§ 6-2-33 — CONTENTS OF MATERIALS MANAGEMENT PLAN
Austin City Code (Supp. No. 174: codified through Ordinance No. 20260521-050, effective June 1, 2026) · Austin City Code § 6-2-33
Corpus is an independent public-information project, not the official City of Austin website. Stable reference: corpuslaw.us/code/74eeab26-bb2d-4fe6-a671-ed7be4bb2730
§ 6-2-33 - CONTENTS OF MATERIALS MANAGEMENT PLAN.
(A) A materials management plan must include the following general information: (1) name and address of the facility; (2) business phone number; (3) name, title, and business phone number of the responsible person; (4) number of employees; (5) hours of operation; (6) principal business activity; and (7) names and telephone numbers of the primary and secondary emergency response persons. (B) A materials management plan must include a general map of the facility. (1) The general map must depict: (a) location of each structure; (b) hazardous material loading, handling, and storage areas; (c) parking lots, internal roads, drives; and (d) storm sewer and sanitary sewer drains, and manholes; (2) The director may require that the general map depict the one hundred-year floodplain and the location of surface water. (C) A materials management plan must include a hazardous materials areas map that depicts: (1) the location of each hazardous material storage or use area, including a temporary storage area; and (2) for each storage or use area: (a) the access route; (b) the type and location of emergency equipment; and (c) the name and maximum quantity of hazardous material. (D) A materials management plan must include a hazardous materials inventory that includes: (1) the name of each hazardous material stored; (2) the floor plan to scale and the maximum hazardous materials storage capacity of the facility; and (3) the estimated maximum amounts and the Underwriter's Laboratory (UL) number, if any, for each hazardous material stored. (E) A materials management plan must include, for each hazardous material stored: (1) a material safety data sheet describing the material's toxicity rating, reactivity rating, and flammability rating, if available; or (2) the material classification assigned by Title 49 of the Code of Federal Regulations, Section 172.101. (F) A materials management plan must include a contingency plan as prescribed by Section 6-2-34 (Contingency Plan). (G) Except as provided in Subsection (H), a materials management plan must include: (1) a closure plan as prescribed by Section 6-2-35 (Closure Plan); and (2) a warning marking plan as prescribed by Section 6-2-36 (Warning Marking Plan). (H) A closure plan or a warning marking plan is not required for: (1) a person required by Title 29 of the Code of Federal Regulations Section 1910.1200(e) to develop and implement a written hazard communication program; or (2) a person regulated by Chapter 502 (Hazard Communication Act) of the Texas Health and Safety Code.
Source: 1992 Code Sections 14-3-38, 14-3-39(A), 14-3-40(A), and 14-3-45; Ord. 031023-10; Ord. 031211-11.
Ask a question about Austin law
Corpus searches the Austin sections it holds and shows the ones that match, with their citations. Free, no sign-in.
