2) Deviation report. The major stationary source owner or operator shall promptly submit reports of any deviations or exceedance of the plantwide applicability limitation (PAL) requirements, including periods where no monitoring is available. The report shall be submitted according to the requirements of section 4-12 of this chapter. The deviation report will be certified by the responsible official as required in Rule 18.21(n)(1)g. The reports shall contain the following information: a. The identification of owner and operator and the permit number; b. The PAL requirement that experienced the deviation or that was exceeded; c. Emissions resulting from the deviation or the exceedance; and d. A statement by the responsible official meeting the requirements of Rule 18.21(n)(1)g. (3) Re-validation results. The owner or operator shall submit to the Director the results of any re-validation test or method within 3 months after completion of such test or method. (o) Transition requirements. (1) The Director may not issue a plantwide applicability limitation (PAL) that does not comply with the requirements in Rule 18.21 after March 3, 2003. (2) The Director may supersede any PAL that was established prior to March 3, 2003 with a PAL that complies with the requirements of Rule 18.21. Rule 18.22. Basic design parameters are determined as follows: (a) Except as provided in Rule 18.22(c) for a process unit at a steam electric generating facility, the owner or operator may select as its basic design parameters either maximum hourly heat input and maximum hourly fuel consumption rate or maximum hourly electric output rate and maximum steam flow rate. When establishing fuel consumption specifications in terms of weight or volume, the minimum fuel quality based on British Thermal Units content shall be used for determining the basic design parameter(s) for a coal-fired electric utility steam generating unit. (b) Except as provided in Rule18.22(c), the basic design parameter(s) for any process unit that is not at a steam electric generating facility are maximum rate of fuel or heat input, maximum rate of material input, or maximum rate of product output. Combustion process units will typically use maximum rate of fuel input. For sources having multiple end products and raw materials, the owner or operator should consider the primary product or primary raw material when selecting a basic design parameter. (c) If the owner or operator believes the basic design parameter(s) in Rule 18.22(a) and (b) are not appropriate for a specific industry or type of process unit, the owner or operator may propose to the director an alternative basic design parameter(s) for the source's process unit(s). If the Director approves of the use of an alternative basic design parameter(s), the Director shall issue a permit that is legally enforceable that records such basic design parameter(s) and requires the owner or operator to comply with such parameter(s). (d) The owner or operator shall use credible information, such as results of historic maximum capability tests, design information from the manufacturer, or engineering calculations, in establishing the magnitude of the basic design parameter(s) specified in Rule 18.22(a) and (b). (e) If design information is not available for a process unit, then the owner or operator shall determine the process unit's basic design parameter(s) using the maximum value achieved by the process unit in the five (5) year period immediately preceding the planned activity. (f) Efficiency of a process unit is not a basic design parameter its function. Rule 19. Regulation of Lead Emissions. Rule 19.1. Definitions. Unless specifically defined in this Rule 19, the definitions from Section 4-2 will apply: (1) Significant source of lead means a. Any one (1) permit unit, or combination of permit units as determined by the Board of Director, at any of the following stationary sources that emit lead or lead compounds (measured as elemental lead) of at least one twenty-five (125) tons per calendar quarter or at least five (5) tons per year whichever is the more restrictive: primary lead smelters, secondary lead smelters, primary cooper smelters, lead gasoline additive plants, lead-acid storage battery manufacturing plants that produce two thousand (2,000) or more batteries per day. b. Notwithstanding the source sizes specified in subparagraph a. of this paragraph, any other stationary source that emits twenty-five (25) or more tons per year of lead or lead compounds measured as elemental lead. (2) Source means any structure, building, facility, equipment, installation, or operation, or combination thereof, which is located on one (1) or more contiguous or adjacent properties and which is owned or operated by the same person or by persons under common control. If a portion of a source is rented to or leased to another person for the purpose of a totally separate business venture, the Board or the Director may designate that portion as a separate source. (3) Permit unit means any part of a source required to obtain a certificate of operation as required by this chapter. Rule 19.2. General limitations for lead emissions. (1) No person shall cause, suffer, allow, or permit lead emissions in excess of the limits established in this chapter. (2) Upon mutual agreement of the Board or the Director and the owner or operator of a significant source of lead, an emission limitation more restrictive than that otherwise specified in this chapter may be established. Also, upon mutual agreement of the owner or operator of any source and the Board or the Director, operating hours, process flow rates, or any other operating parameters may be established as a binding limitation. The mutually acceptable limitations shall be stated as a special conditions for any permit, or certificate concerning the source. Violation of any accepted special limitations is grounds for revocation of the issued permit or certificate and/or other enforcement measures. Rule 19.3. Requirements for new and modified sources of lead. (1) A new source the actual emissions of which are in excess of five (5.0) tons per year of lead or lead compounds measured as elemental lead shall utilize best available control technology (BACT). (2) Any modification of a source which results in an increase in excess of six-tenths (0.6) tons per year of lead or lead compounds measured as elemental lead shall utilize BACT. (3) The owner or operator of a proposed new or modified source of lead shall perform a source impact analysis to demonstrate that the allowable emission increases from the proposed source or modification would not cause or contribute to a violation of the lead ambient air quality standard in the source impact area including background concentrations. Source impact analysis shall be based on the applicable air quality models and data bases acceptable to the Board or the Director. (4) Additional requirements for certain new or modified sources of lead are given in Section 4-41, Rule 18.2 (Prevention of Significant Deterioration) and in Section 4-41, Rule 15 (New Source Performance Standards) of this chapter. Rule 19.4. Source sampling and analysis. Source sampling and analysis for lead shall be conducted in the manner prescribed in Section 4-3(c) of this chapter. Rule 19.5. Ambient monitoring requirements for lead. The Board or the Director may require ambient lead monitoring in the vicinity of a source regulated by this Rule 19. This monitoring shall be done in accordance with the requirements of this chapter. Rule 20. (Reserved) Rule 21. Ambient Air Quality Standards. Ambient air quality standards as given in the following table. Ambient Air Quality Standards Pollutant | Primary/ Secondary Standard | Averaging Time | Level | Form Carbon Monoxide | Primary | 8-hour | 9 ppm | Not to be exceeded more than once per year 1-hour | 35 ppm Lead | Primary and Secondary | Rolling 3-Month Average | 0.15 μg/m 3 | Not to be exceeded Nitrogen Dioxide | Primary | 1-hour | 100 ppb | 98 th percentile of 1-hour daily maximum concentrations, averaged over 3 years Primary and Secondary | 1-year | 53 ppb | Annual arithmetic mean Ozone | Primary and Secondary | 8-hour (1) | 0.070 ppm | Annual fourth-highest daily maximum 8-hour concentration, averaged over 3 years 1-hour (2) | 0.12 ppm | Not to be exceeded during more than one day per year Particulate Matter-PM 2.5 | Primary | 1-year (3) | 9.0 μg/m 3 | Annual arithmetic mean, averaged over 3 years Secondary | 15.0 μg/m 3 Primary and Secondary | 24-hour (4) | 35 μg/m 3 | 98 th percentile, averaged over 3 years Particulate Matter-PM 10 | Primary and Secondary | 1-year (5) | 50 μg/m 3 | Annual arithmetic mean 24-hour (6) | 150 μg/m 3 | Not to be exceeded more than once per year on average over three years Sulfur Dioxide | Primary | 1-year | 0.030 ppm | Annual arithmetic mean 24-hour | 0.14 ppm | Not to be exceeded more than once per year 1-hour | 75 ppb | 99 th percentile of 1-hour daily maximum concentrations, averaged over 3 years Secondary | 3-hour | 0.5 ppm | Not to be exceeded more than once per year Gaseous Fluorides (expressed as HF) (7) | Secondary | 30-day | 1.5 ppb (1.2 μg/m 3 ) | Not to be exceeded more than once per year 7-day | 2.0 ppb (1.6 μg/m 3 ) 24-hour | 3.5 ppb (2.9 μg/m 3 ) 12-hour | 4.5 ppb (3.7 μg/m 3 ) Notes: ppm — parts per million by volume ppb — parts per billion by volume μg/m 3 — microgramsper cubic meter of air (1) To attain this standard, the three (3) year average of the fourth highest daily maximum eight (8) hour average ozone concentrations measured at each monitor within an area over each year must not exceed 0.070 ppm. (2) This standard is attained when the expected number of days per calendar year, with maximum hourly average concentrations above 0.12 ppm, as determined in accordance with 40 CFR Part 50, Appendix H, is less than or equal to one. [This standard has been eliminated by the U.S. Environmental Protection Agency but remains a standard of the State of Tennessee.] (3) To attain these standards, the three (3) year average of the weighted annual PM2.5 concentrations from single or multiple community-oriented monitors must not exceed 9.0 μg/m 3 for the primary standard and 15.0 μg/m 3 for the secondary standard. (4) To attain this standard, the three (3) year average of the 98 th percentile of twenty-four (24) hour concentrations at each population-oriented monitor within an area must not exceed 35 μg/m 3 . (5) This standard is attained when the expected annual arithmetic mean concentration, as determined in accordance with 40 CFR Part 50, Appendix K, is less than or equal to fifty (50)μg/m 3 . [This standard has been eliminated by the U.S. Environmental Protection Agency but remains a standard of the State of Tennessee.] (6) This standard is attained when the expected number of days per calendar year with a twenty-four (24) hour average concentration above 150 μg/m 3 , as determined in accordance with 40 CFR Part 50, Appendix K, is less than or equal to one. (7) Sources that emit gaseous fluorides, including hydrogen fluoride, and that are within a source category (including sources that would otherwise be included in the source category but fall below emissions or size thresholds for the source category) for which the EPA has promulgated standards under Section 112 of the Clean Air Act are deemed to be in compliance with any requirements under these standards if they meet any and all applicable requirements of the federal standards. These standards are not applicable to sources subject to 40 CFR Part 63, Subpart LL. [These are standards of the State of Tennessee.] Rule 22. Good Engineering Practices Stack Heights. Rule 22.1. General Provisions. (1) This Rule 22 provides that the degree of emission limitation required of any source for control of any air pollutant must not be affected by that portion of any source's stack height that exceeds good engineering practice (GEP) or any other dispersion technique, except as provided in Rule 22.1(2). Before a new or revised emission limitation is established that is based on a GEP stack height that exceeds the height allowed by Rule 22.2(3)a. or b., the Director must notify the public of the availability of the applicable demonstration study that is specified by Rule 22.2(3)c. and must provide opportunity for a public hearing on it. This Rule 22 does not restrict in any manner the actual stack height of any source. (2) The provisions of this Rule 22 shall not apply to stack heights in existence, or dispersion techniques implemented on or before December 31, 1970, except where pollutants are being emitted from such stacks or using such dispersion techniques by stationary sources which were constructed, reconstructed, or for which major modifications, as defined in Section 4-2, and were carried out after December 31, 1970. Rule 22.2. Definitions. As used in this Rule 22, the following definitions shall apply: (1) Dispersion technique means any technique which attempts to affect the concentration of a pollutant in the ambient air by: a. Using that portion of a stack which exceeds good engineering practice stack height; b. Varying the rate of emission of a pollutant according to atmospheric conditions or ambient concentrations of that pollutant; or c. Increasing final exhaust gas plume rise by manipulating source process parameters, exhaust gas parameters, stack parameters, or combining exhaust gases from several existing stacks into one (1) stack; or other selective handling of exhaust gas streams so as to increase the exhaust gas plume rise. The preceding sentence defining dispersion technique does not include: a. The reheating of a gas stream, following use of a pollution control system, for the purpose of returning the gas to the temperature at which it was originally discharged from the facility generating the gas stream; b. The merging of exhaust gas streams where: 1. The source owner or operator demonstrates that the facility was originally designed and constructed with such merged gas streams; 2. After July 8, 1985, such merging is part of a change in operation at the facility that includes the installation of pollution controls and is accompanied by a net reduction in the allowable emissions of a pollutant. This exclusion from the definition of dispersion techniques shall apply only to the emission limitation for the pollutant affected by such change in operation; or 3. Before July 8, 1985, such merging was part of a change in operation at the facility that included the installation of emissions control equipment or was carried out for sound economic or engineering reasons. Where there was an increase in the emissions limitation or, in the event that no emission limitation was in existence prior to the merging, an increase in the quantity of pollutants actually emitted prior to the merging, the Director shall presume that the merging was significantly motivated by an intent to gain emissions credit for greater dispersion. Absent a demonstration by the source owner or operator that merging was not significantly motivated by such intent, the Director shall deny credit for the effects of such merging in calculating the allowable emissions for the source; c. Smoke management in agricultural or silvicultural prescribed burning programs; d. Episodic restrictions on residential wood burning and open burning; or e. Techniques under Rule 22.2(1)(C) which increase final exhaust gas plume rise where the resulting plant-wide allowable emissions of sulfur dioxide do not exceed five thousand (5,000) tons per year. (2) Emission limitation means a requirement established by the Director, which limits the quantity, rate or concentration of emissions of air pollutants on a continuous basis, including any requirements which limit the level of opacity, prescribe equipment, set fuel specifications, or prescribe operation or maintenance procedures for a source to assure continuous emission reduction. (3) Good engineering practice (GEP) stack height means the greater of: a. Sixty-five (65) meters (two hundred thirteen (213)) feet, measured form the ground-level elevation at the base of the stack; b. Considering other stack criteria the following formulae apply: 1. For stacks in existence on January 12, 1979, and for which the owner or operator had obtained all applicable permits or approvals required, Hg = 2.5H, provided the owner or operator produces evidence that this equation was actually relied on in establishing an emission limitation; 2. For all other stacks; Hg = H + 1.5L, where Hg = good engineering practice stack height, measured from the ground-level elevation at the base of the stack, H = height of nearby structure(s) measured from ground-level elevation at the base of the stack, L = lesser dimension, height (H) or projected width, of nearby structure(s) provided that the director may require the use of a field study or fluid model to verify GEP stack height for the source; or c. The height demonstrated by a fluid model or a field study approved by the director, which ensures that the emissions from a stack do not result in excessive concentrations of any air pollutant as a result of atmospheric downwash, wakes, or eddy effects created by the source itself, nearby structures or nearby terrain features. (4) Nearby as used in Rule 22.2(3) is defined for a specific structure or terrain feature and a. For the purposes of applying the formulae provided in Rule 22.2(3)(b) means that distance up to five times the lesser of the height or the width dimension of a structure, but not greater than eight-tenths (0.8) kilometers (one-half ½ mile), and b. For conducting demonstrations under Rule 22.2(3)(c) means not greater than eight-tenths (0.8) kilometers (one-half ½), except that the portion of a terrain feature may be considered to be nearby which falls within a distance of up to 10 times the maximum height (H t ) feature achieves a height (h t ) eight-tenths (0.8) kilometers from the stack that is at least forty percent (40%) of the GEP stack height determined by the formulae provided in Rule 19(B)(3)(b)2. or 26 meters (85 feet), whichever is greater, as measured from the ground level elevation at the base of the stack. The height of the structure of terrain feature is measured from the ground-level elevation at the base of the stack. (5) Excessive concentration is defined for the purposes of determining good engineering practice stack height under Rule 22.2(3)(C), and means: a. For sources seeking credit for stack height exceeding that established under Rule 22.2(3)(b), a maximum ground-level concentration due to emissions from a stack due in part to downwash, wakes, and eddy effects produced by nearby structures or nearby terrain features which individually is at least fifty percent (50%) in excess of the maximum concentration experienced in the absence of such downwash, wakes, or eddy effect and which contributes to a total concentration due to the emissions from all sources that is greater than an ambient air quality standard. For sources subject to Rule 18.2, an excessive concentration alternatively means a maximum ground-level concentration due to emissions from a stack due in whole or part to downwash, wakes, or eddy effects produced by nearby structures or nearby terrain features which individually is at least fifty percent (50%) in excess of the maximum concentration experienced in the absence of such downwash, wakes or eddy effects and greater than a prevention of significant deterioration increment. The allowable emission rate to be used in making demonstrations under this rule shall be prescribed by the new source performance standards (NSPS) that is applicable to the source category unless the owner or operator demonstrates that this emission rate is infeasible. Where such demonstrations are approved by the director, an alternative emission rate shall be established in consultation with the source owner or operator; b. For sources seeking credit after October 11, 1983, for increases in existing stack heights established under Rule 22.2(3)(b) either: 1. a maximum ground-level concentration due in whole or part to downwash, wakes, or eddy effect as provided in Rule 22.2(5)(a), except that the emission rate specified by the State Implementation Plan (or, in absence of such a limit, the actual emission rate) shall be used, or 2. the actual presence of a local nuisance caused by the existing stack, as determined by the director; and c. For sources seeking credit after January 12, 1979, for a stack height determined under Rule 22.2(3)(b) where the director requires the use of a field study or fluid model to verify GEP stack height; for sources seeking stack height credit after November 9, 1984, based on the aerodynamic influence of cooling towers; and for sources seeking stack height credit after December 31, 1970, based on the aerodynamic influence of structures not adequately represented by the equations in Rule 22.2(3)(b), a maximum ground-level concentration due in whole or part to downwash, wakes, or eddy effects that is at least forty percent (40%) in excess of the maximum concentration experienced in the absence of such downwash, wakes, or eddy effects. (6) Stack for the purpose of good engineering practice means any point in a source designed to emit solids, liquids, or gases into the air, including a pipe or duct but not including flares. (7) A stack in existence means that the owner or operator had (1) begun, or caused to begin, a continuous program of physical on-site construction of the stack; or (2) entered into binding agreements or contractual obligations, which could not be cancelled or modified without substantial loss to the operator, to undertake a program of construction of the stack to be completed in a reasonable time. Rule 22.3. Good Engineering Practice Stack Height Requirements. (1) No person shall cause, suffer, allow, or permit emissions in excess of the limitations in this Rule 22. (2) Upon mutual agreement of the owner or operator of a source and the director, an emission limitation more restrictive than that otherwise specified in this Rule 22 may be established. The mutually acceptable limits shall be stated as a special condition(s) for any permit or certificate concerning the source. Violation of any accepted special limitation is grounds for revocation of the issued certificate of operation and other enforcement measures provided for in law. (3) The possession of a valid permit or certificate of operation shall not protect the source from enforcement actions if permit or certificate conditions are not met. Rule 22.4. Specific Emissions Limitations. For any affected air contaminant source or sources at a facility, the director shall specify as special conditions on the installation permit, and certificate of operation the emission limitation that is determined to be necessary under the provisions of this Rule 22. Such conditions shall be subjected to a public hearing and incorporated as a revision to the State Implementation Plan. Rule 23. General Provisions and Applicability for Process Gaseous Emissions Standards. Rule 23.1. No person shall cause, suffer, allow or permit gaseous emission in excess of the standards provided in this chapter. For the purpose of this Rule 23 the term "process gaseous emission" shall mean any gaseous emission of an air contaminant to the ambient air other than that from fuel-burning equipment, incinerators or open burning. Rule 23.2. Any person constructing or otherwise establishing an air contaminant source emitting gaseous air contaminants after the effective date of this regulation, which is not limited by a specific standard provided elsewhere in this chapter, shall install and utilize equipment and technology which is deemed reasonable and proper by the director. Rule 24. Reserved. Rule 25. General Provisions and Applicability for Volatile Organic Compounds. Rule 25.1. Purpose. It is the purpose of this Rule 25 to establish emission standards for new and existing sources of volatile organic compounds located within the city. The emission standards established within this rule will apply to different sources depending upon the potential emissions of the source. Rule 25.2. Definitions. Words or terms defined in Rule 25 are for the purpose of this rule only and will not affect the definitions of section 4-2. Unless specifically defined in this Rule 25, the definitions from section 4-2 will apply: (1) Approved means approved by the director, Chattanooga-Hamilton County Air Pollution Control Bureau. (2) Capture system means the equipment (including hoods, ducts, fans, etc.) used to contain, capture or transport a pollutant to a control device. (3) Coating applicator means an apparatus used to apply a surface coating. (4) Coating line means one (1) or more apparatus or operations, which include a coating applicator, flashoff area, and over, wherein a surface coating is applied, dried and/or cured. (5) Commenced means that an owner operator has undertaken a continuous program of construction or modification or that an owner or operator has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of construction or modification. (6) Construction means commencement of on-site fabrication, erection or installation of a new or modified source or facility. (7) Control device means any method, process or equipment which removes or reduces volatile organic compounds (VOC) emissions to the ambient air. (8) Continuous vapor control system means a vapor control system that treats vapors displaced from tanks during filling on a demand basis without intermediate accumulation. (9) Day means a twenty-four (24) hour period beginning at midnight. (10) Emission means the release or discharge, whether directly or indirectly, of VOC's into the ambient air from any source. (11) Existing source is any process in existence or having an installation permit prior to the effective date of each Rule 25 category. (12) Facility means any building, structure, installation, activity or combination thereof which contains one (1) or more stationary source of air contaminants. (13) Flashoff area means the space between the application area and the oven. (14) Incinerator means a combustion apparatus designed for high temperature operation in which solid, semisolid, liquid or gaseous combustible wastes are ignited and burned efficiently and from which the solid and gaseous residues contain little or no combustible material. (15) Intermittent vapor control system means a vapor control system that employs an intermediate vapor holder to accumulate vapors displaced from tanks during filling. The control device treats the accumulated vapors only during automatically controlled cycles. (16) Knife coating means the application of a coating material to a substrate by means of drawing the substrate beneath a knife that spreads the coating evenly over the full width of the substrate. (17) Loading rack means an aggregation or combination of gasoline loading equipment arranged so that all loading outlets in the combination can be connected to a tank truck or trailer parked in a specified loading space. (18) New source is all other processes not defined in definition (11) as an existing source. (19) Organic material means a chemical compound of carbon excluding carbon monoxide, carbon dioxide, carbonic acid, metallic carbides or carbonates and ammonium carbonate. (20) Oven means a chamber within which heat is used to bake, cure, polymerize and/or dry a surface coating. (21) Owner or operator means any person who owns, leases, controls, operates or supervises a facility, existing source, new source or control device. (22) Petroleum liquid means crude oil, condensate and any finished or intermediate products manufactured or extracted in a petroleum refinery. (23) Prime coat means the first film of coating applied to a multiple-coat operation. (24) Reid vapor pressure means the absolute vapor pressure of volatile crude oil and volatile nonviscous petroleum liquids except liquefied petroleum gases as determined by American Society for Testing and Materials, D-323-94 Standard Test Method for Vapor Pressure of Petroleum Products (Reid Method), 1994 Annual Book of ASTM Standards Volume 5.01. (25) Roll coating means the application of a coating material to a substrate by means of hard rubber or steel rolls. (26) Rotogravure coating means the application of a coating material to a substrate by means of a roll coating technique in which the pattern to be applied is etched on the coating roll. The coating material is picked up in these recessed areas and is transferred to the substance. (27) Solvent means organic materials which are liquid at standard conditions and which are used as dissolvers, viscosity reducers or cleaning agents. (28) Standard conditions means a temperature of twenty degrees (20°) centigrade (sixty-eight degrees (68°) Fahrenheit) and pressure of seven hundred sixty (760) millimeters of mercury (twenty-nine and ninety-two hundredths (29.92) inches of mercury). (29) Top coat means the final film of coating applied in a multiple-coat operation. (30) True vapor pressure means the equilibrium partial pressure exerted by a petroleum liquid as determined in accordance with methods described in American Petroleum Institute Bulletin 2517, "Evaporation Loss from External Floating-Roof Tanks," Third Edition with addendum, May 1994. (31) Vapor collection system means a vapor transport system which uses direct displacement by the liquid loaded to force vapors from the tank into a vapor control system. (32) Vapor control system means a system approved by the director that prevents release to the atmosphere of organic compounds in the vapors displaced from a tank during the transfer of gasoline. (33) Reserved. Rule 25.3. Standards for new sources. (1) For the purpose of this Rule 25.3, the following definitions apply: a. Lowest achievable emission rate (also denoted as LAER) means for any source that rate of emissions which reflects: 1. The most stringent emission limitation which is achieved in practice by such class or category of source. 2. In no event shall a new or modified source emit any pollutant in excess of the amount allowable under applicable rules of Rule 15. This limit will be determined by the director at the time of the permit application. b. Potential emissions means the maximum capacity to emit a pollutant absent air pollution control equipment. Air pollution control equipment includes control equipment which is not, aside from air pollution control laws and regulations, vital to production of the normal product of the source or to its normal operation. Annual potential shall be based on the maximum annual rated capacity of the source unless the source is subject to enforceable permit conditions which limit the operating rate of hour of operation, or both. Enforceable permit conditions on the type or amount of materials combusted or processed may be used in determining the potential emission rate of a source. (2) New or modified sources identified as having potential emissions of one hundred (100) tons per year or greater shall utilize LAER. All other new or modified sources locating in the county shall utilize BACT. Regardless of the specific emission standards derived from these rules, a new and/or modified source in the county must comply with the provisions of this rule. a. Attainment and unclassified areas. The director shall not grant a permit or waiver for the construction or modification of any air contaminant source in an attainment or unclassified area if such construction or modification will interfere with the maintenance of an air quality standard or will violate any provision of these regulations or will violate any provision of the Tennessee Air Quality Act. b. Nonattainment areas. The director shall not grant a permit for construction or modification of any air contaminant source in a nonattainment area nor to any source that significantly impacts on a nonattainment area if such construction or modification will interfere with reasonable further progress in attainment of the specific air quality standards or will violate any provision of the Tennessee Air Quality Act or will violate provisions of these regulations, except in accordance with the following: 1. All new or modified sources shall utilize good engineering practice as determined by the director in designing stacks. 2. New or modified sources with potential emissions of less than one hundred (100) tons per year shall utilize best available control technology (BACT) as specified by the director. 3. New or modified sources identified as having potential emissions of one hundred (100) tons per year or greater shall meet the lowest achievable emission rate (LAER) for that type of source as determined by the director at the time of the permit application. The term "lowest achievable emission rate" means, for, any source, that rate of emissions which reflects: (i) The most stringent emission limitation which is achieved in practice by such class or category of source. (ii) In no event shall a new or modified source emit any pollutant in excess of the amount allowable under applicable rules of Rule 15. 4. A major source shall also show that it will not interfere with reasonable further progress in attaining the ambient air quality standards by one (1) of the following methods: (i) Banked credits. (A) By agreeing to control the nonattainment emissions to a rate lower than the nonattainment emissions specified as reasonable available control technology (RACT) by the director, the owner or operator of an air contaminant source has reserved the right to utilize the incremental reduction between RACT and the banked credit agreed rate (BCAR) to provide for future growth in the nonattainment area. (B) The banked credit agreed rate is an emission rate more restrictive than RACT which is mutually agreed to by the director and an air contaminant source for the purpose of establishing a banked credit. This emission level is in no way related to BACT or LAER. Only sources in existence at the time of a nonattainment state implementation plan (SIP) revision for an area are eligible to establish a banked credit agreed rate. (C) The following limitations shall apply to the issuance of a permit for construction or modification for sources using banked credit agreed rate. All banked credits in a given nonattainment area shall become void upon official reclassification of that area as an attainment area. An increase in pounds per hour shall be offset by a banked credit of that amount. The banked credit account will be reduced by that amount. An air quality modeling review shall show that the banked credit used and the new and/or modified source result in predicted cleaner air for the nonattainment area than air quality at the RACT emission level. No predicted new violations of the ambient air quality standards will be permitted. A banked credit shall not be used until the banked credit agreed rate level of control is attained by the source involved and demonstrated through another method acceptable to the director. The banked credit agreed rate shall be contained in the state implementation plan as the legally enforceable standard for the air contaminant source. If the source electing to use banked credits must reduce emissions to achieve the banked credit agreed rate level approved by the board, a compliance schedule shall be included in the state implementation plan revision. (ii) Emission offsets. (A) For major sources, a larger than one (1) to one (1) offset of emissions of the nonattainment pollutant, based on both allowable and actual emissions shall be employed. This offset must result in a net improvement in predicted air quality for the pollutant in the area under the influence of emissions from the new or modified major sources and that reasonable further progress shall not be hindered. (B) All or any portions of the offsets shall be accomplished on or before the time of new source operation and demonstrated through a source test or through another method acceptable to the director. (C) The reductions shall come from sources in the emission inventory used in the approved control strategy for the nonattainment area state implementation plan revision. (D) The amount of the proposed reduction shall be sufficient to offset both the emission increases directly associated with the proposed source construction and/or modification and those emissions attributed to permitted minor sources that have come into the area since the last reasonable further progress milestone was met. (iii) Construction or modification of major sources that have no emission offsets or banked credit. The director shall issue a construction permit to proposed new or modified sources provided the sources' emissions will not prevent reasonable further progress in the nonattainment area or will not prevent the ambient air quality standards being met. Completed applications from sources qualifying for this provision will be processed based on the date of receipt of the application by the director. (iv) Combination of the provisions of subparts (i), (ii) and (iii) of this part. 5. Prior to the issuance of a permit to a major volatile organic compound (VOC) source in Hamilton, an analysis of alternate sites, sizes, production process and environmental control techniques for the proposed source shall be made. A permit shall only be issued if the benefits of the proposed source significantly outweigh the environmental and social costs imposed on the public as a result of the source's location, construction or modification in this county. The director shall require the submittal of such information as he deems necessary for this analysis. 6. A source is identified as a major source for each pollutant as indicated below: A major source for volatile organic compounds is a source with potential emissions of more than one hundred (100) tons per year and allowable emissions (based on BACT) greater than any of the following: fifty (50) tons per year; one thousand (1,000) pounds per day; or one hundred (100) pounds per hour. Piecemeal construction is cumulative. When an air contaminant source's new and/or modified allowable emissions equals or exceeds the above levels, it becomes a major source. "Potential emissions" as used above means the capability at maximum capacity to emit a pollutant in the absence of air pollution control equipment. Air pollution control equipment includes control equipment which is not, aside from air pollution control laws and regulations, vital to production of the normal product of the source or to its normal operation. Annual potential shall be based on the maximum annual rated capacity of the source, unless the source is subject to enforceable permit conditions which limit the annual hours of operation. Enforceable permit conditions on the type or amount of materials combusted or processed may be used in determining the potential emission rate of a source. 7. The director shall not issue a permit to any major source in or significantly impacting a nonattainment area unless all other sources owned or operated by the applicant anywhere in the state are in compliance or on an approved compliance schedule. (3) If new or modified sources at a facility occurring since February 16, 1979, or since the time of the last construction approval issued requiring LAER under this rule total to more than one hundred (100) tons per year potential emissions, all the new and modified sources during the period shall utilize LAER. The stage of construction and the ability of the source to install additional control equipment shall be considered in determining LAER. (4) No emissions credit may be allowed for replacing one (1) volatile organic compound (VOC) with another of lesser reactivity. Rule 25.4. Alternate emission limitation. (1) Plants with process emission sources regulated by this Rule 25 with a certificate of alternate control shall not emit volatile organic compounds in excess of the limits on such certificate. This limitation is in lieu of the emission limitation contained in other rules of this chapter. Only sources with an emission limitation in Rule 25 are eligible for inclusion in the certificate. (2) The owner or operator of any plant having process emission sources regulated by Rule 25 can apply to the director for a certificate of alternate control for a plant and the director may grant the request if the following conditions are met: a. The plant is reducing, or will be after a specified date taking actions to reduce, emissions of volatile organic compounds at least as much as is required under the other rules in this Rule 25, even though specific process emission sources in the plant may not be meeting the limitations specified in the other rules of this Rule 25. b. If a specified future date for compliance is involved, this date must be as expeditious as is practicable and be specified in a schedule of compliance as a condition on the certificate. This schedule must conform with the requirements of paragraphs (c) and (d) of Rule 25.42 for individual compliance schedules. c. There must be reasonable means for the director or his representatives to determine that this alternative emission control method is being implemented and complied with. d. A fee of two hundred fifty dollars ($250.00) has been paid to the bureau at the time application is made to cover the cost of review of the request for the certificate of alternate control. e. All process emission sources commenced on or after the effective date of a rule or rules in Rules 15 and 18.2 of this section, and the requirements of section 4-8(f) limiting emissions of volatile organic compounds are meeting the limits specified in those rules. f. No credit can be given for reduction of emissions in determining if the requirements of subparagraph a. of this paragraph are met if another rule would require that reduction anyway. (3) Alternate emission control limitations approved under this section must be subjected to a public hearing and incorporated as a revision to the state implementation plan. The owner or operator requesting this alternate emission control limitation shall be responsible for all costs associated with publishing the required legal notices. (4) The owner or operator of the plant must: a. File or post on the operating premises the certificate of alternate control; b. Keep all pollution control equipment in good operating condition and utilize such equipment at all times; c. Meet other conditions specified in accordance with Rule 25.4(8). (5) The certificate of alternate control may be revoked by the board if it is found that any of the requirements of this section have been violated or the board may enforce this section by seeking any other remedy available under this chapter or at law. (6) The certificate of alternate control does not relieve the owner or operator of the duty to meet all emission requirements in other rules for process emission sources commenced after the effective date of the rule. (7) Upon revocation of the certificate of alternate control, the process emission sources at the plant must comply with all other rules in this chapter that would have been applicable had the certificate not been issued. The board may specify a time period for the source to come into compliance with the more restrictive emission limitations. (8) The certificate of alternate control may specify alternate test methods to determine compliance or different averaging times (so long as this time does not exceed eight (8) hours) or may contain other conditions appropriate to insure compliance with the alternate control method and the meeting of compliance on the date specified in accordance with subparagraph (2)b. of this rule. The certificate must contain, as conditions, specific standards for each emission source involved. Rule 25.5. (Reserved) Rule 25.6. (Reserved) Rule 25.7. Petroleum liquid storage. (1) For the purpose of this Rule 25.7, the following definitions apply: a. Condensate means hydrocarbon liquid separated from natural gas which condenses due to changes in the temperature and/or pressure and remains liquid at standard conditions. b. Crude oil means a naturally occurring mixture which consists of hydrocarbons and/or sulfur, nitrogen and/or oxygen derivatives of hydrocarbons and which is a liquid at standard conditions. c. Custody transfer means the transfer of produced crude oil and/or condensate, after processing and/or treating in the producing operations, from storage tanks or automatic facilities to pipelines or any other forms of transportation. d. External floating roof means a storage vessel cover in an open top tank consisting of a double deck or pontoon single deck which rests upon and is supported by the petroleum liquid being contained and is equipped with a closure seal or seals to close the space between the roof edge and tank shell. e. Internal floating roof means a cover or roof in a fixed roof tank which rests upon or is floated upon the petroleum liquid being contained and is equipped with a closure seal or seals to close the space between the roof edge and tank shell. f. Petroleum refinery means any facility engaged in producing gasoline, kerosene, distillate fuel oils, residual fuel oils, lubricants or other products through distillation of crude oils, or through redistillation, cracking, extraction or reforming of unfinished petroleum derivatives. (2) This Rule 25.7 will apply to all fixed roof storage vessels with capacities greater than forty-two thousand (42,000) gallons containing volatile petroleum liquids whose true vapor pressure is greater than ten and one-half (10.5) kPa (one and fifty-two-hundredths (1.52) psia). (3) This Rule 25.7 will not apply to volatile petroleum liquid storage vessels: a. Equipped with floating roofs before January 1, 1979; or b. Having capacities less than four hundred twenty thousand (420,000) gallons used to store produced crude oil and condensate prior to lease custody transfer. (4) Except as provided under paragraph (3) of this rule, no owner or operator of an affected source under paragraph (2) of this Rule 25.7 shall permit the use of such source except as provided in Rule 25.41 unless: a. The source has been retrofitted with an internal floating roof equipped with a closure seal or seals to close the space between the roof edge and tank wall; b. The source has been retrofitted with equally effective alternative control, approved by the director; c. The source is maintained such that there are no visible holes, tears or other openings in the seal or any seal fabric or materials; d. All openings, except stub drains are equipped with covers, lids or seals such that: 1. The cover, lid or seal is in the closed position at all times except when in actual use; 2. Automatic bleeder vents are closed at all times except when the roof is floated off or landed on the roof leg supposes; and 3. Rim vents, if provided, are set to open when the roof is being floated off the roof leg supports or at the manufacturer's recommended setting; e. Routine inspections are conducted through roof hatches once per month; f. A complete inspection of cover and seal is conducted as specified by the director; and g. Records are maintained as specified by the director. Rule 25.8. Bulk gasoline plants. (1) For the purpose of this Rule 25.8, the following definitions apply: a. Bottom filling means the filling of a tank truck through an opening or nozzle located either flush with or near the bottom of the tank compartment or the filling of a stationary storage tank through a shell nozzle located in conformance with "API Standard 650 Welded Steel Tanks for Oil Storage; Section 3.6.3, Shell Nozzles" or the equivalent as approved by the director. b. Bulk gasoline plant means a gasoline storage and distribution facility with an annual average daily throughout of less than seventy-six thousand (76,000) liters (twenty thousand (20,000) gallons) which receives gasoline from bulk terminals by trailer transport, stores it in tanks, and subsequently dispenses it via account trucks to local farms, businesses and service stations. c. Gasoline means any petroleum distillate having a Reid vapor pressure of twenty-seven and six-tenths (27.6) kPa (four (4) psia) or greater. d. Splash filling means the filling of a tank truck or stationary storage tank through a pipe or hose whose discharge opening is above the surface level of the liquid in the tank being filled. e. Submerged filling means the following for the specified sources: 1. Tank trucks. Filling with a drop tube which extends within six (6) inches of the bottom of the compartment. 2. Terminal or bulk plant storage tanks. Filling through an outlet located in accordance with "API Standard 650 Welded Steel Tanks for Oil Storage; Section 3.6.3 Shell Nozzles" or the equivalent as approved by the director. f. Vapor balance systems means a combination of pipes or hoses which create a closed system between the vapor spaces of an unloading tank and a receiving tank such that vapors displaced from the receiving tank are transferred to the tank being unloaded. (2) This Rule 25.8 will apply, in accordance with Rule 25.41, to the unloading, loading and storage facilities of all bulk gasoline plants and all tank trucks or trailers delivering or receiving gasoline at bulk gasoline plants. (3) This Rule 25.8 will not apply to: a. Stationary storage tanks of less than two thousand (2,000) gallons capacity; or b. Bulk plants in the county with less than four thousand (4,000) gallons per day annual average throughout, provided records of throughput are maintained and reported to the director as specified by the director. (4) Except as provided under paragraph (3) of this Rule 25.8, no owner or operator of a bulk gasoline plant (tank truck or trailer) shall load gasoline into a stationary storage tank from a tank truck, trailer or other stationary storage tank unless each tank and truck or trailer is equipped with a vapor balance system as described under paragraph (7) of this rule. (5) Except as provided under paragraph (3) of this Rule 25.8, no owner or operator of a bulk gasoline plant, tank truck or trailer shall unload gasoline from a stationary tank into a tank truck or trailer unless a bottom filling or submerged filling system or its equivalent is installed at the bulk plant. (6) No owner, or operator of a bulk gasoline plant, tank truck or trailer shall permit the transfer of gasoline between a tank truck or trailer and a stationary storage tank unless the equipment required in paragraph (4) and (5) is installed and properly operated to minimize the loss of VOC emissions. (7) Vapor balance systems required under paragraph (4) of this Rule 25.8 shall consist of the following major components: a. A vapor space connection on the stationary storage tank equipped with fittings which are vapor tight and will eliminate back flow so as to prevent release of organic material; b. A connecting pipe or hose equipped with fittings which are vapor tight and will automatically and immediately close upon disconnection so as to prevent release of organic material; and c. A vapor space connection on the tank truck or trailer equipped with fittings which are vapor tight and must be closed prior to disconnection so as to prevent release of organic material. (8) No owner or operator of a bulk gasoline plant may permit gasoline to be stored in open containers or handled in any other manner that would result in evaporation. Rule 25.9. Bulk gasoline terminals. (1) For the purpose of this Rule 25.9, the following definitions apply: a. Bulk gasoline terminal means a gasoline storage facility which receives gasoline from refineries primarily by pipeline, ship or barge and delivers gasoline to bulk gasoline plants or to commercial or retail accounts primarily by tank truck, and has an annual average daily throughput of more than seventy-six thousand (76,000) liters (twenty thousand (20,000) gallons) of gasoline. b. Gasoline means a petroleum distillate having a Reid vapor pressure of 27.6 kPa (4 psia) or greater. (2) This Rule 25.9 will apply, in accordance with Rule 25.41, to bulk gasoline terminals and the appurtenant equipment necessary to load the tank truck or trailer compartments. (3) No person may load gasoline into any tank trucks or trailers from any bulk gasoline terminals unless: a. The bulk gasoline terminal is equipped with a vapor control system capable of complying with paragraph (4) of this rule properly installed, in good working order, in operation and consisting of one (1) of the following: 1. An absorber or condensation system which processes and recovers vapors and gases from the equipment being controlled; 2. A vapor collection system which directs all vapors to a fuel gas system; 3. A control system, demonstrated to have control efficiency equivalent to or greater than parts (3)a. 1. or (3)a. 2. of this section and approved by the director; and b. All displaced vapors and gases are vented only to the vapor control system; c. Loading devices must not leak when in use and should be designed and operated to allow no more than ten (10) cubic centimeters drainage per disconnect on the basis of five (5) consecutive disconnects; and d. All loading and vapor lines are equipped with fittings which are vapor-tight. (4) Sources affected under subparagraph (3)a. may not allow mass emissions of volatile organic compounds from control equipment to exceed eighty (80) milligrams per liter (four and seven-tenths (4.7) grains per gallon) of gasoline loaded. (5) Sources affected under paragraph (2) may not: a. Allow gasoline to be discarded in sewers or stored in open containers or handled in any manner that would result in evaporation; or b. Allow the pressure in the vapor-collection system to exceed the tank truck or trailer pressure relief settings. Rule 25.10. Gasoline dispensing facilities — stage I vapor recovery. (1) For the purpose of this rule, the following definitions will apply: a. Coaxial system means the delivery of the product to the stationary storage tank and the recovery of vapors from the stationary storage tanks occurs through a single coaxial fill tube, which is a tube within a tube. Produce is delivered through the inner tube and vapor is recovered through the annular space between the walls of the inner tube and outer tube. b. Delivery vessel means tank trucks or trailers equipped with a storage tank and used for the transport of gasoline from sources of supply to stationary storage tanks of gasoline dispensing facilities. c. Dual point system means the delivery of the product to the stationary storage tank and the recovery of vapors from the stationary storage tank occurs through two (2) separate openings in the storage tank and two (2) separate hoses between the tank truck and the stationary storage tank. d. Gasoline means any petroleum distillate having a Reid vapor pressure of four (4.0) psia or greater. e. Gasoline dispensing facility means any site where gasoline is dispensed to motor vehicle gasoline tanks from stationary storage tanks. f. Gasoline service station means any gasoline dispensing facility where gasoline is sold to the motoring public from stationary storage tanks. g. Line means any pipe suitable for transferring gasoline. h. Operator means any person who leases, operates, controls or supervises a facility at which gasoline is dispensed. i. Owner means any person who has legal or equitable title to the gasoline storage tank at a facility. j. Poppeted vapor recovery adaptor means a vapor recovery adaptor that automatically and immediately closes itself when the vapor return line is disconnected and maintains a tight seal when the vapor return line is not connected. k. Stationary storage tank means a gasoline storage container that is a permanent fixture. l. Submerged fill pipe means any fill pipe with a discharge opening which is entirely submerged when the pipe normally used to withdraw liquid from the tank can no longer withdraw any liquid, or which is entirely submerged when the level of liquid is: 1. Six (6) inches above the bottom of the tank if the tank does not have a vapor recovery adaptor; or 2. Twelve (12) inches above the bottom of the tank if the tank has a vapor recovery adaptor. If the opening of the submerged fill pipe is cut at a slant, the distance is measured from the top of the slanted cut to the bottom of the tank. m. Throughput means the amount of gasoline dispenses at a facility. (2) Applicability. This rule applies to all gasoline dispensing facilities and gasoline service stations and to delivery vessels delivering gasoline to a gasoline dispensing facility or gasoline service station; and this rule applies to all persons owning, occupying, operating or using a gasoline distribution facility or gasoline service station. (3) Exemptions. This rule does not apply to: a. Transfers made to storage tanks at gasoline dispensing facilities or gasoline service stations equipped with floating roofs or their equivalent; b. Stationary tanks with a capacity of not more than two thousand (2,000) gallons which were in place before July 1, 1979, if the tanks are equipped with a permanent or portable submerged fill pipe; c. Stationary storage tanks with a capacity of not more than five hundred fifty (550) gallons which were installed after June 30, 1979, if the tanks are equipped with a permanent or portable submerged fill pipe; d. Stationary storage tanks at a gasoline dispensing facility or gasoline service station where the combined annual throughput of gasoline at the facility or station does not exceed fifty thousand (50,000) gallons, if the tanks are equipped with a permanent submerged fill pipe; and e. Any tanks used exclusively to test fuel dispensing meters. (4) No person may cause, suffer, allow or permit the transfer of gasoline from any delivery vessel into any stationary storage tank unless they comply with the following: a. The stationary storage tank is equipped with a submerged fill pipe and the vapors displaced from the tank during filing are controlled by a vapor control system as described in Paragraph (8) of this rule; b. The vapor control system is in good working order and is connected and operating with a vapor tight connection; c. The vapor control system is properly maintained and any damaged or malfunctioning components or elements of design have been repaired, replaced or modified; d. Gauges, meters or other specified testing devices are maintained in proper working order; e. All loading lines and vapor lines of delivery vessels and vapor collection systems are equipped with fittings which are leak tight and vapor tight; and f. All hatches on the delivery vessel are kept closed and securely fastened. (5) The following records shall be maintained for not less than two (2) years and the same shall be made available for inspection and copy by representative or designees of the Bureau: a. The scheduled date for maintenance or the date that a malfunction was detected; b. The date the maintenance was performed or the malfunction corrected; and c. The date the component or element of design of the control system was repaired, replaced or modified. (6) The premises of any gasoline dispensing facility or gasoline service station shall be available for inspection by representatives or designees of the Bureau at any time the facility or station is in operation. (7) The process of transfer of gasoline from any delivery vessel into any stationary storage tank shall be subject to observation and inspection or investigation by representatives or designees of the Bureau. (8) The vapor control system required by Paragraph (4) of this rule shall include one (1) or more of the following: a. A vapor-tight line from the stationary storage tank to the delivery vessel and; 1. For a coaxial vapor recovery system, either a poppeted or unpoppeted vapor recovery adaptor; or 2. For a dual point vapor recovery system, a poppeted vapor recovery adaptor; or b. A refrigeration-condensation system or equivalent designed to recover at least ninety (90) percent by weight of the organic compounds in the displaced vapor. (9) If an unpoppeted vapor recovery adaptor is used pursuant to Part (8)a.1 of this rule, the tank liquid fill connection shall remain covered either with a vapor-tight cap or a vapor return line except when the vapor return line is being connected or disconnected. (10) If an unpoppeted vapor recovery adaptor is used pursuant to Part (8)a.1 of this rule, the unpoppeted vapor recovery adaptor shall be replaced with a poppeted vapor recovery adaptor when the tank is replaced or upgraded. (11) Where vapor lines from the storage tanks are manifolded, poppeted vapor recovery adaptors shall be used. No more than one (1) tank is to be loaded at a time if the manifold vapor lines have a nominal pipe size of less than three (3) inches. If the manifold vapor lines have a nominal pipe size of three (3) inches or larger, then two (2) tanks at a time may be loaded. (12) Vent lines on stationary storage tanks shall have pressure release valves or restrictors. (13) The vapor-laden delivery vessel: a. Shall be designed and maintained to be vapor-tight during loading and unloading operations and during transport with the exception of normal pressure/vacuum venting as required by regulations of the Department of Transportation; and b. If it is refilled in Hamilton County, Tennessee, shall be refilled only at: 1. Bulk gasoline plants complying with Rule 25.8 of this section; and 2. Bulk gasoline terminals complying with Rule 25.9 of this section. (14) It shall be the responsibility of owners, occupiers and operators of gasoline dispensing facilities and gasoline service stations to assure compliance with this rule and to disallow the transfer from any delivery vessel that does not comply with those requirements of this rule applicable to delivery vessels. It shall be the responsibility of owners, operators and drivers of delivery vessels to assure compliance with this rule and to refuse to transfer from any delivery vessel that does not comply with those requirements of this rule applicable to delivery vessels. Rule 25.11. (Reserved) Rule 25.12. Can coating. (1) For the purpose of this Rule 25.12, the following definitions apply: a. End sealing compound means a synthetic rubber compound which is coated onto can ends and which functions as a gasket when the end is assembled on the can. b. Exterior base coating means a coating applied to the exterior of a can to provide exterior protection to the metal and to provide background for the lithographic or printing operation. c. Interior base coating means a coating applied by roller coating or spray to the interior of a can to provide a protective lining between the can metal and product. d. Interior body spray means a coating sprayed on the interior of the can body to provide a protective film between the product and the can. e. Overvarnish means a coating applied directly over the ink to reduce the coefficient of friction, to provide gloss and to protect the finish against abrasion and corrosion. f. Three-piece can side-seam spray means a coating sprayed on the exterior and interior of a welded, cemented or soldered seam to protect the exposed metal. g. Two-piece can exterior end coating means a coating applied by roller coating or spraying to the exterior end of a can to provide protection to the metal. (2) This Rule 25.12 will apply, in accordance with Rule 25.18(3) to coating applicators and ovens of sheet, can or end coating lines involved in sheet basecoat (exterior and interior) and overvarnish; two-piece can exterior (basecoat) and overvarnish; two and three-piece can interior body spray; two-piece can exterior end (spray or roll coat); three-piece can side-seam spray and end sealing compound operations. (3) No owner or operator of a can coating line subject to this Rule 25.12 may cause, allow or permit the discharge into the atmosphere of any volatile organic compounds, except as provided in Rule 25.41, in excess of: a. Thirty-four hundredths (0.34) kilograms per liter of coating (two and eight-tenths (2.8) pounds per gallon), excluding water, delivered to the coating applicator from sheet basecoat (exterior and interior) and overvarnish or two-piece can exterior (basecoat and overvarnish) operations. b. Fifty-one hundredths (0.51) kilograms per liter of coating (four and two-tenths (4.2) pounds per gallon), excluding water, delivered to the coating applicator from two- and three-piece can interior body spray and two-piece can exterior end (spray or roll coat) operations. c. Sixty-six hundredths (0.66) kilograms per liter of coating (five and five-tenths (5.5) pounds per gallon), excluding water, delivered to the coating applicator from three-piece can side-seam spray operations. d. Forty-four hundredths (0.44) kilograms per liter of coating (three and seven-tenths (3.7) pounds per gallon), excluding water, delivered to the coating applicator from end sealing compound operations. (4) This Rule 25.12 will apply to facilities having potential VOC emissions from can coating of twenty-five (25) tons per year or greater. Rule 25.13. Coil coating. (1) For the purpose of this Rule 25.13, the following definitions apply: a. Coil coating means the coating of any flat metal sheet or strip that comes in rolls or coils. b. Quench area means a chamber where the hot metal exiting the oven is cooled by either a spray of water or a blast of air followed by water cooling. (2) This Rule 25.13 will apply, in accordance with Rule 25.13(3), to the coating applicators, ovens and quench areas of coil coating lines involved in prime and top coat or single coat operations. (3) No owner or operator of a coil coating line subject to this Rule 25.13 may cause, allow or permit the discharge into the atmosphere of any volatile organic compounds in excess of thirty-one hundredths (0.31) kilograms per liter of coating (two and six-tenths (2.6) pounds per gallon excluding water, delivered to the coating applicator from prime and topcoat or single coat operations except as provided in Rule 25.41. (4) This Rule 25.13 will apply to facilities having potential VOC emissions from can coating of twenty-five (25) tons per year or greater. Rule 25.14. Fabric and vinyl coatings. (1) For the purpose of this Rule 25.14, the following definitions apply: a. Fabric coating means the coating of a textile substrate with a knife, roll or rotogravure coater to impart properties that are not initially present, such as strength, stability, water or acid repellancy, or appearance. b. Vinyl coating means applying a decorative or protective topcoat, or printing on vinyl-coated fabric or vinyl sheets. (2) This Rule 25.14 will apply, in accordance with Rule 25.14(3), to roll, knife or rotogravure coaters and drying ovens of fabric and vinyl coating lines. (3) No owner or operator of a fabric coating line or a vinyl coating line subject to this Rule 25.14 may cause, allow or permit the discharge into the atmosphere of any volatile organic compounds except as provided in Rule 25.14 in excess of: a. Thirty-five hundredths (0.35) kilograms per liter of coating (two and nine-tenths (2.9) pounds per gallon), excluding water, delivered to the coating applicator from a fabric coating line. b. Forty-five hundredths (0.45) kilograms per liter of coating (three and eight-tenths (3.8) pounds per gallon, excluding water, delivered to the coating applicator from a vinyl coating line. (4) This Rule 25.14 will apply to facilities having potential VOC emissions from fabric and vinyl coating of twenty-five (25) tons per year or greater. Rule 25.15. Metal furniture coating. (1) For the purpose of this Rule 25.15, the following definitions apply: a. Application area means the area where the coating is applied by spraying, dipping or flowcoating techniques. b. Metal furniture coating means the surface coating of any furniture made of metal or any metal part which will be assembled with other metal, wood, fabric, plastic or glass parts to form a furniture piece. (2) This Rule 25.15 will apply, in accordance with Rule 25.15(3), to the application areas, flashoff areas and ovens of metal furniture coating lines involved in prime and topcoat or single coating operations. (3) No owner or operator of a metal furniture coating line subject to this Rule 25.15 may cause, allow or permit the discharge into the atmosphere of any volatile organic compounds in excess of thirty-six hundredths (0.36) kilograms per liter of coating (three (33) pounds per gallon excluding, water, delivered to the coating applicator from prime and topcoat or single coat operations except as provided in Rule 25.41. (4) This Rule 25.15 will apply to facilities having the potential VOC emissions from metal furniture coating of twenty-five (25) tons per year or greater. (5) This Rule 25.15 shall not apply to the use of quick-drying lacquers for repair of scratches and nicks that occur during assembly. Rule 25.16. Surface coating of large appliances. (1) For the purpose of this Rule 25.16, the following definitions apply: a. Application area means the area where the coating is applied by spraying, dipping or flowcoating techniques. b. Single coat means a single film of coating applied directly to the metal substrate, omitting the primer application. c. Large appliances means doors, cases, lids, panels and interior support parts of residential and commercial washers, dryers, ranges, refrigerators, freezers, water heaters, dishwashers, trash compactors, air conditioners and other similar products. (2) This Rule 25.16 will not apply to the use of quick-drying lacquers for repair of scratches and nicks that occur during assembly. (3) This Rule 25.16 will apply, in accordance with Rule 25.16(4), to the application areas, flashoff areas and ovens of large appliance coating lines involved in prime, single or topcoat coating operations. (4) No owner or operator of a large appliance coating line subject to this Rule 25.16 may cause, allow or permit the discharge into the atmosphere of any volatile organic compounds in excess of thirty-four hundredths (0.34) kilograms per liter of coating (two and eight-tenths (2.8) pounds per gallon), excluding water, delivered to the coating applicator from prime, single or topcoat coating operations except as provided in Rule 25.41. (5) This Rule 25.16 will apply to facilities having potential VOC emissions from surface coating of large appliances of twenty-five (25) tons per year or greater. Rule 25.17. Magnet wire coating. (1) For the purpose of this Rule 25.17, the following definition applies: Magnet wire coating means the process of applying a coating of electrically insulating varnish or enamel to aluminum or copper wire for use in electrical machinery. (2) No owner or operator of a magnet wire coating oven subject to this Rule 25.17 may cause, allow or permit the discharge into the atmosphere of any volatile organic compounds in excess of twenty hundredths (0.20) kilograms per liter of coating (one and seven-tenths (1.7) pounds per gallon), excluding water, delivered to the coating applicator from magnet wire coating operations except as provided in Rule 25.41. (3) This Rule 25.17 will apply to facilities having potential VOC emissions from magnet wire coating of twenty-five (25) tons per year or greater. Rule 25.18. Solvent metal cleaning. (1) For the purpose of this Rule 25.18, the following definitions apply: a. Cold cleaning means the batch process of cleaning and removing greasy soils from metal surfaces by spraying, brushing, flushing or immersion while maintaining the solvent below its boiling point. Wipe cleaning is not included in this definition. b. Conveyorized degreasing means the continuous process of cleaning and removing greasy soils from metal surfaces by operating with either cold or vaporized solvents. c. Freeboard height means the distance from the top of the vapor zone to the top of the degreaser tank for vapor degreasers and from the liquid surface to the top of degreaser toner for cold cleaners. d. Freeboard ratio means the freeboard height divided by the width of the degreaser. e. Open top vapor degreasing means the batch process of cleaning and removing greasy soils from metal surfaces in an open top tank by condensing hot solvent vapor on the colder metal parts. f. Solvent metal cleaning means the process of cleaning greasy soils from metal surfaces by cold cleaning or open top vapor degreasing or conveyorized degreasing. (2) The provisions of this Rule 25.18 shall apply, in accordance with Rule 25.41, with the following exceptions: a. Open top vapor degreasers with an open area smaller than one (1) square meter (ten and eight-tenths (10.8) square feet) shall be exempt from parts (5)c.2. and (5)c.4. of this rule; b. Conveyorized degreasers with an air/vapor interface smaller than two (2.0) square meters (twenty-one and six-tenths (21.6) square feet) shall be exempt from subparagraph (6)b. of this rule. (3) This Rule 25.18 will apply to facilities having potential VOC emissions from solvent metal cleaning of twenty-five (25) tons per year or greater. (4) Except as provided under paragraphs (2) and (3) of this rule, the owner or operator of a cold cleaning facility shall: a. Equip the cleaner with a cover; b. Equip the cleaner with a facility for draining cleaned parts; c. Provide a permanent, conspicuous label, summarizing the operating requirements; d. Store waste solvent only in covered containers and not dispose of waste solvent or transfer it to another party such that greater than twenty percent (20%) of the waste solvent (by weight) can evaporate into the atmosphere; e. Close the cover whenever parts are not being handled in the cleaner; f. Drain the cleaned parts for at least fifteen (15) seconds or until dripping ceases; and g. If used, supply a solvent spray that is a solid fluid stream (not a fine, atomized or shower-type spray) at a pressure which does not cause excessive splashing. (5) Except as provided under paragraph (2) of this Rule 25.18, the owner or operator of an open top vapor degreaser shall: a. Equip the vapor degreaser with a cover that can be opened and closed easily without disturbing the vapor zone; b. Keep the cover closed at all times except when processing work loads through the degreaser; c. Minimum solvent carryout by: 1. Racking parts to allow complete drainage; 2. Moving parts in and out of the degreaser at less than three and three-tenths (3.3) meters per minute (eleven (11) feet per minute); 3. Holding the parts in the vapor zone at least thirty (30) seconds or until condensation ceases; 4. Tipping out any pools of solvent on the cleaned parts before removal from the vapor zone; 5. Allowing parts to dry within the degreaser for at least fifteen (15) seconds or until visually dry; d. Not degrease porous or absorbed materials such as cloth, leather, wood or rope: e. Not occupy more than half of the degreaser's open top area with a workload; f. Not load the degreaser to the point where the vapor level would drop more than ten (10) centimeters (four (4) inches) when the workload enters the vapor zone; g. Always spray below the vapor level; h. Repair solvent leaks immediately or shut down the degreaser; i. Store waste solvent only in covered containers and not dispose of waste solvent or transfer it to another party such that greater than twenty percent (20%) of the waste solvent (by weight) can evaporate into the atmosphere; j. Not operate the cleaner so as to allow water to be visually detectable in solvent exiting the water separator; k. Not use ventilation fans near the degreaser opening, nor provide exhaust ventilation exceeding twenty (20) cubic meters per minute per square meter (sixty-five (65) cubic feet per minute per square foot) of degreaser open area, unless necessary to meet OSHA requirements; and l. Provide a permanent, conspicuous label summarizing the operating procedures of subparagraphs (5)b. through (5)j. of this rule. (6) Except as provided under paragraph (3) of this Rule 25.18, the owner or operator of a conveyorized degreaser shall: a. Not use workplace fans near the degreaser opening, nor provide exhaust ventilation exceeding twenty (20) cubic meters per minute per square meter (sixty-five (65) cubic feet per minute per square foot of degreaser opening, unless necessary to meet OSHA requirements; b. Equip the cleaner with equipment such as drying tunnel or rotating (tumbling) basket sufficient to prevent cleaned parts from carrying out solvent liquid or vapor; c. Minimize openings during operation so that entrances and exits will silhouette workloads with an average clearance between the largest parts and the edge of the degreaser opening of less than ten (10) centimeters (four (4) inches) or less than ten percent (10%) of the width of the opening; d. Provide downtime covers for closing off the entrance and exit during shutdown hours; e. Minimize carryout emissions by: 1. Racking parts for best drainage; and 2. Maintaining the vertical conveyor speed at less than three and three-tenths (3.3) meters per minute (eleven (11) feet per minute); f. Store waste solvent only in covered containers and not dispose of waste solvent or transfer it to another party such that greater than twenty percent (20%) of the waste solvent (by weight) can evaporate into the atmosphere; g. Repair solvent leaks immediately or shut down the degreaser; h. Not operate the cleaner so as to allow water to be visually detectable in solvent exiting the water separator; and i. Place downtime covers over entrances and exits of conveyorized degreasers immediately after the conveyors and exhausts are shut down and not remove them until just before startup. Rule 25.19. Cutback asphalt. (1) For the purpose of this Rule 25.19, the following definitions apply: a. Asphalt means a dark brown to black cementitious material (solid, semisolid or liquid consistency) in which the predominating constituents are bitumens which occur in nature as such or which are obtained as residue in refining petroleum. b. Cutback asphalt means asphalt cement which has been liquefied by blending with petroleum solvents (diluents). Upon exposure to atmospheric conditions the diluents evaporate, leaving the asphalt cement to perform its function. c. Penetrating prime coat means an application of low viscosity liquid asphalt to an absorbent surface. It is used to prepare an untreated base for an asphalt surface. The prime penetrates the base and plugs the voids, hardens the top, and helps bind it to the overlying asphalt course. It also reduces the necessity of maintaining an untreated based course prior to placing the asphalt pavement. (2) No person may cause, allow or permit the use or application of cutback asphalts for paving purposes in urban counties except for: a. Long-term stockpile storage; b. Application when the ambient temperature is less than fifty degrees (50°) Fahrenheit within four (4) hours after the time of application; c. Use as a penetrating prime coat; or d. Use for base stabilization. Rule 25.20. Reserved. Rule 25.21. Surface coating of miscellaneous metal parts and products. (1) For the purpose of this rule, the following definitions apply: a. Air dried coating is a coating which is dried by the use of air or forced warm air at temperatures up to ninety degrees (90°) Celsius (one hundred ninety-four degrees (194°) Fahrenheit); b. Clear coating is a coating which lacks color and opacity or is transparent and uses the undercoat as a reflectant base or undertone color; c. Extreme performance coating is a coating designed for extreme environmental conditions; d. Extreme environmental conditions is exposure to outdoor conditions most of the time, temperatures consistently above ninety-five degrees (95°) Celsius, detergents, abrasive and scouring agents, solvents, corrosive atmospheres or similar environmental conditions; e. Coating operation includes all equipment which applies, conveys and dries a surface coating, including, but not limited to, spray booths, flow coaters, flashoff areas, air dryers and ovens; f. Top coating includes all coatings other than prime coatings. (2) No owner or operator of a coating operation subject to this rule may cause, suffer, allow or permit the discharge into the atmosphere of any volatile organic compounds from that operation in excess of the following, except as provided for in Rule 25.4 or 25.42 or paragraph (7) of this rule: a. Fifty-two-hundredths (0.52) kg/l (four and three-tenths (4.3) lb/gal) of coating, excluding water, delivered to a coating applicator in a clear coating operation; b. Forty-three-hundredths (0.43) kg/l (Three and one-half (3.5) lb/gal) of coating, excluding water, delivered to a coating applicator in an air dried coating operation; c. Forty-three-hundredths (0.43) kg/l (Three and one-half (3.5) lb/gal) of coating, excluding water, delivered to a coating applicator in an extreme performance coating operation; or d. Thirty-six-hundredths (0.36) kg/l (three (3.0) lb/gal) of coating, excluding water, delivered to a coating applicator in all other coating operations. (3) If more than one (1) emission limitation in paragraph (2) applies to a specific coating operation, then the least stringent emission limitation shall be applied. (4) This rule applies to surface coating of the following miscellaneous metal parts and products: a. Large farm machinery (harvesting, fertilizing and planting machines, tractors, combines, etc.; b. Small farm machinery (lawn and garden tractors, lawn mowers, rototillers, etc.); c. Small appliances (fans, mixers, blenders, crock pots, dehumidifiers, vacuum cleaners, etc.); d. Commercial machinery (office equipment, computers and auxiliary equipment, typewriters, calculators, vending machines, etc.); e. Industrial machinery (pumps, compressors, conveyor components, fans, blowers, transformers, etc.); f. Fabricated metal products (metal covered doors, frames, etc.); g. Any other industrial category which coats metal parts or products under the Standard Industrial Classification Code of Major Group 33 (primary metal industries), Major Group 34 (fabricated metal products), Major Group 35 (non-electric machinery), Major Group 36 (electrical machinery), Major Group 37 (transportation equipment), Major Group 38 (miscellaneous instruments) and Major Group 39 (miscellaneous manufacturing industries). (5) This Rule 25.21 does not apply to the surface coating of the following metal parts and products: a. Automobile and light-duty truck manufacturing plants subject to Rule 25.5; b. Metal cans; c. Flat metal sheets and strips in the form of rolls or coils; d. Magnet wire for use in electrical machinery; e. Metal furniture; f. Large appliances; g. Exterior surface areas of airplanes; h. Automobile refinishing; i. Customized top coating of automobiles and truck, if production is less than thirty-five (35) vehicles per day; j. Exterior surfaces of marine vessels; and k. Storage vessels. (6) This rule applies to facilities having potential volatile organic compound emissions of twenty-five (25) or more tons per year from coating operations not otherwise exempt from this rule. (7) The owner or operator of a coating operation subject to this rule shall: a. Meet the applicable increments of progress in the following schedule: 1. Submit final plans for the emission control technique before April 1, 1983; 2. Award contracts or purchase orders before July 1, 1983; 3. Initiate on-site construction or installation before December 1, 1983; 4. Complete on-site construction or installation before December 1, 1984; 5. Achieve final compliance before December 31, 1984; b. Certify to the director within twenty (20) days after each deadline for each applicable increment of progress whether the required increment has been met. (8) Proof of compliance with the standards of this rule shall be provided by: a. Methods approved by the director and consistent with: 1. EPA Guideline Series document, "Measurement of Volatile Organic Compounds," EPA-450/2-78-0041; 2. Appendix A of "Control of Volatile Organic Emissions from Existing Stationary Sources-Volume II: Surface Coating of Cans, Coils, Paper, Fabrics, Automobiles, and Light-Duty Trucks," EPA-450/2-77-008; and 3. Rules 25.43, 25.44 and 25.45; b. Certification by the manufacturer of the composition of coatings, if supported by batch formulation records and approved by the director, may be accepted as the coatings analyses; c. Monitoring of process equipment and emission control equipment as required by the director to confirm continued compliance. Rules 25.22 through 25.26. Reserved. Rules 25.27. Manufacture of synthesized pharmaceutical products. (1) For the purpose of this rule, the following definitions apply: a. Synthesized pharmaceutical manufacturing is the manufacture of pharmaceutical products by chemical synthesis; b. Condenser is a device which cools a gas stream to a temperature which removes organic compounds by condensation: c. Control system is any number of control devices, including condensers, which are designed and operated to reduce the quantity of volatile organic compounds emitted to the atmosphere. d. Exhaust system is a device for collecting and directing out of the work area volatile organic compound fugitive emissions from the reactor openings, centrifuge openings, and other vessel openings for the purpose of protecting workers from excessive volatile organic compounds exposure; e. Reactor is a vat or vessel which may be jacketed to allow temperature control and is designed to contain chemical reactions. (2) No owner or operator of a synthesized pharmaceutical manufacturing facility subject to this rule may cause, suffer, allow or permit the discharge into the atmosphere of any volatile organic compounds from that facility, except as provided in Rule 25.4 or 25.42 or paragraph (4) of this rule, unless: a. From reactors, distillation operations, crystallizers, centrifuges and vacuum dryers that have the potential to emit 6.80 kg/day (15 lb/day) or more of volatile organic compounds, condensers or equivalent control systems shall be used, provided that: 1. If condensers are used, the condenser outlet gas temperature must not exceed: (i) Minus twenty-five degrees (-25°) Celsius when condensing volatile organic compounds of vapor pressure greater than forty (40.0) kPa (five and eight-tenths (5.8) psi) at twenty degrees (20°) Celsius; (ii) Minus fifteen degrees (-15°) Celsius when condensing volatile organic compounds of vapor pressure greater than twenty (20.0) kPa (two and nine-tenths (2.9) psi) at twenty degrees (20°) Celsius; (iii) Minus zero degrees (-0°) Celsius when condensing volatile organic compounds of vapor pressure greater than ten (10.0) kPa (one and one-half (1.5) psi) at twenty degrees (20°) Celsius; (iv) Ten degrees (10°) Celsius when condensing volatile organic compounds of vapor pressure greater than seven (7.0) kPa (one (1.0) psi) at twenty degrees (20°) Celsius; or (v) Twenty-five degrees (25°) Celsius when condensing volatile organic compounds of vapor pressure greater than three and one-half (3.50) kPa (one-half (0.5) psi) at twenty degrees (20°) Celsius; or 2. If equivalent control systems are used, the volatile organic compounds emissions must not be in excess of what would be emitted by using condensers which meet the requirements above. b. From all air dryers and production equipment exhaust systems: 1. Achieve at least ninety percent (90%) control efficiency if total facility uncontrolled emissions are one hundred fifty (150) kg/day (330 lb/day) or more; 2. Reduce emissions to fifteen (15.0) kg/day (thirty-three (33) lb/day) or less if total facility uncontrolled emissions are less than one hundred fifty (150) kg/day (330 lb/day); c. Provide a vapor balance system or equivalent control system with control efficiency of at least ninety percent (90%) for control of emissions from truck or railcar deliveries to storage tanks with capacities greater than seven thousand five hundred (7,500) liters (two thousand (2,000) gallons) that store volatile organic compounds with vapor pressures greater than twenty-eight (28.0) kPa (four and one-tenth (4.1) psi) at twenty degrees (20°) Celsius; d. Install pressure/vacuum conservation vents set at —+-0.2 kPa on all storage tanks that store volatile organic compounds with vapor pressures greater than ten (10.0) kPa (one and one-half (1.5) psi) at twenty degrees (20°) Celsius, unless a more effective control system is used; e. Enclose all centrifuges, rotary vacuum filters, and other filters having an exposed liquid surface, where the liquid contains volatile organic compounds and exerts a total volatile organic compounds vapor pressure of three and one-half (3.50) kPa (one-half (0.5) psi) or more at twenty degrees (20°) Celsius; f. Install covers on all in-process tanks containing volatile organic compounds; g. Repair leaks of liquids containing volatile organic compounds. (3) This rule applies to operations which are sources of volatile organic compounds, including reactors, distillation units, dryers, storage of volatile organic compounds, transfer of volatile organic compounds, extraction equipment, filters, crystallizers and centrifuges that have the potential to emit six and eight-tenths (6.8) kg/day (fifteen (15) lb/day) or more in synthesized pharmaceutical manufacturing facilities having total facility potential emissions, from subject operations, of volatile organic compounds of twenty-five (25) or more tons per year. (4) The owner or operator of a facility subject to this rule must: a. Meet the applicable increments of progress contained in the following schedule: 1. Submit final plans for the emission control techniques before April 1, 1983; 2. Award contracts or purchase orders before July 1, 1983; 3. Initiate on-site construction or installation before December 1, 1983; 4. Complete on-site construction or installation before December 1, 1984; 5. Achieve final compliance before December 31, 1984; b. Certify to the director within twenty (20) days after the deadline for each applicable increment of progress whether the required increment has been met. Rules 25.28 through 25.40. Reserved. Rule 25.41. Compliance schedules. (1) Process equipment and control devices. The owner or operator of an existing source of volatile organic compound emissions subject to the standard in this chapter proposing to install and operate a control device and/or replacement process equipment to comply shall adhere to the increment of progress contained in the following schedule: a. Final plans for the emission control device and/or process equipment must be submitted before March 1, 1980. b. Contracts for the emission control systems and/or process equipment must be awarded or orders must be issued for purchase of component parts before June 1, 1980. c. Initiation of on-site construction of control device or process equipment before January 1, 1981. d. On-site construction or installation of the control device or process equipment completed before October 1, 1981. e. Final compliance shall be determined before November 1, 1981 in accordance with the methods specified by the director. f. Any owner or operator of an existing emission source subject to the compliance schedule of this section shall certify to the director within thirty (30) days after the deadline for each increment of progress whether the required increment of progress has been met. (2) Low solvent content coating. The owner or operator of an existing source of volatile organic compound emissions subject to the standards in this chapter proposing to employ low solvent content coating technology to comply shall adhere to the increments of progress contained in the following schedule: a. Final plans for the application of low solvent content coating technology must be submitted before March 1, 1980. b. Research and development of low solvent content coating must be completed before September 1, 1980. c. Evaluation of product quality and commercial acceptance must be completed before January 1, 1981. d. Purchase orders must be issued for low solvent content coatings and process modifications before April 1, 1981. e. Initiation of process modifications must begin before June 1, 1981. f. Process modifications must be completed and use of low solvent content coatings must begin before August 1, 1981. g. Final compliance shall be determined before September 1, 1981, in accordance with the methods specified by the director. h. Any owner or operator of an existing source subject to the compliance schedule of this section shall certify to the director within twenty (20) days after the deadline for each increment of progress whether the required increment of progress has been met. (3) Equipment modification. The owner or operator of an existing source of volatile organic compound emissions subject to the standards in this chapter proposing to comply by modification of existing process equipment shall adhere to the increments of progress contained in the following schedule: a. Final plans for process modification must be submitted before March 1, 1980. b. Contracts for process modifications must be awarded or orders must be issued for the purchase of component parts to accomplish process modifications before June 1, 1980. c. Initiation of on-site construction or installation of process modifications must begin before January 1, 1981. d. On-site construction or installation of process modifications must be completed before October 1, 1981. e. Final compliance shall be determined before November 1, 1981, in accordance with the methods specified by the director. f. Any owner or operator of an existing source subject to the compliance schedule of this section shall certify to the director within thirty (30) days after the deadline for each increment of progress whether the required increment of progress has been met. Rule 25.42. Individual compliance schedules. (1) A facility may petition for a source-specific compliance schedule extending beyond those categorical compliance schedules contained in Rule 25.41 only if one (1) or more of the following conditions are satisfied: a. The facility demonstrates that it is physically impossible for the source in question to comply with the date in the categorical schedule. b. That, by allowing additional time, innovative technology will be applied and the reductions to be achieved will be significantly greater than that from the applicable emission standard. That the facility agrees that this revised value will be contained on the permit as a condition of source operation. c. Additional time is necessary to allow for the development of low solvent systems rather than apply add-on controls. d. The facility in question is a part of a state-wide or multistate program to prioritize the sequence of installing controls at a number of similar sources owned or controlled by the same company, and the overall compliance program is as expeditious as practicable. (2) Individual compliance schedules approved under this section must contain the increments of progress below and achieve final compliance with the specified emission standard no later than July 1, 1987: a. Date control plan will be submitted. b. Date contract will be awarded. c. Date initial construction will commence. d. Date construction will be completed. e. Date final compliance will be achieved. (3) Individual compliance schedules approved under this section will be subjected to a public hearing and incorporated as a revision to these regulations. The facility requesting such individual compliance schedule shall be responsible for all costs associated with the required legal notices. (4) No individual compliance schedule will be granted if such a revised schedule would interfere with reasonable further progress in the county. (5) The petition for the individual compliance schedule must be received by the director prior to the first date contained in the categorical compliance schedule. Rule 25.43. General provisions for test methods and procedures. (1) The owner or operator of any new or existing source required to comply with standards contained in this chapter shall at his own expense, when so directed by the director, demonstrate compliance by the following methods or an alternative method approved by the director. (2) No volatile organic compound emissions compliance testing will be allowed, nor the results accepted, unless prior notification has been supplied to the director as required under paragraphs (3) and (4) of this Rule 25.43, and the director has granted approval. (3) Any person proposing to conduct a volatile organic compound emissions compliance test shall notify the director of the intent to test not less than thirty (30) days before the proposed initiation of the tests so the director may, at his option, observe the test. (4) For compliance determination, the owner or operator of any new or existing source shall be responsible for providing: a. Sampling ports, pipes, lines or appurtenances for the collection of samples and data required by the test procedure; b. Safe access to the sample and data collection locations; and c. Light, electricity and other utilities required for sample and data collection. (5) A copy (or copies) of the test report shall be submitted to the director by the prescribed time period in a format stipulated by the director. Rule 25.44. Determination of volatile content of surface coatings. (1) This method applies, in accordance with Rule 25.43, to paint, varnish, lacquer and surface coatings which are air-dried or force dried. (2) This method does not apply to any coating system requiring a special curing process such as: a. Exposure to temperatures in excess of one hundred ten degrees (110°) Celsius (two hundred thirty degrees (230°) Fahrenheit) to promote thermal cross-linking; or b. Exposure to ultraviolet light to promote cross-linking. (3) For the purpose of this method, the applicable surface coatings are divided into three (3) classes. They are: a. Class I: General solvent-type paints. This class includes white linseed oil outside paint, white soya and phthalic alkyd enamel, white linseed o-phthalic alkyd enamel, red lead primer, zinc chromate primer, slat white inside enamel, white epoxy enamel, white vinyl toluene modified alkyd, white amino modified baking enamel, and other solvent-type paints not included in Class II. b. Class II: Varnishes and lacquers. This class includes clear and pigmented lacquers and varnishes. c. Class III: Water-thinned paints. This class includes emulsion or latex paints and colored enamels. (4) For the purposes of this method, a representative sample of the surface coating shall be obtained at the point of delivery to the coater or any other point in the process that the director approves. (5) The volatile organic content of the sample shall be determined as follows: a. Assign the coating to one (1) of the three (3) classes in paragraph c. of this section. Assign any coating not clearly belonging to Class II or III or Class I. b. Determine the density D m (in grams per cubic centimeter) of the paint, varnish, lacquer or, related product according to the procedure outlined in ASTM D 1475-60, Standard Method of Test for Density of Paint, Varnish, Lacquer and Related Products. Then, depending on the class of the coating, use one (1) of the following specified procedures to determine the volatile content: 1. Class I. Use the procedure in ASTM D 2369-73, Standard Method of Test for Volatile Content of Paints. (i) Record the following information: W 1 = Weight of dish and sample, grams W 2 = Weight of dish and sample after heating, grams S = Sample, weight, grams (ii) Compute the volatile matter content C, (in grams/liter of paint) as follows: C v = (W1- W2)(Dm) (103) S (iii) To convert grams per liter to pounds per gallon, multiply C, by 8.3455 × 10 -3 . 2. Class II. Use the procedure in ASTM D 1644-59 Method A, Standard Methods of Test for Nonvolatile Content of Varnishes. (Do not use Method B). (i) Record the following information: A = Weight of dish, grams B = Weight of sample used, grams C = Weight of dish and contents after heating, grams (ii) Compute the volatile matter content C, (in grams/liter of paint) as follows: C v = (A + B - C)(Dm)(103) B (iii) To convert grams per liter to pounds per gallon, multiply C v by 8.3455 × 10 -3 . 3. Class III. Use the procedure in ASTM D 2369-73, Standard Method of Test for Volatile Content of Paints. (i) Record the same information as specified for Class II. (ii) Determine the water content in P (in percent water) of the paint according to the procedure outlined in Federal Standard 141a, Method 4082.1, Water in Paint and Varnishes (Karl Fischer Titration Method). (iii) Compute the nonaqueous volatile matter content C, (in grams/liter) as follows: C v = (W1- W2- 0.01 PS)(Dm)(103) S (iv) To convert grams per liter to pounds per gallon, multiply C v by 8.3455 × 10 -3 . Rule 25.45. Test method for determination of volatile organic compound emission control system efficiency. (1) The provisions of this section are generally applicable, in accordance with Rule 25.43, to any test method employed to determine the collection or control efficiency of any device or system designed, installed and operated for the purpose of reducing volatile organic compound emissions. (2) The following procedures shall be included in any efficiency determination: a. The volatile organic compound containing material shall be sampled and analyzed in a manner approved by the director such that the quantity of emissions that could result from the use of the material can be quantified. b. The efficiency of any capture system used to transport the volatile organic compound emissions from their point of origination to the control equipment shall be computed using accepted engineering practice and in a manner approved by the director. c. Samples of the volatile organic compound shall be taken simultaneously at the inlet and outlet of the emissions control device in a manner by the director. d. The total combustible carbon content of the samples shall be determined by a method approved by the director. e. The efficiency of the control device shall be expressed as the fraction of total combustible carbon content reduction achieved. f. The volatile organic compound mass emission rate shall be the sum of emissions from the control device, emissions not collected by the capture system and capture system losses. Rule 25.46. Test method for determination of solvent metal cleaning organic compound emissions. (1) This method is applicable to determining volatile organic compound emissions from solvent metal cleaning equipment in accordance with Rule 25.43. (2) The purpose of this method is to quantify, by material balance, the amount of solvent input into a degreaser over a sufficiently long period of time so that an average emission rate can be computed. (3) The following procedure shall be followed to perform a material balance test: a. Clean the degreaser sump before testing. b. Record the amount of solvent added to the tank with a flow meter. c. Record the weight and type of work load degreased each day. d. At the end of the test run, pump out the used solvent and measure the amount with a flow meter. Also, estimate the volume of metal chips and other material remaining in the emptied sump, if significant. e. Bottle a sample of the used solvent and analyze it to find the percent that is oil and other contaminants. The oil and solvent proportions can be estimated by weighing samples of used solvent before and after boiling of the solvent. The volume of solvent displaced by this oil along with the volume of makeup solvent added during operations is equal to the solvent emission. Rule 25.47. Test procedure for determination of VOC emissions from bulk gasoline terminals. (1) Use of test. This test method is applicable to determining volatile organic compound emissions from bulk gasoline terminals in accordance with Rule 25.43. (2) Principle. VOC mass emissions are determined directly using flow meters and hydrocarbon analyzers. The volume of liquid gasoline dispensed is determined by a computation based on the metered quantity of gasoline at the loading rack. Test results are expressed in milligrams of hydrocarbons emitted per liter of gasoline transferred. (3) Summary of the method. This method describes the test conditions and test procedure to be followed in determining the emissions from systems installed to control volatile organic compound vapors resulting from tank truck and trailer loading operations at bulk terminals. Under this procedure, direct measurements are made to compute the hydrocarbon mass exhausted from the vapor control system. All possible sources of leaks are qualitatively checked to insure that no uncontrolled vapors are emitted to the atmosphere. The results are expressed in terms of mass hydrocarbons emitted per unit volume of gasoline transferred. Emissions are determined on a total hydrocarbon basis. If methane is present in the vapors returned from the tank trucks or trailers, provisions are included for conversion of a total nonmethane hydrocarbon basis. (4) Applicability. This method is applicable to determining VOC emission rates at tank truck and trailer gasoline loading terminals employing vapor collection systems and either continuous or intermittent vapor control systems. This method is applicable to motor tank truck and trailer loading only as per Rule 25.9. (5) Apparatus. The components essential to the evaluation of emissions from gasoline loading terminals. a. Portable combustible gas detector equipped to read zero (0) to one hundred (100) percent of the lowest explosive limit; b. Flexible thermocouple with recorder; c. Gas volume meter, sized for the expected exhaust flow rate and range; d. Total hydrocarbon analyzer with recorder (flame ionization detector or nondispersive infrared equipped to read zero (0) to ten percent (10%) by volume hydrocarbon as propane for vapor control systems which recover the vapor as liquid; or zero (0) to ten thousand (10,000) ppm hydrocarbons as propane for incineration vapor control systems); e. Barometer to measure atmospheric pressure; f. Gas chromatography/flame ionization detector with a column to separate C 1 -C 7 alkanes, used if methane is present in recovered vapors or if incineration is the vapor control technique. (6) Test requirements. a. No fewer than three (3) eight-hour test repetitions will be performed. b. During the test period, all loading racks shall be open for each product line which is controlled by the system under test. Simultaneous use of more than one (1) loading rack shall occur to the extent that such use would normally occur. c. Simultaneous use of more than one (1) dispenser on each loading rack shall occur to the extent that such use would normally occur. d. Dispensing rates shall be set at the maximum rate at which the equipment is designed to be operated. Automatic product dispensers are to be used according to normal operating practices. e. Applicable operating parameters of the vapor control system shall be monitored to demonstrate levels. For intermittent vapor control systems employing a vapor holder, each test repetition shall include at least one (1) fully automatic operation cycle of the vapor holder and control device. Tank trucks and truckers shall be essentially leak-free as determined by the director. (7) Basic measurements required. The basic measurements essential to the evaluation of emissions from gasoline loading terminals are: a. The amount of gasoline dispensed from gasoline dispensers; b. Leak check of all fittings and vents; exhaust: c. The following items for the processing unit exhaust: 1. Temperature; 2. Pressure; 3. Volume of vapors; 4. Hydrocarbon concentration of vapors; 5. Gas chromatograph analysis of vapors if methane is present in recovered vapors. (8) Test procedure. a. Calibrate and span all instruments as outlined under paragraph (10) of this rule. b. Install an appropriately sized gas meter on the exhaust vent of the vapor control system. For those vapor control systems where size restrictions preclude the use of a volume meter, or when incineration is used for vapor control, a gas flow rate meter) orifice, pitot tube, annubar, etc.) is necessary. At the meter inlet, install a thermocouple with recorder. Install as tap at the volume meter outlet. Attach a sample line for a total hydrocarbon analyzer (zero (0) to ten percent (10%) as propane) to this tap. If the meter pressure is different than barometric pressure, install a second tap at the meter outlet and attach an appropriate manometer for pressure measurement. If methane analysis is required, install a third tap for connection to a constant volume sample/pump evacuated bag assembly as described in Method 3, Federal Register, 36:247, December 23, 1977. c. Measurements and data required for evaluating emissions from the system: 1. At the beginning and end of each test repetition, record the volume readings on each product dispenser on each loading rack served by the system under test. 2. At the beginning of each test repetition and each two (2) hours thereafter record the ambient temperature and the barometric pressure. 3. For intermittent vapor control systems employing a vapor holder, the unit shall be manually started and allowed to process vapors in the holder until the lower automatic cutoff is reached. This cycle should be performed immediately prior to the beginning of the test repetition before readings required under part 8(c)1 of this rule are taken. 4. For each cycle of the vapor control system during each test repetition, record the start and stop time, the initial and final gas meter readings, the average vapor temperature, pressure and hydrocarbon concentration. If a flow rate meter readouts continuously during the cycle. If required, extract a sample continuously during each cycle for chromatographic analysis for specific hydrocarbons. 5. For each tank truck or trailer loading during the test period, check all fittings and seals on the tanker compartments with the combustible gas detector. Record the maximum combustible gas reading for any incidents of leakage of hydrocarbon vapors. Explore the entire periphery of the potential leak source with the sample hose inlet one (1) centimeter (four-tenths (0.4) inches) away from the interface. 6. During each test period, monitor all possible sources of leaks in the vapor collection and control systems with the combustible gas indicator. Record the location and combustible gas reading for any incidents of leakage. 7. For intermittent vapor control systems, the control unit shall be manually started and allowed to process vapors in the holder until the lower automatic shut off is reached at the end of each test repetition. (9) Calculations. a. Terminology: T a = Ambient temperature P b = Barometric pressure (mm Hg) L t = Total volume of liquid dispensed from all controlled racks during the test period (liters) V e = Volume of air-hydrocarbon mixture exhausted from the processing unit (M 3 ) V es = Normalized volume of air-hydrocarbon mixture exhausted, NM 3 at 20°C, 760 mm Hg C e = Volume fraction of hydrocarbons in exhausted mixture (volume percent as C 3 H 10 /100, corrected for methane content if required) T e = Temperature at processing unit exhaust (°C) P e = Pressure at processing unit exhaust (mm Hg abs) (M/L) e = Mass of hydrocarbons exhausted from the processing unit per volume of liquid loaded, (mg/liter) b. 1. Calculate the following results for each period of the vapor control system: V e = V ef V ei (M 3 ) Where: V e = Totalized volume from flow rate and time records V ef = Final volume V ei = Initial volume 2. Normalized volume of exhausted mixture: V es = (0.3858 °K/mm Hg) VePe NM at 20°C, 760 mm Hg (T e + 273.2) 3. Mass of hydrocarbons exhausted from the vapor control system: M e = (1.833 × 106mg C3H8 ) NM 3 C 3 H 8 c. Calculate the average mass of hydro carbons emitted per volume of gasoline loaded: (M/L) e = Me (mg/liter) Lt (10) Calibrations. a. Flow meters shall be calibrated using standard methods and procedures which have been approved by the director. b. Temperature recording instruments shall be calibrated prior to a test period and following the test period using an ice bath (zero degrees Celsius) and a known reference temperature source of about thirty-five degrees (35°) Celsius. Daily during the test period, use an accurate reference to measure the ambient temperature and compare the ambient temperature reading of all other instruments to this value. c. Manufacturer's instructions concerning warmup and adjustments shall be followed for total hydrocarbon analyzers. Prior to and immediately after the emission test, perform a comprehensive laboratory calibration on each analyzer used. Calibration gases should be propane in nitrogen prepared gravimetrically with mass quantities of approximately one hundred percent (100%) propane. A calibration curve shall be provided using a minimum of five (5) prepared standards in the range of concentrations expected during testing: 1. For each repetition, zero with zero gas (3 ppm C) and span with seventy percent (70%) propane for instruments used in the vapor lines and with ten percent (10%) propane for instruments used at the vapor control system exhaust. 2. The zero and span procedure shall be performed at least once prior to the first test measurement, once during the middle of the run, and once following the final test measurement for each run. 3. Conditions in calibration gas cylinders must be kept such that condensation of propane does not occur. A safety factor of two (2) for pressure and temperature is recommended. Rule 26. Reasonably Available Control Technology (RACT). Rule 26.1. General provisions. (1) No person shall cause, suffer, allow or permit any source located inside the particulate matter nonattainment area, or any source of a plant located outside the particulate matter nonattainment area which plant significantly impacts the nonattainment area, to emit particulate matter concentrations in excess of the limitations set forth in this Rule 26. If the particulate matter nonattainment area is redesignated to attainment or unclassifiable, the emission limitations contained in this Rule 26 shall remain in full force and effect for those plants to which this Rule 26 had applicability on its effective date. No source shall be deemed in automatic violation of the emission limitations in this Rule 26 provided that each increment of progress established pursuant to Rules 26.21 and 26.22 is met in a timely fashion. (2) This Rule 26 shall apply only to those sources and plants specified in Rule 26.1(1) which were in existence on January 1, 1978. (3) Nothing in this Rule 26 shall prevent a source from exceeding the limitations set forth in this Rule 26 as provided for in section 4-13 by use of an alternate control strategy so that maximum allowable particulate matter limitations for the plant containing the source are not exceeded on either daily or an annual basis. (4) If any source is subject to more than one (1) of the limitations in this Rule 26, for any one (1) piece of equipment or operation, then the most stringent limitation shall apply. (5) The limitations of this Rule 26 shall not apply to emissions from any internal combustion engine. (6) Definitions. As used in this Rule 26, all terms, units and abbreviations not defined herein but defined in section 4-2 shall have the meaning give them in section 4-2. a. Asphalt concrete plant means any plant used to manufacture asphalt concrete by heating and drying aggregate and mixing with asphalt cements. b. Btu means British thermal unit. c. Ceramic plant means any plant used for the manufacture of any product made essentially from a nonmetallic mineral by firing at a high temperature. d. CO2 means carbon dioxide. e. (Reserved) f. Drop point means any area where particulate laden process or waste material is allowed to fall in a manner which causes particulate matter to become airborne. g. Concrete batch plant means any plant where sand, aggregate and cement are transferred to vehicles which transport the batch to a site. h. dscf means dry cubic feet at standard conditions. i. Dust disturbance point means any area where particulate laden process or waste material is exposed to activities which cause particulate matter to become airborne. j. (Reserved) k. gr means grain (one-seven-thousandth (1/7000th) pound avoirdupois weight). l. Grain means any corn, wheat, sorghum, rice, rye, oats, barley or soybeans. m. Grain elevator means any plant used for the processing, unloading, loading, handling, cleaning, drying or storing of grain. n. Liquid alum reactor means any plant used to complete the reaction of required ingredients under pressure in a reactor for manufacturing alum. o. Material handling source means any plant engaging in the processing or storing of materials by conveyor, elevator, feeder, vehicle or other method including loading or unloading. p. Metal melting plant means any plant engaged in the smelting or refining of ferrous and nonferrous metals from ore, pig or scrap. q. Outlet concentration means the particulate matter content of gases exhausted from control equipment, expressed in weight per unit volume. r. Portland cement plant means any plant used for the manufacturing of Portland-type cement by either the wet or dry process. s. Pharmaceutical plant means any plant used for the conversion of basic raw material into products used in the manufacture or pharmaceuticals. t. Rare earth plant means any plant used for the processing of menozite sand to extract the rare earth elements. u. Rock crushing and quarry operation means any plant engaged in operating gravel pits and quarries and in crushing, washing, screening and otherwise preparing gravel for construction use. v. Rule 26.1(6)v. (Reserved) w. Synthetic yarn plant means any plant used for the processing of synthetic fibers in the form of monofilament, yarn, staple or tow suitable for further manufacturing on spindles, looms, knitting machines or other textile processing equipment. x. Transfer point means any area where particulate laden process or waste material moves from one (1) conveyance to another in such a manner which causes particulate matter to become airborne. y. Woodworking plant means any plant used for manufacturing articles made entirely or partially of wood or wood substitutes. Rule 26.2. Asphalt concrete plants. No person shall cause, suffer, allow or permit to be emitted from any asphalt concrete plant operation any gases which: (1) Contain particulate matter in excess of 0.040 gr/dscf; (2) Exceed twenty percent (20%) opacity for an aggregate of more than five (5) minutes in any one (1) hour or more than twenty (20) minutes in any twenty-four (24) hour period. Rule 26.3. Ceramics plants. (1) No person shall cause, suffer, allow or permit to be emitted from any ceramics plant operation any gases which contain particulate matter in excess of: a. 0.025 gr/dscf from any spray dryer; b. 0.022 gr/dscf from any machining system; c. 0.100 gr/dscf from any calciner; d. 0.090 gr/dscf from any tunnel kiln; e. 0.020 gr/dscf from any other equipment or operation. (2) No person shall cause, suffer, allow or permit to be emitted from any transfer point, drop point or dust disturbance point any particulate matter in excess of 0.020 gr/dscf. Rule 26.4. (Reserved) Rule 26.5. Concrete batch plants. No person shall cause, suffer, allow or permit to be emitted from any concrete batch plant operation any gases which: (1) Contain particulate matter in excess of 0.100 gr/dscf from any belt conveyor, clam shell crane, bucket elevator or truck loadout; (2) Exceed ten percent (10%) opacity for an aggregate of more than fifteen (15) minutes in any one (1) hour or more than sixty (60) minutes in any twenty-four (24) hour period from any belt conveyor, clam shell crane, bucket elevator or loadout; (3) Exceed five percent (5%) opacity for an aggregate of more than five (5) minutes in any one (1) hour or more than twenty (20) minutes in any twenty-four (24) hour period from any storage silo. Rule 26.6. Fuel-burning equipment. No person shall cause, suffer, allow or permit to be emitted from any fuel-burning equipment any gases which contain particulate matter in excess of the limitations determined as follows: (1) Determine the total rated fuel-burning capacity of all fuel-burning equipment at a plant in millions of Btu, designated as "B" in Table 1 below, and then using Table 1, determine the allowable emission rate in pounds per million Btu (lbs/10 6 Btu), designated as "Q" in Table 1. (2) To determine compliance, calculate actual emissions rate (lbs/10 6 Btu) when all equipment is burning the most particulate-producing fuel that equipment is capable of handling. (3) A lower fuel-burning capacity may be specified if the owner or operator notifies the bureau in writing that the specified fuel-burning rate will not be exceeded any time during the year, and fuel monitoring equipment and verification logs adequate to determine fuel-burning rates are available to the bureau for inspection during normal business hours. This lower, specified fuel-burning rate will become a permit condition. (4) If the owner or operator of the equipment agrees to utilize a technique whereby a less polluting fuel will be used in conjunction with the more polluting fuel to achieve these emissions limitations, and this agreement is made a permit condition, the provisions of Rule 26.6(2) shall not apply. (5) This Rule 26.6 shall not apply to equipment designed to be fueled solely by coke oven gas. TABLE 1 Equipment Rating (10 6 Btu) | Maximum Allowable Particulate Emissions (lbs/10 6 Btu) Below 10 | Q = 0.6 10 to 250 | Q = 2.16 × B -0.5566 250 and greater | Q = 0.1 Rule 26.7. (Reserved) Rule 26.8. Grain elevators. (1) No person shall cause or allow to be operated a grain dryer unless it complies with one (1) of the following: a. No existing column grain dryers shall have external sheeting with transverse perforations of effective circular diameter greater than 0.094 inch. b. No existing rack grain dryers shall have any portion of exhaust air emitted to the atmosphere without passing through a particulate collection screen having a maximum opening of 50-mesh US Sieve series. c. All other types of grain dryers shall be controlled in a manner which shall result in the same degree of control required pursuant to Rule 26.8(1)a. and Rule 26.8(1)b. (2) The owner or operator may use methods of emission control other than those described above, or combinations of the same, if it is demonstrated to the director's satisfaction that these other methods or combinations would result in the same degree of control required pursuant to Rule 26.8(1)a. and Rule 26.8(1)b. (3) No person shall cause or allow to be emitted from any grain dryer gases which exceed zero percent opacity. (4) No person shall cause to be emitted from any process where the exhaust gases have a dew point higher than the ambient temperature any gases which contain particulate matter in excess of 0.050 grains per dscf. This regulation shall not apply to those processes specified in Rule 26.8(1). (5) No person shall cause to be emitted from any grain elevator process other than those specified in Rule 26.8(1) any gases which contain particulate matter in excess of 0.010 grains per dscf. (6) No person shall cause, suffer, allow or permit to be emitted from any grain handling operation except barge or ship loading any particulate matter which exceeds ten percent (10%) opacity for an aggregate of more than fifteen (15) minutes in any one-hour period or more than sixty (60) minutes in any twenty-four (24) hour period. (7) No person shall cause, suffer, allow or permit to be emitted from any grain barge or ship loading operation any particulate matter which exceeds twenty percent (20%) opacity for an aggregate of more than five (5) minutes in any one-hour period or more than twenty (20) minutes in any twenty-four (24) hour period. Rule 26.9. (Reserved) Rule 26.10. Liquid alum reactors. No person shall cause, suffer, allow or permit to be emitted from any liquid alum reactor operation any gases which: (1) Contain particulate matter in excess of 0.250 gr/dscf; (2) Exceed twenty percent (20%) opacity for an aggregate of more than five (5) minutes in any one (1) hour or more than twenty (20) minutes in any twenty-four (24) hour period. Rule 26.11. Material handling sources. No person shall cause, suffer, allow or permit to be emitted from any material handling operation, including stored product or waste material, any particulate matter which exceeds ten percent (10%) opacity for an aggregate of more than fifteen (15) minutes in any one-hour period or sixty (60) minutes in any twenty-four (24) hour period. Rule 26.12. Metal melting plants. (1) No person shall cause, suffer, allow or permit to be emitted from any metal melting plant operation any gases which contain particulate matter in excess of 0.020 gr/dscf except from operations specified in Rule 26.12(2), (3) and (4). (2) No person shall cause, suffer, allow or permit to be emitted from any sand transfer point, drop point or dust disturbance point, any particulate matter in excess of 0.02 gr/dscf. (3) No person shall cause, suffer, allow or permit to be emitted from any inoculation operation any gases which contain particulate matter in excess of 0.022 gr/dscf. (4) No person shall cause, suffer, allow or permit to be emitted from any cupola top gases which contain particulate matter in excess of 0.022 gr/dscf. (5) No person shall cause, suffer, allow or permit to be emitted from any metal melting plant any gases which exceed twenty percent (20%) opacity for an aggregate of more than five (5) minutes in any one (1) hour or more than twenty (20) minutes in any twenty-four (24) hour period. (6) This Rule 26.12 shall not apply to any metal melting plant with a melting capacity of forty (40) tons per day, or ten thousand (10,000) tons per year metal melted, or less. Rule 26.13. Pharmaceutical plants. No person shall cause, suffer, allow or permit to be emitted from any pharmaceutical plant operation any gases which: (1) Contain particulate matter in excess of 0.020 gr/dscf. (2) Exceed twenty percent (20%) opacity for an aggregate of more than five (5) minutes in any one (1) hour, or more than twenty (20) minutes in any twenty-four (24) hour period. Rule 26.14. Portland cement plants. (1) No person shall cause, suffer, allow or permit to be emitted from any Portland cement plant operation any gases which contain particulate matter in excess of: a. The applicable emission limitation established under Rule 10 from any cement kiln or clinker cooler; provided, however, that process weight for any cement kiln shall be calculated using the dry feed basis; b. 0.020 gr/dscf from any stack or vent serving any raw or finish mill system, raw mill dryer, raw materials storage, conveyor transfer point bagging, bulk loading or unloading system. (2) No person shall cause, suffer, allow or permit to be emitted from any stack or vent serving any transfer point, drop point or dust disturbance point any particulate matter in excess of 0.020 gr/dscf. (3) No person shall cause, suffer, allow or permit to be emitted from any Portland cement plant operation specified in Rule 26.14 (1) and (2), any gases which exceed twenty percent (20%) opacity for an aggregate of more than five (5) minutes in any one (1) hour or more than twenty (20) minutes in any twenty-four (24) hour period. For the purpose of this Rule 26.14(3), the provisions of Rule 26.11 shall not apply to material handling sources located at any Portland cement plant operation. (4) The owner or operator of any source of particulate matter emissions subject to the limitations in this Rule 26.14 proposing to install and operate a control device or replacement process equipment, or proposing to modify existing process equipment or control device, shall adhere to the increments of progress contained in the following schedule: a. Final plans for the installation or modification must be submitted before January 1, 1982. b. Contracts for the control device or process equipment must be awarded or orders must be issued for purchase of component parts before February 1, 1982. c. Initiation of on-site construction or modification of the control device or process equipment before March 1, 1982. d. On-site construction, installation of modification completed and final compliance shall be determined before December 31, 1982. Final compliance shall be determined in accordance with methods specified by the director. (5) Any owner or operator subject to the compliance schedule contained in Rule 26.14(4) shall certify to the director, within thirty (30) days after the deadline for each increment of progress, whether the required increment of progress has been met. (6) The provisions of Rules 26.21 and 26.22 shall not apply to any owner or operator of any Portland cement plant subject to this Rule 26.14. Rule 26.15. Rare earth plants. (1) No person shall cause, suffer, allow or permit to be emitted from any earth plant operation any gases which: a. Contain particulate matter in excess of 0.100 gr/dscf; b. Exceed twenty percent (20%) opacity for an aggregate of more than five (5) minutes in any one (1) hour or more than twenty (20) minutes in any twenty-four (24) hour period. (2) No person shall cause, suffer, allow or permit to be emitted from any transfer point, drop point or dust disturbance point, particulate matter in excess of 0.020 gr/dscf. Rule 26.16. Rock crushing and quarry operation. (1) No person shall cause, suffer, allow or permit to be emitted from any rock crushing or quarry operation any particulate matter in excess of: a. 0.075 pounds per ton of rock crushed from any primary or secondary crushing or primary or secondary crushing or primary or secondary screening equipment; b. 0.300 pounds per ton of rock crushed from any tertiary crushing or tertiary screening equipment, or any fines mill equipment; c. 0.250 pounds per ton of rock crushed from any recrusher or recrusher screening equipment; d. 0.100 pounds per ton of rock crushed from any sand and gravel screening, conveying or handling equipment. (2) No person shall cause, suffer, allow or permit to be emitted from any rock crushing or quarry operation any particulate matter which exceeds ten percent (10%) opacity for an aggregate of more than fifteen (15) minutes in any one (1) hour or more than sixty (60) minutes in any twenty-four (24) hour period. Rule 26.17. Synthetic yarn plants. (1) No person shall cause to be emitted from any synthetic yarn plant any particulate matter in excess of: a. 1.0 pounds per hour from any spinning machines; b. 1.2 pounds per hour from any evaporator; c. 1.0 pounds per hour from any autoclave; d. 1.5 pounds per hour from any continuous polymerization line. (2) No person shall cause, suffer, allow or permit to be emitted from any synthetic yarn plant any gases which exceed twenty percent (20%) opacity for an aggregate of more than five (5) minutes in any one (1) hour or more than twenty (20) minutes in any twenty-four (24) hour period. Rule 26.18. Woodworking plants. (1) No person shall cause, suffer, allow or permit to be emitted from any woodworking operation any gases which contain particulate matter in excess of: a. 0.030 gr/dscf from any woodworking operation except sanding; b. 0.050 gr/dscf from any sanding operation. (2) No person shall cause, suffer, allow or permit to be emitted from any transfer point, drop point or dust disturbance point any particulate matter in excess of 0.020 gr/dscf. Rule 26.19. Dumping of material from control equipment. (1) a. No material from air pollution control equipment shall be dumped on the ground or in the open unless it is thoroughly wet (at least ten percent (10%) average moisture), chemically treated or adequately shielded from the wind to minimize the generation of fugitive dust to an equal level as would be reached by thoroughly wetting. Even wet materials, if dumped in the open, must either be covered over or chemically treated to prevent wind erosion before the material has had opportunity to dry out. For sources not meeting these requirements, a compliance plan for achieving the requirement of this rule must be submitted by January 31, 1981, and purchase orders for any new equipment issued by March 31, 1981. These requirements must be achieved at all plants by July 31, 1981. b. The director may approve the use of an alternate method of control as a condition of the certificate of operation if it will result in an equivalent emission reduction or a greater reduction on a twenty-four (24) hour basis and an annual basis. (2) All presently existing accumulations of materials from control equipment must be eliminated, covered or treated so as to prevent wind erosion no later than June 30, 1981. For sources not presently meeting these requirements, a compliance plan for achieving the requirements of this rule must be submitted to the director by November 30, 1980, and purchase orders for any new equipment issued by January 15, 1981. Rule 26.20. Visible emissions from buildings. No person shall cause, suffer, allow or permit visible emissions from buildings at a plant subject to this Rule 26, other than gases or particulate matter emitted through a stack or flue, with an opacity in excess of five percent (5%) for an aggregate of more than five (5) minutes in any one (1) hour or more than twenty (20) minutes in any twenty-four (24) hour period. Rule 26.21. (Reserved) Rule 26.22. (Reserved) Rule 27. Particulate Matter Controls for New Sources and New Modifications After August 29, 1995. Rule 27.1. Particulate Matter Best Available Control Technology. Any new source or modification, alteration or reconstruction the installation of which commences after August 29, 1995, that emits or can potentially emit, prior to being controlled, fifteen (15) tons per year or more of PM 10 emissions, or that emits or can potentially emit, prior to being controlled, twenty-five (25) tons per year or more of particulate matter shall utilize "particulate matter best available control technology" (particulate BACT) as defined in Rule 27.2. If test results at a source subject to Rule 27.1 show more than 15.0 tons per year actual emissions of particulate matter, such source shall forward such test results to the Director. In addition, within sixty (60) days after receiving such test results, such source shall complete PM 10 emissions testing and forward the results of the PM 10 emissions testing to the Director. Rule 27.2. For the purposes of Rule 27, "particulate matter best available control technology" means an emissions limitation (including a visible emissions limitation) based on the maximum degree of reduction for particulate matter which would be emitted from any proposed stationary source or modification, alteration, ore reconstruction which the director, on a case-by-case basis, taking into account energy, environmental, and economic impacts and other costs, determines is achievable for such source or modification through such application of production processes or available methods, systems and techniques, including fuel cleaning or treatment or innovative fuel combination techniques for control of each such pollutant. In no event shall the application of particulate matter best available control technology result in emissions of particulate matter which would exceed the emissions allowed by any applicable limitation established under Rules 15 and 16. If a source demonstrates to the director that technological or economic limitations on the application of measurement methodology to a particular emissions unit would make the imposition of an emissions limitation infeasible, a design, equipment, work practice, operations standard or combination thereof, submitted by the source and approved by the director, may be prescribed instead to satisfy the requirement for the application of particulate matter best available control technology. Such a standard shall, to the degree possible, set forth the emissions reduction achievable by implementation of such design, equipment, work practice or operations standard and shall provide for compliance by means which achieve equivalent results. Rule 27.3. Reasonable and Proper Emission Limitations. Any new source or modification, alteration or reconstruction the installation of which commences after August 29, 1995, that emits or has the potential to emit at its maximum, prior to being controlled, less than fifteen (15) tons per year of PM 10 emissions and less than twenty-five (25) tons per year of particulate matter shall achieve "reasonable and proper emission limitations" as defined in Rule 27.4. Rule 27.4. For the purposes of Rule 27, "reasonable and proper emission limitations" means an emissions limitation (including a visible emission standard) which the director, on a case-by-case basis, determines is reasonably achievable and cost-effective for such new source or modification, alteration or reconstruction through the application of production processes or through available methods, systems, and techniques (including fuel cleaning or treatment or innovative fuel combustion techniques) for control of emissions of particulate matter taking into account the following factors: (1) The necessity of requiring emissions reductions in order to attain or maintain ambient air quality standards; and (2) The technology available, the costs, energy and other environmental impacts, and any control equipment in use at the source. If the director determines that technological or economic limitations on the application of control technology to a particular emissions unit would make the imposition of a quantitative emissions limitation infeasible, a design, equipment, work practice, operational standard, or combination thereof, may be prescribed instead to satisfy the requirement for reasonable and proper emissions reductions. Rule 28. General Provisions and Applicability for Sulfuric Acid Plants and Oleum Manufacturing Plants. Rule 28.1. Purpose. The purpose of this Rule 28 is to establish emission standards and other requirements for sulfuric acid plants and for oleum manufacturing plants. Rule 28.2. Definitions. Words or terms defined in Rule 28 are for the purpose of this rule only and will not affect the definitions of Section 4-2. Unless specifically defined in this Rule 28, the definitions from Section 4-2 will apply: (1) Acid mist means sulfuric acid mist, as measured by EPA Method 8 in Title 40 Code of Federal Regulations Part 60, Appendix A, which has been incorporated by reference in Chapter 4, or an equivalent or alternative method, as provided in Title 40 Code of Federal Regulations Part 60, Subpart H, which has been incorporated by reference in Chapter 4. (2) Deluge system means a system to overflow an area of a release with an extinguishing agent. (3) Oleum manufacturing plant means any facility producing oleum. (4) Sulfuric acid plant means any facility producing sulfuric acid by the contact process by burning elemental sulfur, alkylation acid, hydrogen sulfide, organic sulfides and mercaptans, or acid sludge or by any other method. Rule 28.3. Standards. (1) Best Available Control Technology. Any sulfuric acid plant or oleum manufacturing plant or the modification, alteration or reconstruction of a sulfuric acid plant or oleum manufacturing plant shall utilize "best available control technology" for the control of sulfur dioxide emissions and for the control of acid mist emissions during start-up, normal operations and shut-down. For the purposes of this Rule 28, "best available control technology" shall have the same definition as for "Best available control technology (BACT) for Section 4-8(e) and Section 4-41, Rule 25." (2) Normal operations. a. In no case shall "best available control technology" be less stringent than the requirements of the Standards of Performance for Sulfuric Acid Plants, Title 40 Code of Federal Regulations Part 60, Subpart H, which has been incorporated by reference in Chapter 4. Except during startup, no emissions containing sulfuric acid mist shall be discharged from the facility with an opacity in excess of five percent (5%) for an aggregate of more than five (5) minutes in any one (1) hour or more than twenty (20) minutes in any twenty-four (24) hour period. b. The process equipment and material handling shall be operated in accordance with the facility's leak detection and repair (LDAR) procedures, which shall be submitted to the Director for written approval prior to the issuance of any installation permit, certificate of operation, or Part 70 operating permit. Written approval must be received from the Director prior to the initial start-up of the plant. (3) Plant start-up operations. a. Acid mist emissions, including fugitive emissions, shall not exceed fifteen-hundredths (0.15) pounds of acid mist emissions per ton of one hundred percent (100%)sulfuric acid produced. b. Sulfur dioxide emissions shall not exceed one thousand two hundred (1,200) parts per million by volume, averaged over the three (3) consecutive hours immediately following the initiation of sulfur burning. c. No emissions containing sulfuric acid mist shall be discharged from the facility with an opacity in excess of twenty percent (20%) for an aggregate of more than five (5) minutes in any one (1) hour during startup. d. A continuous monitoring system for the measurement of sulfur dioxide emissions during start-up shall be installed, calibrated, maintained, and operated by the owner or operator during start-up. The pollutant gas used to prepare calibration gas mixtures for calibration checks shall be sulfur dioxide. EPA Method 8 in Title 40 Code of Federal Regulations Part 60, Appendix A, which has been incorporated by reference in Chapter 4, shall be used for conducting monitoring system performance evaluations except that only the sulfur dioxide portion of the Method 8 results shall be used. The span value shall be set at two thousand (2,000) ppm of sulfur dioxide. e. Plant start-up shall be at the lowest practicable production rate, not to exceed seventy percent (70%) of the maximum production rate, until the sulfur dioxide continuous emissions monitor required under Rule 28.3(3)d. indicates compliance with the best available control technology sulfur dioxide emissions limitations provided in Rule 28.3(1). If a more appropriate indicator (such as blower pressure, furnace temperature, gas strength, blower speed, number of sulfur guns operating, or equivalent operating parameter) can be documented, tested and validated, the Director may accept this in lieu of directly documenting the production rate. f. If the sulfur dioxide continuous emissions monitor required under Rule 28.3(3)d. indicates that the plant is not in compliance with the sulfur dioxide emissions limitations of Rule 28.3(1) by the end of the third hour after start-up initiation, the plant shall be shut down within the fourth hour after start-up initiation. Restart may occur as soon as practicable following any needed repairs or adjustments, provided that corrective action has been taken, logged, and initialed prior to restart. g. Plant start-up procedures which minimize sulfur dioxide emissions and acid mist emissions during start-up shall be developed, documented, and submitted to the Director for written approval prior to issuance of any installation permit, certificate of operation, or Part 70 operating permit. Written approval must be received from the Director prior to the initial start-up of the plant. These procedures shall include recording the inlet and outlet temperatures of each catalyst mass; and the concentration, temperature, and flow of circulating acid in each absorbing tower on a written operator log. The plant shall operate in accordance with the approved start-up procedures. h. Plant start-up shall not commence unless meteorological conditions clearly demonstrate that inversion and/or air stagnation conditions do not exist in the vicinity of the plant. 1. The owner or operator shall develop, document, and implement procedures to be followed during start-up which clearly demonstrate that inversion and/or air stagnation conditions do not exist at the plant at the time of start-up. These procedures shall be submitted to the Director for written approval prior to the issuance of any installation permit, certificate of operation, or Part 70 operating permit. Written approval must be received from the Director prior to the initial start-up of the plant. Any modifications to these procedures shall require the written approval of the Director. Written approval must be received from the Director prior to implementation of the modifications. 2. A record of the meteorological conditions present during each start-up shall be recorded on a written operator log. (4) Storage tanks. Storage tanks used to store concentrated sulfuric acid or oleum at ambient temperature shall meet the design, fabrication, and inspection requirements of the National Association of Corrosion Engineers (NACE) Standard RP0294-94, "Recommended Practice Design, Fabrication, and Inspection of Tanks for Storage of Concentrated Sulfuric Acid and Oleum at Ambient Temperatures," which has been incorporated by reference in Chapter 4. (5) Deluge system. The owner or operator of an oleum manufacturing plant or a sulfuric acid plant where oleum is a product or by-product shall install and maintain a deluge system, which shall be operated in the event of an oleum release. Rule 29. General Provisions and Applicability for Oleum Transfer Operations. Rule 29.1. Purpose. The purpose of this Rule 29 is to prevent releases of oleum from oleum transfer facilities. Rule 29.2. Definitions. Words or terms defined in Rule 29 are for the purpose of this rule only and will not affect the definitions of Section 4-2. Unless specifically defined in this Rule 29, the definitions from Section 4-2 will apply: (1) Deluge system means a system to overflow an area of a release with an extinguishing agent. (2) Failure event means any release of oleum into the ambient air which may expose the public to sulfuric acid and sulfur trioxide (combined) in excess of 0.01 grams per cubic meter or two (2) parts per million calculated as sulfuric acid averaged over any ten (10) consecutive minutes, or any release of oleum of any amount into the ambient air that causes or contributes to cause any of the following health effects: irritated eyes, skin or mucous membranes; headaches; burning sensation in the nose or throat; nausea; difficulty breathing; inflammation of the upper respiratory tract; chronic bronchitis; lung damage; loss of consciousness; or chemical pneumonitis. (3) Oleum means sulfuric acid (H 2 SO 4 ) with any dissolved sulfur trioxide (SO 3 ). (4) Oleum transfer facility means a facility or operation that loads or unloads oleum into or out of containers. Rule 29.3. Standards. Any owner or operator of an oleum transfer facility shall meet all of the following requirements: (1) No owner or operator of an oleum transfer facility shall cause, suffer, allow or permit any oleum release into the ambient air which may expose the public to sulfuric acid and sulfur trioxide (combined) in excess of 0.01 grams per cubic meter or two (2) parts per million calculated as sulfuric acid averaged over any ten (10) consecutive minutes, or any release of oleum of any amount into the ambient air that causes or contributes to cause any of the following health effects: irritated eyes, skin or mucous membranes; headaches; burning sensation in the nose or throat; nausea; difficulty breathing; inflammation of the upper respiratory tract; chronic bronchitis; lung damage; loss of consciousness; or chemical pneumonitis. (2) All oleum transfers shall be continuously conducted, attended, and monitored by a qualified operator. A qualified operator is a person who is trained under the facility's oleum transfer procedures to conduct an oleum transfer. (3) All oleum transfers shall be conducted in strict accordance with the facility's written oleum transfer procedures. The oleum transfer procedures shall meet the following requirements: a. The procedures shall be submitted for written approval by the Director that the requirements of Rule 29.3(3)b. through (3)f. have been met prior to the issuance of an installation permit, certificate of operation, or Part 70 permit. Written approval must be received from the Director prior to the initial start-up of the facility. The Director shall provide a thirty (30) day public comment period followed by a public hearing prior to the initial start-up of the facility and will consider all comments received during the public comment period and the public hearing prior to approval of the procedures. b. The procedures shall explicitly establish and thoroughly describe a qualified operator training program; an equipment inspection and maintenance plan; and monitoring and warning systems to avoid a failure event as defined in Rule 29.2. c. The procedures shall detail the steps that must be taken by the qualified operator during the oleum transfer and shall include a written oleum transfer checklist. The checklist must provide for a method that will verify completion of each step in the transfer procedure. d. The procedures shall detail the approval process that must be followed to change the oleum transfer procedures or the oleum transfer checklist. Any change in procedures must be submitted for advance written approval by the Director; e. The procedures must be approved and signed by a responsible manager. A responsible manager is a person who is an employee of the facility and who is responsible for the management of the facility. f. The owner or operator, using a process hazards analysis as described in Title 40 Code of Federal Regulations Part 68, Subpart D, Section 68.67, which has been incorporated by reference in Chapter 4, shall predict failure events; identify and evaluate hazards involved in the process; plan, implement, and document at least three (3) consecutive prevention measures for every predicted failure event. A process hazards analysis is a systematic method for reducing the likelihood for an oleum release, and for identifying conditions, component failure, and human activities that may result in emissions to the ambient air. The procedures must contain the written predictions, plans, and prevention measures. 1. Prevention measures include, but are not limited to, flow, level and pressure indicators with interlocks; deadman switches; monitoring systems; documented and verified routine inspection and maintenance programs specified in detail by the oleum transfer procedure; and secondary containment and control equipment. 2. Operator training and documented and verified routine inspection and maintenance programs specified in detail by the oleum transfer procedure, collectively, may count as only one (1) of the three (3) required prevention measures. 3. A component, system or program with an unacceptable probability for failure shall not be considered a prevention measure. 4. As part of the process hazards analysis, methods for reducing the likelihood for a release include an inherent safety review of the operation, which considers process modifications and which minimizes the number of oleum transfers. g. So that appropriate protective measures, such as shelter in place or evacuation plans, may be instituted, the owner or operator will develop, document, and implement notification procedures to immediately notify the public in the event of an oleum release which may result in a failure event as defined in Rule 29.2. The written notification procedures shall be included in the oleum transfer procedures. (4) At the time of each transfer, an oleum transfer checklist shall be completed by the qualified operator who attends and conducts the transfer. Immediately following the completion of the transfer, the qualified operator shall sign the completed checklist, which shall include the date and the time of the transfer. (5) The owner or operator of an oleum transfer facility shall vent all pressure relief devices to a secondary containment system, which is a system designed to contain and control a release of oleum in order to avoid a failure event as defined in Rule 29.2. In lieu of controlling any pressure relief device on a tank truck or railroad tankcar, an additional pressure relief device may be installed on the stationary vent line to the tank truck or railroad tankcar. This additional pressure relief device shall be vented to a secondary containment system and shall be designed to relieve at less than eighty percent (80%) of the set point of the tank truck or railroad tankcar pressure relief device. (6) Oleum transfer checklists for each transfer shall be retained for at least two (2) years following the date of the transfer and shall be available for inspection by the Director or his designated representatives during normal business hours. (7) In the event of an oleum release, the owner or operator of an oleum transfer facility shall immediately report the release to the Director and to the local emergency services. This shall mean an immediate telephone report to the Director and to the local emergency services, followed up by a written report submitted to the Director within seven (7) days after the release. (8) The owner or operator of an oleum transfer facility shall install and maintain a deluge system, which shall be operated in the event of an oleum release to prevent a failure event as defined in Rule 29.2.

(Code 1986, § 4-41; Ord. No. 9171, §§ 6-8, 10—13, 5-30-89; Ord. No. 9652, § 1, 12-17-91; Ord. No. 9846, §§ 3—8, 3-9-93; Ord. No. 10269, §§ 1—3, 7-25-95; Ord. No. 10277, §§ 15—26, 28, 8-15-95; Ord. No. 10785, §§ 1—4, 10-27-98; Ord. No. 10786, §§ 31—50, 62, 10-27-98; Ord. No. 10923, § 1, 11-2-99; Ord. No. 10968, §§ 5, 6, 2-8-00; Ord. No. 11539, § 1, 3-30-04; Ord. No. 11650, § 1, 11-23-04; Ord. No. 12053, §§ 1—3, 12-11-07; Ord. No. 12054, §§ 8—29, 12-11-07; Ord. No. 13221, §§ 13—15, 9-19-17; Ord. No. 13452, § 1, 4-16-19; Ord. No. 13998, §§ 24—76, 6-27-23; Ord. No. 14165, §§ 6—16, 10-29-24; Ord. No. 14324, §§ 7-10, 2-17-26)

Ask a question about Chattanooga law

Corpus searches the Chattanooga sections it holds and shows the ones that match, with their citations. Free, no sign-in.