For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

III — Permitting

Code of Ordinances of the City of Allen, Texas (Codified through Ordinance No. 4212-2-26, adopted February 10, 2026 (Supp. No. 23)) · Allen Code of Ordinances, App. A to ch. 13, § III

Corpus is an independent public-information project, not the official City of Allen website. Stable reference: corpuslaw.us/code/a7214fb1-7e62-48f0-be5b-3641a9b8eefe

Sec. III. - Permitting.

3.1 General requirements and information. A provider shall not install, modify, or relocate a network node or install, modify, or relocate a node support pole within the public right-of-way without first obtaining a right-of-way permit from the city. Prior to installation, modification, or relocation of a network node or installation, modification, or relocation of a node support pole, provider shall complete and submit to the city a commercial building (electrical) permit application and a right-of-way permit application in the form provided by the city, along with standard required documents and the following items: A. Payment. Permit application fee and all other fees required under V.T.C.A., Local Government Code ch. 284, including but not limited to annual fees set forth in § 284.053(a), as such fees may be adjusted from time to time pursuant to § 284.054, and fees set forth in §§ 284.055 and 284.056, as applicable. B. Map. An aerial map showing the location of the existing pole or structure to which the network node is proposed to be attached, and a street view image of the same. C. GIS data. Geographic Information System (GIS) data for the location of each proposed wireless facility or node support pole in the format acceptable to the city. D. Size limits. Network providers shall provide detailed drawings, with calculations to show strict conformity to the size limitations as set forth in V.T.C.A., Local Government Code ch. 284, in accordance with, but not limited to V.T.C.A., Local Government Code § 284.002, size of a micro network node; § 284.003, size of network nodes; and § 284.103, max. pole height, with each application and with each request for a permit for each location. E. Non-interference with city safety communication networks. Documentation identifying the frequency on which the proposed network node will operate and a certification that the proposed network node shall not cause any interference with the city's traffic signal light system, public safety radio system, private police cell system, or other city communications components in accordance with V.T.C.A., Local Government Code § 284.304. It shall be the responsibility of the network provider to evaluate, prior to making application for permit, the compatibility between the existing city infrastructure and provider's proposed network node. A network node shall not be installed in a location that causes any interference. Network nodes shall not be allowed on city's public safety radio infrastructure. F. Emergency contacts. The names and telephone numbers of at least two (2) persons serving as emergency contacts for the provider who can be reached by telephone twenty-four (24) hours a day, seven (7) days a week, in the event of an emergency. G. Electrical drawings. Sealed engineering drawings for the electrical service providing power to the proposed network node, which must include the conduit size, circuit size, calculations for amp, and distances running. Provider shall use one hundred twenty (120) voltage when connecting to any city service pole or decorative pole and shall provide a disconnect switch and key to meter enclosure upon inspection. The city is entitled to disconnect power to the network node or other wireless facilities in emergency situations. H. Engineering drawings. Scaled dimensional construction and engineering drawings indicating the current public right-of-way line and showing any proposed underground conduit and equipment and its spacing from the city's existing utility facilities. Such drawings shall also show a sectional profile of the public right-of-way and identify all existing utilities and existing utility conflicts. I. State and federal rights-of-way permit. If the project lies within right-of-way adjacent to a state or federal highway, the provider must provide evidence of a permit from the state or federal government. J. Daily work information. If the work proposed in the right-of-way permit application involves more than five hundred (500) feet of continuous trenching or boring or the installation of more than three (3) new node support poles or more than three (3) electrical meter pedestals or ground boxes, then the provider shall submit daily work location information, before work can begin. K. Other. All other information required to be submitted by a right of user in connection with a right-of-way permit application under Chapter 13, Article III (Management of Public Rights-of-Way) of the Code of Ordinances or other applicable laws, ordinances, codes, rules and regulations of the city. L. Traffic control/storm water pollution prevention/trench safety. Where required by the city, based on the proposed scope of work, provider shall submit a traffic control plan, storm water pollution prevention plan, and/or trench safety plan. 3.2 Attachments to existing poles or structures. In addition to the items in the General Requirements and Information Section 3.1, provider will submit the following items prior to installation, modification, or relocation of a network node on an existing pole or structure or modification or relocation of an existing node support pole: A. Construction and engineering drawings prepared by a professional engineer licensed in the State of Texas, and for wireless facilities proposed to be attached to a service pole, a decorative pole or other city-owned or -controlled structure, a certification from the engineer that the existing pole or structure and its foundations have sufficient structural stability to support the proposed network node and can bear the wind load without pole modification, or in the event the installation will require pole re-enforcement, that such re-enforced pole will have sufficient structural stability to support the proposed network node and can bear the wind load without further pole modification. Such construction and engineering drawings must also address the design of the connection of any item to the pole. If pole re-enforcement is necessary, provider shall provide construction and engineering drawings for the proposed alteration to the existing pole. Any re-enforcement or replacement of a pole shall match the color of the existing pole. Any pole re-enforcement or replacement shall be at provider's sole cost; B. A certificate that the network node complies with applicable regulations of the Federal Communications Commission; C. Certification that the proposed network node will be placed into active commercial service by or for a provider not later than the sixtieth day after the date the construction and final testing of the network node is completed; D. Scaled dimensional drawings or pictures of the proposed attachments of the network node to the existing poles or structures as well as any other proposed wireless facility, indicating the spacing from existing curbs, driveways, sidewalks, and other existing poles. This shall include a before-and-after image of the pole and all proposed attachments thereto and associated standalone equipment. 3.3 Substitution of existing municipal poles. A provider shall not replace an existing municipal service pole without first obtaining a right-of-way permit from the city. Each permit application shall disclose if it is a proposed substitution pole. A provider may elect to remove an existing municipal service pole, replace it with a similar pole (with some modification) that serves primarily as a node support pole in addition to the original purpose. Once construction of a substitution pole is complete, it shall become a node support pole and shall be the responsibility of the provider to maintain. Maintenance—Street lights. If the substitution pole also serves as a street light, city agrees to perform routine maintenance, at city expense, of the street light, including maintenance and all repair and/or replacement of switches, bulbs, ballasts, and starters in accordance with city's standard practices and procedures for maintaining city's standard street lights. Nothing herein shall obligate city to undertake pole replacement, pole repair, decorative modifications, painting, or other repairs deemed aesthetic in nature. Pole replacement, pole repair, and aesthetic improvements shall be at the sole cost and expense of provider. 3.4 Installation of network nodes on new poles. In addition to the items in the General Requirements and Information section 3.1, provider will submit the following items prior to installation or modification of a new node support pole or a network node on a new node support pole: A. Scaled dimensional drawings or pictures of the proposed node support pole and any other proposed wireless facilities to be installed in connection with the proposal, indicating the spacing from existing curbs, driveways, sidewalks, and other existing poles. This shall include a before-and-after street view image of the pole and all proposed attachments and associated standalone equipment. 3.5 Installation of transport facilities. A provider shall not install or modify a new transport facility within the public right-of-way without first obtaining a right-of-way permit from the city. Before beginning excavation in any public right-of-way, provider shall be responsible for complying with all laws relating to verifying the location of existing utility lines and facilities and avoiding encroachment thereon, including the requirements of Chapter 13, Article III (Management of Public Rights-of-Way) of the Code of Ordinances.

Ask a question about Allen law

Corpus searches the Allen sections it holds and shows the ones that match, with their citations. Free, no sign-in.