§ 6.5 — Drainage and Environmental Standards

Code of the City of Arlington, Texas (City Secretary chapter PDFs as posted 2026-11-07, each current through the ordinance named on its cover, with the City Secretary's adopted-not-yet-codified Ordinances 25-063, 25-069, 25-073, 25-074, 25-075, 25-084, 26-003, 26-004, 26-019, 26-024 and 26-027 applied; Anti-Discrimination chapter not included) · Arlington City Code, Unified Development Code Chapter, § 6.5

Corpus is an independent public-information project, not the official City of Arlington website. Stable reference: corpuslaw.us/code/68a4a47d-79c0-4dc5-b20a-bd8a160b46d9

6.5. DRAINAGE AND ENVIRONMENTAL STANDARDS

6.5.1. DRAINAGE AND STORMWATER MANAGEMENT POLICIES A. Adequate Facilities Where it is anticipated that runoff incident to the development of the subdivision will exceed the capacity of an existing downstream drainage feature and result in hazardous conditions (such as flood heights, velocity, flow over road, etc.), the City may deny approval of the plat (or Development Plan) if plans for mitigation have not been accepted by the City. Mitigation plans shall be provided that include, but are not limited to, all necessary onsite and off-site improvements including storage, storm sewer systems, channel modifications, driveway adjustments, and culvert improvements. The mitigation construction shall be completed prior to the issuance of building permits. Where a development is constructed in more than one phase, each phase shall fully comply with the stormwater requirements in the Design Criteria Manual and shall carry storm drainage to an adequate and acceptable outfall. B. Developer Responsibility The developer shall be responsible for all storm drainage flowing to, through, from, and adjacent to the property. This responsibility includes the drainage directed to that property by prior or anticipated development as well as drainage naturally flowing through the property due to topography. The developer shall pay for all costs associated with the onsite and off-site drainage features and improvements to comply with the Design Criteria Manual. The developer shall also pay for the dedication or acquisition of any necessary drainage easements. C. Easements Drainage easements shall be dedicated for public drainage features in accordance with requirements of Section 6.5.2, Drainage Features. Drainage easements and features shall be included as a portion of buildable (habitable structure) lots and not as a lot by itself unless specifically authorized by the Zoning Administrator or designee. If a drainage feature is approved on a separate lot, a mandatory property owner's association is required and subject to Section 6.2.3.D, Property Owners’ Association Responsibility. Permanent public drainage features such as pipes, flumes, or engineered channels located in a street right-of-way or in a public drainage easement are considered public. Drainage features that do not meet these criteria or deemed otherwise by the City may be considered private and shall be maintained by the property owner. Drainage easements shall be dedicated for all private drainage features when required by the Design Criteria Manual. Easements not dedicated by plat shall be dedicated by separate instrument. D. Stormwater Quality Designs for development shall manage stormwater in a manner that protects and/or improves stormwater quality by addressing the development’s potential to cause erosion, pollution, siltation, and sedimentation in the MS4 and natural creeks. The goal is to maintain after development, to the maximum extent practicable, the predevelopment characteristics of stormwater runoff from the development. It is the developer's responsibility to ensure that designs for the development meet the stormwater management requirements of adopted City codes. E. Stormwater Runoff Stormwater runoff shall be calculated anticipating a fully developed watershed. The comprehensive plan, existing land use, and zoning maps shall be used to determine fully developed conditions. The Zoning Administrator or designee reserves the right to review the determination of fully developed conditions and may require revisions. F. Conveyance of Development Runoff The runoff for the design frequency storm shall be collected onsite and conveyed to an adequate and acceptable outfall as defined in the Design Criteria Manual. G. Positive Overflow Positive overflow means that flow greater than the design frequency storm will be conveyed by a secondary drainage feature without flooding structures. Streets are designed to carry a specified quantity of stormwater within the right-of-way according to the street classification. At sump locations or slope limitations where the stormwater will leave the right-of-way, a positive overflow path shall be provided. A drainage easement shall be dedicated between lots at or near the low point in the street to allow for positive overflow systems. The Zoning Administrator or designee may allow alternative designs. H. Minimum Finish Floor Elevations The City may require the developer’s engineer to establish minimum finished floor elevations (MFF) to provide flood protection on certain lots contained within the subdivision. The MFFs shall be shown on the plat. These elevations shall incorporate the most current floodplain management criteria or other criteria as necessary to avoid damages. The minimum finish floor elevation shall be two feet above the fully developed 100-year water surface elevation where the MFF is associated with a natural creek or open channel. When the MFF is necessitated by situations other than a natural creek or open channel, the MFF shall be set by the developer's engineer and agreed upon by the City. The following note or an amended version appropriate to the specific plat shall be added to any plat upon which the City requires the establishment of minimum finish floor elevations: "The City of Arlington reserves the right to require minimum finish floor elevations on any lot contained within this addition. The minimum elevations shown are based on the most current information available at the time the plat is filed and may be subject to change. Additional lots, other than those shown, may also be subject to minimum finish floor criteria." I. Off-Site Drainage 1. The developer is responsible for the evaluation of the discharge leaving the proposed development and its effect on downstream structures, features, and property, including but not limited to, flooding, stream channel stability, and water quality. The developer may be required to mitigate adverse impacts. 2. When any proposed development requires off-site grading or where stormwater runoff has been collected or concentrated, the runoff from the required design frequency shall not be permitted to drain onto adjacent property except in existing creeks, channels, storm sewers, or streets unless a drainage easement is provided in accordance with the Design Criteria Manual. 6.5.2. DRAINAGE FEATURES A. Stormwater Conveyance The three types of runoff conveyance features are natural creeks, closed systems, and improved open channels. The Design Criteria Manual contains specific criteria regarding the design of the drainage features. 1. Natural Creeks Natural creeks shall be preserved unless it is determined by the Zoning Administrator or designee that it is not feasible to leave the creek in its natural state. In order to assist in this determination, the following are required: a. Report A hydrologic and hydraulic report is required to establish the 25- and 100-year water surface profiles. The requirements for the report are outlined in the Design Criteria Manual. b. Easement Easements shall be dedicated for all drainage features as outlined in the Design Criteria Manual. Additional easements may be required to provide access to the creek for maintenance. c. Erosion Clear Zone (ECZ) An ECZ shall apply to all development activity. No portion of any building, pavement surface, fence, wall, swimming pool, or other structure shall be located or constructed within the ECZ. The ECZ shall be shown, labeled, and described by metes and bounds on the plat or site plan when the ECZ lies outside the drainage easement. The limit of the ECZ shall be determined as described in the Design Criteria Manual. d. Erosion Protection Where natural creeks connect to improved systems, permanent transitional materials shall be required. Additionally, in areas along the natural creek where excessive erosion may occur, grade control structures, drop structures, or other structures may be required to stabilize the channel and flowline. e. Maintenance The following shall apply to natural creeks. (i) The City is not responsible for any maintenance or cleaning of the natural creek. (ii) The property owner shall be responsible for maintenance and cleaning of the creek. (iii) The property owner shall acknowledge maintenance responsibility by means of a maintenance statement or by an agreement approved by the City to provide for any maintenance of the natural creek and its associated drainage easement. (iv) Maintenance Statement. When an easement is dedicated for a natural creek by plat, a maintenance note as approved by the Zoning Administrator must be placed on the plat acknowledging maintenance responsibility by the property owner. If the easement is created by separate instrument, a maintenance statement shall be included in the dedication instrument to provide for the continuing maintenance of the natural creek and associated easement by the property owner. (v) Maintenance Agreement. Maintenance Agreements shall be utilized when required by the Design Criteria Manual. When an agreement is required, the agreement must be executed and recorded prior to issuance of a building permit. The agreement shall be filed with the Tarrant County Clerk and be a covenant running with the land. Property owner will be responsible for all fees associated with filing the agreement with the Tarrant County Clerk. 2. Closed Systems The closed system, when permitted, shall be connected to an adequate and acceptable outfall as described in the Design Criteria Manual. Alternative designs shall be approved by the Zoning Administrator or designee when it is determined that the proposed design is satisfactory and complies with the intent of the provisions of this article, and that the alternative is at least the equivalent of that prescribed by this article in quality, strength, effectiveness, durability, and safety. a. Easement Drainage easements shall be dedicated as outlined in the Design Criteria Manual. Additional drainage easements may be required at specific locations for access to the system for maintenance. b. Erosion Protection Where closed systems connect to natural creeks or improved open channels, end sections and/or transitional materials are required for erosion protection. c. Maintenance The City will maintain only the public drainage improvements within the drainage easement. Any other improvements or maintenance, including driveways or driveway culverts, shall be the responsibility of the property owner. 3. Constructed/Modified Open Channels A request for a constructed/modified open channel shall be evaluated by the Zoning Administrator or designee and permitted when appropriate based on-site constraints and hydraulic conditions. Constructed/modified open channels may incorporate the following: gabions, pre-cast concrete block, native stone, vegetation, bio-engineered systems, or equivalent erosion control devices. The following requirements shall be met: a. Report A hydrologic and hydraulic report is required to establish the 100-year water surface profiles. The requirements for the report are outlined in the Design Criteria Manual. b. Easement Drainage easements shall be dedicated as outlined in the Design Criteria Manual. Additional drainage easements may be required at specific locations for access to the system for maintenance. c. Erosion Prevention A transition material is required when there are connections between constructed/modified open channels, natural creeks and closed systems. The transition downstream of outfalls shall be shaped and/or lined to the point that flow velocities from the outfall and the channel are non-erosive. d. Maintenance (i) The City will maintain only structurally improved public drainage improvements within the drainage easement. (ii) Private improvements and channels constructed of other materials within the easement shall be maintained by the owner or property owner’s association. The property owner or association shall acknowledge maintenance responsibility by means of a maintenance statement and agreement approved by the City to provide for any maintenance of the open channel and its associated drainage easement. (iii) Maintenance Statement. When an easement for a privately maintained stormwater facility is dedicated by plat, a maintenance note as approved by the Zoning Administrator must be placed on the plat and be a covenant running with the land. This statement shall be signed by the property owner. If the easement is created by separate instrument, a maintenance statement must be included in the dedication instrument to provide for the continuing maintenance of the stormwater facility and its associated easement. (iv) Maintenance Agreement. Maintenance Agreements shall be utilized when required by the Design Criteria Manual. When an agreement is required, the agreement must be executed and recorded prior to issuance of a building permit. The agreement shall be filed with the Tarrant County Clerk and shall be a covenant running with the land. Property owner will be responsible for all fees associated with filing the agreement with the Tarrant County Clerk. B. Stormwater Mitigation 1. Stormwater Storage Facilities Stormwater storage facilities shall be designed and constructed when proposed stormwater discharge from a new land disturbance or redevelopment outfalls to a downstream system with flooding affecting public safety or insurable, habitable structures or when the downstream capacity is exceeded. The storage facility design (detention or retention) shall be in accordance with the Design Criteria Manual. 2. Easements The easement shall be sized in accordance with the Design Criteria Manual. Additional drainage easement may be required at specific locations for access to the stormwater facility for maintenance. 3. Maintenance a. The City will not maintain any portion of the stormwater storage facility. b. The property owner or property owner’s association shall acknowledge the maintenance responsibility by means of a maintenance statement and agreement approved by the City to provide for any maintenance of the stormwater storage and its associated drainage easement. If the stormwater storage facility is located on a separate lot held in ownership by the property owner’s association, responsibility shall be as outlined in Section 6.2.3.D, Property Owners’ Association Responsibility. c. When an easement is dedicated by plat for the stormwater storage, a maintenance note as approved by the Zoning Administrator must be placed on the plat and shall be a covenant running with the land. This statement shall be signed by the property owner. If the easement is created by separate instrument, a maintenance statement must be included in the dedication instrument to provide for the continuing maintenance of the stormwater storage and associated easement. d. Maintenance Agreement. Maintenance Agreements shall be utilized when required by the Design Criteria Manual. When an agreement is required, the agreement must be executed and recorded prior to issuance of a building permit. The agreement shall be filed with the Tarrant County Clerk and shall be a covenant running with the land. Property owner will be responsible for all fees associated with filing the agreement with the Tarrant County Clerk. 4. Fencing Where certain situations exist, such as slope adjacency to the pond, depth of pond, and location of pond relative to vehicular or pedestrian traffic, a four (4) foot open fence adjacent to or surrounding drainage areas/ detention/retention ponds may be required. C. Temporary Drainage Features Temporary drainage features, including but not limited to grade to drain features and ditches that do not cause adverse impacts to existing stormwater infrastructure or adjacent properties, may be allowed with the approval of the Zoning Administrator or designee. The temporary drainage facilities shall be permanently improved with the development of the property in which the feature is located. Where a development is constructed in more than one phase, each phase shall fully comply with the stormwater requirements in the Design Criteria Manual and shall carry storm drainage to an adequate and acceptable outfall. D. Permanent Best Management Practices (BMPs) for Stormwater Quality When a permanent BMP for stormwater quality is established, the following shall apply: 1. Easements Easements shall be dedicated in accordance with the Design Criteria Manual. 2. Maintenance a. The City will not maintain any portion of the BMPs. b. The property owner or property owner’s association shall be responsible for maintenance and cleaning of the BMPs. c. The property owner or property owner’s association shall acknowledge the maintenance responsibility by means of a maintenance statement and agreement approved by the City to provide for any maintenance of the BMPs and associated easements. If the BMP is maintained by the property owner’s association, responsibility shall be as outlined in Section 6.2.3.D, Property Owners’ Association Responsibility. d. When an easement is dedicated by plat for the BMPs, a maintenance note as approved by the Zoning Administrator must be placed on the plat and be a covenant running with the land. This statement shall be signed by the property owner. If the easement is created by separate instrument, a maintenance statement must be included in the dedication instrument to provide for the continuing maintenance of the features and associated easement. e. Maintenance Agreement. Maintenance Agreements shall be utilized when required by the Design Criteria Manual. When an agreement is required, the agreement must be executed and recorded prior to issuance of a building permit. The agreement shall be filed with the Tarrant County Clerk and be a covenant running with the land. Property owner will be responsible for all fees associated with filing the agreement with the Tarrant County Clerk. 6.5.3. CONTRACT POLICIES AND PROCEDURES Standard three-party contracts executed by the contractor, the developer, and the City are required for all public drainage construction. The contracts also include two-year maintenance bonds, performance bond, payment bond, insurance, and other requirements and fees as detailed in the Design Criteria Manual. 6.5.4. OWNERSHIP AND MAINTENANCE All public facilities constructed within dedicated public rights-of-way or public easements shall be and shall remain the property of the City and, after expiration of the maintenance bonds, shall be maintained by the City. 6.5.5. POST DEVELOPMENT AND POST CONSTRUCTION DRAINAGE ATTESTATION A. In addition to all other permits and approvals required by this Code, no parcel, tract, or lot shall be released for development or approved for occupancy, unless the parcel, tract, or lot conforms with approved drainage plans, as evidenced by the following attestations: 1. Post-Development. The developer shall attest that the entirety of the site to be built upon has been graded, improved, altered, or otherwise prepared in conformance with approved drainage plans; and 2. Post-Construction. The builder shall attest that at the conclusion of construction, the parcel, tract, or lot remains in conformance with approved drainage plans. An attestation shall not be required for non-residential development if there is no residential adjacency. A post-construction attestation shall also be provided for the following residential accessory structures when not constructed in conjunction with the primary residence: pool or spa, building greater than 320 square feet, retaining wall, and detached garage. B. The attestation shall include a topographic survey and supporting documentation in a form acceptable to and approved by the Zoning Administrator.

Ask a question about Arlington law

Corpus searches the Arlington sections it holds and shows the ones that match, with their citations. Free, no sign-in.