§ 3.03 — Required Inspections

Code of the City of Arlington, Texas (City Secretary chapter PDFs as posted 2026-11-07, each current through the ordinance named on its cover, with the City Secretary's adopted-not-yet-codified Ordinances 25-063, 25-069, 25-073, 25-074, 25-075, 25-084, 26-003, 26-004, 26-019, 26-024 and 26-027 applied; Anti-Discrimination chapter not included) · Arlington City Code, Irrigation Chapter, § 3.03

Corpus is an independent public-information project, not the official City of Arlington website. Stable reference: corpuslaw.us/code/8f0ef208-2672-4ed4-8a84-a2826acbca81

Section 3.03 Required Inspections

A. The regulatory authority, upon notification from the permit holder or the permit holder’s authorized agent, shall make the following inspection and such other inspections as necessary, and shall either release that portion of the construction or shall notify the permit holder or an agent of any violations that must be corrected. The holder of the permit shall be responsible for the scheduling of the inspections: 1. Underground inspection shall be made after trenches or ditches are excavated, piping and control wiring installed and before any backfill is put in place. 2. Cross connection inspection for reclaimed water. The cross connection inspection is required on all new and converted systems. The following procedure shall be followed by the applicant in the presence of the code official to determine whether a cross connection occurred; a. The potable water system shall be in service and pressurized. The reclaimed water system shall not be connected to the service. b. The potable water system and the reclaimed water system shall have the appropriate backflow device installed at the point of service before any branch connections and shall be tested. c. All fixtures and open devices, potable and reclaimed, shall be operated and checked for flow. d. The open piping system on the reclaimed water system shall be checked for flow during the entire test. e. The potable water system shall then be turned off at the service connection and completely drained to the lowest fixture outlet. f. The reclaimed water system shall then be connected and pressurized. g. All fixtures and devices, potable and reclaimed, shall be operated and checked for flow. h. The lowest fixture outlet on the potable water system shall be checked for flow during the entire test. i. Approval by the code official will permit the potable water system to be re-pressurized. j. Subject to the approval of the code official, a dye test method of cross connection inspection may be permitted. A food grade dye is injected into the reclaimed water system to test for cross connection. Steps “a” through “d” shall be performed along with the additional steps “k” through “m” below. k. The reclaimed water system shall be connected and pressurized with the dye injected into the system. The reclaimed water system shall be operated until the dyed water is detected at each outlet. l. All fixtures and devices connected to the potable water system shall be operated and checked for the presence of dyed water. m. The inspector shall give written acceptance if no cross connection is discovered. 3. Final inspection shall be made after the installation is complete and operational and the installation is ready for use. 4. Where any work does not pass any initial inspection, the necessary corrections shall be made to comply with this chapter. The corrected work shall then be rescheduled for inspection.

(Amend Ord 11-020, 3/22/11)