Sec. 8-152. - Definitions.

Slab on grade. A slab on grade is any slab that is poured onto earth materials that are in direct contact with the slab and which are used to support the slab. This process may be flat on the ground or foundation walls can be constructed to any engineered height and backfilled with sand to the bottom of the slab to be poured to support the slab.

(Ord. No. 56-2016, pt. 1(Exh. A), 10-27-16)