For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 4-6-65 — Policy established

Code of Ordinances, City of Amarillo, Texas (Supp. No. 81: codified through Ordinance No. 8226, enacted December 9, 2025) · Amarillo City Code § 4-6-65

Corpus is an independent public-information project, not the official City of Amarillo website. Stable reference: corpuslaw.us/code/bb5e98d6-df98-4156-a1fd-52c8d63c0b12

Sec. 4-6-65. - Policy established.

(a) Adequate Public Facilities Policy. Land proposed for development in the City and in the City's Extraterritorial Jurisdiction must be served adequately by essential public facilities and services, including water, wastewater, roadway, and drainage facilities. Land shall not be approved for platting or development unless and until adequate public facilities necessary to serve the development exist or provision has been made for the facilities, whether the facilities are to be located within the property being developed or off-site. (b) Responsibility of the Developer to Provide. The Developer shall be responsible for the following to ensure that public facilities provided are adequate: (1) Phasing of development or improvements in order to ensure the provision of adequate public facilities; (2) Extensions of public facilities and roadways (including any necessary on-site and off-site facilities) to connect to existing public facilities or roadways to the development; (3) Providing and/or procuring all necessary property interests, including rights-of-way and easements, for the facilities (whether on-site or off-site), (4) Providing proof to the City of adequate public facilities; (5) Making provisions for future expansion of the public facilities as needed to serve future developments, in coordination with the City's oversize participation regulations (i.e., when the City will provide for the cost of over-sizing facilities), if applicable; (6) Providing for all operations and maintenance of the public facilities, or if the City is not the provider, providing proof that a separate entity will be responsible for the operations and maintenance of the facilities; (7) Providing all fiscal security required for the construction of the public facilities; (8) Obtaining approvals from any applicable utility providers other than the City; and (9) Comply with all requirements of utility providers, including the City or other applicable providers. (c) Responsibility of the Developer to Conform to Adopted Plans. The Developer shall ensure that facilities provided are consistent with the City's adopted plans. (1) Proposed facilities serving new development shall conform to and be properly related to the public facility elements of the City's adopted Comprehensive Plan, other adopted master plans for public facilities and services, and applicable capital improvement plans, and shall meet the service levels specified in such plans. (2) The design and construction of all water and wastewater facilities to serve the subdivision shall be in conformance with the City's master plans for water and wastewater facilities and with the City's technical specifications. (d) Study Required. If a Developer seeking approval of a Plat or Construction Plan for which an exaction requirement is imposed as a condition of approval, believes the exaction requirement is not roughly proportional to the nature and extent of the impact created by the proposed development, then the Developer shall state in writing the reasons for such and shall provide a study in support of such position. The City Engineer shall evaluate the study and shall make a determination based upon analysis of the information contained in the study. The City Engineer shall notify, in writing, the Developer of the determination. The Developer's study shall, at a minimum, include the following information, and may also contain other pertinent data and analysis: (1) Total capacity of the City's water, wastewater, storm water, or roadway system to be utilized by the proposed development, employing standard measures of the capacity and equivalency tables relating the type of development proposed to the quantity of system capacity to be consumed by the development. If the proposed development is to be developed in phases, such information also shall be provided for the entire development proposed, including any phases already developed; (2) Total capacity to be supplied to the City's water, wastewater, storm water, or roadway system by the proposed dedication of an interest in land or construction of capital improvements. If the development application is part of a phased development, the information shall include any capacity supplied by prior dedications or construction of capital improvements; (3) Comparison of the capacity of the City's public facilities system(s) to be consumed by the proposed development with the capacity to be supplied to such system(s) by the proposed dedication of an interest in land or construction of capital improvements. In making this comparison, the impacts on the City's public facilities system(s) from the entire development shall be considered; (4) The effect of any City participation in the costs of oversizing the capital improvement to be constructed in accordance with the City's requirements; (5) Any other information that shows the allege disproportionality between the impacts created by the proposed development and the dedication or construction requirement imposed by the City; (6) This proportionality analysis should not only be based on any immediate plans for the property, but should be based on the size of the property, existing use of the property, the existing zoning, and what impacts the highest and best use of the property could have on the City's infrastructure system; and (7) Only costs directly related to the dedication or construction requirement should be included in the analysis. Indirect costs, such as applications, permits, and fees, shall not be included. (e) Responsible Official. The City Engineer is the Responsible Official for an appeal for relief from a dedication or construction requirement. Where the appeal is for relief from dedication of rights-of-way for or construction of a facility in the City's extraterritorial jurisdiction that is to be dedicated to the public, the City Engineer may coordinate a recommendation with the county official responsible for reviewing plats in the county. (f) Evaluation and decision. The Development Review Committee shall make an initial review of the appeal and supporting study and shall provide comments to the City Engineer. The City Engineer shall evaluate the appeal, the supporting study, and the Development Review Committee comments and shall make a determination based upon the information contained in the Developer's study, any comments received from the county and Development Review Committee, and the City Engineer's own analysis of pertinent data and the circumstances of the case. (g) Adjustments. If the City Engineer is persuaded by the materials considered under the preceding subsection, then the City Engineer is authorized to make reasonable and necessary adjustments to infrastructure requirements, exactions, required dedications, and similar, so as to render such roughly proportionate to the impact of the development on the City's facilities. In most instances where an adjustment is warranted, a reduction of the requirements would likely be most appropriate, rather than a complete waiver of dedication or construction requirements.

(Ord. No. 7507, §§ 3, 4, 3-3-2015)

Ask a question about Amarillo law

Corpus searches the Amarillo sections it holds and shows the ones that match, with their citations. Free, no sign-in.