§ 4.04 — Variance Procedures
Code of the City of Arlington, Texas (City Secretary chapter PDFs as posted 2026-11-07, each current through the ordinance named on its cover, with the City Secretary's adopted-not-yet-codified Ordinances 25-063, 25-069, 25-073, 25-074, 25-075, 25-084, 26-003, 26-004, 26-019, 26-024 and 26-027 applied; Anti-Discrimination chapter not included) · Arlington City Code, Flood Damage Prevention Chapter, § 4.04
Corpus is an independent public-information project, not the official City of Arlington website. Stable reference: corpuslaw.us/code/c5e8ac23-a8c5-4be2-b412-39e46cca6abc
Section 4.04 Variance Procedures
(1) The City Council shall hear and render judgment on requests for variances from the requirements of this ordinance in accordance with this ordinance and 44 C.F.R. Part 60. (2) The City Council shall hear and render judgment on an appeal only when it is alleged there is an error in any requirement, decision, or determination made by the Floodplain Administrator in the enforcement or administration of this Chapter. (3) Once the City Council’s decision is final, any person or persons aggrieved by the decision of the City Council may appeal such decision to a court of competent jurisdiction. (4) The Floodplain Administrator shall maintain a record of all actions involving an appeal and shall report variances to the Federal Emergency Management Agency upon request. (5) Variances may be issued for the reconstruction, rehabilitation or restoration of structures listed on the National Register of Historic Places or the State Inventory of Historic Places, without regard to the procedures set forth in the remainder of this ordinance. (6) Upon consideration of the factors noted above and the intent of this ordinance, City Council may attach such conditions to the granting of variances as it deems necessary to further the purpose and objectives of this ordinance (Section 1.03). (7) Variances shall not be issued within any designated floodway if any increase in flood levels during the base flood discharge would result. (8) Variances may be issued for the repair or rehabilitation of historic structures upon a determination that the proposed repair or rehabilitation will not preclude the structure's continued designation as a historic structure and the variance is the minimum necessary to preserve the historic character and design of the structure. (9) Prerequisites for granting variances: (a) Variances shall only be issued upon a determination that the variance is the minimum necessary, considering the flood hazard, to afford relief. (b) Variances shall only be issued upon: (i) showing a good and sufficient cause; (ii) a determination that failure to grant the variance would result in exceptional hardship to the applicant; and (iii) a determination that the granting of a variance will not result in increased flood heights, additional threats to public safety, extraordinary public expense, create nuisances, cause fraud on or victimization of the public, or conflict with existing local laws or ordinances. (c) The Floodplain Administrator shall provide signed, written notice to the applicant that (i) the structure will be permitted to be built with the lowest floor elevation below the base flood elevation, and such construction increases risks to life and property; and (ii) that the issuance of a variance to construct a structure below the base flood level will result in increased premium rates for flood insurance up to amounts as high as $25 per $100 of insurance coverage, as those provisions may be amended in Section 60.6(a)(5) of the National Flood Insurance Program Regulations. (10) Variances may be issued by a community for new construction and substantial improvements and for other development necessary for the conduct of a functionally dependent use provided that (i) the criteria outlined in Section 4.04(1)-(9) are met, and (ii) the structure or other development is protected by methods that minimize flood damages during the base flood and create no additional threats to public safety. (11) Variances and appeals can only be considered upon submittal of an appeal letter or request for variance to the Floodplain Administrator. (a) Applicants may be required to submit additional information which the Floodplain Administrator may deem necessary to review the appeal or request for variance. (b) Each appeal or request for variance shall be accompanied by an appeal/variance review fee as established by resolution of the City Council, payable to the City, no part of which shall be refundable, unless the appeal or request for variance is withdrawn by the Applicant prior to the Floodplain Administrator's review of the appeal or request, in which case the City shall refund the fee to the Applicant. (c) Upon receipt of the appeal or request for variance, the Floodplain Administrator shall review and determine compliance with the provisions of this ordinance and applicable policies. (12) Prior to the request being considered, the variance review fee and, at minimum, the following supporting information shall be forwarded to the Floodplain Administrator for review and recommendations: (a) Plans drawn to scale showing the nature, location, dimensions and elevation of the property, existing or proposed structures, fill, storage of materials, floodproofing measures and the relationship of the above to the location of the channel and floodway and the minimum building elevation. (b) Furnish the following additional information as is deemed necessary by the Floodplain Administrator for the evaluation of the effects of the proposed use upon flood flows and other factors necessary to render an opinion on the suitability of the proposed use: (i) Cross-sections showing the channel of the stream, elevation of land areas adjoining each side of the channel, and cross-sectional areas to be occupied by the proposed development. (ii) A site plan showing elevations or contours of the ground, pertinent structure, fill or storage elevations; size, location and spatial arrangement of all proposed and existing streets, water supply, sanitary facilities, soil types and other pertinent information. (iii)Profile showing the slope of the bottom of the channel or flow line of the stream. (iv) Hydraulic information including water surface profiles for a minimum of the 25- and 100-year events for existing and proposed improvements. (v) Specifications for building construction and materials, floodproofing, filling, dredging, grading, channel improvement, storage of materials, water supply, and sanitary facilities. (vi) Photographs showing existing land uses and vegetation upstream and downstream. (13) The City Council may attach conditions to the granting of a variance as it deems necessary to further the purposes of this ordinance. The following conditions may be included without limitation: (a) Modification of waste disposal and water supply facilities. (b) Limitations on periods of use and operation. (c) Imposition of operation controls and bonding or other form of surety. (d) Requirements for construction of channel modifications, dikes, levees and other protective measures. (e) Floodproofing measures.
(Adopt Ord 09-049, 9/1/09)
Ask a question about Arlington law
Corpus searches the Arlington sections it holds and shows the ones that match, with their citations. Free, no sign-in.
