§ 13-24 — Construction permits
Code of Ordinances of the City of Allen, Texas (Codified through Ordinance No. 4212-2-26, adopted February 10, 2026 (Supp. No. 23)) · Allen Code of Ordinances § 13-24
Corpus is an independent public-information project, not the official City of Allen website. Stable reference: corpuslaw.us/code/6c43f160-8acb-4f2a-af15-51d3829ed89a
Sec. 13-24. - Construction permits.
(a) General. (1) An owner shall not install, modify, or relocate a facility within the public right-of-way without first obtaining a right-of-way permit from the city. (2) Emergency responses related to existing facilities may be undertaken without first obtaining a permit; however, the department shall be notified in writing within two (2) business days of any construction related to an emergency response; including a reasonably detailed description of the work performed in the right-of-way. An updated map of any facilities that were relocated, if applicable, shall be provided within ninety (90) days. (3) A permit is not required under subsection (a)(1) if the activity in the public right-of-way consists exclusively of: a. A residential service connection on the same side of the public right-of-way, if the connection does not require a pavement cut; or b. The replacement of an existing, single-damaged owner facility that does not require boring. (4) Unless approved by the city engineer, the owner or contractor shall not close any traffic lanes or otherwise impede traffic on major thoroughfares weekdays prior to 9:00 a.m. or after 3:30 p.m. Any closure of a traffic lane for more than four (4) hours shall also require a permit, unless waived by the director. (5) All construction and installation in the right-of-way shall be in accordance with the permit for the facilities. The director shall be provided access to the work and to such further information as he or she may reasonably require to ensure compliance with the permit. (6) A copy of the construction permit and approved engineering plans shall be maintained at the construction site and made available for inspection by the director at all times when construction work is occurring. (7) No owner or contractor shall perform construction, excavation, or work in an area larger or at a location different than that specified in the permit or permit application. If, after construction, excavation, or work has commenced under an approved permit, it becomes necessary to perform construction, excavation, or work in a larger or different area than originally requested under the application, the owner or contractor shall notify the director immediately and, within twenty-four (24) hours, shall file a supplementary application for the additional construction, excavation, or work. (8) A copy of any permit or approval issued by federal or state authorities for work in federal or state right-of-way located in the City of Allen shall be provided, if requested by the director. (b) Permit application. (1) The permit shall state to whom it is issued, location of work, location of facilities, dates and times work is to take place and any other conditions set out by the director. If the owner fails to act upon any permit within ninety (90) calendar days of issuance, owner may request an extension of the time period from the director. The director will use his/her best efforts to approve or disapprove a request for extension as soon as possible. No permit shall be transferable. (2) The permit will be in the name of the person who will own the facilities to be constructed. The permit application must be completed and signed by a representative of the owner of the facilities to be constructed or authorized owner contractor. (3) Prior to requesting a permit, the city engineering department shall be contacted to obtain record drawings and city utility mapping to include existing city utilities in design plans. (4) Any person requesting a permit will provide the director with documentation in the format specified by the department, at the time of permit submittal, describing: a. The proposed location and route of all facilities to be constructed or installed and the owner's plan for right-of-way construction. b. One (1) set of engineering plans, including plan and profile, which will be on a reasonable scale, acceptable to the department, unless waived by the director. When required by the Texas Engineering Practice Act, as amended, the plans must be sealed by a professional engineer licensed to practice in the State of Texas. c. Detail of the location of all right-of-way and utility easements that owner plans to use. d. Detail of existing utilities located in the right-of-way, including the city's utilities, in relationship to owner's proposed route. e. Detail of what owner proposes to construct including size of facilities, materials used, such as pipe size, number of ducts, valves, etc. f. Detail of plans to remove and replace asphalt or concrete in streets in accordance with current city standard specifications and details for restoration within public rights-of-way. g. Drawings of any bores, trenches, handholes, manholes, switch gear, transformers, pedestals, etc., including depth located in public right-of-way. h. Typical details of manholes and/or handholes owner plans to use or access. i. Complete legend of drawings submitted by owner, which may be provided by reference to previously submitted documents acceptable to the city. j. The construction methods to be employed for the protection of existing structures, fixtures, and facilities within or adjacent to the right-of-way, and the dates and times work will occur, all of which (methods, dates, times, etc.) are subject to approval of the director. k. Proof of insurance and bonds as required by section 13-35. (5) A request for a permit must be submitted at least fifteen (15) business days before the proposed commencement of work identified in the request, unless waived by the director. (6) Requests for permits will be approved or disapproved by the director within a reasonable time of receiving all the necessary information. The director will use his/her best efforts to approve or disapprove a request for permit as soon as possible. The director will consider all information submitted by the applicant including a review of the availability of space in the right-of-way based on the applicant's proposed route and location. The director will provide a written notification of denial for rejected permits. (7) The construction contractor must be available for a pre-construction meeting if requested by the director or the owner, prior to commencement of permit work activities.
(Ord. No. 3506-8-17, § 1, 8-22-2017)
Ask a question about Allen law
Corpus searches the Allen sections it holds and shows the ones that match, with their citations. Free, no sign-in.