§ 6-404 — Well drilling and extraction standards
Code of Ordinances of the City of Allen, Texas (Codified through Ordinance No. 4212-2-26, adopted February 10, 2026 (Supp. No. 23)) · Allen Code of Ordinances § 6-404
Corpus is an independent public-information project, not the official City of Allen website. Stable reference: corpuslaw.us/code/cb71965f-a553-4632-99fa-80452b665f53
Sec. 6-404. - Well drilling and extraction standards.
The drilling and extraction of oil or gas shall be permitted within the city, provided that all terms, conditions, and requirements of federal, state and local law are met. Well drilling and extraction standards may be varied on a case-by-case basis as allowed by the specific use permit. (a) Distance requirements. The measurement of the distances set forth in this article shall be calculated from the proposed well bore, in a straight line, without regard to intervening structures or objects, to the closest exterior point of the object listed below: (1) No well, tank battery or equipment shall be located within one thousand (1,000) feet of a residential structure unless written documentation from the owner of the surface on which the residential structure is located agrees to a location between six hundred (600) feet and one thousand (1,000) feet of the structure. (2) No well shall be located within one thousand (1,000) feet of a place of public assembly. (3) No well shall be located within five hundred (500) feet of any existing storage tank or source of potential ignition. (4) No well shall be located within five hundred (500) feet of any outer boundary line of the tract or lease. (5) No well shall be located within five hundred (500) feet of any fresh water well. (6) No well shall be located within seven hundred fifty (750) feet of the one-hundred-year floodplain as determined by the latest FIRM published at the time of application for the well drilling permit. (7) No well shall be located within one thousand (1,000) feet of a planned or developed data center. (b) On site requirements. (1) Fencing. All drilling features including storage pits shall be fenced to prevent access from unauthorized people. When not supervised, all fences shall remain locked. Fencing, screening and landscaping shall be required as followed: a. A secured entrance gate and a sign shall be required. The sign identifying the entrance to the drill site or operation site shall be reflective. b. Opaque fences shall be required to surround drill sites during initial drilling operations and shall be locked when no operations personnel are present. c. After initial drilling operations are complete, a solid masonry wall not less than eight (8) feet in height but not higher than the enclosed equipment shall surround operation sites. All permanent-fencing structures shall have a wrought iron gate to allow visibility into the well site which shall remain locked at all times when no authorized person is present on the operation site. (2) Landscaping/tree mitigation and irrigation plans. Landscaping/tree mitigation and irrigation plans shall be required along all street frontages at the well site with suitable screening shrubs that complement the architectural character of the surrounding neighborhood as required by Article VII of the ALDC. The landscaping shall be maintained as required by Section 7.05.04 of the ALDC. (3) Discharge or illegal dumping. No person shall place, deposit, or discharge any oil, naphtha, petroleum, asphalt, tar, hydrocarbon substance, or any refuse including wastewater or brine, from any oil or gas operations or the contents of any container used in connection with any oil or gas operations in, into, or upon any public right-of-way, storm drain, ditch or sewer, sanitary drain, any body of water, or any private property within the corporate limits or extraterritorial jurisdiction of the city. (4) Fire suppression. All fire suppression and prevention equipment required by an operator shall comply with applicable federal, state, or local law and the maintenance of such equipment shall be the responsibility of the operator. (5) Pit lining. Pit liners shall be designed, constructed, and installed to prevent any migration of materials from the pit into adjacent subsurface soils, ground water, or surface waters at any time during the life of the pit. All lined pits shall adhere to the liner standards set forth by the railroad commission. (6) Closed-loop drilling systems. Closed-loop drilling fluid systems shall be used instead of lined reserve pits. (7) Signs. a. A sign shall be immediately and prominently displayed at the gate on the temporary and permanent fencing of the well site. Such sign shall be durable material, maintained in good condition and, unless otherwise required by the railroad commission, shall have a surface area of not less than two (2) square feet nor more than four (4) square feet and shall be lettered with the following: i. Well name and number; ii. Name of operator; iii. The emergency 911 number; and iv. Telephone numbers of two (2) persons responsible for the well who may be contacted twenty-four (24) hours a day in case of an emergency. b. Permanent weatherproof signs reading "DANGER NO SMOKING ALLOWED" shall be posted immediately upon completion of the well site fencing at the entrance of each well site and tank battery or in any other location approved or designated by the city's fire chief. Sign lettering shall be four (4) inches in height and shall be red on white background or white on a red background. Each sign shall include the emergency notification numbers of the fire services department and the operator, well and lease designations required by the railroad commission. (8) Electric lines. All electric lines to production facilities shall be located underground. (9) Rights-of-way use agreement. No operator shall excavate or construct any lines for the conveyance of fuel, water, gas or petroleum liquids on, under, or through the streets or alleys or other land of the city without an easement or rights-of-way agreement from the city, at a price to be agreed upon, and then only in strict compliance with all applicable law. (10) Temporary street use license. The digging up, breaking, excavating, tunneling, undermining, breaking up, or damaging of any public street or leaving upon any public street any earth or other material or obstruction, is prohibited unless the operator has first obtained written permission from the city, and then only in compliance with all applicable law. (11) Temporary street closure permit. No well permit shall be issued for any well to be drilled within any of the streets or alleys of the city or streets shown by the City of Allen Master Thoroughfare Plan, and no street shall be blocked or encumbered or closed due to any exploration, drilling, or production activities unless a temporary street closure permit is obtained from the city manager. (c) Operations and equipment practices and standards. (1) Fracing operations. In parallel to gas gathering pipeline, a flow back line shall be installed to handle water and gas flow back following well fracture treatment. (2) Nuisance prevention. Adequate nuisance prevention measures shall be taken to prevent or control offensive odor, fumes, dust, noise and vibration. For vehicular safety reasons, the operator shall immediately notify the city of any substantial accumulations of dirt, dust, mud or other debris deposited on city thoroughfares by vehicles involved in the well drilling or servicing or pipeline installation process. If for safety reasons, the city elects to perform the removal, the operator shall pay the cost of such removal. (3) Directional lighting. No person shall permit any lights located on any drill or operation site to be directed in such a manner so that they shine directly on public roads, adjacent property or property in the general vicinity of the operation site. To the extent practicable and taking into account safety considerations, site lighting shall be directed downward and internally so as to avoid glare on public roads and adjacent dwellings and buildings. The location, height and style of any lights shall be identified on the site plan and shall comply with the requirements of Article VII of the ALDC. (4) Field rules. The operator shall at all times comply with the rules and regulations of the railroad commission including but not limited to all applicable field rules. (5) Noise. Internal combustion engines may be used in drilling and producing operations if they have mufflers that will reduce noise to not more than seventy (70) decibels at any point three hundred (300) feet from the boundary of the drill site or operation site. The noise level during fracing operations shall reduce the noise to not more than eighty (80) decibels at any point three hundred (300) feet from the boundary of the drill site or operation site. If noise levels at a distance of three hundred (300) feet exceed required decibel levels, a sound reduction enclosure shall be required around a drilling rig and any internal combustion engines. Only electric motors shall be used for the purpose of pumping oil wells. Electric motors shall be used for compressors located at gas well sites. Any on-site compressor or pipeline compressor used to lift gas shall comply with noise levels for fracing. The operator may propose a noise reduction plan using ambient noise levels. (6) Vehicle routes. Vehicles, equipment, and machinery shall not be placed or located on a drill site or operation site or on any public street, alley, driveway, or other public right-of-way in such a way as to constitute a fire hazard or to unreasonably obstruct or interfere with fighting or controlling fires. Vehicles associated with drilling and/or production in excess of three (3) tons shall be restricted to streets designated as arterials or collectors as delineated in the city's master thoroughfare plan or as allowed by the truck route of the approved site plan. (7) Work hours. Site development and truck delivery other than for drilling, shall be conducted only between 7:00 a.m. and 7:00 p.m. Monday through Friday and 9:00 a.m. through 5:00 p.m. on Saturday. (8) Prohibitions. Air, gas, or pneumatic drilling shall not be permitted. (9) Removal of the drilling rig and equipment. The drilling rig and associated drilling equipment shall be removed from the well site within thirty (30) days of the completion of the well or drilling activities. (10) Separators and dehydrators. No refining process, or any process for the extraction of products from gas, shall be carried on at a drill site or operation site, except that a dehydrator and separator may be maintained on a drill site or operation site for the separation of liquids from gas. Any such dehydrator or separator may serve more than one (1) well. (d) Storage tanks and separators. (1) An operator shall identify such storage tanks and separation equipment as shown on the application for the site plan. All tanks and permanent structures shall be permitted and conform to the fire code and American Petroleum Institute specifications. (2) The use of centralized tank batteries shall be permitted as shown on the applicable site plan. (3) No meters, storage tanks, separation facilities, or other above ground facilities except flow lines shall be placed in the one-hundred-year floodplain. (4) No tank batteries may be installed higher than eight (8) feet above ground level. (5) All production equipment on an operation site shall be painted and maintained at all times, including but not limited to, pumping units, storage tanks, buildings, and structures. (e) Flow lines and gathering line. Each operator shall place an identifying sign at each point where a flow line or gathering line crosses a public street or road. (1) If a gas field in the city is identified as an H2S gas field, the operator shall be required to cease operations. (2) All flow lines and gathering lines within the corporate limits of the city (excluding city utility lines and franchise distribution systems) that are used to transport oil, gas, and/or water shall be limited to the maximum allowable operating pressure applicable to the pipes installed. Flow lines and gathering lines shall be buried and installed at the required depth and with at least the minimum cover or backfill specified by the American National Safety Institute Code, as amended. (3) Easements must be acquired for all flow lines, gathering lines and flow back lines. The location of easements shall be shown on the site plan. (4) Structures shall not be built over flow lines or gas gathering pipelines. (5) The location of all pipelines must be marked with warning signs in accordance with federal and state law. In addition, during backfill of pipeline excavations, "buried pipeline" warning tape shall be buried one (1) foot above the pipeline to warn future excavators of the presence of buried pipeline. (f) Safety and environmental regulations. (1) The drilling and production of oil or gas and accessing the well site shall be in compliance with all applicable federal, state or local environmental regulations and shall not occur within environmentally sensitive areas. (2) Wells may have a target location or bottom-hole location that is under an environmentally sensitive area when the well is drilled directionally from a location outside the environmentally sensitive area. (3) Blowout prevention equipment shall be used on all wells being drilled, re-worked, or in which tubing is being changed. Each producing well shall be equipped with an automated valve that closes the well in the event of an abnormal change in operating pressure. All wellheads shall contain an emergency shut off valve to the well distribution line. Protection shall be provided to prevent blowout during well operations as required by and in conformance with the requirements of the railroad commission and the requirements of the American Petroleum Institute. The operator will be responsible for the installation and maintenance of an alarm system which will emit an "audible warning alarm" as well as transmit a communiqué to the City of Allen Dispatch Center for emergency response purposes. The operator will also be responsible for complying with chapter 8, article IV of this Code. (4) Low toxicity glycols, synthetic hydrocarbons, polymers, and esters shall be substituted for conventional oil-based drilling fluids. No drilling storage pits shall be located in the city. (5) All open hold formation or drill stem testing shall be done during daylight hours. Drill stem tests may be conducted only if the well effluent during the test is produced through an adequate gas separator to storage tanks and the effluent remaining in the drill pipe at the time the toll is closed is flushed to the surface by circulating drilling fluid down the annulus and up the drill pipe. (6) Each storage tank shall be equipped with a level control device that will automatically activate a valve to close the well in the event of excess liquid accumulation in the tank. (7) Storage tank facilities shall be equipped with a secondary containment system including lining with an impervious material. The secondary containment system shall be of a sufficient height to contain one and one-half (1½) times the contents of the largest tank in accordance with the fire code, and the impervious liner shall be covered with at least one (1) foot of sand. Drip pots shall be provided at pump out connections to contain the liquids from the storage tank. (8) Tank battery facilities shall be equipped with a remote foam line utilizing a two-and-one-half-inch National Standard Hose Thread female inlet connection in locations approved by the fire department. A lightning arrestor system shall be installed according to the most current edition of the National Electrical Code. (9) An approved hazardous materials management plan and emergency response plan shall be on file with the fire department. The costs of cleanup operations due to hazards associated with a well site shall be the responsibility of the operator. (10) All wells shall be abandoned in accordance with the rules of the railroad commission; however, all well casings shall be cut and removed to a depth of at least ten (10) feet below the surface. (11) No structures shall be built over an abandoned well. (12) No salt-water disposal wells shall be located within the city. (13) Light sand frac technology shall be used in fracing a well or other technology to frac a well, unless another technology is approved by the fire marshal upon recommendation by a petroleum specialist. (14) Erosion control is required and shall comply with all applicable federal, state and local requirements. The operator shall file a copy of the storm water pollution plan if required by the EPA. Identify and indicate the proposed method of erosion control on a drainage and erosion control plan that is prepared by a professional engineer licensed to operate in the State of Texas. The drainage and erosion control plan must be approved by the city engineer and must conform with the following: a. All floodplain, creek and stream crossings shall be designed to a twenty-five-year storm frequency; b. The erosion control plan must provide references to all applicable federal, state and local standards and must indicate how these requirements are to be satisfied; and c. Verification that all floodplain, creek, and stream crossings shall not have negative affects on other property. (g) Supplemental Drilling. (1) Supplemental drilling to deepen or directional drill an existing well shall be conducted in accordance with the conditions of the applicable specific use permit. The operator shall provide the city with a copy of additional railroad commission permits that allow drilling to a deeper depth. (2) Supplemental drilling to deepen or directional drill an existing well shall be conducted in accordance with the approved well permit for the well on file with the city. (h) Seismic, reworking or fracing notice. Any person who intends to rework a well using a drilling rig, to frac a well after initial completion, or to conduct seismic exploration shall give written notice to the city not less than ten (10) days before the activities begin. (1) The notice shall identify where the activities will be conducted and shall describe the activities in reasonable detail, including but not limited to, the duration of the activities and the time of day they will be conducted. (2) The notice must also provide the address and twenty-four-hour phone number of the person conducting the activities. (3) The person conducting the activities will post a sign on the property giving the public notice of the activities, including the name, address, and twenty-four-hour phone number of the person conducting the activities. (i) Abandonment of wells and pipelines. (1) Abandonment of wells. Not later than sixty (60) days after the abandonment of a well or well site, the well shall be plugged in accordance with railroad commission standards, the site shall be cleaned and cleared of all equipment, holes or excavations filled, and the land graded and returned to its original condition including replanting of vegetation to match the surrounding area. (2) Abandonment of pipelines. Not later than sixty (60) days after the abandonment of a pipeline, a pipeline must be purged and plugged in accordance with the rules and regulations of the railroad commission and removed as required by the city.
(Ord. No. 2969-12-10, § 1, 12-14-2010)
Ask a question about Allen law
Corpus searches the Allen sections it holds and shows the ones that match, with their citations. Free, no sign-in.