For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 31-7.21 — Construction and completion bond

Code of Ordinances, City of Murfreesboro, Tennessee (Supp. No. 18: codified through Ordinance No. 26-O-38, enacted September 17, 2026) · Murfreesboro City Code § 31-7.21

Corpus is an independent public-information project, not the official City of Murfreesboro website. Stable reference: corpuslaw.us/code/fccb6a88-07ca-4e93-8ae9-c9a6d03b001a

Section 31-7.21 - Construction and completion bond.

Unless otherwise provided in a license or franchise agreement, a performance bond written by a corporate surety acceptable to the City equal to at least 100% of the estimated cost of constructing grantee's telecommunications facilities within the public ways of the City shall be deposited before construction is commenced. (A) The construction bond shall remain in force until 60 days after substantial completion of the work, as determined by the City Engineer, including restoration of public ways and other property affected by the construction. (B) The construction bond shall guarantee, to the satisfaction of the City: (1) timely completion of construction; (2) construction in compliance with applicable plans, permits, technical codes and standards; (3) proper location of the facilities as specified by the City; (4) restoration of the public ways and other property affected by the construction; (5) the submission of "as-built" drawings after completion of the work as required by this chapter; and (6) timely payment and satisfaction of all claims, demands or liens for labor, material or services provided in connection with the work.

(Ord. No. 96-O-83 § 1, 05-29-97)

Ask a question about Murfreesboro law

Corpus searches the Murfreesboro sections it holds and shows the ones that match, with their citations. Free, no sign-in.