§ 1.04 — Definitions
Code of the City of Arlington, Texas (City Secretary chapter PDFs as posted 2026-11-07, each current through the ordinance named on its cover, with the City Secretary's adopted-not-yet-codified Ordinances 25-063, 25-069, 25-073, 25-074, 25-075, 25-084, 26-003, 26-004, 26-019, 26-024 and 26-027 applied; Anti-Discrimination chapter not included) · Arlington City Code, Impact Fees Chapter, § 1.04
Corpus is an independent public-information project, not the official City of Arlington website. Stable reference: corpuslaw.us/code/b124b6fd-f6c3-4a91-a1be-59614a89dade
Section 1.04 Definitions
The definitions found in Texas Local Government Code Section 395.001, and as may be amended by the legislature, are hereby adopted. The following definitions shall apply to the Impact Fees Chapter: “Area-related Facility” means a capital improvement or facility expansion, which is designated in the Impact Fee Capital Improvements Plan. “Assessment” means the determination of the amount of the maximum impact fee per service unit, which can be imposed, on new development. “Capital Improvement” means a roadway facility, a water facility or a sanitary sewer facility, each with a life expectancy of three (3) or more years, to be owned and operated by or on behalf of the City. “City” means the City of Arlington, Texas. “Discount” means the amount of the reduction of an impact fee designed to fairly reflect the value of area-related facilities provided by a developer pursuant to the City’s development regulations or requirements. “Impact Fee” means a fee for roadway facilities, water facilities or sanitary sewer facilities imposed on new development in order to fund or recoup the costs of capital improvements or facilities expansions necessitated by and attributable to such new development. Impact fees do not include the dedication of rights-of-way or easements for facilities or the construction of improvements necessitated by and attributable to the new development. Impact fees also do not include any participation or extension agreements for water and/or sanitary sewer improvements imposed pursuant to Section 9.04 of the “Water” Chapter of the Code of the City of Arlington; front footage charges for water and/or sanitary sewer lines imposed pursuant to Section 7.01 of the “Water” Chapter; or funds deposited for the construction of roadway improvements imposed pursuant to Article 6 of the Unified Development Code. “Offsite” means outside the boundaries of the property for which a new development is proposed. “Plat Approval or Approval of a Plat” means the point at which the applicant has complied with all conditions of approval, and the plat has been released for filing with Tarrant County. “Recoupment” means the imposition of an impact fee to reimburse the City for capital improvements, which the City has previously oversized to serve new development. “Roadway” means any freeway, expressway, major or minor arterials or collectors designated in the City’s adopted Thoroughfare Plan. “Roadway Facility” means a roadway together with appurtenances to a roadway which includes, but is not limited to design, rights-of-way, whether conveyed by deed or easement; intersection improvements; traffic control devices; turn lanes; drainage facilities associated with the roadway; sidewalks; street lighting or curbs. Roadway Facility also includes any improvement or appurtenance to an intersection with a roadway officially enumerated in the federal or Texas highway system. Roadway facility excludes those improvements to a roadway or appurtenances, which are site-related facilities. “Sanitary Sewer Facility” means an improvement for providing sanitary sewer service, including but not limited to land or easements, treatment facilities, lift stations or interceptor mains. Sanitary sewer facility excludes sanitary sewer mains which are constructed by developers, the costs of which are reimbursed from pro rata charges paid by subsequent users of the facilities. Sanitary sewer facilities exclude site-related facilities. “Service Unit” means the applicable standard units of measure shown on the conversion table in the Impact Fees Capital Improvements Plan which can be converted either to vehicle miles of travel during the highest one hour peak as measured during the 4 p.m. to 6 p.m. weekday peak period, or to five-eighths inch (5/8”) water meter equivalents, as the context indicates, which serves as the standardized measure of consumption, use or generation attributable to the new unit of development. “Site-Related Facility” means an improvement or facility which is for the primary use or benefit of a new development and/or which is for the primary purpose of safe and adequate provision of roadway, water or sanitary sewer facilities to serve the new development, and which is not included in the Impact Fees Capital Improvements Plan and for which the developer or property owner is solely responsible under Subdivision and other applicable regulations. “Water Facility” means an improvement for providing water service, including but not limited to land or easements, water treatment facilities, water supply facilities or water distribution mains. Water facility excludes water mains which are constructed by developers, the costs of which are reimbursed from pro rata charges paid by subsequent users of the facilities. Water facility excludes site-related facilities.
Ask a question about Arlington law
Corpus searches the Arlington sections it holds and shows the ones that match, with their citations. Free, no sign-in.
