For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 2.1 — General

Code of Ordinances of the City of Allen, Texas (Codified through Ordinance No. 4212-2-26, adopted February 10, 2026 (Supp. No. 23)) · Allen Land Development Code, App. C, § 2.1

Corpus is an independent public-information project, not the official City of Allen website. Stable reference: corpuslaw.us/code/8f43d669-ac3f-45b8-9c81-197b67ba093d

2.1. - General.

1. [General requirement.] This part shall include the furnishing of all materials of the dimensions and types as shown in construction documents or as established by the city. 2. Source quality control. a. Certification. All materials incidental to tree planting shall comply with governmental regulations prevailing at the supply source and the job site. b. Analysis and standards. Products packaged in sealed containers shall be labeled and manufacturer's certified analysis. c. Plant material selection. Plant materials shall be inspected for approval or rejection at the project site by the City of Allen. The contractor is responsible for giving the City of Allen 48-hour prior notice of tree delivery. Failure to provide such notice and planting of the trees without such notice shall subject the installation to rejection by the City of Allen without recourse. 3. Product delivery, storage, and handling. a. General. Store materials only in areas as designated in construction documents or as approved by the city. b. Packaged materials. Deliver packaged materials in unopened containers showing weight, analysis and name of manufacturer. During shipment and storage on site, protect materials from breakage, moisture, heat or other damage. c. Trees. i. Shipping shall be scheduled to minimize on-site storage of trees. Stock shall not be shipped until the planting preparations have been completed and staking of tree locations is approved by the city. All trees delivered to the site shall be planted on the day of delivery. Theft of any trees or incidental materials is the sole responsibility of the contractor. ii. Labels: Trees which are shipped shall be clearly identified, with legible labels stating correct name and size of the tree, securely attached to individual trees, or to groups of like species and size. iii. During shipment, trees shall not be bent, stacked or bound in a manner that damages bark, breaks branches, deforms root balls or destroys natural shape. iv. Transport plant material in closed vehicles or in open vehicles with the entire load properly covered for protection from drying winds, heat, freezing or other harmful exposure. v. If delays in planting beyond the contractor's control occur after delivery, trees shall be kept watered and protected from sun, wind, freezing, or mechanical damage; and root balls shall be covered with topsoil (not heavy clay). This shall be considered an incidental cost to the planting of each tree. Do not remove container grown stock from containers until planting time. "Heel in" trees in moist soil immediately upon delivery. Keep the roots constantly moist until planted. The heeling-in grounds shall be a well-protected, shaded area and shall be restored to its original or better condition prior to acceptance of the project. vi. Handle trees at all times in accordance with the best arboricultural practices. Lift ball and burlapped trees from the bottom of the ball only. Trees handled otherwise will be subject to rejection. Balled and burlapped trees which have cracked or broken balls are not acceptable and shall not be planted. vii. Protect trees in transit. Material not properly protected and which is damaged will be rejected.

(Ord. No. 2721-3-08, § 1(Exh. A), 3-25-2008)

Ask a question about Allen law

Corpus searches the Allen sections it holds and shows the ones that match, with their citations. Free, no sign-in.