§ 5.03 — Fees
Code of the City of Arlington, Texas (City Secretary chapter PDFs as posted 2026-11-07, each current through the ordinance named on its cover, with the City Secretary's adopted-not-yet-codified Ordinances 25-063, 25-069, 25-073, 25-074, 25-075, 25-084, 26-003, 26-004, 26-019, 26-024 and 26-027 applied; Anti-Discrimination chapter not included) · Arlington City Code, Electrical Code Chapter, § 5.03
Corpus is an independent public-information project, not the official City of Arlington website. Stable reference: corpuslaw.us/code/0a3ed3e0-1aa4-412e-b827-47ddeaa47284
Section 5.03 Fees
A. Starting Work Without Obtaining Permit: In any case where a Registrant allows the commencing of work requiring any permit and said registrant does not first make application for such permits as may be necessary, the fees therefor shall be doubled. B. Fee Payment: The permit fee for installation of electrical equipment in all buildings and the permit fee for alterations of electrical equipment in any building shall be submitted prior to permit issue. The fees shall be set from time to time by resolution of the City Council. C. Reinspections: A reinspection fee may be assessed for each inspection or reinspection when such portion of work for which inspection is called is not complete, or when corrections called for are not made or for failure to provide access on the date for which inspection is requested. D. Standards for Fee Administration The following standards shall apply in calculating permit fees under this Chapter: 1. Calculations for area (square footage) shall be on a gross basis, measured from the exterior face of exterior walls; 2. The Administrative Authority may approve a mixed calculation method when differing occupancy descriptions are applied to various areas within a single structure; 3. For any installation not clearly defined herein, the Administrative Authority shall designate the applicable method of calculation; 4. Final permit fee calculations shall be carried to the nearest whole dollar. Fractions greater than forty-nine one hundredths (0.49) shall be extended upward; 5. There shall be no full refund of any permit fee except when: a. The permit has been issued, and no part of the work has commenced; or b. The permit has been issued through error on the part of the City of Arlington, and it is found that the work applied for cannot be allowed. No full refund shall be made of any fee paid unless a written request is submitted by the original permittee no later than sixty (60) days after the date of the fee payment; 6. Refund of a fee submitted for any administrative action under this Chapter of the Code of the City of Arlington, other than an electric permit, shall be made in accordance with Section 4.12 of the "Construction" Chapter of said Code; 7. When the replacement of a contractor occurs during a project for which a permit has been issued pursuant to this Electrical Code, the Administrative Authority may prorate the amount of the permit fee for the new contractor based on said Administrative Authority's determination of the percentage of work remaining; and 8. When it is determined after a permit has been issued that the scope of work is to be significantly changed, the Administrative Authority may authorize and require that appropriate adjustments be made to the permit fee. Any increase in the permit fee shall be paid prior to performing any part of such increased scope of work. Any decrease in the permit fee which is based on previously approved work which will not be performed shall be refunded in the amount of fifty percent (50%) of the fee related to the work not to be performed, as determined by the Administrative Authority. No refund shall be made, unless a written request is submitted by the original permittee not later than sixty (60) days following approval of the permittee's change in scope of work. This subsection is not to be interpreted as requiring reinspection fees the first time a job is rejected for failure to comply with the requirements of this Code, but as controlling the practice of calling for inspections before the job is ready for such inspection or reinspection. In instances where reinspection fees have been assessed, no additional inspection of the work shall be performed until the required fees have been paid. The fees shall be set from time to time by resolution of the City Council.
(Amend Ord 04-089, 9/21/04)
Ask a question about Arlington law
Corpus searches the Arlington sections it holds and shows the ones that match, with their citations. Free, no sign-in.
