§ 30-5-366 - RELOCATION OF SHORELINE BETWEEN TOM MILLER DAM AND LONGHORN DAM.

(A) This section applies: (1) along the Colorado River; (2) between Tom Miller Dam and Longhorn Dam; and (3) below a contour elevation of 435 feet above mean sea level. (B) City council approval is required to relocate existing earth material in the area described in Subsection (A). (C) A person may request approval under this section by filing an application with the council that includes a plan showing the proposed layout of the relocation and a legal description of the property. (D) The applicant must demonstrate to the council that: (1) approving the application will not: (a) endanger a water supply, water supply system, storm or sanitary sewer facility, or other public utility facility; (b) create a hazard to navigation or swimming; (c) create a hazard to the safety, maintenance and operation of a dam, bridge, or other structure not owned by the applicant; and (d) materially and adversely affect the use and enjoyment of other property on the Colorado River between the Tom Miller Dam and Longhorn Dam; and (2) if similar applications were granted for all similarly situated properties, the water storage or flood capacity of the Colorado River basin would not be materially reduced.

Source: City Code Section 25-8-651; Ord. 031211-11; Ord. 031211-42; Ord. No. 20160922-048, Pt. 9.