For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 3.02 — Water and Sewer Rates

Code of the City of Arlington, Texas (City Secretary chapter PDFs as posted 2026-11-07, each current through the ordinance named on its cover, with the City Secretary's adopted-not-yet-codified Ordinances 25-063, 25-069, 25-073, 25-074, 25-075, 25-084, 26-003, 26-004, 26-019, 26-024 and 26-027 applied; Anti-Discrimination chapter not included) · Arlington City Code, Water and Sewer Chapter, § 3.02

Corpus is an independent public-information project, not the official City of Arlington website. Stable reference: corpuslaw.us/code/a2a29a5e-c3c1-45df-bea7-4da05ff939ef

Section 3.02 Water and Sewer Rates

A. Water Rates: (1) The following rates per month shall be the rates charged for water service furnished to customers within and outside the corporate limits of the City: Conservation Rates Residential Water Volumetric Block Structure Usage (1,000) gallons | Rate 0-2 | $2.38 3-10 | $3.44 11-15 | $5.49 16-29 | $8.23 ≥30 | $9.91 Conservation Rates Commercial Water Volumetric Block Structure Usage (1,000) gallons | Rate 0-15 | $4.62 ≥16 | $4.88 Conservation Rates Irrigation Water Volumetric Block Structure Usage (1,000) gallons | Rate 0-29 | $8.23 ≥30 | $9.91 Conservation Rates Construction Water Volumetric Block Structure Usage (1,000) gallons | Rate 0-99 | $7.95 ≥100 | $10.00 Conservation Rates Reclaimed Water Structure Usage (1,000) gallons | Rate All usage | $4.14 Water Fixed Fees Meter Size | Fixed Monthly Charge ⅝ x ¾” (≤2,000 gal) Residential only | $7.76 ⅝ x ¾” (≥3,000 gal) Residential and all other customer classes | $11.26 ¾” x ¾” | $17.89 1” | $25.85 1½” | $61.88 2” | $108.02 3” | $254.70 4” | $405.39 6” | $944.15 8” | $1,476.23 10” | $2,219.01 (2) The charges set forth in the schedule in the preceding paragraph are based upon the amount of water used, as measured by a single meter or accumulation of several meters, in increments of one thousand (1,000) gallons. B. Sewer Rates: (1) The following rates per month shall be the rates charged for sanitary sewer service furnished to customers within and outside the corporate limits of the City where the sewage produced by such customers is a normal strength wastewater (250 mg/1 BOD and 250 mg/1 Suspended Solids), except as provided in Subsections 3.02(B)(2), 3.02(B)(3) and 3.02(C), or in the "Industrial Waste and Pollution Control" Chapter of the Code of the City of Arlington, 1987, as amended. Wastewater Fixed Fees Meter Size | Fixed Monthly Charge | Consumption ⅝ x ¾” (≤2,000 gal) Residential only | $9.00 | $7.00/1,000 gallons ⅝ x ¾” (≥3,000 gal) Residential and all other customer classes | $15.44 | $7.00/1,000 gallons ¾” x ¾” | $24.69 | $7.00/1,000 gallons 1” | $35.94 | $7.00/1,000 gallons 1½” | $79.62 | $7.00/1,000 gallons 2” | $134.04 | $7.00/1,000 gallons 3” | $414.29 | $7.00/1,000 gallons 4” | $618.18 | $7.00/1,000 gallons 6” | $1,681.55 | $7.00/1,000 gallons 8” | $2,215.49 | $7.00/1,000 gallons 10” | $3,204.74 | $7.00/1,000 gallons (2) Residential customers' billable wastewater flows will be calculated by averaging the three lowest of the four months' billings of metered water consumption for each December, January, February and March unless otherwise provided below. Each April, the billable flows for each residential customer will be adjusted according to the greater of the average of three of the four prior December, January, February and March billing months or one thousand (1,000) gallons. Where no prior December, January, February and March billing is available to average for wastewater billing for an individual customer, the average consumption for all residential customers for those months will be used. If actual water consumption during any month is less than the average winter months' consumption, the wastewater flow billed will be equal to the actual metered water consumption for that month. The billable flows for each residential customer may be adjusted for such periods as determined just and reasonable and adopted by resolution of the Arlington City Council. Any resolution regarding residential rates will be automatically adopted and incorporated in this Ordinance. (3) The charges set forth in Section 3.02(B)(1) and Section 3.02(B)(2) herein are based upon the amount of water used, as measured by a single meter, in increments of one thousand (1,000) gallons. Where water is furnished to residential customers by other than the City, the charge shall be equal to the current City residential charge for the average consumption for all residential customers for the prior December, January and February. Commercial customers in this classification shall be charged a flat rate to be determined in accordance with Section 4.07 of the "Industrial Waste and Pollution Control Chapter" of the Code of the City of Arlington, 1987, as amended. All customers connected to the sanitary sewage system who have a source of water supply that is in addition to or in lieu of the City of Arlington Water Supply, must have a meter approved and tested by the Arlington Water Utilities Department on that alternate source of water supply, and the wastewater charge as set forth in Section 3.02(B) shall be based on the sum of the volumes delivered by all sources of supply. C. Water and Sewer Rates for Less than Full Billing Cycle: The above water and/or sewer rates shall apply to any customer with any consumption. For customers who have occupied the service address for less than a full billing cycle, the following policy will be in effect: DAYS OF OCCUPANCY RATE 15 days or less with no consumption No charge 15 days or less with consumption Regular rate More than 15 days Regular rate D. Construction Water Rates: (1) Construction water is water necessary for the construction of water, sewer, street and other projects including oil or gas exploration, development, production or drilling or water drawn from a hydrant for any purpose. All construction water will be measured by meters furnished by the Water Utilities department. A construction meter is any water meter used to connect to a hydrant or other water service connection for the purpose of metering construction water usage. The water utility account holder securing the meter will be responsible for meeting the terms and conditions of the construction water agreement, and for the meter, valve fittings and backflow prevention device. If a meter is connected to a hydrant, the water utility account holder will be responsible for the hydrant. The deposit plus a construction meter service charge shall be paid to the Water Utilities department. Any alteration or damage that occurs to the meter will be repaired by the City at the expense of the water utility account holder. The cost of the repairs will be deducted from the deposit and the remaining deposit, if any, will be credited to the final bill. Additional charges shall apply to meters that are lost or stolen. (2) The contractor or person securing a meter may move a meter to various Arlington locations, but when meters are moved the contractor must notify the Water Utilities department. The meter readings shall be communicated to the Water Utilities Department between the 5th and 10th of each month, regardless of consumption. Failure to comply with this provision will result in the account being billed for the amount specified in the construction water agreement. Credit for this payment shall not be applied to current or subsequent billings. The account shall also be billed for actual meter readings, when obtained, based on the existing water rates. (3) The Conservation Rates Construction Water Block Structure is the rate per month charged for construction water, which is the service furnished to customers using water: a. for any purpose of construction; b. drawn from a fire hydrant for any purpose; or c. for gas or oil exploration, development, production or drilling. E. Service Available Charge: Construction water necessary for construction phases of residences with a service line one inch (1") or smaller may be received without a meter. To receive the service available charge feature, the tap and deposit must be paid at the Water Utilities Department prior to the issuance of a building permit. The service available charge will begin upon payment of tap, meter activation and deposit fees. The following consumption levels shall be used to calculate the service available charges. These charges will be calculated using rates in effect at the time of the billing. (1) Six thousand (6,000) gallons per month for the first three (3) months. (2) Fourteen thousand (14,000) gallons per month for the next two (2) months. (3) Twenty-three thousand (23,000) gallons per month thereafter until such time as a meter has been set. (4) In order for the meter to be set, adopted Water Utilities Office Policies must be met. (5) The request for setting a meter should be made at least three (3) full working days prior to the date the meter is needed. (6) A thirty (30) day calendar month will be used. (7) When a service available account is established for less than a full billing cycle, the following charges shall be made: 0-15 days service - One-half (½) Charge 16 days or more service - Full Charge (8) The charge made to an account where a meter has been installed during a billing period will be for consumption used or the service available charge, whichever is larger. (9) If a customer becomes delinquent in one (1) or more service available accounts, no additional service available accounts may be opened or meters set until all such accounts are made current. Final inspection approval of any construction shall not be given until such time as all requirements of the adopted Water Utilities Office Policy have been met with regard to the tap, meter and box, and accepted by Building Inspections. Such approval can be withheld by the Building Inspector if compliance is found not to be complete. F. Raw Water Rates: The following rates per month shall be the rates charged for furnishing raw water to customers unless approved otherwise by the City Council: GALLONS OF WATER RATE 0 to 1,000 gallons $30.00 minimum charge All over 1,000 gallons $ 0.87 per 1,000 gallons Any required chemicals will be charged at actual cost at the City plus a ten percent (10%) handling fee. G. Fire Protection System Fees: The following fixed monthly fees shall be charged to customers with fire protection systems and/or fire lines. Fire Protection System/Fire Line Fees Fire Line Size | Fixed Monthly Charge 1” | $25.85 1½” | $61.88 2” | $108.02 3” | $254.70 4” | $350.00 6” | $600.00 8” | $800.00 10” and above | $1,010.00 H. Rate Adjustment Authority: The Director of Utilities shall have the authority to adjust the monthly billing calculations/procedures for any customer to correct inequities that may arise due to methodologies adopted for calculating rates.

(Amend Ord 24-052, 9/17/24) (Amend Ord 01-108, 9/14/01) (Amend Ord 12-009, 3/20/12) (Amend Ord 90-96, 9/25/90) (Amend Ord 07-065, 9/18/07) (Amend Ord 05-079, 9/13/05) (Amend Ord 99-106, 8/31/99) (Amend Ord 89-110, 9/26/89) Amended by Ord. No. 25-073, passed 9-16-2025.

Ask a question about Arlington law

Corpus searches the Arlington sections it holds and shows the ones that match, with their citations. Free, no sign-in.