§ 7.01 — Right of Entry; Inspection and Sampling
Code of the City of Arlington, Texas (City Secretary chapter PDFs as posted 2026-11-07, each current through the ordinance named on its cover, with the City Secretary's adopted-not-yet-codified Ordinances 25-063, 25-069, 25-073, 25-074, 25-075, 25-084, 26-003, 26-004, 26-019, 26-024 and 26-027 applied; Anti-Discrimination chapter not included) · Arlington City Code, Stormwater Pollution Control Chapter, § 7.01
Corpus is an independent public-information project, not the official City of Arlington website. Stable reference: corpuslaw.us/code/71441bf8-f95f-457e-bc6c-7d4d44146563
Section 7.01 Right of Entry: Inspection and Sampling
The Director, or his/her authorized representative, shall have the right to enter the premises of any person discharging stormwater to the municipal separate storm sewer system (MS4) or to waters of the United States to determine if the discharger is complying with all requirements of this Chapter, and with any state or federal discharge permit, limitation, or requirement. Dischargers shall allow the Director, or his/her authorized representative, ready access to all parts of the premises for the purposes of inspection, sampling, records examination and copying, and for the performance of any additional duties. Dischargers shall make available to the Director, or his/her authorized representative, upon request, any SWPPP's, modifications thereto, self-inspection reports, monitoring records, compliance evaluations, Notices of Intent, and any other records, reports, and other documents related to compliance with this Chapter and with any state or federal discharge permit. A. Where a discharger has security measures in force which require proper identification and clearance before entry into its premises, the discharger shall make necessary arrangements with its security guards so that, upon presentation of suitable identification, the Director or his/her authorized representative(s) will be permitted to enter without delay for the purposes of performing his/her responsibilities. B. The Director, or his/her authorized representative, shall have the right to set up on the discharger's property, or require installation of, such devices as are necessary to conduct sampling and/or metering of the discharger's operations. C. The Director, or his/her authorized representative, may require any discharger to the MS4 or waters of the United States to conduct specified sampling, testing, analysis, and other monitoring of its stormwater discharges, and may specify the frequency and parameters of any such required monitoring. D. The Director or his/her authorized representative, may require the discharger to install monitoring equipment as necessary at the discharger's expense. The facility's sampling and monitoring equipment shall be maintained at all times in a safe and proper operating condition by the discharger at its own expense. All devices used to measure stormwater flow and quality shall be calibrated to ensure their accuracy. 7.01 E. Any temporary or permanent obstruction to safe and easy access to the facility to be inspected and/or sampled shall be promptly removed by the discharger at the written or verbal request of the Director or his/her authorized representative and shall not be replaced. The costs of clearing such access shall be borne by the discharger. F. Unreasonable delays in allowing the Director, or his/her authorized representative, access to the discharger's premises shall be a violation of this Chapter.
Ask a question about Arlington law
Corpus searches the Arlington sections it holds and shows the ones that match, with their citations. Free, no sign-in.
