§ 4-58 — Permit issuance, renewal, reopenings, and revisions
Code of Ordinances, City of Chattanooga, Tennessee (Supp. No. 40: codified through Ordinance No. 14374, enacted June 16, 2026) · Chattanooga City Code § 4-58
Corpus is an independent public-information project, not the official City of Chattanooga website. Stable reference: corpuslaw.us/code/e88c9e45-a02a-4335-86b9-91826f4d3483
Sec. 4-58. - Permit issuance, renewal, reopenings, and revisions.
(a) Action on application. (1) A permit, permit modification, or renewal may be issued only if all of the following conditions have been met: (i) The permitting authority has received a complete application for a permit, permit modification, or permit renewal, except that a complete application need not be received before issuance of a general permit under Section 4-57(d) of this ordinance; (ii) Except for modifications qualifying for minor permit modification procedures under Section 4-58(e)(1) and (2) of this ordinance, the permitting authority has complied with the requirements for public participation under paragraph (h) of this section 4-58; (iii) The permitting authority has complied with the requirements for notifying and responding to affected States under Section 4-59(b) of this ordinance; (iv) The conditions of the permit provide for compliance with all applicable requirements and the requirements of this ordinance; and (v) The Administrator has received a copy of the proposed permit and any notices required under 40 CFR §§ 70.8(a) and 70.8(b), and has not objected to issuance of the permit under 40 CFR § 70.8(c) within the time period specified therein. (vi) No permit for a solid waste incineration unit may be issued by an agency, instrumentality or person that is also responsible, in whole or in part, for the design and construction or operation of the unit. (2) Except as provided under the initial transition plan provided for under Section 4-56(e) of this ordinance or under Title IV or Title V of the Act for the permitting of affected sources under the acid rain program, the permitting authority takes final action on each permit application (including a request for permit modification or renewal) within eighteen (18) months, or such lesser time established by the permitting authority, after receiving a complete application. (3) Priority shall be given to taking action on applications for construction or modification under Title I, parts C and D of the Act. (4) The permitting authority shall promptly provide notice to the applicant of whether the application is complete. Unless the permitting authority requests additional information or otherwise notifies the applicant of incompleteness within sixty (60) days of receipt of an application, the application shall be deemed complete. For modifications processed through minor permit modification procedures, such as those in paragraphs (e)(1) and (2) of this section, a completeness determination is not required. (5) The permitting authority shall provide a statement that sets forth the legal and factual basis for the draft permit conditions (including references to the applicable statutory or regulatory provisions). The permitting authority shall send this statement to EPA and to any other person who requests it. (6) The submittal of a complete application shall not affect the requirement that any source or emissions unit at a Part 70 source have a preconstruction permit under Title I of the Act. (b) Requirement for a permit. Except as provided in the following sentence, Section 4-58(i)(1) of this ordinance, and paragraphs Section 4-58(e)(1)(v) and (2)(v) of this ordinance, no Part 70 source may operate after the time that it is required to submit a timely and complete application under this ordinance after its approval by EPA, except in compliance with a permit issued under a Part 70 program. If a Part 70 source submits a timely and complete application for permit issuance (including for renewal), the source's failure to have a Part 70 permit is not a violation of this ordinance until the permitting authority takes final action on the permit application, except as noted in this section. This protection shall cease to apply if, subsequent to the completeness determination made pursuant to paragraph (a)(4) of this section, and as required by Section 4-56(a)(2) of this ordinance, the applicant fails to submit by the deadline specified in writing by the permitting authority any additional information identified as being needed to process the application. (c) Permit renewal and expiration. (1) (i) Permits being renewed are subject to the same procedural requirements, including those for public participation, affected State and EPA review, that apply to initial permit issuance; and (ii) Permit expiration terminates the source's right to operate unless a timely and complete renewal application has been submitted consistent with paragraph (b) of this section and Section 4-56(a)(1)(iii) of this ordinance. (2) If the permitting authority fails to act in a timely way on a permit renewal, EPA may override the permitting authority to terminate or revoke and reissue the permit. (3) If a timely and complete application for a permit renewal is submitted, consistent with Section 4-56(a)(2) of this ordinance, but the permitting authority has failed to issue or deny the renewal permit before the end of the term of the previous permit, then: (i) The permit shall not expire until the renewal permit has been issued or denied and any permit shield that may be granted pursuant to Section 4-57(f) of this ordinance may extend beyond the original permit term until renewal; or (ii) All the terms and conditions of the permit including any permit shield that may have been granted under this ordinance or pursuant to Section 4-57(f) of this ordinance shall remain in effect until the renewal permit has been issued or denied. (4) Consistent with the requirements of this ordinance and 40 CFR Part 70, the permitting authority is authorized to terminate, modify, or revoke and reissue permits for cause. (5) The permitting authority shall make available to the public for inspection any permit application, compliance plan, permit, and monitoring and compliance certification report pursuant to section 503(e) of the Act [42 U.S.C. § 7661b.(e)], except for information entitled to confidential treatment pursuant to section 114(c) of the Act [42 U.S.C. § 7414]. The contents of a Part 70 permit shall not be entitled to protection under section 114(c) of the Act [42 U.S.C. § 7414]. (d) Administrative permit amendments. (1) An "administrative permit amendment" is a permit revision that: (i) Corrects typographical errors; (ii) Identifies a change in the name, address, or phone number of any person identified in the permit, or provides a similar minor administrative change at the source; (iii) Requires more frequent monitoring or reporting by the permittee; (iv) Allows for a change in ownership or operational control of a source where the permitting authority determines that no other change in the permit is necessary, provided that a written agreement containing a specific date for transfer of permit responsibility, coverage, and liability between the current and new permittee has been submitted to the permitting authority; (v) Incorporates into the Part 70 permit the requirements from preconstruction review permits authorized under an EPA-approved program, provided that such a program meets procedural requirements substantially equivalent to the requirements of Section 4-58 and Section 4-59 of this ordinance that would be applicable to the change if it were subject to review as a permit modification, and compliance requirements substantially equivalent to those contained in Section 4-57 of this ordinance; or (vi) Incorporates any other type of change which the Administrator has determined as part of the approved Part 70 program to be similar to those in paragraphs (d)(1)(i) through (iv) of this section provided that such "other type of change" has been identified in this ordinance by amendment subsequent to the action of the Administrator. (2) Administrative permit amendments for purposes of the acid rain portion of the permit shall be governed by regulations promulgated under Title IV of the Act which are incorporated by reference in this ordinance at Section 4-52(d). (3) Administrative permit amendment procedures. An administrative permit amendment may be made by the permitting authority consistent with the following: (i) The permitting authority shall take no more than sixty (60) days from receipt of a request for an administrative permit amendment to take final action on such request, and may incorporate such changes without providing notice to the public or affected States provided that it designates any such permit revisions as having been made pursuant to this section of this ordinance. (ii) The permitting authority shall submit a copy of the revised permit to the Administrator. (iii) The source may implement the changes addressed in the request for an administrative amendment immediately upon submittal of the request. (4) The permitting authority may, upon taking final action granting a request for an administrative permit amendment, allow coverage by the permit shield in Section 4-57(f) of this ordinance for administrative permit amendments made pursuant to paragraph (d)(1)(v) of this section which meet the relevant requirements of Sections 4-57, 4-58, and 4-59 of this ordinance for significant permit modifications. (e) Permit modification. A permit modification is any revision to a Part 70 permit that cannot be accomplished under the program's provisions for administrative permit amendments under paragraph (d) of this section. A permit modification for purposes of the acid rain portion of the permit shall be governed by regulations promulgated under Title IV of the Act which are incorporated by reference in this ordinance at Section 4-52(d). (1) Minor permit modification procedures. (i) Criteria. (A) Minor permit modification procedures may be used only for those permit modifications that: (1) Do not violate any applicable requirement; (2) Do not involve significant changes to existing monitoring, reporting, or recordkeeping requirements in the permit; (3) Do not require or change a case-by-case determination of an emission limitation or other standard, or a source-specific determination for temporary sources of ambient impacts, or a visibility or increment analysis; (4) Do not seek to establish or change a permit term or condition for which there is no corresponding underlying applicable requirement and that the source has assumed to avoid an applicable requirement to which the source would otherwise be subject. Such terms and conditions include: (A) A federally enforceable emissions cap assumed to avoid classification as a modification under any provision of Title I of the Act; and (B) An alternative emissions limit approved pursuant to regulations promulgated under section 112(i)(5) of the Act [42 U.S.C. § 7412(i)(5)]; (5) Are not modifications under any provision of Title I of the Act; and (6) Are not required by this ordinance to be processed as a significant modification. (B) Notwithstanding paragraphs (e)(1)(i)(A) and (e)(2)(i) of this section, minor permit modification procedures may be used for permit modifications involving the use of economic incentives, marketable permits, emissions trading, and other similar approaches, to the extent that such minor permit modification procedures are explicitly provided for in an applicable implementation plan or in applicable requirements promulgated by EPA. (ii) Application. An application requesting the use of minor permit modification procedures shall meet the requirements of Section 4-56(c) of this ordinance and shall include the following: (A) A description of the change, the emissions resulting from the change, and any new applicable requirements that will apply if the change occurs; (B) The source's suggested draft permit; (C) Certification by a responsible official, consistent with Section 4-56(d) of this ordinance, that the proposed modification meets the criteria for use of minor permit modification procedures and a request that such procedures be used; and (D) Completed forms for the permitting authority to use to notify the Administrator and affected States as required under 40 CFR § 70.8. (iii) EPA and affected State notification. Within 5 working days of receipt of a complete permit modification application, the permitting authority shall meet its obligation under Section 4-59(a)(1) and (b)(1) of this ordinance to notify the Administrator and affected States of the requested permit modification. The permitting authority promptly shall send any notice required under Section 4-59(b)(2) of this ordinance to the Administrator. (iv) Timetable for issuance. The permitting authority may not issue a final Part 70 permit modification until after EPA's forty-five (45) day review period or until EPA has notified the permitting authority that EPA will not object to issuance of the permit modification, whichever is first, although the permitting authority can approve the permit modification prior to that time. In the event of an objection by the Administrator, the director shall follow the procedures set forth at Section 4-59(c) of this ordinance. Within ninety (90) days of the permitting authority's receipt of an application under minor permit modification procedures or fifteen (15) days after the end of the Administrator's forty-five (45) day review period under Section 4-59(c) of this ordinance, whichever is later, the permitting authority shall: (A) Issue the permit modification as proposed; (B) Deny the permit modification application; (C) Determine that the requested modification does not meet the minor permit modification criteria and should be reviewed under the significant modification procedures; or (D) Revise the draft permit modification and transmit to the Administrator the new proposed permit modification as required by 40 CFR § 70.8(a). (v) Source's ability to make change. The source is allowed to make the change proposed in its minor permit modification application immediately after it files such application. After the source makes the change allowed by the preceding sentence, and until the permitting authority takes any of the actions specified in paragraphs (e)(1)(iv)(A) through (C) of this section, the source must comply with both the applicable requirements governing the change and the proposed permit terms and conditions. During this time period, the source need not comply with the existing permit terms and conditions it seeks to modify. However, if the source fails to comply with its proposed permit terms and conditions during this time period, the existing permit terms and conditions it seeks to modify may be enforced against it. (vi) Permit shield. The permit shield under Section 4-57(f) of this ordinance may not extend to minor permit modifications. (2) Group processing of minor permit modifications. Consistent with this paragraph, the permitting authority may modify the procedure outlined in paragraph (e)(1) of this section to process groups of a source's applications for certain modifications eligible for minor permit modification processing. (i) Criteria. Group processing of modifications may be used only for those permit modifications: (A) That meet the criteria for minor permit modification procedures under paragraph (e)(1)(i)(A) of this section; and (B) That collectively are below the threshold level approved by the Administrator as part of the approved program. This threshold shall be ten percent (10%) of the emissions allowed by the permit for the emissions unit for which the change is requested, twenty percent (20%) of the applicable definition of major source in Section 4-53 of this ordinance, or five (5) tons per year, whichever is least. (ii) Application. An application requesting the use of group processing procedures shall meet the requirements of Section 4-56(c) of this ordinance and shall include the following: (A) A description of the change, the emissions resulting from the change, and any new applicable requirements that will apply if the change occurs. (B) The source's suggested draft permit. (C) Certification by a responsible official, consistent with Section 4-56(d) of this ordinance, that the proposed modification meets the criteria for use of group processing procedures and a request that such procedures be used. (D) A list of the source's other pending applications awaiting group processing, and a determination of whether the requested modification, aggregated with these other applications, equals or exceeds the threshold set under paragraph (e)(2)(i)(B) of this section. (E) Certification, consistent with Section 4-56(d) of this ordinance, that the source has notified EPA of the proposed modification. Such notification need only contain a brief description of the requested modification. (F) Completed forms for the permitting authority to use to notify the Administrator and affected States as required under Section 4-59 of this ordinance. (iii) EPA and affected State notification. On a quarterly basis or within five (5) business days of receipt of an application demonstrating that the aggregate of a source's pending applications equals or exceeds the threshold level set under paragraph (e)(2)(i)(B) of this section, whichever is earlier, the permitting authority promptly shall meet its obligation under Section 4-59(a)(1) and (b)(1) of this ordinance to notify the Administrator and affected States of the requested permit modifications. The permitting authority shall send any notice required under Section 4-59(b)(2) of this ordinance to the Administrator. (iv) Timetable for issuance. The provisions of paragraph (e)(1)(iv) of this section shall apply to modifications eligible for group processing, except that the permitting authority shall take one (1) of the actions specified in paragraphs (e)(1)(iv)(A) through (D) of this section within one hundred eighty (180) days of receipt of the application or fifteen (15) days after the end of the Administrator's forty-five (45) day review period under Section 4-59(c) of this ordinance, whichever is later. (v) Source's ability to make change. The provisions of paragraph (e)(1)(v) of this section shall apply to modifications eligible for group processing. (vi) Permit shield. The provisions of paragraph (e)(1)(vi) of this section shall also apply to modifications eligible for group processing. (3) Significant modification procedures. (i) Criteria. Significant modification procedures shall be used for applications requesting permit modifications that do not qualify as minor permit modifications or as administrative amendments. The permitting authority shall follow these criteria in determining whether a change is significant: Any change in existing monitoring permit terms or conditions and every relaxation of reporting or recordkeeping permit terms or conditions shall be considered significant. Nothing herein shall be construed to preclude the permittee from making changes consistent with this part that would render existing permit compliance terms and conditions irrelevant. (ii) Significant permit modifications shall meet all requirements of this ordinance, including those for applications, public participation, review by affected States, and review by EPA, as they apply to permit issuance and permit renewal. The permitting authority shall design and implement this review process to complete review on the majority of significant permit modifications within nine (9) months after receipt of a complete application. (f) Reopening for cause. (1) Each issued permit shall include provisions specifying the conditions under which the permit will be reopened prior to the expiration of the permit. A permit shall be reopened and revised under any of the following circumstances: (i) Additional applicable requirements under the Act become applicable by ordinance amendment to a major Part 70 source with a remaining permit term of three (3) or more years. Such a reopening shall be completed not later than eighteen (18) months after promulgation of the applicable requirement. No such reopening is required if the effective date of the requirement is later than the date on which the permit is due to expire, unless the original permit or any of its terms and conditions has been extended pursuant to Section 4-58(c)(3) of this ordinance. (ii) Additional requirements (including excess emissions requirements) become applicable to an affected source under the acid rain program. Upon approval by the Administrator and amendment of this ordinance, excess emissions offset plans shall be incorporated into the permit by the permitting authority. (iii) The permitting authority or EPA determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or other terms or conditions of the permit. (iv) The Administrator or the permitting authority determines that the permit must be revised or revoked to assure compliance with the applicable requirements. (2) Proceedings to reopen and issue a permit shall follow the same procedures as apply to initial permit issuance and shall affect only those parts of the permit for which cause to reopen exists. Such reopening shall be made as expeditiously as practicable. (3) Reopenings under paragraph (f)(1) of this section shall not be initiated before a notice of such intent is provided to the Part 70 source by the permitting authority at least thirty (30) days in advance of the date that the permit is to be reopened, except that the permitting authority may provide a shorter time period in the case of an emergency. (g) Reopenings for cause by EPA. (1) If the Administrator finds that cause exists to terminate, modify, or revoke and reissue a permit pursuant to paragraph (f) of this section, the Administrator is required by federal law to notify the permitting authority and the permittee of such finding in writing. (2) The permitting authority shall, within ninety (90) days after receipt of such notification, forward to EPA a proposed determination of termination, modification, or revocation and reissuance, as appropriate. The Administrator may extend this ninety (90) day period for an additional ninety (90) days if he finds that a new or revised permit application is necessary or that the permitting authority must require the permittee to submit additional information. (3) The Administrator is required by federal regulations to review the proposed determination from the permitting authority within ninety (90) days of receipt. (4) The permitting authority shall have ninety (90) days from receipt of an EPA objection to follow the procedures set forth at Section 4-59(c) of this ordinance in an effort to resolve any objection that EPA makes. (5) If the permitting authority fails to submit a proposed determination pursuant to paragraph (g)(2) of this section or fails to resolve any objection pursuant to paragraph (g)(4) of this section, the Administrator is required by federal law to exercise override authority and to terminate, modify, or revoke and reissue the permit after taking the following actions: (i) Providing at least thirty (30) days' notice to the permittee in writing of the reasons for any such action. This notice may be given during the procedures in paragraphs (g)(1) through (4) of this section. (ii) Providing the permittee an opportunity for comment on the Administrator's proposed action and an opportunity for a hearing. (h) Public participation. Except for modifications qualifying for minor permit modification procedures, all permit proceedings, including initial permit issuance, significant modifications, and renewals, shall provide adequate procedures for public notice including offering an opportunity for public comment and a hearing on the draft permit. These procedures include the following: (1) Notice shall be given: by publication as an electronic notice (e-notice) on the Bureau website, along with a copy of the draft permit, for the duration of the public comment period; to persons on a mailing list developed by the Bureau, including those who request in writing to be on the list; and by other means designated by the Director, if necessary, to assure adequate notice to the affected public; (2) The notice shall identify the affected facility; the name and address of the permittee; the name and address of the permitting authority processing the permit; the activity or activities involved in the permit action; the emissions change involved in any permit modification; the name, address, and telephone number of a person from whom interested persons may obtain additional information, including copies of the permit draft, the application, all relevant supporting materials, including the compliance plan, and monitoring and compliance certification report pursuant to section 503(e) of the Act, except for information entitled to confidential treatment pursuant to Section 114(c) of the Act [the contents of a Part 70 permit shall not be entitled to confidential treatment under section 114(c) of the Act.], and all other materials available to the permitting authority that are relevant to the permit decision; a brief description of the comment procedures required by this part; and the time and place of any hearing that may be held, including a statement of procedures to request a hearing (unless a hearing has already been scheduled); (3) The permitting authority shall provide such notice and opportunity for participation by affected States as is provided for by Section 4-59 of this ordinance; (4) Timing. The permitting authority shall provide at least thirty (30) days for public comment and shall give notice of any public hearing at least thirty (30) days in advance of the hearing. (5) The permitting authority shall keep a record of the commentors and also of the issues raised during the public participation process so that the Administrator may fulfill his obligation under section 505(b)(2) of the Act [42 U.S.C. § 7661d.(b)(2)] to determine whether a citizen petition may be granted, and such records shall be available to the public. [40 CFR § 70.7] (i) Operational Flexibility. Consistent with paragraphs (i)(1) through (3) of this section changes within a permitted facility are allowed without requiring a permit revision, if the changes are not modifications under any provision of Title I of the Act and the changes do not exceed the emissions allowable under the permit (whether expressed therein as a rate of emissions or in terms of total emissions): Provided that the facility provides the Administrator and the permitting authority with written notification as required below in advance of the proposed changes, which shall be a minimum of seven (7) days, unless the permitting authority provides a different time frame for emergencies. The source, permitting authority, and EPA shall attach each such notice to their copy of the relevant permit. The following provisions implement this requirement: (1) The source shall be allowed to make section 502(b)(10) of the Act [42 U.S.C. § 7661a.(b)(10)] changes without requiring a permit revision, if the changes are not modifications under any provision of Title I of the Act and the changes do not exceed the emissions allowable under the permit (whether expressed therein as a rate of emissions or in terms of total emissions). (i) For each such change, the written notification required above shall include a brief description of the change within the permitted facility, the date on which the change will occur, any change in emissions, and any permit term or condition that is no longer applicable as a result of the change. (ii) The permit shield described in 40 CFR § 70.6(f) and Section 4-57(f) of this ordinance shall not apply to any change made pursuant to this paragraph 4-58(i)(1). (2) If the applicant in possession of a certificate of alternate control (issued pursuant to section 4-13 of the Chattanooga Air Pollution Control Ordinance) for an operating permit requests them, the permitting authority shall include terms and conditions for the trading of emissions increases and decreases in the permitted source, to the extent that the applicable requirements in the certificate of alternate control provide for trading such increases and decreases without a case-by-case approval of each emissions trade. (i) Such terms and conditions: (A) Shall include all terms required under this ordinance and the Chattanooga Air Pollution Control Ordinance to determine compliance; and (B) Must meet all applicable requirements in the Chattanooga Air Pollution Control Ordinance that are not altered by the certificate of alternate control. (ii) Under this paragraph (i)(2)(ii), a seven (7) day advance written notification is required and shall include the following information: when the proposed change will occur, a description of each such change, any change in emissions, the permit requirements with which the source will comply using the emissions trading provisions of the applicable implementation plan, and the pollutants emitted subject to the emissions trade. The notice shall also refer to the provisions with which the source will comply in the applicable certificate of alternate control and that provide for the emissions trade. (iii) The permit shield described in 40 CFR § 70.6(f) and in Section 4-57(f) of this ordinance shall not extend to any change made under this paragraph (i)(2). Compliance with the permit requirements that the source will meet using the emissions trade shall be determined only to the extent that requirements of an applicable certificate of alternate control authorize the emissions trade. (3) The permitting authority shall, if a permit applicant requests it, issue permits that contain terms and conditions, including all terms required under Section 4-57(a) and (c) of this ordinance to determine compliance, allowing for the trading of emissions increases and decreases in the permitted facility solely for the purpose of complying with a federally-enforceable emissions cap that is established in the permit independent of otherwise applicable requirements. The permit applicant shall include in its application proposed replicable procedures and permit terms that ensure the emissions trades are quantifiable and enforceable. The permitting authority shall not be required to include in the emissions trading provisions any emissions units for which emissions are not quantifiable or for which there are no replicable procedures to enforce the emissions trades. The permit shall also require compliance with all applicable requirements. (i) Under this paragraph (i)(3), the written notification required above shall state when the change will occur and shall describe the changes in emissions that will result and how these increases and decreases in emissions will comply with the terms and conditions of the permit. (ii) The permit shield described in 40 CFR § 70.6(f) and Section 4-57(f) of this ordinance may extend to terms and conditions that allow such increases and decreases in emissions. (j) Off permit changes. The source may make changes that are not addressed or prohibited by the permit, other than those described in paragraph (k) of this section, to be made without a permit revision, only after the source meets the requirements of (1) through (3) of this paragraph. (1) Each such change shall meet all applicable requirements and shall not violate any existing permit term or condition. (2) Sources must provide contemporaneous written notice to the permitting authority and EPA of each such change, except for changes that qualify as insignificant under the provisions adopted pursuant to 40 CFR § 70.5(c) or Sections 4-56(c)(11) and (c)(12) of this ordinance. Such written notice shall describe each such change, including the date, any change in emissions, pollutants emitted, and any applicable requirement that would apply as a result of the change. (3) The change shall not qualify for the shield under 40 CFR § 70.6(f) or Section 4-57(f) of this ordinance. (4) The permittee shall keep a record describing changes made at the source that result in emissions of a regulated air pollutant subject to an applicable requirement, but not otherwise regulated under the permit, and the emissions resulting from those changes. The records shall be retained until the changes are incorporated into subsequently issued permits. (k) No source shall make, without a permit revision, changes that are not addressed or prohibited by the Part 70 permit, if such changes are subject to any requirements under Title IV of the Act or are modifications under any provision of Title I of the Act. (l) Sharing of information. Any information obtained or used in the administration of this Part 70 program shall be available to EPA upon request without restriction and in a form specified by the Administrator, including computer-readable files to the extent practicable. If the information has been submitted to the permitting authority under a claim of confidentiality, the permitting authority may require the source to submit this information to the Administrator directly. Where the permitting authority submits information to the Administrator under a claim of confidentiality, the permitting authority shall submit that claim to EPA when providing information to EPA under this section. Any information obtained from a permitting authority or Part 70 source accompanied by a claim of confidentiality will be treated in accordance with the applicable regulations.
(Ord. No. 10114, § 2, 9-27-94; Ord. No. 10786, § 61, 10-27-98; Ord. No. 13998, § 98, 6-27-23)
Ask a question about Chattanooga law
Corpus searches the Chattanooga sections it holds and shows the ones that match, with their citations. Free, no sign-in.
