Sec. 6.06.10. - Wind energy systems.
An applicant's submittal for a building permit, electrical permit, and specific use permit for location and installation of a wind energy system within the city must demonstrate compliance with the following use and development regulations, in addition to the specific use permit review standards under section 6.01: 1. Location requirements. a. Minimum lot size. Minimum lot size for all districts is 1.5 acres. b. Lot to system ratio. Maximum of one system per 1.5 acres. c. Maximum height. Maximum height for all freestanding systems is 90 feet. The height of a freestanding wind energy system must be measured as the distance from the existing grade, prior to any modifications to the grade, to the highest point on the system, including the vertical length of any extensions such as the rotor blade. Attached systems shall not extend more than 15 feet above the roofline and shall not exceed 90 feet in total height, dependent upon the results of the structural engineering plans, performed by a Texas registered professional engineer, for the building or structure on which the system will be mounted. The height of any wind energy system may not exceed the manufacturer's recommendations for the system. d. Yards. No wind energy system may be located in any required front yard, between a principle building and a required front yard, in front of the front building line of the principal building, or between the principal building and any public street. e. Fall radius. Each wind energy system must be set back a minimum distance of 110 percent of the total system height from any property line, right-of-way, or public or private easement where above ground structures or utility lines exist, or are likely to exist, without proof of the lawful consent of the easement owners. f. Vertical ground clearance. The blade tip of any wind energy system must, at its lowest point, have a ground clearance of no less than 25 feet, as measured at the lowest point of the arc of the blades. 2. Requirements. a. Certification. All wind energy systems must be approved under an emerging technology program, such as the California Energy Commission, IEC, or any other small wind certification program recognized by the American Wind Energy Association (AWEA) or the U.S. Department of Energy. b. Survival wind speed. All wind energy systems and associated components, including, but not limited to, generator, rotor blades, or other components and covers, must be constructed of materials and be installed to meet or exceed the minimum wind resistant construction standards of the Texas Department of Insurance wind load factors for the north Texas area and article III of this Code. c. Controls and brakes. All wind energy systems must have automatic and manual braking systems which engage at the maximum wind speeds allowable as designated for the type of wind energy system installed to prevent uncontrolled rotation and excessive pressure on the tower structure, rotor blades, and turbine components. d. Maintenance. The owner and operator of a wind energy system must maintain the system to manufacturer standards. All required periodic maintenance must be performed as recommended by the manufacturer. e. Appearance. All wind energy systems must maintain a non-reflective, white or off-white finish. f. Signs. i. Advertising. Advertising or identification of any kind on wind energy conversion systems is prohibited. ii. Informational sign. Each wind energy system must have a sign, not to exceed two square feet in area, posted at the base of the tower providing the following information: (a) Electrical shock hazard or high voltage warning; (b) Manufacturer's name; (c) Emergency phone number; and (d) Emergency shutdown procedures. g. Wiring. i. Storage. All electrical wires and cables associated with a freestanding wind energy conversion system must be located on or within the tower in a manner that minimizes their visibility and must be installed in compliance with article III of this Code. ii. Installation. All transmission wires and cables must be installed underground and comply with article III of this Code. h. Lighting. Wind energy systems may not be artificially lighted, unless requested or required by the Federal Aviation Administration. 3. Prohibition, nuisance abatement and decommissioning. a. Prohibited models. The following wind energy systems are prohibited in all zoning districts: i. Guyed or latticed towers for small, medium, or large wind energy systems; ii. Experimental, homebuilt, and prototype models. b. Shadow flicker. Plans submitted for review with the building permit application must disclose how the property owner and operator shall minimize shadow flicker to any occupied building on or offsite, by limiting flicker effect to a maximum of two five-minute periods in one day. c. Signal interference. The manufacturer or wind energy system representative must take into consideration the proposed location of the wind energy system and certify that the siting of the wind energy system will not interfere with any existing microwave communications links or existing fixed broadcast, retransmission, or reception antenna for radio, television, wireless phone, or other personal communication systems. Operation of wind energy systems must be discontinued if such interference occurs after the construction, until such time as the interference is mitigated for or eliminated. d. Security. i. Ground clearance. The bottom of the tower, measured from ground level to 15 feet above ground level, must be designed in a manner to discourage unauthorized climbing. ii. Access. All access doors to wind turbine towers and electrical equipment must be lockable and remain locked at all times except while people are on the site of the tower performing maintenance or repair of the system. iii. Fencing. Fencing of turbine areas may be required, at the discretion of the director, based upon site-specific safety concerns. e. Public safety. The proposed wind energy system must be designed and operated to protect public safety by measures that may include, but are not limited to, the following: i. The proposed wind energy system must be designed, constructed, and operated so the public cannot come within close proximity to turbine blades and electrical equipment; and, ii. The proposed wind energy system must be designed, sited, constructed, operated, and maintained to prevent the structural failure of the system or blades that could endanger the public's safety. f. Other properties. The wind energy system or facility may not adversely affect the uses of adjoining and adjacent properties. g. Wildlife resources. The proposed wind energy system must be designed to reduce the likelihood of significant adverse effects on wildlife and wildlife habitat, particularly with regard to migratory birds and protected species. h. Enforcement. i. Safety. Any wind energy system found to be unsafe by the city building official must be repaired by the owner not later than 60 days of receipt of the building official's notice to meet federal, state, local and manufacturer safety standards, and the standards of this section. ii. Notice. If any wind energy system is not operated for at least a continuous period of six months because of operational difficulties or abandonment, the landowner shall provide the city the reasons for the operational difficulty or abandonment and provide a reasonable timetable for corrective action, or removal of the wind energy system as outlined under subsection 3.i, below, regarding decommissioning. iii. Resolution. If the director or designee deems the timetable for corrective action as unreasonable, the director or designee, may notify the landowner or operator, who shall remove the wind energy system not later than six months of receipt of notice from the director. i. Decommissioning. i. Useful life. The wind energy system is presumed to be at the end of its useful life if no electricity is generated for a continuous period of six months. ii. Responsibility. The property owner or operator shall, at their sole expense, complete decommissioning of the wind energy system not later than six months from the time it is determined that the wind energy system has met the end of its useful life as outlined in this subsection 3.i. iii. Required action. Decommissioning must include removal of the entire wind energy system, including buildings, cabling, electrical components, and any other associated facilities. iv. Remediation. Disturbed earth must be graded and re-seeded. v. Bonds. At the city's request, the applicant shall post a bond for the costs of decommissioning the wind energy system at the end of its useful life. 4. Application requirements. a. Applications. An application for approval of a wind energy system must include text and maps sufficient to show that the proposed wind energy system complies with the standards under this section. A site plan meeting the requirements of section 6.05 must be submitted in addition to the following: i. The approximate generating capacity of the wind energy system. ii. An estimate of the total on-site electrical demands. iii. The name of the manufacturer and model being used. iv. The height of the wind turbine to be constructed. v. The phone number and name of a responsible person for the public to contact with inquiries and complaints throughout the life of the project. vi. The exact location and orientation of each wind energy system within the site and the direction of the prevailing winds. vii. The location and distance to neighboring residences, buildings, schools, churches, hospitals, or libraries to a distance of 500 feet. viii. The location and distance to neighboring residences, buildings, schools, religious facilities, hospitals, or libraries to a distance of 500 feet. (a) Design specifications of the wind energy system, including the tower, base, footings, and system components; (b) An engineering analysis and certification of each tower, showing compliance with article III of this Code; (c) Drawings that indicate the total finished wind energy system heights from the grade level prior to any modifications, including any engineered break points along the tower; (d) The wind survival speed of the entire system, including turbine, rotor blades, covers, and other components; (e) Data pertaining to the tower's safety and stability, including any safety results from test facilities; and (f) A copy of the manufacturer's installation instructions. (g) For building or structurally-mounted systems: (i) The certified and sealed engineering plans prepared by a professional engineer registered in the State of Texas must show how the wind energy system will be installed for the portions of the structure proposed for use in the mounting the system. (ii) The engineering plans must state and show that the proposed wind energy system is compatible with the portions of the mounting structure proposed for use. (iii) The engineering plans must state that the wind energy system does not impose a safety hazard to the main structure, adjacent property, or their occupants. b. Written statements and additional documentation. In addition to the site plan, applications for all wind energy systems must include proof of the following in the form of written statements: i. A statement verifying that the small, medium, or large wind energy conversion system will be used solely for on-site consumption of electricity, and any additional energy produced above the total onsite demand can only be sold to an electrical utility that normally provides electrical power to the property; ii. A statement from any architectural review board, property owners', or homeowners' association that the proposed system complies with association requirements and restrictions if applicable; iii. A statement that the project site is, or is not, where air traffic may be a consideration affecting the installation of the system. (The applicant shall provide evidence of compliance with any applicable aviation regulatory requirements); iv. Copies of all required applications for city, state, and federal permits and licenses; v. Copies of all biological/environmental assessments performed for the project site, which may have been required by a federal or state government agency having jurisdiction of the property or the system; vi. Copies of any city, state, and federal permits, licenses, biological opinions, records of decision, memoranda of understanding, exemption, variance, or other authorization or approval related to the proposed wind energy project; and vii. Copy of the manufacturer's scheduled maintenance requirements for the proposed system. c. Permit issuance. Prior to receiving a building permit, electrical permit, or specific use permit for the wind energy system from the city, the applicant must show consideration of, and provide proof of compliance with the following: i. Federal Aviation Administration (F.A.A.) Order JO 7400.2, "Procedures for Handling Airspace Matters Advisory Circular AC 70/7460-1K," and Title 14 Code of Federal Regulations (14 CFR) part 77, "Obstruction Marking and Lighting, Obstruction Standards," including, if required, filing Form 7460-1 with the F.A.A. ii. All state laws regarding connection of the wind energy system to the state electrical grid, which proof shall include providing a copy of the "Application for Interconnection and Parallel Operation of Distributed Generation," as may be amended or replaced in the future, that has been fully executed and approved by the electric utility company that owns the electrical system to which the wind energy system will be connected.
(Ord. No. 2978-12-10, § 9, 12-14-2010; Ord. No. 3846-8-21, § 2.K, 8-10-2021; Ord. No. 4083-5-24, § 1, 5-28-2024)
Ask a question about Allen law
Corpus searches the Allen sections it holds and shows the ones that match, with their citations. Free, no sign-in.