For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 7.01 — Technical Regulations

Code of the City of Arlington, Texas (City Secretary chapter PDFs as posted 2026-11-07, each current through the ordinance named on its cover, with the City Secretary's adopted-not-yet-codified Ordinances 25-063, 25-069, 25-073, 25-074, 25-075, 25-084, 26-003, 26-004, 26-019, 26-024 and 26-027 applied; Anti-Discrimination chapter not included) · Arlington City Code, Gas Drilling and Production Chapter, § 7.01

Corpus is an independent public-information project, not the official City of Arlington website. Stable reference: corpuslaw.us/code/3f18c279-4cc4-482a-9857-e5ba5e5c609c

Section 7.01 Technical Regulations

A. On Site Requirements 1. Abandoned Wells. All wells shall be plugged and abandoned in accordance with the rules of the RRC and Section 7.03. 2. Blowout prevention. In all cases, blowout prevention equipment shall be used on all wells being drilled, worked-over, or in which tubing is being changed. Protection shall be provided to prevent blowout during operations as required by and in conformance with the requirements of the RRC and the recommendations of the API. 3. Compliance with Fire Code. All operations, well facilities and equipment used at or located on the site shall comply with the provisions of the Fire Code and NFPA standards where applicable. 4. Discharge. No person shall place, deposit, discharge, or cause or permit to be placed, deposited or discharged, any oil, naphtha, petroleum, asphalt, tar, hydrocarbon substances or any refuse including wastewater or brine from any gas operation or the contents of any container used in connection with any gas operation in, into, or upon any public rights-of-way, alleys, streets, lots, storm drain, ditch or sewer, sanitary drain or any body of water or any private or public property in the City. 5. Drill Stem testing. All open hole formation or drill stem testing shall be done during daylight hours. Drill stem tests may be conducted only if the well effluent during the test is produced through an adequate gas separator to storage tanks and the effluent remaining in the drill pipe at the time the tool is closed is flushed to the surface by circulating drilling fluid down the annulus and up the drill pipe. 6. Dust, Vibration, Odors. All drilling and production operations shall be conducted in such a manner as to minimize, so far as practicable, dust, vibration, or noxious odors, and shall be in accordance with the best accepted practices incident to drilling for the production of gas and other hydrocarbon substances in urban areas. All equipment used shall be so constructed and operated so that vibrations, dust, odor or other harmful or annoying substances or effect will be minimized by the operations carried on at any drilling or production site or from anything incident thereto, to the injury or annoyance of persons living in the vicinity; nor shall the site or structures thereon be permitted to become dilapidated, unsightly or unsafe. Proven technological improvements in industry standards of drilling and production in this area shall be adopted as they become available if capable of reducing factors of dust, vibration and odor. Watering, wetting or other methods or materials must be used to control dust adjacent to residential property. After April 1, 2019, all Operators of pad sites located within six hundred (600) feet of a protected use must submit a dust mitigation plan to the City, at the time of SUP application or gas well permit application, whichever comes first. The dust mitigation plan shall include a private road and pad site watering schedule as well as alternatives, such as, but not limited to, the application of calcium chloride or asphalt. Failure of the Operator or its agents to comply with the approved schedule may result in a violation of this Chapter and the subsequent requirement and implementation of more permanent solutions, such as chip sealing and the complete replacement of worn caliche. 7. Electric lines. All electric lines to production facilities shall be located in a manner compatible to those already installed in the surrounding area or subdivision. 8. Electric motors. Only electric prime movers or motors shall be permitted for the purpose of pumping wells. All electrical installations and equipment shall conform to the City ordinances and the appropriate electrical codes. 9. Emergency Response Plan. Prior to the commencement of any gas or other hydrocarbons production activities, Operator shall submit to the Fire Chief and Inspector an Emergency Response Plan establishing written procedures to minimize any hazard resulting from drilling, completion or producing of gas wells. Said plan shall use existing guidelines established by the RRC, TCEQ, Department of Transportation, and/or the EPA and City Fire Code. A copy of the Emergency Response Plan shall be kept on site. 10. Equipment painted. All production equipment shall be painted and maintained at all times, including wellheads, pumping units, tanks, and buildings or structures. When requiring painting of such facilities, the Inspector shall consider the deterioration of the quality of the material of which such facility or structure is constructed, the degree of rust, and its appearance. Paint color shall comply with any State requirements, be of a neutral color, and be compatible with surrounding uses. 11. Explosives. The use of explosive charges on any drill site shall require an explosives permit from the Fire Marshal, as required by the Fire Code of the City. Use of explosive charges within the City limits shall require approval by the Fire Marshal. 12. Fire notice. In the event of a fire or discovery of a fire, smoke, or unauthorized release of flammable or hazardous materials on any property, the Operator shall immediately report such condition to the Fire Department. 13. Fire prevention. Firefighting apparatus, suppression equipment and supplies as approved by the Fire Department and required by any applicable federal, state, or local law shall be provided by the Operator, at the Operator’s cost, and shall be maintained on the drill site at all times during drilling and production operations. Fire extinguishers must be located on the site at all times when personnel are present. The Operator shall be responsible for the maintenance and upkeep of such equipment. Each well shall be equipped with an automated valve that closes the well in the event of an abnormal change in operating pressure. All well heads shall contain an emergency shut off valve to the well production sale line. 14. Fracture Stimulation Earthen Pit. Frac ponds shall be designed in accordance with the following table: Tier | Pond Design | Fencing/Landscaping 1 | Water feature on the site | • 6-foot tall black vinyl-coated chain link fence around pond • Informal planting of shrubs around the pond • One street tree for every 30 feet of frontage along ROW 2 | Water feature on the site | • 6-foot tall black vinyl-coated chain link fence around pond • One street tree for every 30 feet of frontage along ROW Tier 1 requirements apply when frac ponds are located within 600 feet of a protected use, adjacent to ROW, or visible from a public street. Tier 2 requirements apply when frac ponds are not adjacent to ROW and not within 600 feet of a protected use. Street trees shall be planted and selected in accordance with the parkway planting standards contained in the Unified Development Code. Frac ponds must have a lining with a permeability of no more than 1 x 10- 4 cm/sc. Soils used for pond lining must be free from foreign material such as paper, brush, trees and large rocks. If an Operator who maintains a tank or pit does not take protective measures necessary to prevent harm to birds, the operator may incur liability under federal and state wildlife protection laws. Federal statutes, such as the Migratory Bird Treaty Act, provide substantial penalties for the death of certain species of birds due to contact with oil in a tank or pit. These penalties may include imprisonment. State statutes also protect certain species of birds. An Operator must screen, net, cover, or otherwise render harmless to birds all open-top storage tanks that are eight feet or greater in diameter and contain a continuous or frequent surface film or accumulation of oil. However, temporary, portable storage tanks that are used to hold fluids during drilling operations, workovers, or well tests are exempt. 15. Gas emission or burning restricted. No person shall allow, cause or permit gases to be vented into the atmosphere or to be burned by open flame except as provided by law or as permitted by the Fire Code. If the venting of gases into the atmosphere or the burning of gases by open flame is authorized as provided by law or as permitted by law, then such vent or open flame shall not be located closer than three hundred (300) feet from any building not used in operations on the drill site and such vent or open flame shall be screened in such a way as to minimize detrimental effects to adjacent property owners. Written notification must be provided to the Inspector at least 72 hours before any flaring activity is to begin. In the event of the loss of gas or other hazardous material from the well site, Operator shall immediately take all reasonable steps to regain control regardless of any other provision of this Ordinance and shall notify the Fire Department and P&DS Director as soon as practicable. If the Fire Inspector believes that it is necessary to take emergency action due to a potential or actual situation that danger to persons and property exists or will exist because of such loss or potential loss of well control and that the Operator is not taking or is unable to take all reasonable and necessary steps to regain control of such well, the Inspector may then employ any well control expert or experts or other contractors or suppliers of special services, or may incur any other expenses for labor and material which the Inspector deems necessary to regain control of such well. Operator shall reimburse the City for any expenses incurred and the City may pursue all available recourses to collect its expenses from Operator including use of security and insurance provided by Operator under this chapter. The standard of care applicable to the Fire Inspector for emergency action is set out in the Emergency Chapter of the City Code. 16. Gas lift compressor. Any onsite compressor used to ‘lift gas’ shall be designed to comply with the noise requirements of this Ordinance. Electric gas lift compressors are preferred. However, if other gas lift compressors are utilized and located in drilling zones located within six hundred (600) feet of a protected use, they must be buffered from residential protected uses by an acoustical structure of metal, masonry or other approved material. A four-wall encasement is preferred. Other sound buffering methods may be approved by the Director of Planning and Development Services, if the buffering is oriented in a way that redirects sound from the surrounding residential protected uses. 17. Gas processing onsite. Except for a conventional gas separator or line heater, no refinery, processing, treating, dehydrating or absorption plant of any kind shall be constructed, established or maintained on the premises unless approved as part of the Gas Well Permit. 18. Grass, weeds, trash. The property on which a drill site is located shall at all times be kept free of debris, pools of water or other liquids, contaminated soil, weeds, brush, trash or other waste material within a radius of one hundred (100) feet around any separators, tanks and producing wells. 19. Hazardous Plan. A Hazardous Materials Management Plan shall be on file with the Fire Department and the Inspector. 20. Lights. No person shall permit any lights located on any drill site to be directed in such a manner so that the lights shine directly on public roads, adjacent property or property in the general vicinity of the drill site. To the extent practicable, and taking into account safety considerations, site lighting shall be directed downward and internally to avoid glare on public roads and adjacent dwellings and buildings within three hundred (300) feet. The location of existing and proposed lights should be shown on the gas well permit site plan. 21. Muffling exhaust. Exhaust from any internal combustion engine, stationary or mounted on wheels, used in connection with the drilling of any well or for use on any production equipment shall not be discharged into the open air unless it is equipped with an exhaust muffler, or mufflers or an exhaust muffler box constructed of noncombustible materials sufficient to suppress noise and prevent the escape of obnoxious gases, fumes or ignited carbon or soot. 22. Private roads and drill sites. Prior to the commencement of any drilling operations, all private roads used for access to the drill site itself shall be at least twenty-four (24) feet wide and have an overhead clearance of fourteen (14) feet. At a minimum, the road shall be surfaced with bituminous surface treatment (e.g., chip seal), but asphalt and concrete paving are acceptable. Roads shall not be surfaced with gravel or caliche. All private roads shall have a concrete drive approach constructed in accordance with City design standards. In particular cases these requirements governing surfacing of private roads may be altered at the discretion of the Inspector after consideration of all circumstances including, but not limited to, the following: distances from public streets and highways; distances from adjoining and nearby property owners whose surface rights are not leased by the operation; the purpose for which the property of such owners is or may be used; topographical features; nature of the soil; and exposure to wind. Watering, wetting, or other methods or materials must be used to control dust adjacent to residential property. 23. Rigs. Electric rigs must be utilized for drilling a well located within six hundred (600) feet of a protected use, unless approved in advance by the Director of Planning and Development Services after submission in writing of a compelling reason to use an alternative rig. 24. Salt Water Wells. No salt water disposal wells shall be located within the City of Arlington. 25. Security. At all times, the operation site or compressor station shall have a minimum of one security camera mounted inside the enclosure. Signs shall be posted on the fence or wall of the site to indicate that activity on the site may be recorded by video surveillance. Camera systems shall be maintained in proper operating condition and shall be designed and located to meet the following requirements: a. capture clear video images (day and night) of all traffic entering and exiting the gate(s); b. capture clear video images (day and night) of all production equipment located on the site; and c. show the date and time of all activity on the footage. Operator shall maintain video data for a period of five (5) business days. At the request of City law enforcement officials, the operator shall make available any recorded views of the enclosed area. 26. Signs. a. A sign shall be displayed immediately and prominently at the gate on the fencing erected pursuant to Section 7.01.C.2 of this Ordinance. Such sign shall be durable material, maintained in good condition and, unless otherwise required by the RRC, shall have a surface area of not less than two (2) square feet or more than four (4) square feet and shall be lettered with the following: (1) Well name and number; (2) Name of Operator; (3) The emergency 911 number; and (4) Telephone numbers of two (2) persons responsible for the well who may be contacted in case of emergency. Well Name/Number Name of Operator Operator 24-hour emergency number EMERGENCY - DIAL 911 b. Permanent weatherproof signs reading DANGER NO SMOKING OR OPEN FLAME ALLOWED, PELIGRO NO FUMAR O INICIAR LLAMA EN ESTA AREA shall be posted immediately upon completion of the drill site fencing at the entrance of each drill site and tank battery or in any other location approved or designated by the Fire Chief of the City. Sign lettering shall be four (4) inches in height and shall be red on a white background or white on a red background. A label must be located on each tank indicating exact chemicals that may be contained in the tank. Text shall be minimum six (6) inches in height, contrasting with the background color. Each sign shall include the emergency notification numbers of the Fire Department and the Operator, well and lease designations required by the RRC. c. No other signs shall be permitted on the site except as required by the RRC. DANGER! DANGER! NO SMOKING OR OPEN NO SMOKING OR OPEN FLAME ALLOWED FLAME ALLOWED ¡PELIGRO! ¡PELIGRO! NO FUMAR O INICIAR NO FUMAR O INICIAR LLAMA EN ESTA AREA LLAMA EN ESTA AREA 27. Storage of equipment. On-site storage of equipment is prohibited on the drill site. Lumber, pipes, tubing and casing shall not be left on the operation site except when drilling or well servicing operations are being conducted on the site. No vehicle or item of machinery shall be parked or stored on any street, ROW or in any driveway, alley or upon any drill site which constitutes a fire hazard or an obstruction to or interference with fighting or controlling fires except that equipment which is necessary for drilling or production operations on the site. The Fire Department shall be the entity that determines whether equipment on the site shall constitute a fire hazard. 28. Storage Tanks, Well Facilities and Equipment. a. All tanks, temporary or permanent, shall conform to API specifications unless other specifications are approved by the Fire Chief. All storage tanks shall be equipped with a secondary containment system including lining with an impervious material. The secondary containment system shall be a minimum of three (3) feet in height and one and one-half (1½) times the contents of the largest tank in accordance with the Fire Code, and buried at least one (1) foot below the surface. Drip pots shall be provided at the pump out connection to contain the liquids from the storage tank. b. Secondary containment shall be required for all equipment. Secondary containment shall be capable of containing a release of one hundred fifty (150) percent of the largest storage container within the containment and have adequate freeboard to contain an average annual rain event. c. All tanks, well facilities and equipment shall be set back pursuant to the standards of the RRC and the NFPA, and in all cases shall be at least twenty-five (25) feet from any public ROW or property line and at least two hundred (200) feet from a protected use. d. The sidewalk height of all tanks shall be no higher than eight (8) feet above the terrain surrounding the tanks. e. Each storage tank shall be equipped with a level control device that will automatically activate a valve to close the well in the event of excess liquid accumulation in the tank. f. The appropriate NFPA diamond hazard placard shall be placed on each tank and piece of equipment, as applicable. g. All storage tanks, well facilities and equipment shall be equipped with a lightning arrestor system in accordance with the Fire Code and NFPA standards. h. No meters, storage tanks, separation facilities, or other aboveground facilities, other than the well head and flow lines, shall be placed in a floodway or the 100-year floodplain. 29. Valves. Each well must have a shutoff valve to terminate the well’s production. 30. Vapor Recovery Units. Any drill site that produces more than one (1) barrel of condensate per day shall install a vapor recovery unit on the site. Operator shall provide monthly reports to the Inspector documenting any found condensate. 31. Waste Disposal. Unless otherwise directed by the RRC, all tanks used for storage shall conform to the following: a. Operator must use portable closed steel storage tanks for storing liquid hydrocarbons. Tanks must meet API standards. All tanks must have a vent line, flame arrester and pressure relief valve. No tank battery shall be within one hundred (100) feet of any dwelling or other combustible structure. b. Drilling mud, cuttings, liquid hydrocarbons and all other field waste derived or resulting from or connected with the drilling, re-working or deepening of any well shall be discharged into above-ground tanks (closed loop mud system). All disposals must be in accordance with the rules of the RRC and any other appropriate local, state or federal agency. c. Unless otherwise directed by the RRC, waste materials shall be removed from the site and transported to an off-site disposal facility not less often than every thirty (30) days. Water stored in on-site tanks shall be removed as necessary. All waste shall be disposed of in such a manner as to comply with the air and water pollution control regulations of the State, this Ordinance and any other applicable ordinance of the City. 32. Wellhead Status after Fracing. a. All wellbores, mouse holes, rat holes, cellars, and conduit casings shall be: (1) covered at all times when not in use by appropriate means that adequately covers the entire bore hole; (2) completed through the production casing flange with a metal plate or blind flange bolted across the head; and (3) protected from vandalism, wind driven debris, vehicle damage or other threat that would have the potential to disrupt operations or release any amount of natural gas. b. The cellar shall be filled or closed. c. The Bradenhead shall be piped to the surface and have an observable and adequate pressure gauge with operable test valve. B. Well setbacks. 1. External Setbacks. a. It shall be unlawful to drill any well outside a drilling zone approved by the City Council that, at the surface of the ground, is located within six hundred (600) feet from a park or within six hundred (600) feet from a protected use for which a building permit has been issued on or before the date of the application for a drilling permit. The distance shall be calculated from the boundary of the drilling zone, in a straight line, without regard to intervening structures or objects, to: (i) the boundary of the public park; (ii) the primary structure of a day care or the boundary of the area designated by the day care for use as a playground, whichever is closest; and (iii) the primary structure of all other protected uses. (1) This setback distance may be reduced by the City Council to not less than three hundred (300) feet upon the affirmative vote of not less than a super-majority of seven (7) members of the City Council. Petitions in support or opposition to the setback distance reduction must be submitted to the City at least one (1) business day prior to the date of the City Council public hearing. In the event the public hearing is continued, additional petitions may be submitted until one (1) business day prior to the date at which the hearing is continued. (2) For protection of the public health, safety and welfare, the City Council may impose additional requirements for a reduction of such distance, and take into account the presence of natural or man-made barriers. b. It shall be unlawful to drill any well that, at the surface of the ground, is located within six hundred (600) feet from Lake Arlington reservoir area, as defined by the Lake Arlington chapter of the City Code. The distance shall be calculated from the boundary of the drilling zone, in a straight line, without regard to intervening structures or objects to the boundary of the reservoir area. 2. Internal Setbacks. a. Within twenty-five (25) feet from any outer boundary line of the drill site; or b. Within twenty-five (25) feet from any storage tank, or source of ignition; or c. Within seventy-five (75) feet of any public street, road, highway or future street, right-of-way or property line; or d. Within one hundred (100) feet of any building accessory to, but not necessary to the operation of the well; or e. Within two hundred (200) feet to any fresh water well. 3. Reverse Setbacks a. Pursuant to the Fire Prevention Chapter, buildings with an occupancy in Group A, E or I shall not be established within 300 feet of an existing drilling zone or gas well. b. Pursuant to the Unified Development Code, a residential structure shall not be established within 300 feet of an existing drilling zone or gas well. c. A day care, as defined in Article 2, and otherwise an allowed use under Article 3 of the Unified Development Code, and its outside playground area, shall not be established within 300 feet of an existing drilling zone or gas well. C. Landscaping and Fencing 1. Landscaping and Perimeter Fencing. Within thirty (30) days after spudding the first well on the site, the following landscaping and perimeter fencing improvements shall be installed: Tier | Landscaping | Perimeter Fencing 1 | • 40-foot transitional buffer around drill site • 10-foot wide streetscape setback with street trees | • 8-foot tall masonry wall with 75% opacity around the perimeter of the drill site • Installation of gate 2 | • 20-foot transitional buffer around drill site • 10-foot wide streetscape setback with street trees | • 8-foot tall ornamental iron fence with masonry columns around the perimeter of the drill site • Installation of gate Tier 1 requirements apply in all locations except for industrial zoning districts. Tier 2 requirements apply in industrial zoning districts. All landscaping and fencing must be maintained in accordance to the requirements contained in the Unified Development Code. 2. Administrative Adjustment. The P&DS Director or designee may approve administrative adjustments to the landscaping and perimeter fencing design if it is found that the adjustments: a. are consistent with the state purpose of this Chapter; and b. meet all other applicable building and safety codes; and c. will not adversely affect the proposed development of use of adjacent property or neighborhoods; and d. are necessary to accommodate an alternative or innovative design that achieves to the same or better degree the objective of the landscaping and perimeter fencing standard to be modified. 3. Street Trees. Street trees are required to be planted along the ROW for all Tier 1 and Tier 2 drill sites in accordance with the parkway planting requirements contained in the Unified Development Code. The street trees should be planted in the area the same width of the drill site along the nearest ROW. 4. Masonry wall specifications shall be as follows: a. The wall shall be of a design compatible with the facilities, buildings and structures on and adjacent to the site; b. No trespassing signs are required on the fence on all four sides of the drill site. 5. Gate specifications. All perimeter fences shall be equipped with at least one (1) gate. The gate shall meet the following specifications: a. Each gate shall be not less than twelve (12) feet wide and be composed of two (2) gates, each of which is not less than six (6) feet wide, or one (1) sliding gate not less than twelve (12) feet wide. If two (2) gates are used, gates shall latch and lock in the center of the span. b. The gates shall be provided with a combination catch and locking attachment device for a padlock, and shall be kept locked except when being used for access to the site; and c. Operator must provide the Inspector and Fire Department with a Knox Padlock or Knox Box entry system or equivalent on the gate to access the drill site in case of an emergency. D. Vehicle Routes for Gas Well Permit 1. Vehicles in excess of three (3) tons associated with drilling and/or production shall comply with the City Council approved transportation route. 2. The City Council may restrict the hours of operation of vehicles associated with drilling and/or production when the proposed vehicle route passes through a designated school zone, heavily used roadway or intersection, near protected uses, or along local residential streets. The P&DS Department shall review the vehicle routes to determine if a proposed route includes a designated school zone. 3. In the event of construction detours or roadway deterioration on an approved transportation route or TXDOT permitting, the Inspector may amend the approved route. 4. After April 1, 2019, all operators shall submit an off-site truck staging plan, along with their gas well permit application, to coordinate the order of vehicles and machinery arriving and remaining at the well site. The use of residential streets for off-site truck staging is prohibited. E. Work Hours for Gas Well Permit Drilling and flowback operations may take place on a 24-hour basis any day of the year except Thanksgiving or Christmas Day, which requires approval by the P&DS Director. Site preparation, well servicing, truck deliveries of equipment and materials, fracing, and other related work conducted on the drill site shall be limited to between the hours of 7 a.m. to 6 p.m., Central Standard Time and 7 a.m. to 8 p.m. Central Daylight Saving Time, Monday through Saturday. Other than mobilization, demobilization, and advancing the bore hole, no other activities shall be allowed on the drill site on Thanksgiving or Christmas Day. The restriction on work hours shall not apply in cases of fires, blowouts, explosions, and any other emergencies or where the delivery of equipment is necessary to prevent the cessation of drilling or production. F. Noise Restrictions for Gas Well Permit 1. Prior to the issuance of a gas well permit, the Operator shall report to the Inspector ambient noise readings taken over a 72-hour period, including at least one 24-hour reading during a Saturday or Sunday. During the 72-hour period, readings shall be taken from the hours of 7:00 a.m. to 7:00 p.m. to establish the pre-drilling ambient noise level for daytime operations, and readings shall be taken from 7:00 p.m. to 7:00 a.m. to establish the pre-drilling ambient noise level for any nighttime operations. 2. The ambient reading shall be taken 100 feet from the nearest protected use or 600 feet from the proposed drilling zone in the direction towards the nearest protected use, whichever distance is shorter. 3. The operator must provide the Inspector a noise mitigation plan. The plan should detail the ambient noise level and anticipated mitigation techniques. 4. The sound level meter used in conducting noise evaluations shall meet the American National Standards Institute’s standard for sound meters. 5. The exterior noise level generated by operations shall not exceed the pre-drilling ambient noise level by more than the levels shown in the following table: | Operation | | | Daytime Hours | | | Nighttime Hours Drilling or redrilling | Four (4) decibels | Two (2) decibels Fracing | Seven (7) decibels | | N/A Flowback | Five (5) decibels | Three (3) decibels Production | Zero (0) decibels | Zero (0) decibels 6. An Operator shall not drill or re-drill a well or operate any equipment in such a manner so as to create pure tones where one-third octave band sound pressure level in the band with the tone exceeds the arithmetic average of the sound pressure levels of two contiguous one-third octave bands by five dB for center frequencies of 500 Hertz and above, and by eight dB for center frequencies between 160 and 400 Hertz, and by 15 dB for center frequencies less than or equal to 125 Hertz. 7. An Operator shall not drill or re-drill a well or operate any equipment in such a manner to create low-frequency outdoor noise levels that exceed the following decibel levels: 16 Hertz octave band: 65 dB 32 Hertz octave band: 65 dB 64 Hertz octave band: 65 dB 8. The exterior noise level generated by the drilling, re-drilling, fracing, re-working, or other operations of all gas wells located within six hundred (600) feet of a protected use shall be continuously monitored to ensure compliance. The monitoring shall be real time and continually accessible to the Inspector via a streaming medium, e.g., internet, web based data, Bluetooth sharing. The cost of such monitoring shall be borne by the Operator. Every 24-hour period should be summarized in a report and provided to the Inspector in a format that is acceptable to the Inspector. Failure to provide this information within two business days is considered a violation of this subsection. 9. Acoustical blankets, sound walls, mufflers, or other alternative methods may be used to ensure compliance. All soundproofing shall comply with accepted industry standards and is subject to approval by the Inspector. All soundproofing measures must be removed from the site no later than sixty (60) days after drilling operations have ceased. The Inspector may grant an extension of time if additional drilling activities will commence within a reasonable time period. 10. If a complaint is received after gas well drilling operations begin by either the Operator or the City, the Operator shall immediately upon receipt of the complaint, notify the Inspector and continuously monitor the exterior noise level generated by the gas well drilling or production for a twenty-four (24) hour period and take the action necessary to abate the violation, if a violation exists. 11. After April 1, 2019, on all gas well sites located within six hundred (600) feet of a protected use, in the event the gas well site has two or more confirmed noise violations of this Chapter, the Operator of said gas well site shall thereafter be required to install sound walls prior to conducting any re-working operations that require the use of a well-servicing rig on site. This additional noise mitigation requirement shall continue for the operational life of the gas well drill site. G. Closed Loop Mud Systems A Closed Loop Mud System shall be used in conjunction with all drilling and reworking operations for all Gas Well Permits, unless specifically waived by the City Council. H. Natural Gas Compressor Stations 1. Approved zoning is required before a permit for a natural gas compressor station can be obtained from the City. 2. All natural gas compressor stations shall be constructed, operated and maintained in accordance with the Fire Code, NFPA standards, and all other building and development ordinances of the City. 3. All compressor station equipment, at the issuance of the initial certificate of occupancy, shall be set back a minimum of six hundred (600) feet from a park or from a protected use, or a minimum of three hundred (300) feet from all other uses, for which a building permit has been issued on or before the date of the application for a drilling permit. The distance shall be calculated from the primary structure of the compressor station equipment to the primary structure of the protected use or other use or park boundary. This setback may be reduced by the City Council if written consent of seventy (70) percent of the surface property owners is obtained. In the event such approval or consent is not obtained, and upon providing evidence of an attempt to obtain consent of seventy (70) percent of the surface property owners, then the distance may be reduced upon an affirmative vote of a super-majority of seven (7) members of the City Council. 4. The boundary of the compressor station site shall be enclosed by an eight (8) foot tall masonry screening wall on all sides. 5. All compressor station equipment at the proposed site exceeding 10 feet in height shall be enclosed within a building. All buildings shall have exterior walls constructed of masonry, as defined in Article II of the Unified Development Code. 6. The operation of the equipment shall not create any noise that causes the exterior noise level to exceed the pre-development ambient noise levels, as measured at the six hundred (600) foot setback. The Operator shall be responsible for establishing and reporting to the City the pre-development ambient noise level prior to the issuance of the compressor station permit. The ambient noise level shall be established in accordance with the guidelines defined in Section 7.01.F. 7. The compressor station site shall be landscaped as follows: a. Landscaping and irrigation shall be provided as identified in the approved zoning and/or specific use permit. b. It shall be the responsibility of the Operator to comply with the City’s landscaping ordinance including tree preservation/mitigation and maintenance. c. Landscaping must blend with the environment and existing surrounding area. d. Landscaping must be installed within thirty (30) days from the completion of the permitted compressor station. 8. The Inspector shall inspect the compressor station site on an annual basis to determine compliance with the provisions of this Ordinance. I. Saltwater Disposal Lines 1. Engineered construction drawings for all saltwater disposal lines, including but not limited to gas drilling flowback water, shall be submitted to the City of Arlington Water Utilities department for review. The drawings shall be sealed by a professional engineer licensed to practice in the State. The drawings shall include the surveyed alignment for the saltwater disposal lines and the limits of any easements. A maintenance plan and inspection schedule will be provided to the City. 2. Salt water disposal lines shall be prohibited within one hundred (100) feet of the flowage easement lands around Lake Arlington. Flowage easement lands are defined as those lands below the elevation contour of 560.0 feet above mean sea level. Salt water disposal lines shall also be prohibited under Lake Arlington. 3. City water utility standards must be used in the design. The plans must be approved by the City prior to construction and will be subject to inspection by the City. All applicable plan review and inspection fees shall be paid to the City. J. Installation of pipelines on, under or across public property 1. The Operator shall apply to the City for a franchise, Pipeline License Agreement, or other Arlington City Council approved agreement on, over, under, along or across the City streets, sidewalks, alley, rights-of-way and other City property for the purpose of constructing, laying, maintaining, operating, repairing, replacing and removing pipelines so long as production or operations may be continued under any Gas Well Permit issued pursuant to this Ordinance. Operator shall: a. Not interfere with or damage existing water, sewer or gas lines or the facilities of public utilities located on, under or across the course of such rights-of way. b. Furnish to the P&DS Director a plat showing the location of such pipelines. c. Construct such lines out of pipe in accordance with relevant federal, state and local regulations and laws including venting if under a street; d. Grade, level and restore such property to the same surface condition, as nearly as practicable, as existed before pipeline construction. e. Comply with all City ordinances. 2. No Gas Well Permit shall be issued for any well to be drilled within any of the streets or alleys of the City and/or projected streets or alleys shown by the current comprehensive plan of the City, and no street or alley shall be blocked or encumbered or closed due to any exploration, drilling or production operations unless prior consent is obtained from the Inspector. Any consent from the Inspector shall be temporary in nature and state the number of hours and/or days that any street or alley may be blocked, encumbered or closed. 3. All sites with aboveground equipment such as pipeline facilities, valve stations or pig launchers shall be landscaped and screened in accordance with the requirements of this Chapter. K. Required Notifications 1. Surface Casing. The Operator’s agent shall notify the Inspector in writing at least seventy-two hours prior to running and cementing surface casing. The procedures to be followed in this operation shall be as provided in Cementing, Rule No. 13 of the RRC. 2. Completion. The Operator’s agent shall notify Inspector in writing at least seventy-two hours prior to starting completion procedures such as perforating and fracing. The well must be equipped with a Blowout Preventer before this operation is commenced. In addition, if a bridge plug is set over a producing formation prior to additional completion, it must be pressure tested to a sufficient pressure to ensure that it is not leaking. 3. Pipeline Connections. The Operator’s agent shall notify the Inspector in writing at least seventy-two hours after the first sale. The tank battery shall be equipped with a lightning arrestor. 4. Final Acceptance. Within thirty (30) days of the start of production of a well, or of the operation of a pipeline, the Inspector will inspect and accept or reject the drill site or pipeline installation site clean-up and permanent provisions for security and screening of the drill site. The Inspector will provide the Operator written notification of acceptance within ten (10) working days. If the clean-up or proposed provisions for security and screening are rejected by the City, the Operator will be notified of the rejection and the reasons for the refection in writing within ten (10) working days. The Operator must take action to nullify and correct the reasons for rejection within thirty (30) calendar days from the notification. L. Operations and Equipment; Practices, Standards, and Appearance 1. All drilling and pipeline operations shall be conducted in accordance with the practices of a reasonable and prudent operation in the State. All material, equipment, and testing used shall be of a quality and type consistent with such practice. 2. Each Operator shall not contaminate the ground water by the drilling, pipeline installation or production activities. All rules of the Federal Government, the State, and the City regarding protecting natural resources must be strictly followed. 3. Drilling and pipeline production operations shall be conducted in such a manner as to minimize noise, vibration, dust, odors, or other nuisances. Internal combustion engines used on the well or pipeline site must be fitted with exhaust mufflers. For production purposes, only electrically or natural gas powered compressors or motors may be used. 4. No refining of any kind, except for gas dehydrating and physical phase separation, shall take place at the drill site. 5. The drill site shall not be allowed to become dilapidated, unsightly, or unsafe. 6. The well or pipeline site shall not be used to store pipe, drilling equipment, or materials after the drilling or pipeline installation operation has ceased. 7. No refining plant or cooling plant shall be allowed in the City at any time. 8. Flaring or burning of gas or petroleum of any kind after the well is in production is prohibited. Temporary flaring or burning to accommodate public safety may be performed but only when approved by the Fire Inspector.

(Amend Ord 19-008, 3/19/19) (Amend Ord 19- 008, 3/19/19) (Amend Ord 21- 012, 4/13/21) (Amend Ord 21-012, 4/13/21)

Ask a question about Arlington law

Corpus searches the Arlington sections it holds and shows the ones that match, with their citations. Free, no sign-in.