Code of the City of Arlington, Texas (City Secretary chapter PDFs as posted 2026-11-07, each current through the ordinance named on its cover, with the City Secretary's adopted-not-yet-codified Ordinances 25-063, 25-069, 25-073, 25-074, 25-075, 25-084, 26-003, 26-004, 26-019, 26-024 and 26-027 applied; Anti-Discrimination chapter not included) · Arlington City Code, Construction Chapter, § 4.13
Corpus is an independent public-information project, not the official City of Arlington website. Stable reference: corpuslaw.us/code/695916ae-05ca-4212-8542-065ca91596d5
Section 4.13 Inspections
A. General. All construction or work for which a permit is required shall be subject to inspection by the Building Official, or an authorized representative, and certain types of construction may have continuous inspection by special inspectors as specified in Section 4.14 below. A survey of the lot may be required by the Building Official to verify compliance of the structure with approved plans. It shall be the duty of the permittee to cause the work to be accessible and exposed for inspection purposes. EXCEPTION: The owner of a property may choose to contract with a Third Party Provider that is properly registered with the City for inspections. Inspections performed by Third Party Organizations are subject to the terms of the program as authorized by resolution of the City Council of the City of Arlington. A Third Party Provider shall not be authorized to grant final approval or grant a Certificate of Occupancy. B. Approvals Required. No work shall be done on any part of the building or structure beyond the point indicated in each successive inspection without the permittee first obtaining the written approval of the Building Official. Such written approval shall be given only after an inspection has been made of each successive step in the construction as indicated by each of the Required Inspections. Failure by the permittee to contact the Building Official for any required inspection shall be an offense. There shall be a final inspection and approval on all buildings when completed and ready for occupancy before such occupancy is allowed to occur. C. Required Inspections. It shall be the duty of the holder of the building permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspections of such work that are required by this code. Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the building official. The building official, upon notification, shall make the requested inspections and shall either indicate the portion of the construction that is satisfactory as completed, or notify the permit holder or his or her agent wherein the same fails to comply with this code. Any portions that do not comply shall be corrected and such portion shall not be covered or concealed until authorized by the building official. The Building Official, upon notification from the permit holder or an authorized agent, shall make the following inspections and shall either approve that portion of the construction as completed or shall notify the permit holder or an authorized agent in what respects the same fails to comply with this Building Code: 1. Footing and foundation inspections. Footing and foundation inspections shall be made after excavations for footings are complete and any required reinforcing steel is in place. For concrete foundations, any required forms shall be in place prior to inspection. Materials for the foundation shall be on the job, except where concrete is ready mixed in accordance with ASTM C 94, the concrete need not be on the job. 2. Concrete slab and under-floor inspection. Concrete slab and under-floor inspections shall be made after in-slab or under-floor reinforcing steel and building service equipment, conduit, piping accessories and other ancillary equipment items are in place, but before any concrete is placed or floor sheathing installed, including any subflooring. 3. Lowest floor elevation. In flood hazard areas, upon placement of the lowest floor, including the basement, and prior to further vertical construction, the elevation certification required in Section 1612.5 shall be submitted to the building official. 4. Frame inspection. Framing inspections shall be made after the roof deck or sheathing, all framing, fire-blocking and bracing are in place and pipes, chimneys and vents to be concealed are complete and the rough electrical, plumbing, heating wires, pipes and ducts are approved. As applicable, residential building seconds would include mechanical rough, electrical rough, plumbing top-out and framing. 5. Lath and gypsum board inspection. Lath and gypsum board inspections shall be made after lathing and gypsum board, interior and exterior, is in place, but before any plastering is applied or gypsum board joints and fasteners are taped and finished. EXCEPTION: Gypsum board that is not part of a fire-resistance-rated assembly or a shear assembly. 6. Fire-resistant penetrations. Protection of joints and penetrations in fire-resistance-rated assemblies shall not be concealed from view until inspected and approved. 7. Energy efficiency inspections. Inspections shall be made to determine compliance with the energy code and shall include, but not be limited to, inspections for: a. envelope air leakage and insulation installation and R and U values; b. fenestration U values and SHGC values, c. duct system sealing and insulation R values; d. HVAC and water-heating equipment efficiency, and e. Lighting switching and wattage allowances. 8. Other inspections. In addition to the inspections specified above, the building official is authorized to make or require other inspections of any construction work to ascertain compliance with the provisions of this code and other laws that are enforced by the department of building safety. 9. Special inspections. For special inspections, see Section 1704 of the IBC. 10. Final inspection. The final inspection shall be made after all work required by the building permit is completed. D. Other Inspections. In addition to the required inspections specified in Subsection (C) above, the Building Official may make or require any other inspections of any construction work to ascertain compliance with the provisions of this Building Code and other applicable laws which are enforced by the City of Arlington. For the purpose of determining compliance with I.B.C., Section 3402 the Building Official may cause any structure to be reinspected. E. Reinspections. A fee as established by city council resolution may be charged when: 1. The inspection called for is not ready when the inspector arrives; 2. No building address or permit card is clearly posted; 3. City approved plans are not on the job site available to the inspector; 4. The building is locked or work otherwise not available for inspection when called; 5. The job site is red-tagged twice for the same item; 6. The original red tag has been removed from the job site; or 7. Failure to maintain erosion control, trash control or tree protection. Any re-inspection fees assessed shall be paid before any more inspections are made on that job site.
Ask a question about Arlington law
Corpus searches the Arlington sections it holds and shows the ones that match, with their citations. Free, no sign-in.