§ 14.03.091 — Required; bond to be filed; voiding
Code of Ordinances, City of Beaumont, Texas (through Ord. 26-062 adopted 2026-10-06 (eCode360 BE6239 publication, data-code-date 2026-10-06, scraped 2026-11-21)) · Beaumont Code of Ordinances § 14.03.091
Corpus is an independent public-information project, not the official City of Beaumont website. Stable reference: corpuslaw.us/code/c690a47f-7a3a-494d-b3a0-f505d4d23486
§ 14.03.091: Required; bond to be filed; voiding.
Before constructing, reconstructing, repairing or altering any driveway or sidewalk, a permit, in addition to any other permits, shall be obtained from building inspections division; provided, however, no such permit shall be required for the construction of any driveways or sidewalks installed as a part of the paving or widening of any street in accordance with plans approved by the departments of public works and traffic and transportation and installed as a part of a contract of the city. No permit shall be issued to any person until that person has filed the bond as required in section 14.03.053. If the driveway or sidewalk is not constructed within six (6) months of the date of issuance of a permit, said permit becomes null and void.
( 1958 Code, sec. 33-43 ; 1978 Code, sec. 23-42 )
Ask a question about Beaumont law
Corpus searches the Beaumont sections it holds and shows the ones that match, with their citations. Free, no sign-in.
