Sec. 24-210. - Costs used for calculation of property assessments.
The costs of the improvement to be used by the board for the calculation of the improvement assessments shall be the project costs after final acceptance of the improvement by the city as long as the final project costs do not exceed the estimated costs as approved in the establishing ordinance for the district by more than ten percent. Should the final project costs exceed the estimated costs by more than 110 percent; then the improvement assessments shall be calculated using the estimated costs plus ten percent. The final project costs shall include those costs as identified in the definitions, subsection 24-103(8), with a further breakdown of the "labor, materials, equipment necessary to compete an underground improvements" costs to include trench excavation, piping, manholes and any other required appurtenance for a completed public facility system, trench pavement repair, stormwater prevention and erosion control materials, installation and maintenance, final clean-up and grading, and property stabilization.
(Ord. No. 2011-12, § I, 9-11-2012)