For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 18-106 — Assessment and collection of impact fees

Municipal Code of the City of Franklin, Tennessee (Codified through Ordinance No. 2026-13, adopted June 23, 2026 (Supp. No. 30)) · Franklin Municipal Code § 18-106

Corpus is an independent public-information project, not the official City of Franklin website. Stable reference: corpuslaw.us/code/3ea7f170-8ded-4fc6-a8cb-c25c856551ad

Sec. 18-106. - Assessment and collection of impact fees.

Before a new connection is made to the water system or an existing customer increases requirements by expansion of the original served facilities, fees shall be assessed and collected by the city. The impact fee and installation fee for all customers is assessed and shall be paid prior to the issuance of a building permit. The impact fee shall be based on a single-family unit equivalent (SFUE) metric, with commercial or any other structure a multiple of that metric. The SFUE is defined as 350 gallons/day and is a conservative value used to account for diurnal capacities of the distribution system that is needed to provide customer's potable water. For structures larger in capacity than a single-family house, the building square footage provided by the developer will be used to determine the occupancy loading for the structure. That occupancy loading will be converted to a load factor, which will then be used to calculate the SFUE metric which will provide the associated impact fee. Occupancy loads will be used in conjunction with the latest International Building Code as adopted by the board of mayor and alderman. Refer to appendix A, comprehensive fees and penalties, for tables on the occupancy load factor and demand factors. The developer's engineer will initially calculate the impact fee based upon the square footage of the building and provide detailed calculations for review by the director. While the design of the structure is refined, the impact fee calculation will be refined and reviewed against initial calculations for additions or deletions by the director before the final fee is established. For a detailed description of the calculation process, refer to the most updated version of the Single-Family Unit Equivalent Handbook for water impact fee determination located on the water management department's website. Once the SFUE has been determined, the developer will then submit the proposed meter size for approval by the director. If a conflict exists between the developer and the department after final determination of the impact fee calculation, the developer must submit the following resources to support their reasoning to the director: • Clarifying information from recognized state or national publications. • Records of similar uses and discrepant information. • Information provided from other reliable sources approved by the director. The director will have 30 days to review any disputed discrepancies to make a final determination. Where applicable, the charges as specified in appendix A, comprehensive fees and penalties, shall be collected by the city at the time the permit is issued. These fees will be assessed for any connection inside or outside the corporate limits. The rate per SFUE shall be adjusted annually on April 1 of each year by the percentage change between the U.S. Department of Labor, Bureau of Labor Statistics, Consumer Price Index-U, U.S. city average, all items less food and energy, not seasonally adjusted. The change shall be determined by comparison of the figure for the previous January 1, with that of January 1 of the current calendar year. In no event shall this calculation cause a reduction in the rate per SFUE below that payable during the preceding year. The city shall revise the water impact fee study and the schedule of impact fees at least once every five years, and may do so more frequently, based upon the growth and capacity requirements of water infrastructure, inflation, revised cost estimates for improvements, changes in availability or other funding sources, and such other factors as may be relevant. PRIVATE FIRE HYDRANTS AND SPRINKLER SYSTEMS For mains connecting to the city's distribution system, an impact fee for connection of private fire hydrants and sprinkler system lines to the city's lines shall be as specified in appendix A, comprehensive fees and penalties. Radio-read meters will be required on all private fire hydrants and sprinkler systems, at the discretion of the city.

(Ord. No. 2018-26, § I, 6-26-2018; Ord. No. 2022-40, § I, 4-11-2023)

Ask a question about Franklin law

Corpus searches the Franklin sections it holds and shows the ones that match, with their citations. Free, no sign-in.