§ 7.01 — Subsequent Connection Charges
Code of the City of Arlington, Texas (City Secretary chapter PDFs as posted 2026-11-07, each current through the ordinance named on its cover, with the City Secretary's adopted-not-yet-codified Ordinances 25-063, 25-069, 25-073, 25-074, 25-075, 25-084, 26-003, 26-004, 26-019, 26-024 and 26-027 applied; Anti-Discrimination chapter not included) · Arlington City Code, Water and Sewer Chapter, § 7.01
Corpus is an independent public-information project, not the official City of Arlington website. Stable reference: corpuslaw.us/code/f14f93d7-f61b-4d3e-8ded-8efe6b6cee6e
Section 7.01 Subsequent Connection Charges
A. The subsequent connection charge shall be paid for all water and/or sanitary sewer connections made to all water and/or sanitary sewer mains, constructed, purchased or financed by the City after October 1, 2003 per Resolution No. 03- 311, including participation for which the owner is being reimbursed as provided for in Article 9, hereof. B. Subsequent connection charges are not applicable to mains where the City has received full cost recovery, included in the impact fee study, or constructed as part of a main replacement program. C. Subsequent connection charges shall be calculated by the Front Footage, Lot Count, or Lot Area Method as determined by the Director of Utilities. 1. Front Footage Method a. Front footage is defined as the portion of the property boundary of a lot or tract of land which abuts a street, alley or easement containing public water and/or sanitary sewer mains. b. The subsequent connection charge using the front footage method is calculated by taking the total cost of the main and dividing such cost by the total front footage of the lots capable of receiving service from the main, but not including any lots for which service has been or may become available from an existing main of the system. c. In the case of an easement in which a water and/or sanitary sewer main crosses through the property served, the front footage shall be the length of water and/or sanitary sewer main within the limits of the property measured along the center line of the water and/or sanitary sewer main. d. When using the front footage method, the maximum footage to be used in determining a subsequent connection charge for the connection of a single-family residence shall be two hundred feet (200’). If the property is later subdivided into lots or developed for any use other than a single-family residence, the uncollected subsequent connection charge associated with the original lot shall be paid. e. The subsequent connection charge using the front footage method for a lot with more than one side abutting a water and/or sanitary sewer main shall be calculated using the distance of the shorter side of the lot. 2. Lot Count Method a. The subsequent connection charge using the Lot Count Method shall be calculated by taking the total cost of the main and dividing such cost by the total number of lots capable of receiving service from the main, but not including any lots for which service has been or may become available from an existing main of the system. 3. Lot Area Method a. The subsequent connection charge using the Lot Area Method shall be calculated by taking the total cost of the main and dividing such cost by the total acreage of lots capable of receiving service from the main, but not including any lots for which service has been or may become available from an existing main of the system. b. When using the Lot Area Method, the maximum area to be used in determining a charge to be made for the connection of a single-family residence shall be one acre. If the property is later subdivided into lots or developed for any use other than a single-family residence, the uncollected subsequent connection charge associated with the original lot shall be paid. D. The subsequent connection charges due for a new development shall be collected at the time of issuance of the building permit or at the time that an application is made for connection to the City’s water and/or sanitary sewer system if no building permit is required, unless an agreement between the owner and the City has been executed providing for a different time of payment.
(Amend Ord 19-055, 10/15/19)
Ask a question about Arlington law
Corpus searches the Arlington sections it holds and shows the ones that match, with their citations. Free, no sign-in.
