For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 1.3.2.3 — Petition Requirements

Code of Ordinances of the City of Abilene, Texas (Supp. No. 15: codified through Ordinance No. 85-2026, enacted September 24, 2026) · Abilene Code of Ordinances § 1.3.2.3

Corpus is an independent public-information project, not the official City of Abilene website. Stable reference: corpuslaw.us/code/eb92b697-ee1f-4ba0-a4b5-7603895b1a1d

Section 1.3.2.3 - Petition Requirements

(a) Who May Apply. A property owner or applicant may petition for relief from a dedication or construction requirement when a dedication or construction requirement has been applied to a plat, or is the basis for denying the plat application. (b) Form of Petition. The petition for relief from a dedication or construction requirement shall allege that application of the standard relating to the dedication or construction requirement is not roughly proportional to the nature and extent of the impacts created by the proposed development on the City's water, wastewater, stormwater, parks, or roadway system, as the case may be, or does not reasonably benefit the proposed development. (c) Study Required. The petitioner shall provide a study in support of the petition for relief that includes the following information: (1) Total capacity of the City's water, wastewater, stormwater, parks, or roadway system to be utilized by the proposed development, employing standard measures of capacity and equivalency tables relating the type of development proposed to the quantity of system capacity to be consumed by the development. If the proposed development is to be developed in phases, such information also shall be provided for the entire development proposed, including any phases already developed. (2) Total capacity to be supplied to the City's water, wastewater, stormwater, parks, or roadway system by the proposed dedication of an interest in land or construction of capital improvements. If the development application is part of a phased development, the information shall include any capacity supplied by prior dedications or construction of capital improvements. (3) Comparison of the capacity of the City's public facilities system(s) to be consumed by the proposed development with the capacity to be supplied to such system(s) by the proposed dedication of an interest in land or construction of capital improvements. In making this comparison, the impacts on the City's public facilities system(s) from the entire development shall be considered. (4) The effect of any City participation in the costs of oversizing the capital improvement to be constructed in accordance with the City's requirements. (5) Any other information that shows the alleged disproportionality between the impacts created by the proposed development and the dedication or construction requirement imposed by the City. (6) This proportionality analysis should not only be based on any immediate plans for the property, but should be based on the size of the property, existing use of the property, the existing zoning, and what impacts the highest and best use of the property could have on the City's infrastructure system. (7) Only costs directly related to the dedication or construction requirement should be included in the analysis. Indirect costs, such as applications, permits, and fees, shall not be included. (d) Time for Filing Petition and Study. A petition for relief from a dedication or construction requirement shall be filed with the responsible official within ten (10) business days of the Planning and Zoning Commission's decision to conditionally approve or deny an application for approval of a Preliminary Plat, or where no Preliminary Plat application has been submitted, an application for approval of a Final Plat. The study in support of the petition shall be filed within sixty (60) business days of the initial decision, unless the petitioner seeks an extension in writing. The responsible official may extend the time for submitting the study for a period not to exceed an additional thirty (30) business days for good cause shown.

(Ord. No. 8-2010, pt. 1(Exh. A), 4-22-10; Ord. No. 12-2010, pt. A (Exh. A), 6-10-10)

Ask a question about Abilene law

Corpus searches the Abilene sections it holds and shows the ones that match, with their citations. Free, no sign-in.