§ 42 — Construction Schedule and Reports
Code of the City of Arlington, Texas (City Secretary chapter PDFs as posted 2026-11-07, each current through the ordinance named on its cover, with the City Secretary's adopted-not-yet-codified Ordinances 25-063, 25-069, 25-073, 25-074, 25-075, 25-084, 26-003, 26-004, 26-019, 26-024 and 26-027 applied; Anti-Discrimination chapter not included) · Arlington City Code, Cable Television Chapter, § 42
Corpus is an independent public-information project, not the official City of Arlington website. Stable reference: corpuslaw.us/code/6486d7df-fec8-441e-9658-b60837d603da
Section 42 Construction Schedule and Reports
A. Upon accepting a franchise, a GRANTEE shall, within (60) days, file the documents required to obtain all necessary federal, state and local licenses, permits and authorizations required for the conduct of its business, and shall submit monthly reports to the City Manager on progress in this respect until all such doc-uments are in hand. B. Map and Plan. A GRANTEE shall submit a construction plan or reconstruction plan of both the subscriber net-work and institutional network (see Subsection F) which shall be incorporated by reference and made a part of a Franchise Agreement. The plan shall include cable sys-tem design details, equipment specifications, and design performance criteria. The plan shall also in-clude a map of the entire franchise area disclosed in accordance with the terms and conditions of the fran-chise and shall clearly delineate areas within the franchise area where the cable system will be available to subscribers including a time schedule of con-struction for each year that construction or reconstruction is proposed. C. Every three (3) months after the start of construction or reconstruction, a GRANTEE shall furnish the City Manager a report on progress of construction or recon-struction until complete. The report shall include a map that clearly defines the areas wherein regular sub-scriber service is available. D. Copies of any agreements, reports, petitions, correspondence or other documents filed with any local, state or federal government or any person or legal entity relating to a GRANTEE's operations within the City shall be filed simultaneously with the City Manager. E. A GRANTEE or its authorized contractors shall obtain permits from the City Engineer, Building or other ap-propriate departments prior to any physical work being performed in the City's rights-of-way, or on City-owned property. Permits will be issued to a GRANTEE or ap-proved contractors only on approved plans, which must be submitted on or before the request for the construc-tion permit. All work will be done in accordance with the City's specifications. F. GRANTEE shall cause detailed maps of the entire cable system including both the subscriber network and insti-tutional network showing materials of construction, amplifier, and power supply locations to be filed in the office of the City Engineer prior to the issuance of a permit for construction. Prior to requesting the issuance of a permit for the installation of any facility or apparatus in accordance with the provisions of this section, the GRANTEE shall file such maps with all utility companies and other public agencies whose facilities are affected by such installation and obtain a statement signed by a responsible official thereof that such utility or public agency has no objection to the proposed location of such facility. Such utility companies and public agencies shall act upon a request made to them by a GRANTEE in accordance with the fore-going provisions within thirty (30) days after such request has been made to such utility or public agency.
Ask a question about Arlington law
Corpus searches the Arlington sections it holds and shows the ones that match, with their citations. Free, no sign-in.