For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 6-196 — General criteria for post-construction runoff control

Code of Ordinances of the City of Allen, Texas (Codified through Ordinance No. 4212-2-26, adopted February 10, 2026 (Supp. No. 23)) · Allen Code of Ordinances § 6-196

Corpus is an independent public-information project, not the official City of Allen website. Stable reference: corpuslaw.us/code/e55d6efb-8a32-4ff8-a708-4a036cb4cbc5

Sec. 6-196. - General criteria for post-construction runoff control.

(a) All applicable land development sites shall be designed according to the specific performance criteria outlined in the city drainage design manual or in conformance with a plan designed by an engineer licensed in the State of Texas, approved by the director. (b) Prior to design, applicants are required to consult with the director to determine if they are subject to additional post-construction storm water design requirements.

(Ord. No. 2925-7-10, § 1, 7-13-2010; Ord. No. 3721-12-19, § 1, 12-10-2019)

Ask a question about Allen law

Corpus searches the Allen sections it holds and shows the ones that match, with their citations. Free, no sign-in.